A21 - Summary of Changes__MHC-IOB_Amdt 0004.pdf
PDF 3 MB Posted
- Attached to
- Maintenance Dredging, Morehead City Harbor, Cutoff, Range A and Range B Federal contract opportunity
- Solicitation number
- W912PM20B0014
About this file
This solicitation is for maintenance dredging services for the federal navigation channels of Morehead City Harbor including the Cutoff, Range A and Range B in North Carolina. The U.S. Army Corps of Engineers, Wilmington District requires dredging of accumulated shoaled material since the channels were last dredged and placement of the material on the beach at Atlantic Beach. Services include hydraulic cutter suction dredging and/or hopper dredging to a maximum depth of 47 feet plus 2 feet allowable overdepth for Range A and 45 feet plus 2 feet allowable overdepth for Range B and the Cutoff. The estimated quantity of material to be dredged is approximately 800,000 cubic yards. All beach placement work must be completed between November 16 and April 30, and hopper dredging between December 1 and April 15. The contractor must also provide beach pre- and post-construction surveys and shape the beach fill placement. This is an unrestricted solicitation for a firm fixed price contract valued between $10-25 million. The solicitation issued on July 17, 2020 electronically only through the betaSAM website using number W912PM20B0014.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B1 - Abstract (SB) Signed.pdf | ||
| B1 - Bid Opening Attendance Sheet.pdf | ||
| A21 - FY20_MHC-IOB_RTA_SPECS AMD 0004_8-17-20.pdf | ||
| A21 - W912PM20B0014 AMD 3- Summary of Changes 8-14-20.pdf | ||
| A21 - W912PM20B0014 AMD 3 - Conformed Copy 8-14-20.pdf | ||
| A21 - FY20_MHC-IOB_RTA_SPECS AMD 0003.pdf | ||
| A21 - Summary of Changes__MHC-IOB_Amdt0002.pdf | ||
| A21 - FY20_MHC-IOB_RTA_SPECS AMD 0002 Conformed Version.pdf | ||
| A21 - W912PM20B0014 Amendment 1.pdf | ||
| A21 - W912PM20B0014 AMD 1 Conformed Copy.pdf | ||
| A21 - MHC-IOB-PLANS_AMDT0001.pdf | ||
| A21 - MHC-IOB-PLANS_AMDT0001_unlocked.pdf | ||
| A21 - MHC-IOB-RTA-PLANS_unlocked.pdf | ||
| A21 - FY20_MHC-IOB_RTA_SPECS.pdf | ||
| A21 - W912PM20B0014 MHC IOB Solicitation.pdf | ||
| A21 - MHC-IOB-RTA-PLANS.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
See the Technical Summary of Changes.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 17-Aug-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912PM20B0014
X 9B. DATED (SEE ITEM 11)
17-Jul-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
17-Aug-2020
CODE
U S ARMY CORPS OF ENGINEERS, WILMINGTON
WILMINGTON DISTRICT
ATTN: CONTRACTING DIVISION
69 DARLINGTON AVE
WILMINGTON NC 28403-1343
W912PM 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912PM20B0014
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
(End of Summary of Changes)