A21_-_W912PM19T0067_Amendment.pdf

PDF 216 KB Posted

Attached to
John H Kerr Replace and Install HVAC Unit Federal contract opportunity
Solicitation number
W912PM19T0067
Issued by
Department of the Army Corps of Engineers Engineering District Wilmington

About this file

Amendment to Solicitation

View the file

Other files for this federal contract opportunity

Other files attached to John H Kerr Replace and Install HVAC Unit, newest first.
File Type Posted
A2_-_REVISED_SOW_-_JHK_HVAC_.pdf PDF
A2_REVISED_SOW_-_JHK_HVAC_.pdf PDF
W912PM19T0067_JHK_HVAC_Solicitation.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W81LJ891657556

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

A. To extend the solicitation period, revise the scope of w ork and update the magnitude of this project.

B. The solicitation period has been extended and ALL QUOTES ARE DUE BY 4:00 PM EST, 30 August 2019. SUBMIT YOUR QUOTES

ELECTRONICALLY ON WWW.FBO.GOV.

C. The magnitude of this project is betw een $25,000.00 and $100,000.00.

D. See summary of techcinal specif ication

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 24-Aug-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912PM19T0067

X 9B. DATED (SEE ITEM 11)

18-Jul-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

24-Aug-2019

CODE

U S ARMY CORPS OF ENGINEERS, WILMINGTON

WILMINGTON DISTRICT

ATTN: CONTRACTING DIVISION

69 DARLINGTON AVE

WILMINGTON NC 28403-1343

W912PM 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912PM19T0067

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 19-Aug-2019 04:00 PM to 30-Aug-2019 04:00 PM.

SECTION 00 21 00 - INSTRUCTIONS

The following have been modified:

SCOPE OF WORK

SCOPE OF WORK

HVAC UNIT AT VISITOR ASSISTANCE CENTER

JOHN H. KERR RESERVOIR

1. Summary of Work

The work site is located at the John H. Kerr Reservoir Visitor Assistance Center (VAC), 1930 Mays Chapel Road, Boydton, VA 23917 in Mecklenburg County, Virginia. Services to be provided under this contract shall include all equipment, labor, supervision and materials.

The purpose of this contract is to replace the existing 7.5-ton Armstrong HVAC system and install one (1 ) two (2) new energy efficient Carrier HVAC system or equivalent at the John H. Kerr Reservoir Visitor Assistance Center.

2. Specifications for HVAC Units

a. Purchase and install 1 a new 2 new heat pump units equal to 7.5 ton units HVAC unit system with 2 refrigerant circuits. One air handler unit for inside. {A 3.5 ton heat pump and a 4 ton heat pump (outside unit) connected together to one air handler (inside unit).} two new 3.5 or 4 ton heat pumps with two new matched air handlers with 15 kw heat strips. If two 3.5 ton units will not heat/cool area properly, we request two 4 ton units.

b. Disconnect and remove existing HVAC unit #5, disconnect and remove polyphase generator and properly dispose of off government property.

c. Reclaim the R-22 refrigerant from the existing heat pump unit, lock out/tag out electrical.

d. Remove the existing power wire and thermostat wire for unit.

e. Reconnect the existing power wires back to new unit.

f. Install two (2) New Carrier units equivalent or slightly larger to a 7.5 ton 14 Seer Energy Efficient Unit heat pump and an air handler unit with 15 kW electric heat, strip heater or equivalent to replace unit #5.

g. Install new smoke detector and connect to existing fire panel. Fire system is thru American Federal Security Victoria, VA (434) 676-3680.

h. Provide and install any needed duct work and duct transitions

i. Run a 2 new line set from the condensing unit to unit #5

j. Flush existing refrigerant line set with RX 11

k. Reconnect the existing power wires back up to the new unit.

l. Provide new liquid type conduit and wire at disconnect to condenser unit.

m. Provide transitions to reconnect new air handler.

n. Install new programmable thermostat.

o. Reconfigure existing ductwork to attach to the 2 air handlers.

p. Leaks Test and pull a vacuum on the new system to 500 microns.

q. Start-up and check over unit for proper operation of new unit.

r. Commission system in accordance to the manufacturer’s recommendation.

s. Uphold warranty on new unit (5 year on parts, 1 year on compressor, 1 year on labor)

t. Installation includes connecting to existing (replacing wiring if necessary) wiring, connecting to existing ductwork (replacing if necessary).

u. New system shall be placed within the existing footprint of the existing system.

v. Air handler may require a stand to hold it on top of existing ductwork.

w. All installation shall be according to the National Electric Code and Building Code.

3. Site visit

It is recommended that the Contractor perform an onsite visit to become familiar with the nature and location of the work by inspection of the site; noting the local conditions, security, safety, equipment and facilities required for the work, and all other factors which may affect the work or costs to perform the work.

To schedule a site visit please contact Shannon Crews, see contact information below. All site visits must be scheduled and completed no later than 24 27 August 2019 by close of business.

Name: Shannon Crews Address: John H. Kerr Reservoir Visitors Assistance Center

1930 Mays Chapel Road Boydton, VA Telephone: 434-738-6143 ext. 6155

4. Period of Performance

All work shall be completed within 180 days from date of award. Work must be scheduled between 8:00 AM and 4:30 PM Monday through Friday excluding Federal Holidays and inclement weather days. Any work performed outside this timeframe must be approved by the appointed Contracting Officer’s Representative (COR).

Upon commencement, the Contractor shall work every business day until job is complete.

5. Safety

All work must be performed in accordance with all applicable federal, state, and local building codes. The contractor must comply with all current OSHA regulation, and requirements contained in EM 385-1-1 US Army Corps of Engineers Safety and Health Manual. Materials shall be installed in accordance with the manufacturer’s specifications, details, and workmanship requirements. The contractor shall be responsible for protecting Government property and undisturbed land not intended for modification, from damage. Any damaged property shall be repaired to its original condition by the contractor at their own expense. The contractor will be responsible for removal and proper disposal of the existing HVAC system components.

6. Correction of Unsatisfactory Work

If the work is found to be unsatisfactory, the contractor will be liable for all costs in connection with correcting such errors where the errors are deemed by the contracting officer to be the result of careless or incompetent performance by the contractor’s employees.

7. Liability and Release of Claim

The Government shall not be liable for any damage, loss, or destruction of real or personal property of the Contractor or of employees of the Contractor, or of any individual, partnership or corporation, which results from the operation of or accident to their equipment. The Contractor shall agree to hold and save the Government, its officers, agents, and employees free from all liability from any or all injury, death, loss, damage, or destruction of personnel and/or property caused by or in connection with services required by this contract.

8. Public Safety

The contractor will be responsible for safeguarding the work site at all times. The contractor shall provide adequate signing and barricades and take necessary safety measures to protect the public during all construction operations. At the close of each workday, the contractor shall ensure all materials and equipment is locked and secure, and the worksite does not pose any potential hazards to the general public.

9. Storage of Equipment and Materials

The contractor shall store materials and equipment only in areas approve by the COR. The Government will provide the contractor with a secure storage area near the construction site. However, the Government is not responsible for any theft, vandalism, or damage. The contractor must store all materials per manufacturer recommendations.

10. Antiterrorism/Operations Security Requirements (AT/OPSEC)

The Contractor will be required to adhere to the following conditions:

Access and General Protection/Security Policy and Procedures: All contractor and all associated sub‐contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

Pre‐screen candidates by using E‐Verify Program: The Contractor must pre‐screen Candidates using the E‐verify Program (http://www.dhs.gov/E‐Verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to ensure the correct information is entered into the E‐verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than three business days after the initial contract award.

11. Pre-work Conference

A pre-work conference will be scheduled on a mutually convenient date and place prior to the commencement of work in order to discuss the above information.