Range_190C_RTA_PLANS.pdf
PDF 13 MB Posted
- Attached to
- Range 190C Repairs, Ft. Bragg
- Solicitation number
- W912PM19B0014
About this file
Range 190C Plans
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F
IL
E N
A M
E
D R
A W
IN
G C
O D
E
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
W
IL
M
IN
G T
O N
N O
R T
H C
A R
O L
IN
A
D
A R
L
IN
G T
O N A
V E
N U
E W
IL
M
IN
G T
O N D
IS
T R
IC
T U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
G-000
C O
V E
R S
H E
E T of Engineers
US Army Corps
Wilmington District
J .M
IT
C
H E
L L
J .M
IT
C
H E
L L
O F
R E
E M
A N
"x
S
IZ
E
J
M A
N N
IN
G
A d v
C o v e r.
d g n
TBD
JULY 2019
FORT BRAGG, NORTH CAROLINA
FOUO
FOUO
F O
R O
F F
IC
IA
L U
S E O
N L
Y
RANGE 190C, EROSION CONTROL, SOTF
SF-00004-18
CONTRACT NO.:
IFB NO.: W912PM19B0014
ISSUE DATE:
J U
L Y
IF
B N
O
W P
M
B
F O
R T B
R A
G G
N O
R T
H C
A R
O L
IN
A S
F -0
-1
R
A N
G E
C E
R O
S
IO
N C
O N
T R
O L S
O T
US Army Corps of Engineers
FT. BRAGG, NORTH CAROLINA
SF-00004-18, RANGE 190C EROSION
CONTROL, SOTF
SOLICITATION NO.:
CONTRACT NO.:
ISSUE DATE: 10 AUGUST 2018
WILMINGTON DISTRICT
TITLE
SHEET
NUMBER
G-001
G-002
G-003
G-004
GENERAL
COVER SHEET AND INDEX OF DRAWINGS
VICINITY MAP AND PROJECT LOCATION
GENERAL CONSTRUCTION NOTES
GENERAL CONSTRUCTION NOTES
VF101
C-001
CD101
CS101
CG101
CU101
C-501
C-502
C-503
CIVIL
EXISTING CONDITIONS PLAN
ABBREVIATIONS AND LEGEND
SITE DEMOLITION PLAN
SITE PLAN
SEDIMENT AND EROSION CONTROL PLAN
STORM DRAIN PLAN
SITE DETAILS
SITE DETAILS
SITE DETAILS
INDEX OF DRAWINGS
FILENAME
G-001.DGN
G-002.DGN
G-003.DGN
G-004.DGN
VF101.DGN
C-001.DGN
CD101.DGN
CS101.DGN
CG101.DGN
CU101.DGN
C-501.DGN
C-502.DGN
C-503.DGN
G D
G N
D S
N J
M C
D S
G-001
C O
V E
R
S
H E
E
A
N D
I N
D E
X
O
F
D
R A
W I N
G S
801 JONES FRANKLIN ROAD, SUITE 300
RALEIGH, NC 27606-3394
(919) 851-6866
(919) 851-7024 FAX
LICENSE # F-0672
LOCATION MAP
ROCKINGHAM
LAURINBURG
FAYETTEVILLE
FORT BRAGG
VICINITY MAP
CIVIL
A N
S I
D
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
A
U G
U S
T
F O
R
B
A
G G
N
O R
H
C
R
O L
I N
A
S F
R
A N
G
C
E
R O
S I O
N
C
O N
T R
O L
S
O T
F
SHEET ID
F I L E
N A
M E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
O
US Army Corps of Engineers
C A
T E
G O
Y
D
E
X X
X X
X X
X
X X
X X
X X
X
X X
X
X X
X
X X
X X
X X
X
X X
X
X X
X
D E
S
I P
T I O
N
J O
N E
S
F
R A
N K
L
D
S
U I T
E
R A
L E
I G
H
N
C
F
A X
L I C
E N
ISSUED FOR CONSTRUCTION
FOR OFFICIAL USE ONLY
W I L M
I N
G T
S
T R
I C
T
U S
A
R M
Y
C
O R
P
E
N G
I N
E E
R S
R
L I N
G T
V E
W I L M
I N
G T
O N
N
O R
R
O L I N
A
FOR OFFICIAL USE ONLY
PROJECT SITE
8/10/18
AutoCAD SHX Text
ASHEBORO
AutoCAD SHX Text
BISCOE
AutoCAD SHX Text
DARLINGTON
AutoCAD SHX Text
LUMBERTON
AutoCAD SHX Text
WHITEVILLE
AutoCAD SHX Text
WILMINGTON
AutoCAD SHX Text
ELIZABETHTOWN
AutoCAD SHX Text
WALLACE
AutoCAD SHX Text
CLINTON
AutoCAD SHX Text
MT. OLIVE
AutoCAD SHX Text
GOLDSBORO
AutoCAD SHX Text
SMITHFIELD
AutoCAD SHX Text
WILSON
AutoCAD SHX Text
RALIEGH
AutoCAD SHX Text
DUNN
AutoCAD SHX Text
SANFORD
AutoCAD SHX Text
N. CAROLINA
AutoCAD SHX Text
S. CAROLINA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text N
AutoCAD SHX Text N.T.S.
AutoCAD SHX Text
BUTNER RD
AutoCAD SHX Text
LONGSTREET RD
AutoCAD SHX Text
LAMONT RD
AutoCAD SHX Text
SPOONER ST
AutoCAD SHX Text
MCKELLARS RD.
AutoCAD SHX Text
COOLY
AutoCAD SHX Text
MANCHESTER RD.
M
K
E
L
L
A
A
D
L A
M
O
A
D
L
N
M
SOTF CONSTRUCTION
ENTRANCE
GATE
A 24 M
B
A 24 M
B
C
A
C
B
U
T
N
L
O
N
G
S
T
R
E
G
R
U
B
A
L
E
R
I
C
E
E
W
A
Y
Y
A
D
K
G
R
U
B
L
O
N
G
S
T
R
E
B
U
T
N
H
O
N
E
Y
C
U
H
O
N
E
Y
C
U
B
R
A
V
D
B
R
A
V
D
G
R
U
B
M
U
R
C
H
S
R
A
N
D
O
L
K
N
X
K
N
SIMMONS AIRFIELD
R
E
I L
R
E
I L
R
E
I L
L
A
M
O
C
H
I
C
K
A
D
C
H
I
C
K
A
D
P
L
A
K
A
D
M
I
L
I
T
A
S
E
R
V
A
T
I
U
N
D
A
R
Y
M
I
L
I
T
A
S
E
R
V
A
T
I
U
N
D
A
R
Y
B
A
S
T
O
G
I
V
E c
D
A
D c
D
A
D
N
O
R
M
A
N
A
R
D
E
N
N
S
P
O
O
N
M A
IN
E
N T
R A
N C
E
A
R
M
I S
T
E
L
I
T
A
S
E
R
V
A
T
I
O
N
B
O
U
N
D
A
R
Y
POPE ARMY AIRFIELD
ACP #1
ACP #13
ACP #10
ACP #11
B
R
A
V
D
J
A
C
K
S
O
N
ACP #5 ALL AMERICAN VISITOR
CONTROL CENTER
M
C
K
E
L
L
A
ACP #2
USACE SOCOM RESIDENT OFFICE
BLDG. NO. 2-2414 WOODRUFF ST.
FT. BRAGG, NC 28310 (910)-432-8121
PROJECT LOCATION MAP
PROJECT LOCATION
C
O
O
L
Y
C
O
N
SOLID WASTE
TRANSFER STATION
ACP #3
ACP #4
ACP #2A
ACP #8
ACP #8A
ACP #16 TRUCK PLAZA AND
VISITOR CONTROL CENTER
W
O
M
A
K
M
Y
M
E
D
I C
N
T
E
R
ACP #18
B R
A G
G
B
L V
D
M
A
N
C
H
E
S
T
DIRECTORATE OF PUBLIC WORKS
BUILDING NO. 3-1631
L
I
L
L
I
N
G
T
W
Y
ACP #12
PLAN NORTH
ROAD CLOSED WITH GATES
OR BARRIERS
MAJOR ROADS
STREETS
RAILROADS
INSTALLATION BOUNDARIES
INTERSTATE ROUTE
U. S. ROUTE
STATE ROUTE
LAKES
ACP ACCESS CONTROL POINT
LEGEND:
FORT BRAGG CANTONMENT
NOT TO SCALE
LAMONT ROAD
BORROW PIT
FORT BRAGG LAMONT
RECYCLING FACILITY
W
O
O
D
R
U
F
F
B
U
K
P
S
Y
O
F
L
O
J
T
H
O
M
P
S t h
MANCHESTER RD.
MCKELLARS ROAD
CLOSED TO ALL TRAFFIC
NOTE: UPON LEAVING THE SOTF
LAMONT GATE IT IS THE
CONTRACTOR'S RESPONSIBILITY TO
DETERMINE THE BEST HAUL ROUTE TO
THE FT. BRAGG LAMONT RECYCLING
FACILITY.
G-002
V I C
I N
I T
Y
M
D
P R
O J E
C
A T
I O
N
G D
G N
D S
N J
D S
R D
A N
S I
D
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
A
U G
U S
T
F O
A
G G
N
O R
R
O L
I N
A
S F
R
A N
C
E
R O
S I O
N
C
O N
T R
O L
S
O T
F
SHEET ID
F I L E
N A
M E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
US Army Corps of Engineers
C A
T E
G O
D
E
X X
X X
X X
X
X X
X X
X X
X
X X
X
X X
X
X X
X X
X X
X
X X
X
X X
X
D E
P
T I O
N
J O
N E
S
F
R A
N K
L
S
U I T
E
R A
L E
I G
H
N
C
F
A X
L I C
E N
ISSUED FOR CONSTRUCTION
FOR OFFICIAL USE ONLY
W I L M
I N
G T
S
T R
I C
T
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
R
L I N
G T
E
W I L M
I N
G T
O N
N
O R
R
O L I N
A
FOR OFFICIAL USE ONLY
TO RANGE
190C
N
N
8/10/18
AutoCAD SHX Text
NTS
GENERAL NOTES:
A. CONTRACTOR SHALL COMPLY WITH CURRENT NORTH CAROLINA DEPARTMENT OF
ENVIRONMENTAL QUALITY (DEQ) EROSION AND SEDIMENT CONTROL PLANNING AND
DESIGN MANUAL' AND FORT BRAGG WATER MANAGEMENT BRANCH (WMB) STANDARDS FOR
EROSION CONTROL WORK, IF APPLICABLE.
B. ALL NCDOT STANDARDS REFERENCES WILL BE THE LATEST EDITION. CONTRACTOR MAY
REFER TO HTTPS://CONNECT.NCDOT.GOV, IF APPLICABLE.
C. CONTRACTOR SHALL COMPLY WITH CURRENT UFC, NC BUILDING CODE AND OTHER
APPLICABLE REQUIREMENTS AS INDICATED ON THESE CONTRACT DOCUMENTS.
7. DEMOLITION
A. ALL CONSTRUCTION AFFECTING TRAFFIC SHALL COMPLY WITH THE FORT BRAGG TRAFFIC
CONTROL IDC, MUTCD, AND NCDOT STANDARD DRAWINGS AND SPECIFICATIONS - LATEST
EDITION. AN ALTERNATE EMERGENCY TRAFFIC CONTROL DETOUR MAY BE REQUIRED.
8. TRAFFIC CONTROL
A. UNLESS SPECIFICALLY NOTED TO BE REMOVED, ALL EXISTING BUILDING COMPONENTS
AND OTHER SITE ITEMS SHALL REMAIN INTACT AND BE PROTECTED AGAINST DAMAGE DURING
THE CONSTRUCTION PERIOD.
B. THE CONTRACTOR SHALL EXERCISE CAUTION DURING DEMOLITION OPERATIONS. THE
CONTRACTOR SHALL REPAIR AND RESTORE ALL EXISTING CONSTRUCTION TO REMAIN THAT IS
DAMAGED DURING DEMOLITION OPERATIONS. REPAIRS TO DAMAGED WORK AREAS SHALL
MATCH EXISTING ADJACENT FINISHED SURFACES OR THE CONTRACTOR SHALL REPLACE
DAMAGED CONSTRUCTION WITH NEW WORK.
C. NO KNOWN ASBESTOS EXISTS WITHIN THIS PROJECT AREA. IF CONTRACTOR SUSPECTS
ASBESTOS OR OTHER HAZARDOUS MATERIALS ARE PRESENT HE SHALL NOTIFY THE
CONTRACTING OFFICER'S REPRESENTATION IMMEDIATELY.
6. STANDARDS
9. EXISTING UTILITY INTERRUPTIONS
A. EXISTING UTILITIES MAY BE INTERRUPTED FOR A MAXIMUM OF 12 HOURS AT A TIME.
CONTRACTOR IS REQUIRED TO CONTACT THE CONTRACTING OFFICER AND OBTAIN APPROVAL
PRIOR TO ANTICIPATED INTERRUPTION.
B. ALL UTILITY INTERRUPTIONS AND DURATIONS SHALL BE INDICATED ON THE
CONTRACTOR'S SCHEDULE AND COORDINATED WITH THE COR.
C. FIRE ALARM INTERRUPTIONS SHALL BE SCHEDULED IN WRITING WITH THE COR A MINIMUM OF
14 DAYS IN ADVANCE.
10. EXTERIOR UTILITY WORK
A. ANY EXTERIOR ELECTRICAL WORK PERFORMED BY THE CONTRACTOR SHALL BE COORDINATED
WITH SANDHILLS UTILITY SERVICE (SUS). CONTACT MR. BILL CANNON AT (910) 818-3204.
B. ANY EXTERIOR WATER OR SANITARY SEWER WORK PERFORMED BY THE CONTRACTOR SHALL
BE COORDINATED WITH OLD NORTH UTILITY SERVICES (ONUS).
11. SECURITY POLICIES AND PROCEDURES
A. CONTRACTOR SHALL FOLLOW SECURITY OPERATIONS TRAINING FACILITY (SOTF) SECURITY
REQUIREMENTS AT ALL TIMES. REFER TO SPECIFICATION SECTION 01 00 60 FOR ADDITIONAL
INFORMATION.
B. ACCESS TO “FOR OFFICIAL USE ONLY” (FOUO) INFORMATION ON SOTF PROJECTS WILL BE LIMITED
TO U.S. CITIZENS WHO HAVE A VALID "NEED TO KNOW". IN THE EVENT THAT ACCESS TO
CLASSIFIED INFORMATION IS REQUIRED, AN ADDITIONAL SECURITY PROCEDURES GUIDE WILL BE
FURNISHED.
C. TO GAIN ACCESS TO THE SOTF SITE AND/OR PROJECT INFORMATION, A WRITTEN, EMAIL, OR FAX
REQUEST MUST BE MADE TO THE SOTF PROJECT MANAGER AT LEAST 5 BUSINESS DAYS IN
ADVANCE (SEE SPECIFICATIONS FOR REQUIRED FORM). A SEPARATE REQUEST MUST BE MADE
FOR EACH SITE VISIT. REFER TO SPECIFICATIONS FOR REQUIRED INFORMATION.
D. ONCE ACCESS HAS BEEN GRANTED, NO SOTF INFORMATION OR SITE ACCESS WILL BE GIVEN TO
THE INDIVIDUAL UNTIL HE OR SHE HAS SIGNED A SECURITY BRIEFING FORM. UPON SUCCESSFUL
COMPLETION, THE CONTRACTOR WILL BE GIVEN FULL ACCESS TO THE PROJECT SITE AS SHOWN
ON THE PLANS, HOWEVER, PERIODS MAY BE ENCOUNTERED WHEN NO CONTRACTOR OR
SUBCONTRACTOR PERSONNEL WILL BE ALLOWED ON THE CONSTRUCTION SITE. WORK
STOPPAGES DUE TO THOSE EVENTS WILL BE HELD TO AN ABSOLUTE MINIMUM, AND THE
CONTRACTOR WILL BE GIVEN AS MUCH ADVANCED NOTICE AS POSSIBLE. NOTICE OF THE WORK
STOPPAGE AND RESUMPTION WILL BE RELAYED THROUGH THE SOTF ENGINEERING TO THE COR
WHO WILL COMMUNICATE THIS INFORMATION TO CONTRACTOR. SUCH WORK STOPPAGE WILL NOT
BE THE BASIS FOR A CLAIM AGAINST THE GOVERNMENT. THE GOVERNMENT HAS THE RIGHT TO
INSTRUCT THE CONTRACTOR TO EVACUATE THE SITE WITHOUT PRIOR NOTIFICATION AT ANY TIME
AND MAY REFUSE ENTRY OF ANY OR ALL CONTRACTOR PERSONNEL.
E. PERSONNEL ENTERING SOTF WILL BE ESCORTED BY A FACILITY MEMBER OR BY A SECURITY
GUARD. USE OF ESCORTS WITHIN THE FACILITY IS DONE ROUTINELY FOR CONTRACTED AND
OTHER VISITING PERSONNEL REGARDLESS OF THEIR SECURITY CLEARANCE LEVEL.
F. THE CONTRACTOR'S PERSONNEL MUST WEAR IDENTIFICATION IN ACCORDANCE WITH
SOTF SECURITY POLICIES AT ALL TIMES.
G. CONTRACTOR/VISITOR SHALL NOTIFY (BY EMAIL OR PHONE) THE GOVERNMENT'S CONTRACTING
OFFICER'S REPRESENTATIVE (COR), PROJECT MANAGER (PM), OR DESIGNATED QA PERSONNEL OF
THEIR ANTICIPATED ARRIVAL TIME ON SOTF EACH DAY OF CONTRACT PERFORMANCE. IF THE
CONTRACTOR DOES NOT ARRIVE AT SOTF WITHIN 90 MINUTES OF THEIR SCHEDULED ARRIVAL
TIME, AND DOES NOT COORDINATE DIRECTLY WITH THE COR, PM, OR QA FOR ANY SUCH LATE
ARRIVAL, THE DESIGNATED ESCORT FOR THE DAY WILL BE RELEASED FOR OTHER DUTIES AND
WILL NO LONGER BE AVAILABLE TO THE CONTRACTOR ON THAT DAY. NO SUCH INSTANCES MAY
BE USED BY THE CONTRACTOR AS GOVERNMENT CAUSED DELAY AND THE GOVERNMENT WILL
NOT EXTEND THE PERIOD OF PERFORMANCE.
H. ACCESS TO THE PROJECT AREA IS LIMITED TO NORMAL WORK HOURS (0730 TO 1600), MONDAY
THROUGH FRIDAY, EXCLUDES FEDERAL HOLIDAYS. CONTRACTOR PERSONNEL SHALL REPORT TO
THE SOTF LAMONT ROAD VISITOR CENTER AT 0730 TO EXCHANGE VALID PICTURE IDENTIFICATION
FOR A SOTF VISITOR BADGE. ALL CONTRACTOR VEHICLES WILL BE SEARCHED EACH DAY
STARTING AT 0730. ONCE THE BADGE EXCHANGE AND VEHICLE SEARCH IS COMPLETE, THE
CONTRACTOR SHALL CONVOY WITH THE ESCORT TO THE JOB SITE. THE CONTRACTOR MUST EXIT
THE SOTF COMPOUND BY 1600 EACH DAY. EXCEPTIONS, IF APPROVED BY THE PROJECT
MANAGER, MUST BE COORDINATED TWO WORK DAYS IN ADVANCE.
I. IT IS A CRIME UNDER 18 USC 795 TO PHOTOGRAPH DEFENSE INSTALLATIONS WITHOUT
FIRST OBTAINING THE PERMISSION OF THE COMMANDING OFFICER OF THE MILITARY
INSTALLATION. IT IS ALSO A CRIME UNDER 18 USC 797 TO REPRODUCE, PUBLISH SELL OR GIVE
AWAY ANY PHOTOGRAPH, PICTURE OR GRAPHIC REPRESENTATION OF A DEFENSE INSTALLATION
WITHOUT FIRST OBTAINING THE PERMISSION OF THE COMMANDING OFFICER OF THE MILITARY
INSTALLATION AND SOTF.
J. FT. BRAGG AND SOTF ARE DESIGNATED AS RESTRICTED AREAS. IMAGERY SURVEILLANCE,
PHOTOGRAPHY AND VIDEO RECORDING ARE PROHIBITED WITHOUT THE INSTALLATION
COMMANDER'S AND SOTF CONSENT.
K. THE INTRODUCTION OF WEAPONS, AMMUNITION, EXPLOSIVES OR OTHER PROHIBITED ITEMS AND
PHOTOGRAPHY OF THE FACILITIES IS PROHIBITED WITHOUT SPECIFIC AUTHORIZATION FROM THE
SOTF COMMANDER AND FT. BRAGG COMMANDER.
INSTALLATION:
v AIR QUALITY (GENERATORS) - DPW-ECB AIR QUALITY PROGRAM MANAGER vBORROW PIT PERMIT - DPW - ENVIRONMENTAL BRANCH (SUBMIT 14 CALENDAR DAYS PRIOR TO WORK) vCONSTRUCTION AND DEMOLITION (C&D) WASTE PERMIT - FOR FORT BRAGG LAMONT ROAD CONSTRUCTION
AND DEMOLITION LANDFILL FACILITY - DPW - ENVIRONMENTAL BRANCH. SEE DPW'S SOLID WASTE AND
RECYCLING REQUIREMENTS, DATED 6 OCT 2016, OR CONTACT JEFF SLOOP AT
JEFFERY.W.SLOOP.CTR@MAIL.MIL OR FAX TO (910)396-4188, ATTN: SOLID WASTE OFFICE.
vDIGGING/EXCAVATION PERMIT (FB FORM 1605-E) - DPW - FACILITIES ENGINEER (SUBMIT 15 CALENDAR DAYS
PRIOR TO WORK)
vENVIRONMENTAL PERMITS (POSSIBLE 180 DAY PROCESS). SEE SPEC SECTION 01 57 19.
Ø TRANSPORTER AND DISPOSAL FACILITIES PERMITS
v IRRIGATION PERMIT - DPW WATER QUALITY PROGRAM MANAGER, SHANNON WESTON, 910-907-3214, STORAGE
TANKS AND WATER QUALITY PROGRAM, FORT BRAGG-DPW-ECB
SHANNON.R.WESTON.CIV@MAIL.MIL.
vLANDFILL DISPOSAL PERMIT - DPW-ENVIRONMENTAL SUSTAINMENT DIVISION (ESD), 910-396-3372.
vPHOTOGRAPHY - INSTALLATION PERMIT - DIRECTOR OPERATIONS DIRECTORATE DCS G3/5/7 - POC IS MR.
FREDDRICK BROWN, DSN 225-8469 OR COM (703) 695-8469.
v TRAFFIC CONTROL PERMIT - DPW TRANSPORTATION ENGINEER, RAY GOFF, 910-907-1759 vUTILITY CONNECTION vUTILITY OUTAGE REQUESTS - FT BRAGG DPW
FEDERAL
vNOTICE OF PROPOSED CONSTRUCTION OR ALTERATION - FAA FORM 7460-1
NC STATE:
v AIR QUALITY vDEMOLITION
ONUS :
vWATER AND SANITARY SEWER
COE SAFETY:
vCONFINED SPACE ENTRY PERMIT - (SEE EM 385-1-1, DATED 30 NOV 2014, SECTION 34 (STARTING ON PAGE 34-1) vENERGIZED WORK PERMIT - MUST BE SUBMITTED TO THE COR IN ADVANCE FOR ACCEPTANCE. (SEE EM
385-1-1, DATED 30 NOV 14, PARAGRAPH 11.A.02C.
vHOT WORK PERMIT - DEFINED AS HOT RIVETING, WELDING, BURNING, ABRASIVE BLASTING, OR OTHER FIRE- OR
SPARK-PRODUCING OPERATIONS. (SEE EM 385-1-1, DATED 30 NOV 2014, PARA 09.A.04 (PAGE 9-1 & 2) & PAGE
Q-29. THE FORT BRAGG FIRE DEPARTMENT REQUIRES NOTICE 14 CALENDAR DAYS PRIOR TO WORK, FOR:
Ø WELDING
Ø CUTTING
Ø HEATING
12. PERMITS
A. CONTRACTOR SHALL SECURE ALL PERMITS NECESSARY FOR CONSTRUCTION OF THE PROJECT.
DETERMINE FEE BASIS AND PAY ALL FILING FEES AT NO ADDITIONAL COST TO THE GOVERNMENT.
CONSTRUCTION SHALL NOT BEGIN ON ANY PHASE WITHOUT APPROPRIATE PERMITS.
B. PERMITS ARE TO BE MAINTAINED IN THE CONTRACTOR'S ONSITE CONSTRUCTION OFFICE,
ORGANIZED IN A 3 RING BINDER, TABBED AND WITH A TABLE OF CONTENTS FOR INSPECTION BY THE
GOVERNMENT.
D. PERMITS, AS LISTED ABOVE, ARE NOT INTENDED TO BE A COMPLETE LIST. CONTRACTORS ARE TO ADD
ADDITIONAL PERMITS, AS THEY BECOME KNOWN. PERMIT SUBMITTALS ARE TO BE SUBMITTED TO THE
GOVERNMENT FOR REVIEW AND APPROVAL. AVOID OMISSIONS.
2. CONSTRUCTION PHASING & PROJECT SCHEDULES
A. THE CONTRACTOR SHALL ENSURE THAT HIS ACTIVITIES SHALL NOT INTERFERE WITH THE
OPERATIONS CONDUCTED AT SURROUNDING BUILDINGS AND WORK AREAS.
B. CONTRACTOR SHALL NOT BLOCK ACCESS TO EXISTING BUILDINGS, ROADS AND/OR FACILITIES.
C. CONTRACTOR SHALL PROVIDE A PROJECT SCHEDULE TO THE COR PRIOR TO CONSTRUCTION
AND MOBILIZATION. CONTRACTOR SHALL PROVIDE WEEKLY UPDATES ON THE PROJECT
SCHEDULE FOR FULL DURATION OF PROJECT. THE WEEKLY UPDATES SHALL BE PROVIDED
SHOWING THE SCHEDULE FOR THE UPCOMING 2 WEEKS INCLUDE UPDATES REGARDING THE
PHASING OF CONSTRUCTION.
D. ADJACENT AREAS WILL BE OCCUPIED BY GOVERNMENT PERSONNEL THROUGHOUT THE
CONSTRUCTION PERIOD. CONTRACTOR SHALL NOT ALLOW CONSTRUCTION ACTIVITIES TO
DISRUPT ON-GOING GOVERNMENT OPERATIONS.
3. CONTRACTOR STAGING AREA
A. SEE SEDIMENT AND EROSION CONTROL PLAN AND NOTES.
A. THE LAMONT ROAD BORROW PIT IS ANTICIPATED TO BE OPEN FOR BORROW ONLY.
A. CONTRACTOR, IF HE SO CHOOSES, SHALL BE PERMITTED TO INSTALL TEMPORARY FENCING
WITHIN THE GENERAL PROJECT SITE. THE TYPE, MATERIAL, HEIGHT, AND LOCATION OF THE
FENCE SHALL BE IN ACCORDANCE WITH SPECIFICATIONS AND APPROVED BY THE
GOVERNMENT PRIOR TO INSTALLATION.
B. ALL WORK ACTIVITIES AND STORAGE SHALL BE CONFINED WITHIN THE ESTABLISHED
PROJECT LIMITS UNLESS SPECIFICALLY AUTHORIZED BY THE COR FOR SPECIFIED PERIODS
OF TIME. CONTRACTOR SHALL COORDINATE EXACT PROJECT LIMITS WITH THE COR.
C. THE CONTRACTOR MUST HAVE AT LEAST ONE EMPLOYEE ONSITE TO RECEIVE AND DIRECT
PLACEMENT OF DELIVERED MATERIALS AND SUPPLIES.
1. CONSTRUCTION METHODS AND PROCEDURES & CONTRACTOR ACCESS
A. THE WORK FOR THIS PROJECT CONSISTS OF FURNISHING ALL LABOR, EQUIPMENT,
TRANSPORTATION, AND MATERIALS NECESSARY TO PERFORM ALL WORK IN STRICT
ACCORDANCE WITH THE PROJECT SPECIFICATIONS, APPLICABLE UNITED STATES ARMY CORPS
OF ENGINEERS (USACE) DRAWINGS, UNIFIED FACILITIES CRITERIA (UFC), SECURITY OPERATIONS
TRAINING FACILITY (SOTF) STANDARDS, FORT BRAGG INSTALLATION DESIGN GUIDELINES (IDG)
AND OTHER CONTRACT DOCUMENTS. THE SCOPE OF WORK OF THIS CONTRACT IS REFERENCED
IN PROJECT SPECIFICATIONS SECTION 01 00 05.
B. THE CONTRACTOR SHALL REFER TO THE PROJECT SPECIFICATIONS IN ALL SITUATIONS. THE
CONTRACTOR SHALL BRING CONFLICTS BETWEEN PROJECT SPECIFICATIONS AND PLANS TO THE
ATTENTION OF THE CONTRACTING OFFICER REPRESENTATIVE (COR) FOR RESOLUTION. ALL
MATERIALS AND WORKMANSHIP SHALL CONFORM TO THE PROJECT SPECIFICATIONS.
C. ALL DIMENSIONS AND CONDITIONS TIED TO OR OTHERWISE RELATED TO EXISTING
CONSTRUCTION WILL BE FIELD VERIFIED BY THE CONTRACTOR. VERIFICATION SHALL BE MADE
PRIOR TO ORDERING, FABRICATING, OR CONSTRUCTING ANY RELATED STRUCTURAL
COMPONENTS. WHERE DISCREPANCIES OCCUR, THE CONTRACTOR SHALL ADVISE THE COR
IMMEDIATELY AND PROVIDE THE COR WITH THE CORRECT DIMENSIONS AND CONDITIONS.
D. THE CONTRACTOR SHALL PROVIDE ONSITE SANITARY FACILITIES FOR HIS WORKERS DURING THE
ENTIRE CONSTRUCTION PHASE. COORDINATE LOCATION WITH COR.
E. THE CONTRACTOR SHALL ADEQUATELY PROTECT ALL EXISTING SITE FEATURES AND FACILITIES
DURING DEMOLITION AND CONSTRUCTION. CONTRACTOR SHALL COORDINATE EXACT PROJECT
LIMITS WITH CONTRACTING OFFICER'S REPRESENTATIVE (COR).
F. PRIOR TO ANY DEMOLITION OR NEW WORK COMMENCING THE ELECTRICAL CONTRACTOR SHALL
ARRANGE A MEETING WITH THE CONTRACTING OFFICER AND SOTF REPRESENTATIVE TO DISCUSS
ALL ELECTRICAL OUTAGE PROCEDURES FOR SHUTDOWN OF ANY ELECTRICAL PANELS. THE
ELECTRICAL CONTRACTOR MUST NOTIFY THE CONTRACTING OFFICER, IN WRITING, AT LEAST 7
DAYS PRIOR TO ANY ELECTRICAL SHUTDOWN DURING DEMOLITION OR NEW CONSTRUCTION.
G. CONTRACTOR IS RESPONSIBLE FOR DETERMINING THE BEST AVAILABLE HAUL ROUTE TO THE
FORT BRAGG LAMONT RECYCLING FACILITY AND SHALL COORDINATE WITH THE COR AS NEEDED.
4. LAMONT ROAD BORROW PIT
5. EROSION AND SEDIMENT CONTROL
G E
N E
R A
L
C
O N
S T
R U
C T
I O
N
N
O T
E S
G D
G N
G-003
D S
N J
D S
R D
12. PERMITS (CONTINUED)
C. THE FOLLOWING PERMITS MAY BE REQUIRED FOR PROJECTS AT FT. BRAGG:
A N
S I
D
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
A
U G
U S
T
F O
A
G G
N
O R
R
O L
I N
A
S F
R
A N
C
E
R O
S I O
N
C
O N
T R
O L
S
O T
F
SHEET ID
F I L E
N A
M E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
US Army Corps of Engineers
C A
T E
G O
D
E
X X
X X
X X
X
X X
X X
X X
X
X X
X
X X
X
X X
X X
X X
X
X X
X
X X
X
D E
P
T I O
N
J O
N E
S
F
R A
N K
L
S
U I T
E
R A
L E
I G
H
N
C
F
A X
L I C
E N
ISSUED FOR CONSTRUCTION
FOR OFFICIAL USE ONLY
W I L M
I N
G T
S
T R
I C
T
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
R
L I N
G T
E
W I L M
I N
G T
O N
N
O R
R
O L I N
A
FOR OFFICIAL USE ONLY
8/10/18
N E
R A
L
C
O N
S T
R U
C T
I O
N
N
O T
E S
G-004
THE FORT BRAGG LAMONT CONSTRUCTION AND DEMOLITION (C&D)
LANDFILL IS CLOSED AND WILL NOT BE ACCEPTING ANY C&D WASTE
AND ASBESTOS WASTE.
ALL CONTRACTORS SHALL USE A STATE CERTIFIED C&D LANDFILL OR
SUB TITLE “D” LANDFILL OFF FORT BRAGG FOR THE DISPOSAL OF
C&D AND ASBESTOS WASTE.
THE CONTRACTOR IS RESPONSIBLE TO MAINTAIN DATA OF ALL
WASTE DISPOSED AND MATERIALS RECYCLED OFF FORT BRAGG.
THE DEPARTMENT OF THE ARMY (DA) AND THE NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL QUALITY (NC DEQ) REQUIRES
MONTHLY AND ANNUAL REPORTING OF ALL MATERIALS (WASTE AND
RECYCLABLES) MANAGED BY FORT BRAGG. THE FORT BRAGG
ENVIRONMENTAL COMPLIANCE BRANCH, SOLID WASTE/RECYCLING
OFFICE IS RESPONSIBLE FOR COMPILING DATA INTO MONTHLY
DIRECTORATE REPORTS TO BE CONSOLIDATED INTO REPORTS FOR
THE DA AND THE NC DEQ. A PROVIDED FORM FROM THE SOLID
WASTE/RECYCLING OFFICE OR A CONTRACTOR FORM SHALL BE
FILLED OUT WITH THE TYPE OF WASTE OR RECYCLED MATERIAL, THE
WEIGHT OF THE WASTE/MATERIAL (TONS OR POUNDS) AND THE
FACILITY THE WASTE OR RECYCLABLES WERE DELIVERED. THIS
INFORMATION IS REQUIRED TO BE SENT TO THE FORT BRAGG SOLID
WASTE/RECYCLING OFFICE BY THE SECOND FRIDAY OF EACH
MONTH. EMAIL TO JEFF SLOOP AT JEFFERY.W.SLOOP.CTR@MAIL.MIL
OR FAX TO (910)396-4188, ATTN: SOLID WASTE OFFICE.
THE LAMONT LANDFILL FACILITY WILL ACCEPT RECYCLABLES ITEMS.
1) CONCRETE, BRICK AND BLOCK
- SHALL BE TESTED AND FREE OF ASBESTOS AND LEAD BASED
PAINT TO BE RECYCLED
- SHALL BE NO LARGER THAN 2' BY 2' PIECES OR EQUIVALENT
- SHALL BE MINIMAL AMOUNT OF DIRT IN LOAD
- SHALL HAVE NO REBAR PROTRUDING OUT OF THE CONCRETE
2) TREES, LIMBS AND STUMPS
- SHALL BE CUT TO 6 FEET OR LESS IN LENGTH
- IF THE TREE HAS A LARGE DIAMETER (EXAMPLE 3 FT. DIA.) IT
SHALL BE CUT TO LENGTHS OF 3 FEET OR LESS
- SHALL BE MINIMAL AMOUNT OF DIRT IN LOAD OR IN STUMP
ROOTS
- WILL EXCEPT GROUND WOOD CHIPS
3) PALLETS
- SERVICEABLE AND NON-SERVICEABLE PALLETS
4) SCRAP STEEL
- NO ITEMS REQUIRING DEMILITARIZED ACCEPTED
- NO ITEMS WITH LIQUIDS IN THEM
5) SCRAP ALUMINUM
- NO ITEMS REQUIRING DEMILITARIZED ACCEPTED
- NO ITEMS WITH LIQUIDS IN THEM
6) CARDBOARD TO BE RECYCLED
- A 40 YARD DUMPSTER IS AVAILABLE FOR CARDBOARD
- ALSO CARDBOARD CAN BE TAKEN TO THE FORT BRAGG
RECYCLING CENTER AT BLDG 3-1240, BUTNER AND REILLY
ROAD
- SHALL BE CLEAN OF PLASTICS, STYROFOAM, WOOD, METAL,
TRASH, ETC.
A LANDFILL USAGE PERMIT, FOR CONTRACTORS, SHALL BE
OBTAINED FROM THE DIRECTORATE OF PUBLIC WORKS,
ENVIRONMENTAL COMPLIANCE BRANCH, SOLID WASTE/RECYCLING
PROGRAM AT BLDG 3-1137, (910) 432-6412.
STATE LAW AND FORT BRAGG REGULATIONS REQUIRES COVERING
OF LOADS OF WASTE OR RECYCLABLES TO PREVENT LITTER.
ALL WASTE OR RECYCLABLE MATERIAL LOADS ARE SUBJECT TO BE
INSPECTED OF THEIR CONTENTS WHILE BEING PRESENT ON FORT
BRAGG.
SOLID WASTE AND RECYCLING NOTES
APPLY FERTILIZER/LIME AT RATES AS DETERMINED BY LABORATORY SOIL
ANALYSIS OF SOILS AT THE JOB SITE. IN THE ABSENCE OF THE SOIL ANALYSIS,
APPLY SOIL AMENDMENTS AT THE RATES INDICATED IN STEPS 2 AND 3.
1. AREA WILL BE TILLED TO 4" DEPTH.
2. APPLY LIME AT 70 POUNDS PER 1000 SQUARE FEET, OR 1.5 TONS PER
ACRE.
3. APPLY 10-20 FERTILIZER AT A RATE OF 850 POUNDS PER ACRE OR 20
POUNDS PER 1000 SQUARE FEET. THE FERTILIZER SHOULD BE EITHER
SLOW TIME RELEASE OR APPLIED IN TWO APPLICATIONS, HALF AT TIME OF
PLANTING AND THE SECOND HALF AFTER PERMANENT SEED GERMINATES.
4. THE LIME AND FERTILIZER WILL BE WORKED INTO THE TOP 2 TO 4 INCHES
OF SOIL PRIOR TO SEEDING.
5. SEED MIX AND RATE:
FORT BRAGG SEEDING SPECIFICATION
SITE AREA
DESCRIPTION
1) GROUND STABILIZATION *
STABILIZATION
TIME FRAME
PERIMETER DIKES,
SWALES, DITCHES
AND SLOPES
7 DAYS
STABILIZATION TIME
FRAME EXCEPTIONS
NONE
HIGH QUALITY
WATER (HQW)
ZONES
7 DAYS NONE
SLOPES STEPPER
THAN 3:1
7 DAYS
IF SLOPES ARE 10' OR LESS IN
LENGTH AND ARE NOT STEEPER
THAN 2:1, 14 DAYS ARE
ALLOWED.
SLOPES 3:1 OR
FLATTER
14 DAYS
7-DAYS FOR SLOPES GREATER
THAN 50 FEET IN LENGTH
ALL OTHER AREAS
WITH SLOPES
FLATTER THAN 4:1
14 DAYS
NONE (EXCEPT FOR
PERIMETERS AND
HQW ZONES)
* "EXTENSIONS OF TIME MAY BE APPROVED BY THE PERMITTING AUTHORITY
BASED ON WEATHER OR OTHER SITE-SPECIFIC CONDITIONS THAT MAKE
COMPLIANCE IMPRACTICABLE." (SECTION II.B(2)(b))
MAINTENANCE DURING ESTABLISHMENT PERIOD
MAINTENANCE OF THE SEEDED AREAS SHALL INCLUDE PROTECTING
EMBANKMENTS AND DITCHES FROM SURFACE EROSION; MAINTAINING EROSION
CONTROL MATERIALS AND MULCH; PROTECTING INSTALLED AREAS FROM
TRAFFIC; MOWING; WATERING; AND POST-FERTILIZATION.
MOWING
A. TURF AREAS; TURF AREAS SHALL BE MOWED TO A MINIMUM 3-INCH
HEIGHT WHEN THE TURF IS A MAXIMUM 4 INCHES HIGH. CLIPPINGS
SHALL BE REMOVED WHEN THE AMOUNT CUT PREVENTS SUNLIGHT
FROM REACHING THE GROUND SURFACE.
B. EROSION CONTROL AREAS: EROSION CONTROL AREAS SHALL BE
MOVED TO A MINIMUM 4 INCH HEIGHT WHEN THE PLANTS ARE
MAXIMUM 8 INCHES HIGH. CLIPPINGS SHALL BE REMOVED WHEN THE
AMOUNT CUT PREVENTS SUNLIGHT FROM REACHING THE GROUND
SURFACE.
POST-FERTILIZATION
AFTER THE PERMANENT GRASS HAS BEEN ACCEPTED, AND BETWEEN
THE DATES OF APRIL 15 AND OCTORBER 15, APPLY 425 POUNDS OF
FERTILIZER PER ACRE.
REPAIR OF REINSTALL
UNSATISFACTORY STAND OF GRASS PLANTS AND MULCH SHALL BE
REPAIRED OR REINSTALLED, AND ERODED AREAS SHALL BE REPAIRED
UNTIL A SATISFACTORY STAND OF GRASS RESULTS.
(Rv. 9 JUNE 2017)
TEMPORARY SEEDING
"COOL SEASON": PLANTED BETWEEN 1 SEPTEMBER AND 28 FEBRUARY 120 POUNDS
PER ACRE WINTER WHEAT (TRITICUM SPELTA)
"WARM SEASON": PLANTED BETWEEN 1 MARCH AND 31 AUGUST 65 POUNDS PER
ACRE GERMAN (SETARIA ITALICA), BROWN TOP (SETARIA ITALICA), OR FOX TAIL
MILLET (BRACHIARIA RAMOSUM)
PERMANENT SEEDING "COOL SEASON": PLANTED BETWEEN 1 SEPTEMBER
AND 28 FEBRUARY 50 POUNDS PER ACRE KENTUCKY 31 TALL FESCUE
(FESTUCA ARUNDINACEA) 25 POUNDS PER ACRE COMMON BERMUDA
(CYNODON DACTYLON), HULLED 25 POUNDS PER ACRE COMMON BERMUDA
(CYNODON DACTYLON), UNHULLED
"WARM SEASON": PLANTED BETWEEN 1 MARCH AND 31 AUGUST 50 POUNDS
PER ACRE KENTUCKY 31 TALL FESCUE (FESTUCA ARUNDINACEA) 25 POUNDS
PER ACRE COMMON BERMUDA (CYNODON DACTYLON), HULLED
STRAW MULCH: APPLY 4,000 POUNDS PER ACRE; LEAVING NO BARE SPOT LARGER
THAN A QUARTER. STRAW MUST BE STABILIZED BY EITHER USE OF EMULSIFIED
ASPHALT OR BY CRIMPING THE STRAW INTO THE GROUND.
EMULSIFIED ASPHALT: EMULSIFIED ASPHALT SHALL BE APPLIED AT A RATE
HEAVY ENOUGH THAT THE ENTIRE AREA APPEARS BLACK IN COLOR; WITH
PARTICULAR ATTENTION PAID TO THE EDGES OF AREAS, CRESTS OF RIDGES,
AND BANKS TO PREVENT WIND DAMAGE.
CRIMPING: STRAW MAY BE CRIMPED WITH A MULCH ANCHORING TOOL OR A
WHEEL DISK WITH DULL BLADES SET NEARLY STRAIGHT MAY BE USED AS A
MULCH ANCHORING TOOL. CRIMPING IS NOT PERMITTED ON SLOPES
STEEPER THAN 3:1.
HYDROSEEDING: HYDROSEEDING SHALL ONLY BE ALLOWABLE ON SLOPES
STEEPER THAN 1 HORIZONTAL TO 1 VERTICAL. STEPS 1 THROUGH 4 MUST BE
COMPLETED PRIOR TO HYDROSEEDING. HYDROSEEDING SHOULD BE APPLIED IN
TWO APPLICATIONS. THE FIRST APPLICATION WILL CONSIST OF
OF THE MULCH
AND
OF THE SEED AND THE SECOND APPLICATION WILL CONSIST OF
OF THE
MULCH AND
OF THE SEED. THE MULCH WILL INCLUDE A TACKIFIER AND WILL BE
APPLIED AT A RATE OF 2,000 POUNDS PER ACRE OR THE MANUFACTURER'S
RECOMMENDATION, WHICHEVER IS HIGHER.
6. EXEMPTIONS: SPECIAL USE AREAS, SUCH AS WETLANDS, RIPARIAN AREAS,
FLOODPLAINS, GENERAL OFFICER QUARTERS AND HISTORIC DISTRICT. CONTACT
THE FORT BRAGG WATER MANAGEMENT BRANCH (WMB) AT 910-396-2301/2823
WHEN SEEDING THESE AREAS.
7. UPON COMPLETION OF THE PROJECT, PRIOR TO LEAVING THE SITE, THE WATER
MANAGEMENT BRANCH SHALL BE NOTIFIED TO INSPECT THE PROJECT. POC MR.
JACK WILSON AT 910-396-2301/2823.
NOTE: G.S. 113A-57 NO LAND-DISTURBING ACTIVITY SUBJECT TO THIS ARTICLE
SHALL BE UNDERTAKEN EXCEPT IN ACCORDANCE WITH THE FOLLOWING
MANDATORY REQUIREMENTS:
(1) PERMANENT GROUNDCOVER FOR ALL DISTURBED AREAS SHALL BE PROVIDED
WITHIN 15 WORKING DAYS OR 90 CALENDAR DAYS (WHICHEVER IS SHORTER)
FOLLOWING THE COMPLETION OF CONSTRUCTION OR DEVELOPMENT (FINAL
GRADE).
(2) THE ANGLE FOR GRADED SLOPES AND FILLS SHALL BE NO GREATER THAN THE
ANGLE THAT CAN BE RETAINED BY VEGETATIVE COVER OR OTHER ADEQUATE
EROSION-CONTROL DEVICES OR STRUCTURES. IN ANY EVENT, SLOPES LEFT
EXPOSED WILL, WITHIN 14 CALENDAR DAYS OF COMPLETION OF ANY PHASE OF
GRADING, BE PLANTED OR OTHERWISE PROVIDED WITH TEMPORARY OR
PERMANENT GROUND COVER, DEVICES, OR STRUCTURES SUFFICIENT TO
RESTRAIN EROSION.
ALL PERIMETER DIKES, DITCHES, SWALES PERIMETER SLOPES OR SLOPES
STEEPER THAN 3 HORIZONTAL TO 1 VERTICAL (3:1) SHALL BE PROVIDED
TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS
PRACTICABLE BUT IN ANY EVENT WITHIN 7 CALENDAR DAYS.
FORT BRAGG SEEDING SPECIFICATION (CONT.)
G D
G N
D S
N J
D S
R D
A N
S I
D
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
A
U G
U S
T
F O
A
G G
N
O R
R
O L
I N
A
S F
R
A N
C
E
R O
S I O
N
C
O N
T R
O L
S
O T
F
SHEET ID
F I L E
N A
M E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
US Army Corps of Engineers
C A
T E
G O
D
E
X X
X X
X X
X
X X
X X
X X
X
X X
X
X X
X
X X
X X
X X
X
X X
X
X X
X
D E
P
T I O
N
J O
N E
S
F
R A
N K
L
S
U I T
E
R A
L E
I G
H
N
C
F
A X
L I C
E N
ISSUED FOR CONSTRUCTION
FOR OFFICIAL USE ONLY
W I L M
I N
G T
S
T R
I C
T
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
R
L I N
G T
E
W I L M
I N
G T
O N
N
O R
R
O L I N
A
I S
T I N
G
C
O N
D I T
I O
A
N
VF101
V F
D
G N
D S
N J
D S
R D
N
EXISTING CONDITIONS PLAN
SCALE: 1"=40'
VF101
A N
S I
D
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
A
U G
U S
T
F O
A
G G
N
O R
R
O L
I N
A
S F
R
A N
C
E
R O
S I O
N
C
O N
T R
O L
S
O T
F
SHEET ID
F I L E
N A
M E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
US Army Corps of Engineers
C A
T E
G O
D
E
X X
X X
X X
X
X X
X X
X X
X
X X
X
X X
X
X X
X X
X X
X
X X
X
X X
X
D E
P
T I O
N
J O
N E
S
F
R A
N K
L
S
U I T
E
R A
L E
I G
H
N
C
F
A X
L I C
E N
ISSUED FOR CONSTRUCTION
FOR OFFICIAL USE ONLY
W I L M
I N
G T
S
T R
I C
T
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
R
L I N
G T
E
W I L M
I N
G T
O N
N
O R
R
O L I N
A
FOR OFFICIAL USE ONLY
40'
40' 120'
1"=40'
SHEET NOTES:
1. EXISTING TOPOGRAPHIC INFORMATION IS FROM A FIELD SURVEY BY
STANTEC PERFORMED ON MAY 11 AND 14 AND JUNE 17 AND 18, 2018.
HORIZONTAL DATUM IS NC GRID NAD83 (2011). VERTICAL DATUM IS
NAVD88.
2. SURFACE EVIDENCE OF UTILITIES HAS BEEN LOCATED BY THIS SURVEY.
HOWEVER, UNDERGROUND UTILITY LINES INCLUDING WATER, SANITARY
SEWER, STORM SEWER, ELECTRICAL, TELEPHONE, CABLE TELEVISION
AND OTHERS MAY EXIST ON THIS PROPERTY THAT HAVE NOT BEEN
LOCATED. PRE-EXISTING UTILITY PAINT (IF ANY) WAS LOCATED DURING
THE COURSE OF THE SURVEY. NO UNDERGROUND UTILITIES WERE
MARKED SPECIFICALLY FOR THIS SURVEY. UTILITIES DEPICTED FROM
GIS INFORMATION (IF ANY) ARE APPROXIMATE.
3. THE FOLLOWING CONTROL POINTS HAVE BEEN ESTABLISHED BY
SURVEY CREW:
4. CONTRACTOR SHALL FILE A SERVICE REQUEST TO FORT BRAGG DPW AT
910-396-0325 TO HAVE UNDERGROUND UTILITIES LOCATED AND DIGGING
PERMIT(S) PRIOR TO DIGGING.
5001 12" SPIKE
N= 514,710.93'
E= 1,976,048.35'
EL= 257.19'
5593 60D NAIL
N= 515,211.68'
E= 1,976,302.36'
EL= 258.86'
5594 60D NAIL
N= 515,034.52'
E= 1,976,349.06'
EL= 260.77'
5595 60D NAIL
N= 514,841.21'
E= 1,976,409.47'
EL= 260.37'
EUGE
UNDERGROUND ELECTRICAL LINE
TREE LINE
GRAVEL
ASPHALT
LEGEND
W W
GAS GAS
SAN SAN
SD SD
FENCE LINE
TREES
MAJOR GROUND CONTOUR
MINOR GROUND CONTOUR
WATER LINE
GAS LINE
SANITARY SEWER
STORM DRAINAGE
FIRE HYDRANT
POWER POLE
LIGHT POLE
WATER VALVE
DI
STORM DROP INLET
SANITARY SEWER MANHOLE
S
FH
ELB
E
TR
EHH
ELECTRIC METER
ELECTRIC HAND HOLE
ELECTRICAL BOX
TRANSFORMER
EMR
EHH
ELB
TRANS
LP 39
GAS MARKER WITH TRACER
POST INDICATOR VALVE
STREET LIGHT
TELECOMMUNICATION HAND HOLE
THH
THH
WATER METER
WM
WMR
E
ELB ELECTRIC BOX
EMR ELECTRIC METER
ABBREVIATIONS EXISTING
EHH ELECTRIC HAND HOLE
L
LP LIGHT POLE
T
TRANS
TRANSFORMER
THH
TELECOMMUNICATION
HAND HOLE
F
FH FIRE HYDRANT
S
SSMH
SANITARY SEWER MANHOLE
SS
SANITARY SEWER
C
CMP CONCRETE METAL PIPE
P
PVC
POLYVINYL CLORIDE
I
INV. INVERT
A
ASPH ASPHALT
SURVEY CONTROL POINT
LP LIGHT POLE
LIMITS OF DISTURBANCE/PROJECT LIMITS
LODLOD
C
O
N
T
O
U
E
A
A
P
R
O
X
I M
A
T
E
255.1'
239.3'
257.5'
241.2'
258.9'
242.8'
259.9'
244.3'
260.8'
251.6'
244.4'
259.7'
259.6'
247.7'
249.5'
248.4'
248.2'
247.7'
247.4'
246.7'
246.5'
243.5'
242.8'
244.0'
244.4'
244.8'
258.7'
260.6'
261.2'
260.8'
+2
S
A
N
S
A
N
S
A
N
S
A
N
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
250'
R
A
N
C
M
A
I N
T
E
N
A
N
C
E
S
S
A
S
P
H
A
L
T
A
S
P
H
A
L
T
A
S
P
H
A
L
T
RANGE 190C
S
D
HH
H
T
T
H
T
T
S
D
S
D
CONC
C
O
N
C
R
E
E
N
C
H
5593 60d NAIL
N= 515211.68'
E=1976302.36'
EL= 258.86'
5594 60d NAIL
N= 515034.52'
E=1976349.06'
EL= 260.77'
CONC
C
O
N
C
R
E
E
N
C
H
METAL
SPLASH
PLATE
NOTE:
ELECTRIC AND CONTROL BOXES
ARE MOUNTED TO THE TRENCH WALL.
THE ELECTRIC BOXES ARE 7"X4"X9"
AND 2.5' OFF THE FLOOR OF THE TRENCH.
THE CONTROL BOXES ARE 16"X6"X20"
AND 1.7' OFF THE FLOOR OF THE TRENCH.
CONTROL BOX
5001 12" SPIKE
N= 514710.93'
N= 514710.93'
E=1976048.35'
EL= 257.19'
WOODS
WOODS
DI
TOP=246.9'
INV=242.9' (SW)
INV=242.8' (NE)
INV=243.4'
4" PVC
INV=246.0' (W)
INV=245.6' (E)
P
P
INV=251.7'
INV=245.6'
INV=246.9'
P
5595 60d NAIL
N= 514841.21'
E=1976409.47'
EL= 260.37'
CONTROL BOX
CONTROL BOX
CONTROL BOX
4" PVC
INV=246.2' (W)
INV=245.9' (E)
INV=249.5'
W
O
O
D
S
C
O
N
C
R
E
G
E
R
I
N
E
30" CMP
INV=239.5'
LIMITS OF DISTURBANCE/
PROJECT LIMITS
WATER SURFACE ELEVATION
NORTH CAROLINA DEPARTMENT
OF ENVIRONMENTAL QUALITY
WATER METER
MANUAL ON UNIFORM
TRAFFIC CONTROL
DEVICES
NORTH CAROLINA DEPARTMENT
OF TRANSPORTATION
CIVIL ABBREVIATIONS LEGEND EXISTING:
E E
XX
OR
LOD LOD
LIMITS OF DISTURBANCE
TREE LINE
255.7
SPOT ELEVATION
MINOR CONTOUR
MAJOR CONTOUR
TP TP
TREE PROTECTION
X X
SITE FENCE
DEMOLISH
PINE OAK
UGP UGP
X X
CHERRY
CONCRETE PAVEMENT
CONCRETE SIDEWALK
SF SF
SEDIMENT FENCE OUTLET
W W
GAS GAS
SAN SAN
SD SD
UNDERGROUND ELECTRICAL LINE
ELECTRICAL LINE
FENCE LINE
TREE LINE
TREES
MAJOR GROUND CONTOUR
MINOR GROUND CONTOUR
WATER LINE
GAS LINE
SANITARY SEWER
STORM DRAINAGE
GRAVEL
CONCRETE
ASPHALT
A B
B R
E V
I A
T I O
G
E N
D
C-001
C D
G N
D S
N J
D S
R D
LEGEND PROPOSED:
F F
FIRE LINE
FIRE HYDRANT
SD SD
STORM DRAIN LINE
STORM DRAIN FLOW DIRECTION ARROW
STORM DRAIN SERVICE LINE
STORM DRAIN MANHOLE
CO
STORM DRAIN CLEAN OUT
IP IP
SF SF
SILT FENCE
INLET PROTECTION
POWER POLE
STREET LIGHT
COM COM
TELECOMMUNICATIONS LINE
D
LIMITS OF CONSTRUCTION
ASPHALT PAVEMENT
WATER VALVE
SURVEY CONTROL POINT
L
A
A.D.
ALT.
ALUM.
AMP., A.
A.O.
APPROX.
ARCH.
A.T.F.P.
A.W.G.
A.W.W.A. AMERICAN WATER WORKS
ASSOCIATION
AMERICAN WIRE GAGE
ANTI-TERRORISM FORCE
PROTECTION
ARCHITECTURAL
APPROXIMATELY
ACCESS OPENING
AMPERES
ALUMINUM
ALTERNATE
AREA DRAIN
BLDG.
BM.
BOC
BOL
CAP.
C.B.
CEM.
CER.
C.F.M.
CIRC.
C.J.
CK'D
CKT.
C.M.U.
C.O.
COL.
CONC.
COND.
CONN.
CONST.
CONT.
C. TO C.
C.Y. CUBIC YARD
CENTER TO CENTER
CONTRACTING OFFICERS
REPRESENTATIVE
CONTINUOUS
CONSTRUCTION
CONNECTION
CONDENSATE
CONCRETE
COLUMN
CLEAN OUT
CONCRETE MASONRY UNIT
CENTER LINE
CIRCUIT
CHECKERED
CONSTRUCTION JOINT/
CONTRACTION JOINT
CIRCULATING
CUBIC FEET/MINUTE
CERAMIC
CEMENT
CATCH BASIN
CAPACITY
BOLLARD
BACK OF CURB
BENCH MARK
BUILDING
C
COR
D
DET.
DI
DIA.
DIFF.
DIM.
D.I.P.
DISC.
D.J.
DN.
DR.
D.S.
E
DETAIL
DROP INLET
DIAMETER
DIFFUSER
DIMENSION
DUCTILE IRON PIPE
DISCONNECT
DUMMY JOINT
DOWN
DRAIN
DOWN SPOUT
EA.
E.F.
EL.
ELEC.
EQUIP.
EXH.
EXP. JT.
EXT.
EX. / EXIST.
EACH
EXHAUST FAN
ELEVATION
ELECTRIC
EQUIPMENT
EXHAUST
EXPANSION JOINT
EXTERIOR
FC
F.D.
F.D.C.
F.E.S.
FIN.
FL.
FT.
FTG. FOOTING
FOOT, FEET
FLOOR
FINISH
FLARED END SECTION
FIRE DEPARTMENT CONNECTION
FLOOR DRAIN
FACE OF CURB
GA.
GAL.
GALV.
G.F.E.
GND.
GOV'T
G.P.H.
G.P.M.
GV GATE VALVE
GALLONS/MINUTE
GALLONS/HOUR
GOVERNMENT
GROUND
GALVANIZED
GALLON
GAGE
GOVERNMENT FURNISHED
EQUIPMENT
H
HC
HCP
HCR
HDW
HP
HSS
HT
HYD HYDRANT
HEIGHT
HIGH STRENGTH STEEL
HIGH POINT
HEADWALL
HANDICAP RAMP
HANDICAP PARKING
HANDICAP
ID.
INTX.
INV.
ISL
ITL. INDEPENDENT TESTING
LABORATORY
ISLAND
INVERT
INTERSECTION
INSIDE DIAMETER
J
J.B.
JCT.
JT.
JUNCTION BOX
JUNCTION
JOINT
K
KVA
KW KILOWATT
KILOVOLT AMPERE
LGT
LP
LF LINEAR FEET
LIGHT POLE
LIGHT
L
M
MAX
MED
MH
MIN
MJ
MON
MTL
MW
M.U.T.C.D
N
NCDEQ
NC DOT
NIC
N/A
N.T.S.
O
O.C.
O.D.
OH
OHE
ONUS.
OVH
MAXIMUM
MEDIAN
MANHOLE
MINIMUM
MECHANICAL JOINT
MONUMENT
METAL
MONITOR WELL
NOT IN CONTRACT
NOT APPLICABLE
NOT TO SCALE
ON CENTER
OUTSIDE DIAMETER
OVERHEAD
OVERHEAD ELECTRIC
OLD NORTH UTILITY SERVICE
OVERHANG
P
P/A
PC
PER.
PI
PLT
PSF
PARKING AREA
POINT OF CURVATURE
PERIMETER
POINT OF INTERSECTION
PLATE
POUNDS PER SQUARE FOOT
POUNDS/SQUARE FOOT
POUNDS/SQUARE INCH
POINT
PAVEMENT
PVMT
PT
PSI
PSF
R
R / RAD.
RCP
REINF.
REQ.
REV
RWM
RT
R.P.Z. REDUCED PRESSURE ZONE
RIGHT
RIGHT OF WAY MONUMENT
REVISED
REQUIRED
REINFORCING
REINFORCED CONCRETE PIPE
RADIUS
S
SAN
SCH
SET
SF
SHT
SIA
SOTF
SP
SQ. FT.
SS
STA.
STD.
STM
STL
SUS.
S/W
SWM. STORMWATER MANAGEMENT
SIDEWALK
SANDHILLS UTILITY SERVICE
STEEL
STORM
STANDARD
STATION
SANITARY SEWER
SQUARE FEET
SIGNAL POLE
SECURITY OPERATIONS
TRAINING FACILITY
SIAMESE CONNECTION
SHEET
SQUARE FEET
SETBACK
SCHEDULE
SANITARY SEWER
T
T
TBM
TERR
TEL TELEPHONE
TERRA COTTA PIPE
TEMPORARY BENCHMARK
TANGENT
U
U/C
U/G
UNO UNLESS NOTED OTHERWISE
UNDERGROUND
UNDER CONSTRUCTION
WATER LINE
W
WL
WM
WSEL
WV
WTR
WWF WIRE WELD FABRIC
WATER
WATER VALVE
ABC AGGREGATE BASE COURSE
ABS AIR BREAK SWITCH
A.C. ASBESTOS CEMENT
ASPH. ASPHALT
A/C AIR CONDITIONING
A.F.F. ABOVE FINISHED FLOOR
B
BRG. BEARING
BVC BEGIN VERTICAL CURVE
BVCE BEGIN VERTICAL CURVE ELEVATION
BVCS BEGIN VERTICAL CURVE STATION
C
C&G CURB AND GUTTER
CATV CABLE TELEVISION
CBL CABLE
C.F.S. CUBIC FEET/SECOND
C.I. CURB INLET
C.I.P. CAST IRON PIPE
C.M. CONCRETE MONUMENT
C.M.P. CONCRETE METAL PIPE
DWG.(S) DRAWING(S)
DW DOMESTIC WATER
EXISTING
EG. EXISTING GRADE
E.I.P. EXISTING IRON PIPE
E.J. EXPANSION JOINT
E.M. ELECTRIC METER
EOP EDGE OF PAVEMENT
EVC END VERTICAL CURVE
EVCE END VERTICAL CURVE ELEVATION
EVCS END VERTICAL CURVE STATION
F.F.E. FINISHED FLOOR ELEVATION
FG FINISHED GRADE
FH FIRE HYDRANT
FM
FORCE MAIN
FOC
FACE OF CURB
G
GC GENERAL CONTRACTOR
GL GAS LINE
GM GAS METER
GW GUY WIRE
K K VALVE
L LENGTH
LT LEFT
NAD 27 NORTH AMERICAN DATUM 1927
NAD 83 NORTH AMERICAN DATUM 1983
NORTH BOUND LINENBL
NORMAL CROWNNC
NEMA NATIONAL ELECTRICAL
MANUFACTURES ASSOCIATION
NIP NEW IRON PIPE
PCC POINT OF COMPOUND CURVATURE
PED PEDESTAL
PGL PROPOSED GRADE LINE
PINC POINT OF INTERSECTION ON CURVE
PIV POST INDICATOR VALVE
PIV ELEV POINT OF VERTICAL
INTERSECTION ELEVATION
PIV STA POINT OF VERTICAL
INTERSECTION STATION
R/W RIGHT OF WAY
SB SOIL BORING
SIG SIGNAL
SPECS SPECIFICATIONS
SR STATE ROAD
TOE
TOP
TOW TOP OF WALL
TOP OF SLOPE
TOE OF SLOPE
TOB TOP OF BANK
T/C TOP OF CURB
TYP. TYPICAL
TP TELEPHONE POLE
TRANS TRANSFORMER
V
VC
VCP VITRIFIED CLAY PIPE
VERTICAL CURVE
UP UTILITY POLE
A N
S I
D
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
A
U G
U S
T
F O
A
G G
N
O R
R
O L
I N
A
S F
R
A N
C
E
R O
S I O
N
C
O N
T R
O L
S
O T
F
SHEET ID
F I L E
N A
M E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
US Army Corps of Engineers
C A
T E
G O
D
E
X X
X X
X X
X
X X
X X
X X
X
X X
X
X X
X
X X
X X
X X
X
X X
X
X X
X
D E
P
T I O
N
J O
N E
S
F
R A
N K
L
S
U I T
E
R A
L E
I G
H
N
C
F
A X
L I C
E N
ISSUED FOR CONSTRUCTION
FOR OFFICIAL USE ONLY
W I L M
I N
G T
S
T R
I C
T
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
R
L I N
G T
E
W I L M
I N
G T
O N
N
O R
R
O L I N
A
S I
D
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
A
U G
U S
T
F O
A
G G
N
O R
R
O L
I N
A
S F
R
A N
C
E
R O
S I O
N
C
O N
T R
O L
S
O T
F
SHEET ID
F I L E
N A
M E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
US Army Corps of Engineers
C A
T E
G O
D
E
X X
X X
X X
X
X X
X X
X X
X
X X
X
X X
X
X X
X X
X X
X
X X
X
X X
X
D E
P
T I O
N
J O
N E
S
F
R A
N K
L
S
U I T
E
R A
L E
I G
H
N
C
F
A X
L I C
E N
ISSUED FOR CONSTRUCTION
FOR OFFICIAL USE ONLY
W I L M
I N
G T
S
T R
I C
T
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
R
L I N
G T
E
W I L M
I N
G T
O N
N
O R
R
O L I N
A
FOR OFFICIAL USE ONLY
S I T
E
D
E M
O L
I T
I O
N
P
L A
N
CD101
C D
D
G N
D S
N J
D S
R D
N
SITE DEMOLITION PLAN
SCALE: 1"=20'
CD101
020' 20' 60'
1"=20'
DEMOLITION SEQUENCE:
1. FIELD LOCATE POWER SOURCE TO TARGET CONTROL
BOXES AND CLEARLY MARK IN THE FIELD TO AVOID
DAMAGE DURING CONSTRUCTION
2. COORDINATE TARGET PAD POWER SHUTDOWN WITH
COR AND SOTF. CAREFULLY DISASSEMBLE FOUR (4)
ELECTRIC BOXES AND FOUR (4) CONTROL BOXES ALONG
WITH ASSOCIATED CONDUITS. COORDINATE SAFE
STORAGE W/COR AND SOTF FOR REINSTALLATION AT
THE END OF CONSTRUCTION
3. INSTALL SEDIMENT CONTROLS PER SEDIMENT AND
EROSION CONTROL PER CONSTRUCTION SEQUENCE
(CG101)
4. DEMOLISH 30"CMP, DROP INLET, CONCRETE DITCH, AND
METAL SHEET. INSTALL NEW DROP INLET, 30" RCP AND
SEDIMENT CONTROLS PER CONSTRUCTION SEQUENCE
(CG101)
5. DEMOLISH TARGET PIT AND CONTINUE CONSTRUCTION
PER CONSTRUCTION SEQUENCE (CG101) AND PLANS.
SHEET NOTES:
1. EXISTING UNDERGROUND UTILITY LOCATIONS WERE
NOT LOCATED. CONTRACTOR SHALL VERIFY THE
LOCATION OF ALL EXISTING UTILITIES PRIOR TO
BEGINNING CONSTRUCTION. ANY UTILITIES DAMAGED
DURING CONSTRUCTION SHALL BE REPAIRED
IMMEDIATELY WITH NO ADDITIONAL COST TO THE
GOVERNMENT. CONTRACTOR SHALL NOTIFY
GOVERNMENT IMMEDIATELY IN THE EVENT OF
ENCOUNTERING ANY UNDERGROUND OBSTACLE
REQUIRING A DEVIATION FROM THE PLANS.
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
A
S
P
H
A
L
T
A
S
P
H
A
L
T
R
A
N
I N
T
E
N
A
N
C
E
S
S
239.3'
257.5'
+ 241.2'
+ 258.9'
242.8'
259.9'
+ 260.8'
+ 248.4'
+248.2'
+ 247.7'
247.4'
246.7'
246.5'
+ 243.5'
242.8'
244.0'
244.4'
+244.8'
+ 258.7'
260.6'
261.2'
+ 260.8'
C
O
N
T
O
U
P
R
O
X
I M
A
T
E
HH
H
T
T
H
T
T
DI
TOP=246.9'
INV=242.9' (SW)
INV=242.8' (NE)
S
D
INV=243.4'
METAL
SPLASH
PLATE
4" PVC
INV=246.0' (W)
INV=245.6' (E)
4" PVC
INV=246.2' (W)
INV=245.9' (E)
C
O
N
T
R
X C
O
N
T
R
X
C
O
N
T
R
X
C
O
N
T
R
O
L
B
O
X
W
O
O
D
S
5593 60d NAIL
N= 515211.68'
E=1976302.36'
EL= 258.86'
I N
V
30" CMP
CONC
30" CMP
C
O
N
C
R
E
E
N
C
H d
I L
E
E
NOTE:
ELECTRIC AND CONTROL BOXES
ARE MOUNTED TO THE TRENCH WALL.
THE ELECTRIC BOXES ARE 7"X4"X9"
AND 2.5' OFF THE FLOOR OF THE TRENCH.
THE CONTROL BOXES ARE 16"X6"X20"
AND 1.7' OFF THE FLOOR OF THE TRENCH.
C
O
N
C
R
E
G
E
R
I
N
E
L O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L
O
D
L
O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
LO
D
L
O
D
L
O
D
L
O
D
S
D
S
D
S
D
LIMITS OF DISTURBANCE
DEMO CONCRETE TARGET PIT AND
BACKFILL WITH SOIL FROM ON SITE
CAREFULLY DISASSEMBLE FOUR(4) ELECTRIC BOXES
AND FOUR (4) CONTROL BOXES ALONG WITH
ASSOCIATED CONDUITS. COORDINATE SAFE STORAGE
W/COR AND SOTF FOR REINSTALLATION AT THE END
OF CONSTRUCTION
DEMO CONCRETE DITCH
AND METAL SPLASH PLATE
P
DEMO 100' LF
OF 30" CMP
X
X
X
X
X
X
DEMO EX.
DROP INLET
LIMITS OF DISTURBANCE
S I
D
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
A
U G
U S
T
F O
A
G G
N
O R
R
O L
I N
A
S F
R
A N
C
E
R O
S I O
N
C
O N
T R
O L
S
O T
F
SHEET ID
F I L E
N A
M E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
US Army Corps of Engineers
C A
T E
G O
D
E
X X
X X
X X
X
X X
X X
X X
X
X X
X
X X
X
X X
X X
X X
X
X X
X
X X
X
D E
P
T I O
N
J O
N E
S
F
R A
N K
L
S
U I T
E
R A
L E
I G
H
N
C
F
A X
L I C
E N
ISSUED FOR CONSTRUCTION
FOR OFFICIAL USE ONLY
W I L M
I N
G T
S
T R
I C
T
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
R
L I N
G T
E
W I L M
I N
G T
O N
N
O R
R
O L I N
A
FOR OFFICIAL USE ONLY
S I T
E
P
L A
N
CS101
C G
D
G N
D S
N J
D S
R D
SITE PLAN
SCALE: 1"=20'
CS101
N
020' 20' 60'
1"=20'
KEY NOTES:
SET BACK OF CONCRETE TARGET PAD EDGE TO
BACK OF EXISTING TARGET PIT (TO BE
DEMOLISHED)
SET 6" PERFORATED PVC PIPE 8' FROM EDGE OF
CONCRETE TARGET PAD. SEE CU101 FOR PIPE
INFORMATION.
PROVIDE 6" CLEARANCE BETWEEN EDGE OF DROP
INLET AND EDGE OF TARGET PAD SEE CU101 FOR
DROP INLET INFORMATION
MAINTAIN APPROXIMATE EXISTING TOE OF BERM
AND RESTORE TO PRE-CONSTRUCTION LOCATION.
TOE OF BERM SHALL NOT BE CLOSER THAN 25' TO
THE NEAREST EDGE OF CONCRETE TARGET PAD AT
ANY POINT AFTER CONSTRUCTION UNLESS
APPROVED BY SOTF AND THE COR.
C
O
N
C
R
E
G
E
R
I
N
E
W
W
W
W
W
W
W
W
W
A
S
P
H
A
L
T
A
S
P
H
A
L
T
R
A
N
I N
T
E
N
A
N
C
E
S
S
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
C
O
248.4
(MATCH
EX.)
246.8
(MATCH
EX.)
BID OPTION -
DEFLECTOR PLATE
WALL
CS101
C-503
M
M
T
A
R
G
N
E
T
R
M
T
R
M
T
R
M
T O
E O
F B
E R
M
T O
P O
F B
E R
M
T
R
M
T
R
M
B
O
T
T
A
N
N
E
L
CONCRETE TARGET
PAD
CS101
C-503
S I
D
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
A
U G
U S
T
F O
A
G G
N
O R
R
O L
I N
A
S F
R
A N
C
E
R O
S I O
N
C
O N
T R
O L
S
O T
F
SHEET ID
F I L E
N A
M E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
US Army Corps of Engineers
C A
T E
G O
D
E
X X
X X
X X
X
X X
X X
X X
X
X X
X
X X
X
X X
X X
X X
X
X X
X
X X
X
D E
P
T I O
N
J O
N E
S
F
R A
N K
L
S
U I T
E
R A
L E
I G
H
N
C
F
A X
L I C
E N
ISSUED FOR CONSTRUCTION
FOR OFFICIAL USE ONLY
W I L M
I N
G T
S
T R
I C
T
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
R
L I N
G T
E
W I L M
I N
G T
O N
N
O R
R
O L I N
A
FOR OFFICIAL USE ONLY
S E
D I M
E N
T
A
O
S I O
N
C
O N
T R
A
N
CG101
C G
D
G N
D S
N J
D S
R D
SEDIMENT AND EROSION CONTROL PLAN
SCALE: 1"=30'
CG101
N
DISTURBED AREA = 0.823 ACRES
1. PRIOR TO CONSTRUCTION DISASSEMBLE FOUR (4)
ELECTRIC BOXES AND FOUR (4) CONTROL BOXES
AND FIELD LOCATE POWER SUPPLY. SEE
DEMOLITION PLAN CD101 FOR MORE INFORMATION.
2. INSTALL TEMPORARY CONSTRUCTION ENTRANCE
AND SEDIMENT CONTROLS FOR CONSTRUCTION AT
30" RCP OUTFALL. RE-GRADE CHANNEL BANK AS
NEEDED FOR CONSTRUCTION ACCESS AND
STABILIZE IMMEDIATELY WITH MULCH PER
SPECIFICATIONS.
3. INSTALL RIP-RAP OUTLET PROTECTION AT LOCATION
SHOWN.
4. INSTALL TEMPORARY CONSTRUCTION ENTRANCE
TO RANGE 190C AND INSTALL REMAINING SEDIMENT
CONTROLS.
5. COMMENCE DEMOLITION REMAINING DEMOLITION.
6. INSTALL CONCRETE DROP INLET AND COMPOST
SOCK. COMPLETE TRENCHING AND INSTALLATION
OF 30" RCP.
7. RE-GRADE AREA NEAR EXISTING 18"CMP AS NOTED
ON THE PLAN.
8. RE-INSTALL POWER SUPPLY WIRE , CONDUIT,
CONTROL BOXES, AND ELECTRIC BOXES AT THE
DIRECTION OF SOTF AND COR. INSTALL CONCRETE
TARGET PAD AND MATCH THE ELEVATION OF THE
TOP OF EXISTING TARGET PIT (SURVEY SPOT SHOTS
ARE NOTED ON THE PLAN). BID OPTION-INSTALL
DEFLECTOR PLATE WALL PER PLAN AND DETAIL.
9. INSTALL SOD ON ALL DISTURBED AREAS.
10.WITH PERMISSION FROM COR, REMOVE ALL
SEDIMENT CONTROL DEVICES AND SEED OR SOD
REMAINING DISTURBED AREAS AT THE COR'S
DISCRETION. EXAMINE THE RIP-RAP OUTLET
PROTECTION AND REMOVE ALL SEDIMENT DEPOSITS
AS DIRECTED BY THE COR.
CONSTRUCTION SEQUENCE
030' 30' 90'
1"=30'
SEDIMENT CONTROL NOTES
1. STABILZE THE FACE OF BERMS WITH TEMPORARY
SEEDING AND MUCLH. SIDES OF BERM AND
BACKSIDE OF BERM SHALL BE STABILIZED WITH
SOD.
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
A
S
P
H
A
L
T
A
S
P
H
A
L
T
A
S
P
H
A
L
T
R
A
N
I N
T
E
N
A
N
C
E
S
S
S
D
W
O
O
D
S
W
O
O
D
S
5593 60d NAIL
N= 515211.68'
E=1976302.36'
EL= 258.86'
I L
E
E
I L
E
E
C
O
N
C
R
E
G
E
R
I
N
E
L O
D
L O
D
L
O
D
L O
D
L O
D
L O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L O
D
L O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L
O
D
L
O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
LOD
L
O
D
L
O
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
C
O
248.4
(MATCH
EX.)
246.8
(MATCH
EX.)
C
O
N
T
O
U
P
R
O
X
I M
A
T
E
TEMP. CONST.
ENTRANCE/EXIT
BID OPTION -
DEFLECTOR PLATE WALL
CS101
CG101
C-503
CG101 C-501
TEMP. CONST.
ENTRANCE/EXIT
CG101 C-501
RIP-RAP OUTLET WITH DITCH
CG101 C-503
CLASS B
HARDWARE CLOTH GRAVEL INLET
PROTECTION
CG101
C-503
CONCRETE TARGET PAD
CS101
CG101
C-503
CONSTRUCTION
PIPE INLET PROTECTION
CG101 C-502
SEDIMENT FENCE
CG101C-501
ALL DISTURBED AREAS
TO RECEIVE
SOD FOR FINAL
VEGETATION PER
SPECIFICATIONS.
LIMITS OF DISTURBANCE
CONTRACTOR SHALL NOT ALLOW
HEAVY CONSTRUCTION VEHICLES
ON RANGE MAINTENANCE ACCESS
RD
FIELD CONNECT EXISTING 4"
PVC UNDER DRAINS TO 6"
PERF. PVC OR DROP INLET
SEE CU101
PLACE SANDBAG
DIVERSION PRIOR TO
PLACEMENT OF 30" RCP
30" RCP SEE CU101
6" PERF. PVC SEE CU101
APPROXIMATE AREA
OF SEDIMENT
ACCUMULATION
CONSTRUCTION
PIPE INLET PROTECTION
CG101 C-502
REMOVE SEDIMENT AND
RE-GRADE AROUND EX. 18"
CMP TO ENSURE POSITIVE
DRAINAGE TO PIPE
S I
D
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
A
U G
U S
T
F O
A
G G
N
O R
R
O L
I N
A
S F
R
A N
C
E
R O
S I O
N
C
O N
T R
O L
S
O T
F
SHEET ID
F I L E
N A
M E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
US Army Corps of Engineers
C A
T E
G O
D
E
X X
X X
X X
X
X X
X X
X X
X
X X
X
X X
X
X X
X X
X X
X
X X
X
X X
X
D E
P
T I O
N
J O
N E
S
F
R A
N K
L
S
U I T
E
R A
L E
I G
H
N
C
F
A X
L I C
E N
ISSUED FOR CONSTRUCTION
FOR OFFICIAL USE ONLY
W I L M
I N
G T
S
T R
I C
T
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
R
L I N
G T
E
W I L M
I N
G T
O N
N
O R
R
O L I N
A
FOR OFFICIAL USE ONLY
S T
O R
M
D
R A
A
N
CU101
C U
D
G N
D S
N J
M C
D S
STORM DRAIN PLAN
SCALE: 1"=20'
CG102
020' 20' 60'
1"=20'
N
R
A
N
I N
T
E
N
A
N
C
E
S
S
C
O
N
T
O
U
P
R
O
X
I M
A
T
E
INV=245.6'
4" PVC
INV=246.0' (W)
INV=245.6' (E)
4" PVC
INV=246.2' (W)
INV=245.9' (E)
W
O
O
D
S
W
O
O
D
S
5593 60d NAIL
N= 515211.68'
E=1976302.36'
EL= 258.86'
I L
E
E
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
LOD
L
O
D
L
O
D
L
O
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
R
F
P
V
C
C
O
S
C
H
C
30"RCP INVERT =239.5
EX. CHANNEL
CONCRETE DROP INLET
TOP OF GRATE=246.6
30" RCP INV.=241.8
CU101 C-502
FIELD LOCATE AND
CONNECT EX. 4" PVC
PIPES TO DROP INLET
OR FIELD CONNECT
TO 6" PERFORATED
PVC PIPE
TRENCH FOR STORM DRAIN
30" PIPE
CU101 C-502
NON-PAVED PVC TRENCH
6" PERF. PVC
CU101 C-502
END 6" PERF. PVC AND NO.57 STONE TRENCH AT EDGE OF
TARGET PAD. EXTEND 6" SCHEDULE 40 SOLID PVC AT
SAME DEPTH OF MINIMUM COVER (18") AND BACKFILL
WITH NATIVE SOILS AND SOD ON TOP PER
SPECIFICATIONS.
STORM CLEANOUT
6" PVC
CU101 C-502
T
E
D
E T
A I L
S
C-501
C D
G N
D S
N J
D S
R D
A N
S I
D
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
A
U G
U S
T
F O
A
G G
N
O R
R
O L
I N
A
S F
R
A N
C
E
R O
S I O
N
C
O N
T R
O L
S
O T
F
SHEET ID
F I L E
N A
M E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
US Army Corps of Engineers
C A
T E
G O
D
E
X X
X X
X X
X
X X
X X
X X
X
X X
X
X X
X
X X
X X
X X
X
X X
X
X X
X
D E
P
T I O
N
J O
N E
S
F
R A
N K
L
S
U I T
E
R A
L E
I G
H
N
C
F
A X
L I C
E N
ISSUED FOR CONSTRUCTION
FOR OFFICIAL USE ONLY
W I L M
I N
G T
S
T R
I C
T
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
R
L I N
G T
E
W I L M
I N
G T
O N
N
O R
R
O L I N
A
FOR OFFICIAL USE ONLY
EXISTING
ROADWAY
M
I N
IT IS THE CONTRACTOR'S RESPONSIBILITY TO INSURE THAT
SEDIMENT IS NOT TRACKED ONTO THE EXISTING PAVED
STREET. THE ENTRANCE / EXIT SHALL BE MAINTAINED IN A
CONDITION WHICH WILL PREVENT TRACKING OR FLOW OF
MUD ONTO PUBLIC STREETS OR RIGHTS-OF-WAY. THIS
MAY REQUIRE PERIODIC TOP DRESSING WITH NCDOT
CLASS A STONE, AS CONDITIONS DEMAND AND REPAIR
AND/OR CLEANOUT OF ANY STRUCTURES USED TO TRAP
SEDIMENT. ALL MATERIALS SPILLED, DROPPED, WASHED,
OR TRACKED FROM VEHICLES OR SITE ONTO ROADWAYS
OR INTO STORM DRAINS SHALL BE REMOVED IMMEDIATELY.
PLAN
MAINTENANCE:
TEMPORARY GRAVEL CONSTRUCTION ENTRANCE / EXIT DETAIL
CONSTRUCTION SPECIFICATIONS
(TEMPORARY GRAVEL CONSTRUCTION ENTRANCE/EXIT)
1. CLEAR THE ENTRANCE AND EXIT AREA OF ALL VEGETATION, ROOTS
AND OTHER OBJECTIONABLE MATERIAL AND PROPERLY GRADE IT.
2. PLACE THE GRAVEL TO THE SPECIFIC GRADE AND DIMENSIONS
SHOWN ON THE PLANS, AND SMOOTH IT.
3. PROVIDE DRAINAGE TO CARRY WATER TO SEDIMENT TRAP OR
OTHER SUITABLE OUTLET.
4. USE GEOTEXTILE FABRICS BECAUSE THEY IMPROVE STABILITY OF
THE FOUNDATION IN LOCATIONS SUBJECT TO SEEPAGE OR
HIGH WATER TABLE.
5. IF CONSTRUCTION ON THE SITES AREA SUCH THAT THE MUD IS
NOT REMOVED BY THE CONSTRUCTION ENTRANCE, TIRES
OF THE VEHICLES MUST BE WASHED BEFORE LEAVING THE SITE.
CG101 C-501
NOT TO SCALE
CROSS SECTION
6" MIN.
50' MIN.
50' MIN.
NEW CONSTRUCTION
NCDOT CLASS A STONE
FABRIC UNDER STONE
FLOW
DITCHLINE
WOODEN STAKE
8" FABRIC STAPLE
18"
18"
6" COVER
WOODEN STAKE WITH WATTLE
ANCHORED TO THE TOP
12" DIAMETER STRAW
FILLED WATTLE
DITCHLINE
FILTER FABRIC
OR DITCH LINER
12" DIAMETER STRAW FILLED WATTLE
FASTENED TO WOODEN STAKE
BY NAIL OR STAPLE
FILTER FABRIC
OR DITCH LINER
NOTES:
1. WATTLES SHALL BE FILLED WITH STRAW
OR OTHER BIODEGRADABLE MATERIAL.
2. CHECK STAKE STABILITY AND CONDITION
OF COIR WATTLE AFTER EVERY STORM
EVENT. REMOVE SEDIMENT AND
REPLACE RIPPED WATTLES.
PROFILE VIEW
NOT TO SCALE
CG101
COMPOST FILTER SOCK
C-501
END SECTION VIEW
FILL SLOPE
GROUND LINE
4" MIN.
8" MIN
COMPACTED FILL (8" MIN.)
8' W/STANDARD
FABRIC WITH
WIRE FENCE
MIN. 14 GAUGE
WIRE FENCE
6' W/HIGH
STRENGTH
FABRIC WITHOUT
WIRE FENCE
S T
E E
L
P O
S T
ANCHOR FILTER
FABRIC MIN. 8" DEEP
AND KEY IT IN 4"
HORIZONTALLY
N
NOT TO SCALE
M
I N
5' LONG MIN.
FILTER FABRIC
ELEVATION
SECTION
NOTES:
1. USE A SYNTHETIC FILTER FABRIC OF AT LEAST 95% BY WEIGHT OF POLYOLEFINS OR
POLYESTER, WHICH IS CERTIFIED BY THE MANUFACTURER OR SUPPLIER AS CONFORMING
TO THE REQUIREMENTS IN ASTM D 6461. SYNTHETIC FILTER FENCE SHOULD CONTAIN
ULTRAVIOLET RAY INHIBITORS AND STABILIZERS TO PROVIDE A MINIMUM OF 6 MONTHS OF
EXPECTED USABLE CONSTRUCTION LIFE AT A TEMPERATURE RANGE OF 0 TO 120 DEG F.
2. STEEL POSTS SHALL BE 5'-0" MIN. IN HEIGHT, 1.33 LB/LINEAR FT STEEL AND SHALL HAVE
PROJECTIONS TO FACILITATE FASTENING TO FABRIC.
3. WIRE FENCE SHALL BE MINIMUM 14 GAUGE AND MAXIMUM MESH SPACING OF 6 INCHES,
FOR USE WITH STANDARD STRENGTH FILTER FABRIC.
MAINTENANCE
1. INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE
ANY REQUIRED REPAIRS IMMEDIATELY.
2. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME
INEFFECTIVE, REPLACE IT PROMPTLY.
3. ANY SEDIMENT FENCING WHICH HAS BEEN UNDERMINED OR TOPPED MUST BE REPLACED
IMMEDIATELY.
4. REMOVE SEDIMENT DEPOSITS AS NECESSARY AND AT A MINIMUM WHERE
ACCUMULATIONS REACH 1/2" ABOVE GROUND HEIGHT AT SEDIMENT FENCING TO PROVIDE
ADEQUATE STORAGE VOLUME FOR THE NEXT RAINFALL AND TO REDUCE PRESSURE ON THE
FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT.
5. REMOVE ALL SEDIMENT FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND
BRING THE AREA TO GRADE…
This is the start of the file's text. The full file is on GovTribe.