B1_-_IFB_Abstract_W912PM19B0013_Signed.pdf

PDF 367 KB Posted

Attached to
Storm Damage Flood Control Projects Federal contract opportunity
Solicitation number
W912PM19B0013
Issued by
Department of the Army Corps of Engineers Engineering District Wilmington

About this file

Bid Abstract

View the file

Other files for this federal contract opportunity

Other files attached to Storm Damage Flood Control Projects, newest first.
File Type Posted
B1_-_Bid_Opening_Attendance_Sheet.pdf PDF
W912PM19B0013_AMD2_CC.pdf PDF
W912PM19B0013_AMD2.pdf PDF
A21_-_W912PM19B0013_-_Amendment_1.pdf PDF
A21_-_W912PM19B0013_-_Amendment_1_Conformed_Copy.pdf PDF
PLANS.zip ZIP file
A21_-_Pre-Bid_Site_Visit_Sign-in_Combined).pdf PDF
PIR_Channels_RTA_PLANS_unlocked.pdf PDF
PIR_Channels_RTA_PLANS.pdf PDF
PIR_Channels_RTA_SPECS.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABSTRACT OF BIDS 1. SOLICITATION NUMBER 2. DATE ISSUED 3. DATE OPENED

4. ISSUING OFFICE NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)

U. S. Department of the Army, Corps of Engineers I CERTIFY that I have opened, read, and Rosalind M. Shoemaker, Contracting Officer Wilmington Contracting Office recorded on this abstract all offers received SIGNATURE 69 Darlington Ave. In response to this solicitation.

Wilmington, North Carolina 28403

PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. BIDDERS

(Check A, B or C and complete D, E and F.)

A. OFFEROR 1. A. OFFEROR 2

1501 East Dominick Street A. HIRED LABOR Rome NY 13440 B. REASONABLE CONTRACT B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount)

(WITHOUT PROFIT)

NUMBER OF ADDENDA ISSUED 2 C. REASONABLE CONTRACT C. AMENDMENT ACKNOWLEDGED C. AMENDMENT ACKNOWLEDGED

0001 ELLIS SWAMP - Mobilization and Demobilization 1 Job $201,700.00 $201,700.00 $35,996.00 $35,996.00 $83,300.00 $83,300.00

0002 ELLIS SWAMP - Pre-Construction site assessment survey 1 Job $8,535.00 $8,535.00 $33,396.00 $33,396.00 $13,500.00 $13,500.00

0003 ELLIS SWAMP - 18" HDPE 41 Linear Feet $215.00 $8,815.00 $43,411.00 $43,411.00 $408.00 $16,728.00

0004 ELLIS SWAMP - 24" HDPE 72 Linear Feet $308.00 $22,176.00 $68,886.00 $485.00 $34,920.00

0005 ELLIS SWAMP - 30" HDPE 106 Linear Feet $258.00 $27,348.00 $96,988.00 $498.00 $52,788.00

0006 ELLIS SWAMP - NCDOT CLASS A 5 Net Tons $640.00 $3,200.00 $158.00 $1,350.00 $6,750.00

0007 ELLIS SWAMP - NCDOT CLASS B 15 Net Tons $268.00 $4,020.00 $560.00 $932.00 $13,980.00

0008 ELLIS SWAMP - NCDOT CLASS I 153 Net Tons $215.00 $32,895.00 $7,143.00 $209.00 $31,977.00

0009 ELLIS SWAMP - NCDOT NO. 57 Stone 100 Net Tons $70.00 $7,000.00 $3,362.00 $329.00 $32,900.00

ELLIS SWAMP - Clearing and Snagging Tree Removal (Fallen and Leaning Trees) ---- ---- ---- ---- ---- ---- ---- ----

0010AA ELLIS SWAMP - Snagging Tree Removal - 0 TO 200 200 Each $400.00 $80,000.00 $223,788.00 $43.00 $8,600.00

0010AB ELLIS SWAMP - Snagging Tree Removal - 201 - 260 60 Each $400.00 $24,000.00 $68,025.00 $43.00 $2,580.00

0011 ELLIS SWAMP - Additional Pipe Culvert Replacements ---- ---- ---- ---- ---- ---- ---- ----

0011AA ELLIS SWAMP - 24" HDPE 80 Linear Feet $305.00 $24,400.00 $54,361.00 $456.00 $36,480.00

0011AB ELLIS SWAMP - 36" HDPE 40 Linear Feet $265.00 $10,600.00 $28,894.00 $499.00 $19,960.00

0011AC ELLIS SWAMP - 48" HDPE 40 Linear Feet $545.00 $21,800.00 $30,664.00 $594.00 $23,760.00

0011AD ELLIS SWAMP - NCDOT CLASS B 11 Net Tons $340.00 $3,740.00 $410.00 $1,250.00 $13,750.00

0011AE ELLIS SWAMP - NCDOT CLASS I 48 Net Tons $230.00 $11,040.00 $2,241.00 $372.00 $17,856.00

0012 ELLIS SWAMP - Performance and Payment Bonds 1 Job $7,400.00 $7,400.00 $9,195.00 $9,195.00 $8,200.00 $8,200.00

0013 BROAD CREEK - Mobilization and Demobilization 1 Job $196,000.00 $196,000.00 $15,135.00 $15,135.00 $57,500.00 $57,500.00

0014 BROAD CREEK - Pre-Construction site assessment survey 1 Job $8,585.00 $8,585.00 $15,873.00 $15,873.00 $13,500.00 $13,500.00

0015 BROAD CREEK - 24" HDPE 75 Linear Feet $305.00 $22,875.00 $61,278.00 $459.00 $34,425.00

W912PM19B0013 1-Aug-19 12-Sep-19

Y Y

Mohawk Valley Materials Inc.

Belle Chasse, Louisiana 70037

X

STORM DAMAGE FLOOD CONTROL PROJECTS - ELLIS SWAMP, BROAD CREEK,

PUNGO CREEK AND SOUTH CREEK IN BEAUFORT AND GATES COUNTIES,

NORTH CAROLINA, SMALL BUSINESS SET-ASIDE

Y Y

Grillot Construction, LLC.

2608 Engineers Road

0016 BROAD CREEK - 30" HDPE 37 Linear Feet $304.00 $11,248.00 $36,917.00 $558.00 $20,646.00

0017 BROAD CREEK - NCDOT CLASS B 13 Net Tons $288.00 $3,744.00 $485.00 $1,050.00 $13,650.00

BROAD CREEK - Clearing and Snagging Tree Removal (Fallen and Leaning Trees) ---- ---- ---- ---- ---- ---- ---- ----

0018AA BROAD CREEK - Snagging Tree Removal - 0 TO 120 120 Each $400.00 $48,000.00 $134,780.00 $186.00 $22,320.00

0018AB BROAD CREEK - Snagging Tree Removal - 121 TO 300 180 Each $400.00 $72,000.00 $201,538.00 $186.00 $33,480.00

0018AC BROAD CREEK - Snagging Tree Removal - 301 TO 375 75 Each $400.00 $30,000.00 $84,715.00 $186.00 $13,950.00

BROAD CREEK - OPTIONAL BID ITEM - Additional Pipe Culvert Replacements+B82 ---- ---- ---- ---- ---- ---- ---- ----

0019AA BROAD CREEK - 36" HDPE 40 Linear Feet $260.00 $10,400.00 $25,508.00 $496.00 $19,840.00

0019AB BROAD CREEK - 48" HDPE 40 Linear Feet $540.00 $21,600.00 $27,135.00 $579.00 $23,160.00

0019AC BROAD CREEK - NCDOT CLASS I 43 Net Tons $210.00 $9,030.00 $1,488.00 $398.00 $17,114.00

0020 BROAD CREEK - Performance and Payment Bonds 1 Job $14,000.00 $14,000.00 $8,125.00 $8,125.00 $5,400.00 $5,400.00

0021 PUNGO CREEK - Performance and Payment Bonds 1 Job $210,000.00 $210,000.00 $13,386.00 $13,386.00 $68,800.00 $68,800.00

0022 PUNGO CREEK - Pre-Construction site assessment survey 1 Job $8,585.00 $8,585.00 $45,078.00 $45,078.00 $13,500.00 $13,500.00

0023 PUNGO CREEK - 24" HDPE 225 Linear Feet $285.00 $64,125.00 $152,417.00 $432.00 $97,200.00

0024 PUNGO CREEK - 30" HDPE 73 Linear Feet $270.00 $19,710.00 $65,294.00 $492.00 $35,916.00

0025 PUNGO CREEK - 36" HDPE 146 Linear Feet $214.00 $31,244.00 $122,400.00 $495.00 $72,270.00

0026 PUNGO CREEK - NCDOT CLASS B 78 Net Tons $210.00 $16,380.00 $2,914.00 $725.00 $56,550.00

0027 PUNGO CREEK - NCDOT CLASS I 42 Net Tons $375.00 $15,750.00 $1,960.00 $388.00 $16,296.00

PUNGO CREEK - Clearing and Snagging Tree Removal (Fallen and Leaning Trees) ---- ---- ---- ---- ---- ---- ---- ----

0028AA PUNGO CREEK - Snagging Tree Removal - 0 TO 150 150 Each $400.00 $60,000.00 $168,159.00 $186.00 $27,900.00

0028AB PUNGO CREEK - Snagging Tree Removal - 151 TO 310 160 Each $400.00 $64,000.00 $179,284.00 $186.00 $29,760.00

0028AC PUNGO CREEK - Snagging Tree Removal - 311 TO 390 90 Each $400.00 $36,000.00 $90,277.00 $186.00 $16,740.00

0029 PUNGO CREEK - Additional Pipe Culvert Replacements ---- ---- ---- ---- ---- ---- ---- ----

0029AA PUNGO CREEK - 24" HDPE 153 Linear Feet $285.00 $43,605.00 $108,859.00 $360.00 $55,080.00

0029AB PUNGO CREEK - NCDOT CLASS B 33 Net Tons $330.00 $10,890.00 $1,232.00 $649.00 $21,417.00

0030 PUNGO CREEK - Performance and Payment Bonds 1 Job $8,700.00 $8,700.00 $11,918.00 $11,918.00 $10,300.00 $10,300.00

0031 SOUTH CREEK - Mobilization & Demobilization 1 Job $187,000.00 $187,000.00 $13,049.00 $13,049.00 $77,700.00 $77,700.00

0032 SOUTH CREEK - Pre-Construction site assessment survey 1 Job $8,585.00 $8,585.00 $24,634.00 $24,634.00 $13,500.00 $13,500.00

0033 SOUTH CREEK - 18" HDPE 72 Linear Feet $195.00 $14,040.00 $60,950.00 $442.00 $31,824.00

0034 SOUTH CREEK - 24" HDPE 159 Linear Feet $290.00 $46,110.00 $114,169.00 $421.00 $66,939.00

0035 SOUTH CREEK - NCDOT CLASS A 4 Net Tons $590.00 $2,360.00 $127.00 $1,500.00 $6,000.00

0036 SOUTH CREEK - NCDOT CLASS B 3 Net Tons $715.00 $2,145.00 $112.00 $1,950.00 $5,850.00

SOUTH CREEK - Clearing and Snagging Tree Removal (Fallen and Leaning Trees) ---- ---- ---- ---- ---- ---- ---- ----

0037AA SOUTH CREEK - Snagging Tree Removal - 0 TO 20 20 Each $400.00 $8,000.00 $23,522.00 $79.00 $1,580.00

0037AB SOUTH CREEK - Snagging Tree Removal - 21 TO 50 30 Each $400.00 $12,000.00 $34,647.00 $79.00 $2,370.00

0037AC SOUTH CREEK - Snagging Tree Removal - 51 TO 70 20 Each $400.00 $8,000.00 $23,522.00 $79.00 $1,580.00

SOUTH CREEK - OPTIONAL BID ITEM - Additional Pipe Culvert Replacements ---- ---- ---- ---- ---- ---- ---- ----

0038AA SOUTH CREEK - 36" HDPE 44 Linear Feet $260.00 $11,440.00 $26,505.00 $457.00 $20,108.00

0038AB SOUTH CREEK - 48" HDPE 48 Linear Feet $540.00 $25,920.00 $28,934.00 $511.00 $24,528.00

0038AC SOUTH CREEK - NCDOT CLASS I 48 Net Tons $210.00 $10,080.00 $1,661.00 $365.00 $17,520.00

0039 SOUTH CREEK - Performance and Payment Bonds 1 Job $5,000.00 $5,000.00 $5,249.00 $5,400.00 $5,400.00

$1,787,350.00 $2,529,483.00 $1,367,372.00

$88,470.00 $111,231.00 $122,270.00

$1,875,820.00 $2,640,714.00 $1,489,642.00

*Electronic Equivalent OF 1419

TOTAL AMOUNT OF BASE LINE ITEMS 0001 - 0018AC, 0020 - 0037AC & 0039)

TOTAL AMOUNT OF OPTION LINE ITEMS 00019AA - 0019AD & 0038AA - 0038AC)

TOTAL AMOUNT OF LINE ITEMS 0001 - 0039

PROJECT TITLE 9. BIDDERS

A. OFFEROR 3 A. OFFEROR 4 A. OFFEROR 5

109 White Oak Rd.

B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount) NUMBER OF ADDENDA ISSUED 2 C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED

0001 ELLIS SWAMP - Mobilization and Demobilization 1 Job $59,420.00 $59,420.00 $0.00 $0.00

ELLIS SWAMP - Pre-Construction site assessment survey 1 Job $5,556.00 $5,556.00 $0.00 $0.00

0003 ELLIS SWAMP - 18" HDPE 41 Linear Feet $28.00 $1,148.00 $0.00 $0.00

0004 ELLIS SWAMP - 24" HDPE 72 Linear Feet $43.00 $3,096.00 $0.00 $0.00

0005 ELLIS SWAMP - 30" HDPE 106 Linear Feet $60.00 $6,360.00 $0.00 $0.00

0006 ELLIS SWAMP - NCDOT CLASS A 5 Net Tons $122.00 $610.00 $0.00 $0.00

0007 ELLIS SWAMP - NCDOT CLASS B 15 Net Tons $124.00 $1,860.00 $0.00 $0.00

0008 ELLIS SWAMP - NCDOT CLASS I 153 Net Tons $128.00 $19,584.00 $0.00 $0.00

0009 ELLIS SWAMP - NCDOT NO. 57 Stone 100 Net Tons $107.00 $10,700.00 $0.00 $0.00

ELLIS SWAMP - Clearing and Snagging Tree Removal (Fallen and Leaning Trees) ---- ---- ---- ---- ---- ---- ---- ----

0010AA ELLIS SWAMP - Snagging Tree Removal - 0 TO 200 200 Each $3,499.00 $699,800.00 $0.00 $0.00

0010AB

ELLIS SWAMP - Snagging Tree Removal - 201 - 260 60 Each $3,499.00 $209,940.00 $0.00 $0.00

ELLIS SWAMP - Additional Pipe Culvert Replacements ---- ---- ---- ---- ---- ---- ---- ----

0011AA ELLIS SWAMP - 24" HDPE 80 Linear Feet $43.00 $3,440.00 $0.00 $0.00

0011AB ELLIS SWAMP - 36" HDPE 40 Linear Feet $78.00 $3,120.00 $0.00 $0.00

0011AC ELLIS SWAMP - 48" HDPE 40 Linear Feet $148.00 $5,920.00 $0.00 $0.00

0011AD ELLIS SWAMP - NCDOT CLASS B 11 Net Tons $124.00 $1,364.00 $0.00 $0.00

0011AE ELLIS SWAMP - NCDOT CLASS I 48 Net Tons $128.00 $6,144.00 $0.00 $0.00

0012 ELLIS SWAMP - Performance and Payment Bonds 1 Job $17,000.00 $17,000.00 $0.00 $0.00

0013 BROAD CREEK - Mobilization and Demobilization 1 Job $81,102.00 $81,102.00 $0.00 $0.00

BROAD CREEK - Pre-Construction site assessment survey 1 Job $2,778.00 $2,778.00 $0.00 $0.00

0015 BROAD CREEK - 24" HDPE 75 Linear Feet $43.00 $3,225.00 $0.00 $0.00

0016 BROAD CREEK - 30" HDPE 37 Linear Feet $60.00 $2,220.00 $0.00 $0.00

0017 BROAD CREEK - NCDOT CLASS B 13 Net Tons $124.00 $1,612.00 $0.00 $0.00

BROAD CREEK - Clearing and Snagging Tree Removal (Fallen and Leaning Trees) ---- ---- ---- ---- ---- ---- ---- ----

Greenville, NC 29609 Bid Bonds: Y

STORM DAMAGE FLOOD CONTROL PROJECTS - ELLIS SWAMP, BROAD

CREEK, PUNGO CREEK AND SOUTH CREEK IN BEAUFORT AND GATES

COUNTIES, NORTH CAROLINA, SMALL BUSINESS SET-ASIDE

Southern Disaster Recovery, LLC.

Y

0018AA

BROAD CREEK - Snagging Tree Removal - 0 TO 120 120 Each $3,499.00 $419,880.00 $0.00 $0.00

0018AB

BROAD CREEK - Snagging Tree Removal - 121 TO 300 180 Each $3,499.00 $629,820.00 $0.00 $0.00

0018AC

BROAD CREEK - Snagging Tree Removal - 301 TO 375 75 Each $3,499.00 $262,425.00 $0.00 $0.00

BROAD CREEK - OPTIONAL BID ITEM - Additional Pipe Culvert Replacements+B82 ---- ---- ---- ---- ---- ---- ---- ----

0019AA BROAD CREEK - 36" HDPE 40 Linear Feet $78.00 $3,120.00 $0.00 $0.00

0019AB BROAD CREEK - 48" HDPE 40 Linear Feet $148.00 $5,920.00 $0.00 $0.00

0019AC BROAD CREEK - NCDOT CLASS I 43 Net Tons $128.00 $5,504.00 $0.00 $0.00

0020 BROAD CREEK - Performance and Payment Bonds 1 Job $23,000.00 $23,000.00 $0.00 $0.00

0021 PUNGO CREEK - Performance and Payment Bonds 1 Job $88,548.00 $88,548.00 $0.00 $0.00

PUNGO CREEK - Pre-Construction site assessment survey 1 Job $7,778.00 $7,778.00 $0.00 $0.00

0023 PUNGO CREEK - 24" HDPE 225 Linear Feet $43.00 $9,675.00 $0.00 $0.00

0024 PUNGO CREEK - 30" HDPE 73 Linear Feet $60.00 $4,380.00 $0.00 $0.00

0025 PUNGO CREEK - 36" HDPE 146 Linear Feet $78.00 $11,388.00 $0.00 $0.00

0026 PUNGO CREEK - NCDOT CLASS B 78 Net Tons $124.00 $9,672.00 $0.00 $0.00

0027 PUNGO CREEK - NCDOT CLASS I 42 Net Tons $128.00 $5,376.00 $0.00 $0.00

PUNGO CREEK - Clearing and Snagging Tree Removal (Fallen and Leaning Trees) ---- ---- ---- ---- ---- ---- ---- ----

0028AA

PUNGO CREEK - Snagging Tree Removal - 0 TO 150 150 Each $3,499.00 $524,850.00 $0.00 $0.00

0028AB

PUNGO CREEK - Snagging Tree Removal - 151 TO 310 160 Each $3,499.00 $559,840.00 $0.00 $0.00

0028AC

PUNGO CREEK - Snagging Tree Removal - 311 TO 390 90 Each $3,499.00 $314,910.00 $0.00 $0.00

PUNGO CREEK - Additional Pipe Culvert Replacements ---- ---- ---- ---- ---- ---- ---- ----

0029AA PUNGO CREEK - 24" HDPE 153 Linear Feet $43.00 $6,579.00 $0.00 $0.00

0029AB PUNGO CREEK - NCDOT CLASS B 33 Net Tons $124.00 $4,092.00 $0.00 $0.00

0030 PUNGO CREEK - Performance and Payment Bonds 1 Job $25,000.00 $25,000.00 $0.00 $0.00

0031 SOUTH CREEK - Mobilization & Demobilization 1 Job $16,771.00 $16,771.00 $0.00 $0.00

SOUTH CREEK - Pre-Construction site assessment survey 1 Job $4,444.00 $4,444.00 $0.00 $0.00

0033 SOUTH CREEK - 18" HDPE 72 Linear Feet $26.00 $1,872.00 $0.00 $0.00

0034 SOUTH CREEK - 24" HDPE 159 Linear Feet $43.00 $6,837.00 $0.00 $0.00

0035 SOUTH CREEK - NCDOT CLASS A 4 Net Tons $122.00 $488.00 $0.00 $0.00

0036 SOUTH CREEK - NCDOT CLASS B 3 Net Tons $124.00 $372.00 $0.00 $0.00

SOUTH CREEK - Clearing and Snagging Tree Removal (Fallen and Leaning Trees) ---- ---- ---- ---- ---- ---- ---- ----

0037AA SOUTH CREEK - Snagging Tree Removal - 0 TO 20 20 Each $3,499.00 $69,980.00 $0.00 $0.00

0037AB

SOUTH CREEK - Snagging Tree Removal - 21 TO 50 30 Each $3,499.00 $104,970.00 $0.00 $0.00

0037AC

SOUTH CREEK - Snagging Tree Removal - 51 TO 70 20 Each $3,499.00 $69,980.00 $0.00 $0.00

SOUTH CREEK - OPTIONAL BID ITEM - Additional Pipe Culvert Replacements ---- ---- ---- ---- ---- ---- ---- ----

0038AA SOUTH CREEK - 36" HDPE 44 Linear Feet $78.00 $3,432.00 $0.00 $0.00

0038AB SOUTH CREEK - 48" HDPE 48 Linear Feet $148.00 $7,104.00 $0.00 $0.00

0038AC SOUTH CREEK - NCDOT CLASS I 48 Net Tons $128.00 $6,144.00 $0.00 $0.00

0039 SOUTH CREEK - Performance and Payment Bonds 1 Job $5,000.00 $5,000.00 $0.00 $0.00

$4,333,926.00 $0.00 $0.00

$31,224.00 $0.00 $0.00

$4,365,150.00 $0.00 $0.00

*Electronic Equivalent OF 1419

TOTAL AMOUNT OF BASE LINE ITEMS 0001 - 0018AC, 0020 - 0037AC & 0039)

TOTAL AMOUNT OF OPTION LINE ITEMS 00019AA - 0019AD & 0038AA - 0038AC)

TOTAL AMOUNT OF LINE ITEMS 0001 - 0039

2019-09-12T16:10:51-0400
SHOEMAKER.ROSALIND.MARIE.1395095168

File details come from the government source that posted it.