A21_-_W912PM19B0013_-_Amendment_1.pdf

PDF 7 MB Posted

Attached to
Storm Damage Flood Control Projects Federal contract opportunity
Solicitation number
W912PM19B0013
Issued by
Department of the Army Corps of Engineers Engineering District Wilmington

About this file

AMENDMENT 0001

View the file

Other files for this federal contract opportunity

Other files attached to Storm Damage Flood Control Projects, newest first.
File Type Posted
B1_-_Bid_Opening_Attendance_Sheet.pdf PDF
B1_-_IFB_Abstract_W912PM19B0013_Signed.pdf PDF
W912PM19B0013_AMD2_CC.pdf PDF
W912PM19B0013_AMD2.pdf PDF
A21_-_W912PM19B0013_-_Amendment_1_Conformed_Copy.pdf PDF
PLANS.zip ZIP file
A21_-_Pre-Bid_Site_Visit_Sign-in_Combined).pdf PDF
PIR_Channels_RTA_PLANS_unlocked.pdf PDF
PIR_Channels_RTA_PLANS.pdf PDF
PIR_Channels_RTA_SPECS.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Solicitation hereby modified as follow s:

A) Update bid schedule to include base and optional bid Item CLINs and add language indicated w hen options must be exercised by.

B) Extend the bid opening to 6 September 2019 at 2:00PM Eastern. Extend bidder inquiry capability to COB, Tuesday 27 August 2019.

C) See techncial summary of changes. All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

1 20

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 26-Aug-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912PM19B0013

X 9B. DATED (SEE ITEM 11)

01-Aug-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

26-Aug-2019

CODE

U S ARMY CORPS OF ENGINEERS, WILMINGTON

CONTRACTING - WILMINGTON DISTRICT

69 DARLINGTON AVENUE

WILMINGTON NC 28403

W912PM 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912PM19B0013

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 04-Sep-2019 02:00 PM to 06-Sep-

2019 02:00 PM.

CLIN 0009

The CLIN extended description has changed from:

In accordance with the attached plans and specifications. All quantities are estimated.

To:

In accordance with the attached plans and specifications. All quantities are estimated.

The FSC code Y300 has been added.

The PROG code C20 has been added.

The WSC Equipment code 000 has been added.

The NAICS code 237990 has been added.

The MDAP/MAIS Code 000 has been added.

SUBCLIN 0010AA

0 TO 200

0 TO 200

The FSC code Y300 has been added.

The PROG code C20 has been added.

The WSC Equipment code 000 has been added.

SUBCLIN 0010AB

201 to 260

201 to 260 The FSC code Y300 has been added.

The PROG code C20 has been added.

The WSC Equipment code 000 has been added.

CLIN 0011

The CLIN type priced has been deleted.

The CLIN description has changed from ELLIS SWAMP - Performance and Payment Bo to ELLIS SWAMP - Additional Pipe Culvert Re.

ndsIn accordance with the attached plans and specifications.

placementsIn accordance with the attached plans and specifications. This is not a priced bid item and is included for information only. For bidding purposes, see sub-clins 0011AA, 0011AB, 0011AC, 0011AD and 0011AE.

The pricing detail quantity 1.00 has been deleted.

The unit of issue Job has been deleted.

The FOB Destination has been deleted.

The FSC code Y300 has been deleted.

The PROG code C20 has been deleted.

The WSC Equipment code 000 has been deleted.

The NAICS code 237990 has been deleted.

The MDAP/MAIS Code 000 has been deleted.

CLIN 0012

The CLIN description has changed from BROAD CREEK - Mobilization & Demobilizat to ELLIS SWAMP - Performance and Payment Bo.

ionIn accordance with the attached plans and specifications.

ndsIn accordance with the attached plans and specifications.

CLIN 0013

This CLIN has been renumbered to CLIN 0014.

CLIN 0014

This CLIN has been renumbered to CLIN 0015.

CLIN 0015

This CLIN has been renumbered to CLIN 0016.

CLIN 0016

This CLIN has been renumbered to CLIN 0017.

CLIN 0017

This CLIN has been renumbered to CLIN 0018.

The CLIN extended description has changed from:

Removal (Fallen and Leaning Trees)In accordance with the attached plans and specifications.

This is not a priced bid item and is included for information only. For bidding purposes, see sub-clins 0017AA, 0017AB, and 0017AC.

Removal (Fallen and Leaning Trees)In accordance with the attached plans and specifications.

clins 0018AA, 0018AB, and 0018AC.

SUBCLIN 0017AA

This SUBCLIN has been renumbered to SUBCLIN 0018AA.

0 TO 120

0 TO 120

The FSC code Y300 has been added.

The PROG code C20 has been added.

The WSC Equipment code 000 has been added.

SUBCLIN 0017AB

This SUBCLIN has been renumbered to SUBCLIN 0018AB.

The FSC code Y300 has been added.

The PROG code C20 has been added.

The WSC Equipment code 000 has been added.

SUBCLIN 0017AC

This SUBCLIN has been renumbered to SUBCLIN 0018AC.

The FSC code Y300 has been added.

The PROG code C20 has been added.

The WSC Equipment code 000 has been added.

CLIN 0018

This CLIN has been renumbered to CLIN 0020.

CLIN 0019

This CLIN has been renumbered to CLIN 0021.

CLIN 0020

This CLIN has been renumbered to CLIN 0022.

CLIN 0021

This CLIN has been renumbered to CLIN 0023.

CLIN 0022

This CLIN has been renumbered to CLIN 0024.

CLIN 0023

This CLIN has been renumbered to CLIN 0025.

CLIN 0024

This CLIN has been renumbered to CLIN 0026.

CLIN 0025

This CLIN has been renumbered to CLIN 0027.

CLIN 0026

This CLIN has been renumbered to CLIN 0028.

The CLIN extended description has changed from:

Removal (Fallen and Leaning Trees)In accordance with the attached plans and specifications.

clins 0026AA, 0026AB, and 0026AC.

All quantities are estimated. This is not a priced bid item and is included for information only.

For bidding purposes, see sub-clins 0028AA, 0028AB, and 0028AC.

SUBCLIN 0026AA

This SUBCLIN has been renumbered to SUBCLIN 0028AA.

0 TO 150

0 TO 150

The FSC code Y300 has been added.

The PROG code C20 has been added.

The WSC Equipment code 000 has been added.

SUBCLIN 0026AB

This SUBCLIN has been renumbered to SUBCLIN 0028AB.

151 TO 310

151 TO 310

The FSC code Y300 has been added.

The PROG code C20 has been added.

The WSC Equipment code 000 has been added.

SUBCLIN 0026AC

This SUBCLIN has been renumbered to SUBCLIN 0028AC.

The pricing detail quantity has increased by 10.00 from 80.00 to 90.00.

The FSC code Y300 has been added.

The PROG code C20 has been added.

The WSC Equipment code 000 has been added.

CLIN 0027

This CLIN has been renumbered to CLIN 0030.

CLIN 0028

This CLIN has been renumbered to CLIN 0031.

CLIN 0029

This CLIN has been renumbered to CLIN 0032.

CLIN 0030

This CLIN has been renumbered to CLIN 0033.

CLIN 0031

This CLIN has been renumbered to CLIN 0034.

CLIN 0032

This CLIN has been renumbered to CLIN 0035.

CLIN 0033

This CLIN has been renumbered to CLIN 0036.

CLIN 0034

This CLIN has been renumbered to CLIN 0037.

The CLIN extended description has changed from:

Removal (Fallen and Leaning Trees)In accordance with the attached plans and specifications.

clins 0034AA, 0034AB, and 0034AC.

This is not a priced bid item and is included for information only. For bidding purposes, see sub-clins 0037AA, 0037AB, and 0037AC.

SUBCLIN 0034AA

This SUBCLIN has been renumbered to SUBCLIN 0037AA.

The FSC code Y300 has been added.

The PROG code C20 has been added.

The WSC Equipment code 000 has been added.

SUBCLIN 0034AB

This SUBCLIN has been renumbered to SUBCLIN 0037AB.

The FSC code Y300 has been added.

The PROG code C20 has been added.

The WSC Equipment code 000 has been added.

SUBCLIN 0034AC

This SUBCLIN has been renumbered to SUBCLIN 0037AC.

51 TO 70

51 TO 70

The FSC code Y300 has been added.

The PROG code C20 has been added.

The WSC Equipment code 000 has been added.

CLIN 0035

This CLIN has been renumbered to CLIN 0039.

SUBCLIN 0011AA is added as follows:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0011AA 80 Linear

Foot

ELLIS SWAMP - 24" HDPE

FOB: Destination

NET AMT

SUBCLIN 0011AB is added as follows:

0011AB 40 Linear

ELLIS SWAMP - 36" HDPE

SUBCLIN 0011AC is added as follows:

0011AC 40 Linear

ELLIS SWAMP - 48" HDPE

SUBCLIN 0011AD is added as follows:

0011AD 11 Net Ton

(2,000

LB).

ELLIS SWAMP - NCDOT CLASS B

SUBCLIN 0011AE is added as follows:

0011AE 48 Net Ton

ELLIS SWAMP - NCDOT CLASS I

CLIN 0013 is added as follows:

0013 1 Job BROAD CREEK - Mobilization & Demobilization

In accordance with the attached plans and specifications.

CLIN 0019 is added as follows:

OPTION BROAD CREEK - OPTIONAL BID ITEM -Additional Pipe Culvert

Replacements

In accordance with the attached plans and specifications. All quantities are estimated. This is not a priced bid item and is included for information only. For bidding purposes, see sub-clins 0019AA, 0019AB and 0019AC.

SUBCLIN 0019AA is added as follows:

0019AA 40 Linear

OPTION BROAD CREEK - 36" HDPE

SUBCLIN 0019AB is added as follows:

0019AB 40 Linear

OPTION BROAD CREEK - 48" HDPE

SUBCLIN 0019AC is added as follows:

0019AC 43 Net Ton

OPTION BROAD CREEK - NCDOT CLASS I

CLIN 0029 is added as follows:

PUNGO CREEK - Additional Pipe Culvert Replacements

In accordance with the attached plans and specifications. All quantities are estimated. This is not a priced bid item and is included for information only. For bidding purposes, see sub-clins 0029AA and 0029AB.

SUBCLIN 0029AA is added as follows:

0029AA 153 Linear

PUNGO CREEK - 24" HDPE

SUBCLIN 0029AB is added as follows:

0029AB 33 Net Ton

PUNGO CREEK - NCDOT CLASS B

CLIN 0038 is added as follows:

OPTION SOUTH CREEK - OPTIONAL BID ITEM -Additional Pipe Culvert Replacements

In accordance with the attached plans and specifications. This is not a priced bid item and is included for information only. For bidding purposes, see sub-clins 0038AA, 0038AB, and 0038AC.

SUBCLIN 0038AA is added as follows:

0038AA 44 Linear

OPTION SOUTH CREEK - 36" HDPE

SUBCLIN 0038AB is added as follows:

0038AB 48 Linear

OPTION SOUTH CREEK - 48" HDPE

SUBCLIN 0038AC is added as follows:

0038AC 48 Net Ton

OPTION SOUTH CREEK - NCDOT CLASS I

The following have been modified:

TOTAL AMOUNTS

TOTAL AMOUNTS:

BASE LINE ITEMS $______________________________

(0001 – 0018AC, 0020 – 0037AC & 0039)

OPTION LINE ITEMS $______________________________

(0019AA – 0019AD & 0038AA – 0038AC)

BASE & OPTIONS 0001 – 0039 $______________________________

NOTICE TO BIDDERS:

NOTE 1: Please be sure to include unit prices rounded to two (2) decimal places.

NOTE 2: For completion dates and time frames on all work, please see clause 52.211-10 “Commencement, Prosecution and Completion of Work” noted within this document.

NOTE 3: Option Line items shall be exercised no later than 60 days after Notice to Proceed.

(END OF NOTICE TO BIDDERS)

SECTION 00 70 00 - CONDITIONS OF THE CONTRACT

The Acceptance/Inspection Schedule for CLIN 0011 has been changed from:

INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

N/A N/A N/A Government

To:

INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

N/A N/A N/A N/A

The following Acceptance/Inspection Schedule was added for SUBCLIN 0011AA:

N/A N/A N/A Government

The following Acceptance/Inspection Schedule was added for SUBCLIN 0011AB:

The following Acceptance/Inspection Schedule was added for SUBCLIN 0011AC:

The following Acceptance/Inspection Schedule was added for SUBCLIN 0011AD:

The following Acceptance/Inspection Schedule was added for SUBCLIN 0011AE:

The following Acceptance/Inspection Schedule was added for CLIN 0013:

The following Acceptance/Inspection Schedule was added for CLIN 0019:

The following Acceptance/Inspection Schedule was added for SUBCLIN 0019AA:

The following Acceptance/Inspection Schedule was added for SUBCLIN 0019AB:

The following Acceptance/Inspection Schedule was added for SUBCLIN 0019AC:

The following Acceptance/Inspection Schedule was added for CLIN 0029:

The following Acceptance/Inspection Schedule was added for SUBCLIN 0029AA:

The following Acceptance/Inspection Schedule was added for SUBCLIN 0029AB:

The following Acceptance/Inspection Schedule was added for CLIN 0038:

The following Acceptance/Inspection Schedule was added for SUBCLIN 0038AA:

The following Acceptance/Inspection Schedule was added for SUBCLIN 0038AB:

The following Acceptance/Inspection Schedule was added for SUBCLIN 0038AC:

SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS

The following have been added by reference:

52.211-18

The following have been deleted:

52.211-18

(End of Summary of Changes)

Amendment 0001

Technical Summary of Changes

SPECIFICATIONS:

00 01 15 – LIST OF DRAWINGS

Delete existing Page 1 through Page 4 in their entirety and replace with revised enclosed like numbered Pages.

01 10 00.10 38 - SUPPLEMENTARY SPECIAL CONTRACT REQUIREMENTS

Delete existing Page 1 through Page 23 in their entirety and replace with revised enclosed Page 1 through Page 24.

01 50 00 – TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

Delete existing Page 1 through Page 7 in their entirety and replace with revised enclosed like numbered Pages.

01 57 19 - TEMPORARY ENVIRONMENTAL CONTROLS

ADD enclosed Attachment 1 and Attachment 2 in their entirety.

31 11 00 – CLEARING AND SNAGGING

Delete existing Page 1 through Page 5 in their entirety and replace with revised enclosed Page 1 through Page 6.

NOTE:

Text that is added or revised by this amendment is identified with Amendment 0001 (beginning and ending of revision/addition). Track changes shown as Strikethroughs (Delete/RED) and (ADD/GREEN).

The text changes may have necessitated reformatting of subsequent text or pages. If this is the case, those pages have also been issued as amended pages.

DRAWINGS

Delete the following Sheets in their entirety and replace with revised enclosed Sheets.

G003, G002, G001, G004 and G005

ADD the following Sheet.

C129

Amendment 0001

-- End of Summary of Changes-

Encls as Stated

PI R Channel s Desi gn Rehabi l i t at i on W912PM19B0013 El l i s Swamp, Br oad, Pungo & Sout h Cr eeks

SECTI ON TABLE OF CONTENTS

DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS

DOCUMENT 00 01 15

LI ST OF DRAWI NGS

PART 1 GENERAL

1. 1 SUMMARY

1. 2 CONTRACT DRAWI NGS

- - End of Sect i on Tabl e of Cont ent s - -

DOCUMENT 00 01 15 Page 1

AMENDMENT 0001

DOCUMENT 00 01 15

LI ST OF DRAWI NGS

PART 1 GENERAL

1. 1 SUMMARY

Thi s sect i on l i s t s t he dr awi ngs f or t he pr oj ect pur suant t o cont r act c l ause " DFARS 252. 236- 7001, Cont r act Dr awi ngs and Speci f i cat i ons. "

1. 2 CONTRACT DRAWI NGS

* * * AMENDMENT 0001* * *

Cont r act dr awi ngs ar e as f ol l ows:

SHEET I D TITLE

G000 COVER SHEET

G001 I NDEX OF DRAWI NGS AND PROJECT LOCATI ONS

ELLI S SWAMP CULVERT REPLACEMENTS AND SLOPE REPAI R

G002 ELLI S SWAMP GENERAL MAP PROJECT VI CI NI TY

C101 ELLI S SWAMP CULVERT REPLACEMENT STA. 10+00

C102 ELLI S SWAMP CULVERT REPLACEMENT STA. 20+00

C103 ELLI S SWAMP CULVERT REPLACEMENT STA. 70+00

C104 ELLI S SWAMP SLOPE REPAI R STA. 102+40

C105 ELLI S SWAMP CULVERT REPLACEMENT STA. 115+60

C106 ELLI S SWAMP CULVERT REPLACEMENT STA. 197+60

C107 CYPRESS BRANCH CULVERT REPLACEMENT STA. 0+30

C301 ELLI S SWAMP SLOPE REPAI R TYPI CAL SECTI ON

C302 ELLI S SWAMP SLOPE REPAI R CROSS SECTI ONS STA 0+15 TO STA 0+40

C303 ELLI S SWAMP SLOPE REPAI R CROSS SECTI ONS STA 0+48. 42 TO STA 0+80

C304 ELLI S SWAMP SLOPE REPAI R CROSS SECTI ONS STA 0+90 TO STA 1+03

DOCUMENT 00 01 15 Page 2

SHEET I D TITLE

BROAD CREEK CULVERT REPLACEMENTS

G003 BROAD CREEK GENERAL MAP PROJECT VI CI NI TY

C108 BROAD CREEK CULVERT REPLACEMENT STA. 105+20

C109 BEAVERDAM BRANCH CULVERT REPLACEMENT STA. 150+20

C110 BEAVERDAM BRANCH CULVERT REPLACEMENT STA. 201+70

PUNGO CREEK CULVERT REPLACEMENTS

G004 PUNGO CREEK GENERAL MAP PROJECT VI CI NI TY

C111 PUNGO CREEK CULVERT REPLACEMENT STA. 143+15

C112 PUNGO CREEK CULVERT REPLACEMENT STA. 156+10

C113 PUNGO CREEK CULVERT REPLACEMENT STA. 328+00

C114 PUNGO CREEK CULVERT REPLACEMENT STA. 441+00

C115 PUNGO CREEK CULVERT REPLACEMENT STA. 650+21

C116 WALLA WATTA BRANCH CULVERT REPLACEMENT STA. 124+50

C117 WALLA WATTA BRANCH CULVERT REPLACEMENT STA. 127+89

C118 WALLA WATTA BRANCH CULVERT REPLACEMENT STA. 147+89

C119 WALLA WATTA BRANCH CULVERT REPLACEMENT STA. 157+89

C120 WALLA WATTA BRANCH CULVERT REPLACEMENT STA. 169+70

C121 WALLA WATTA BRANCH CULVERT REPLACEMENT STA. 170+20

SOUTH CREEK CULVERT REPLACEMENTS

G005 SOUTH CREEK GENERAL MAP PROJECT VI CI NI TY

C122 SOUTH CREEK CULVERT REPLACEMENT STA. 206+32

C123 SOUTH CREEK CULVERT REPLACEMENT STA. 232+50

C124 SOUTH CREEK CULVERT REPLACEMENT STA. 244+65

C125 BROOMFI ELD CREEK CULVERT REPLACEMENT STA. 167+60

C126 BROOMFI ELD CREEK CULVERT REPLACEMENT STA. 182+00

DOCUMENT 00 01 15 Page 3

SHEET I D TITLE

C127 BROOMFI ELD CREEK CULVERT REPLACEMENT STA. 193+65

EROSI ON AND SEDI MENT CONTROL

C128 TEMPORARY EROSI ON AND SEDI MENT CONTROL DETAI LS TYPI CAL PI PE TRENCH

EXCAVATION

C129 ADDI TI ONAL PI PE CULVERT REPLACEMENTS TYPI CAL C/ L PROFI LE, OUTLET

PROTECTI ON AND PI PE COVER DETAI LS

* * * AMENDMENT 0001* * *

- - End of Document - -

DOCUMENT 00 01 15 Page 4

SECTI ON TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 10 00. 10 38

SUPPLEMENTARY SPECI AL CONTRACT REQUI REMENTS

PART 1 GENERAL

1. 1 SCOPE OF WORK

1. 2 REFERENCES

1. 3 DEPARTMENT OF ARMY MANDATED SECURI TY REQUI REMENTS

1. 4 SUBMI TTALS

1. 5 TI ME EXTENSI ONS FOR UNUSUALLY SEVERE WEATHER

1. 6 PERFORMANCE AND PAYMENT BONDS

1. 7 WATER CONSERVATI ON

1. 8 BULLETI N BOARD

1. 9 WORK PLAN

1. 10 RETAI NAGE FOR UNTI MELY SUBMI SSI ON OF SUBCONTRACTI NG REPORTS

1. 11 SAMPLI NG, CERTI FI CATES, AND TESTI NG

1. 12 CERTI FI CATES OF COMPLI ANCE

1. 13 CONTRACTOR- PREPARED NETWORK ANALYSI S SYSTEM

1. 14 REQUI RED CONSTRUCTI ON MEETI NGS

1. 15 SURVEY DATA

1. 16 " AS- BUI LT" RECORD DRAWI NGS

1. 17 WORK I N QUARANTI NED AREA

1. 18 FI NAL AND CONDI TI ONAL ACCEPTANCE OF GRASSI NG

1. 19 ACCEPTANCE

1. 20 NCDOT SPECI FI CATI ONS

1. 21 DEFI NI TI ONS FOR NCDOT SPECI FI CATI ONS

1. 22 ADDI TI ONAL SURVEY AND SURVEY PERSONNEL REQUI REMENTS

1. 23 PUBLI C CONVENI ENCE AND SAFETY

1. 23. 1 Roads To Be Cl osed

1. 23. 2 St or age of Mat er i al s

1. 24 MAI NTENANCE DURI NG CONSTRUCTI ON

1. 24. 1 Mai nt enance When Wor k i s Suspended

1. 24. 2 Fi nal Mowi ng

1. 24. 3 Spi l l ed Mat er i al s

1. 25 I NSPECTI ON

1. 26 PARTNERI NG

1. 27 LOAD RESTRI CTI ONS

1. 28 BARRI CADES, DANGER, WARNI NG, AND DETOUR SI GNS

1. 28. 1 Removal of Bar r i cades And War ni ng Si gns

1. 28. 2 Repl acement of Si gns

1. 28. 3 Cost of Pr ot ect i ve Devi ces

1. 29 PROTECTI ON OF EXI STI NG FACI LI TI ES

1. 30 PLANT LAYOUT DRAWI NGS

1. 31 HAUL ROADS

1. 32 PRECONSTRUCTI ON SI TE ASSESSMENT

1. 33 MAI NTENANCE ACCESS

1. 34 CONTRACT AREA AND TRESPASSI NG

1. 35 CONTRACT DRAWI NGS AND SPECI FI CATI ONS

SECTI ON 01 10 00. 10 38 Page 1

PART 2 PRODUCTS

PART 3 EXECUTI ON

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 01 10 00. 10 38 Page 2

SECTI ON 01 10 00. 10 38

SUPPLEMENTARY SPECI AL CONTRACT REQUI REMENTS

PART 1 GENERAL

1. 1 SCOPE OF WORK

The pr oj ect consi st s of t he r epai r and r epl acement of mul t i pl e pi pe cul ver t out f al l s al ong exi st i ng cr eeks and t he r emoval and di sposal of al l f al l en and l eani ng t r ees wi t hi n t he pr oj ect l i mi t s f or f our separ at e Fl ood Cont r ol pr oj ect l ocat i ons at Br oad Cr eek, Pungo Cr eek, and Sout h Cr eek i n Beauf or t Count y, Nor t h Car ol i na and El l i s Swamp i n Gat es Count y, Nor t h Car ol i na. The wor k consi st s of r emoval and r epl acement of damaged pi pe cul ver t s, r est or i ng cr eek bank ar ound end of pi pe cul ver t s by backf i l l i ng and pl aci ng r i pr ap st r eam pr ot ect i on. The wor k i ncl udes t he r epai r and r epl acement of 26 pi pe cul ver t s, addi ng r i pr ap s l ope pr ot ect i on i n one ar ea and t he r emoval of appr oxi mat el y 1315 f al l en and/ or l eani ng t r ees.

1. 2 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

NORTH CAROLI NA DEPARTMENT OF TRANSPORTATI ON ( NCDOT)

NCDOT St andar d Speci f i cat i ons For Roads And Structures

U. S. ARMY CORPS OF ENGI NEERS ( USACE)

ER 1- 1- 11 ( 1995) Admi ni st r at i on - - Pr ogr ess, Schedul es, and Net wor k Anal ysi s Syst ems

ER 1110- 1- 5 Pl ant Pest Quar ant i ned Ar eas and For ei gn Soi l Sampl es

1. 3 DEPARTMENT OF ARMY MANDATED SECURI TY REQUI REMENTS

The Cont r act or shal l be r equi r ed t o compl y wi t h t he f ol l owi ng secur i t y r equi r ement s mandat ed by t he Depar t ment of t he Ar my:

Shor t - t er m empl oyees ( wor ki ng on s i t e l ess t han or equal t o 6 mont hs) : I f a cr i mi nal hi st or y i s f ound, t he empl oyee MAY not be al l owed t o wor k at t he pr oj ect s i t e at t he sol e di scr et i on of t he Government.

Long- t er m empl oyees ( wor ki ng on s i t e mor e t han 6 mont hs) :

ALL of t he f ol l owi ng i s r equi r ed WHEN REPORTI NG FOR WORK -

a) A compl et ed OMB For m No. 3206- 0182 ( al so desi gnat ed as Opt i onal For m 306) .

b) A compl et ed OMB For m No. 3206- 0191 ( al so desi gnat ed as

SECTI ON 01 10 00. 10 38 Page 3

St andar d For m 85P) .

c) A r esume.

The Gover nment wi l l use al l pr ovi ded i nf or mat i on t o per f or m a Nat i onal Agency Check and I nqui r i es ( NACI ) check and wi l l pay t he r equi r ed f ee.

The Cont r act or shal l be r esponsi bl e f or f ur ni shi ng t o each empl oyee and f or r equi r i ng each empl oyee engaged on t he wor k t o di spl ay such i dent i f i cat i on as may be appr oved and di r ect ed by t he Cont r act i ng Of f i cer or hi s/ her desi gnat ed r epr esent at i ve. Al l pr escr i bed i dent i f i cat i on shal l i mmedi at el y be del i ver ed t o t he Cont r act i ng Of f i cer or hi s/ her desi gnat ed r epr esent at i ve f or cancel l at i on upon t he r el ease of any empl oyee.

( End of Cl ause)

1. 4 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

Li st of Subcont r act or s

Pr ogr ess Char t ; G, A

Qual i t y Cont r ol Pl an; G, A

Cer t i f i cat e of I nsur ance

Wi t hi n 24 hour s of concl usi on of physi cal t est s, 5 copi es of t est r esul t s i ncl udi ng cal i br at i on cur ves and r esul t s of cal i br at i on t est s.

SD- 07 Cer t i f i cat es

Compl et i on of Cor ps CQC Cour se

Let t er Appoi nt i ng Super i nt endent

Qual i f i cat i ons of t he commer ci al t est i ng l abor at or y or Contractor's t est i ng l abor at or y/facilities G, A

1. 5 TI ME EXTENSI ONS FOR UNUSUALLY SEVERE WEATHER

ER 415- 1- 15 dt d 31 OCT 89

( a) Thi s pr ovi s i on speci f i es t he pr ocedur e f or det er mi nat i on of t i me ext ensi ons f or unusual l y sever e weat her i n accor dance wi t h t he cont r act c l ause ent i t l ed " DEFAULT ( FI XED- PRI CE CONSTRUCTI ON) " . I n or der f or t he Cont r act i ng Of f i cer t o awar d a t i me ext ensi on under t hi s c l ause, t he f ol l owi ng condi t i ons must be f ound t o be sat i sf i ed i n t he sol e di scr et i on of t he Cont r act i ng Of f i cer :

( 1) The weat her exper i enced at t he pr oj ect s i t e dur i ng t he

SECTI ON 01 10 00. 10 38 Page 4 cont r act per i od must be f ound t o be unusual l y sever e, t hat i s , mor e sever e t han t he adver se weat her ant i c i pat ed f or t he pr oj ect l ocat i on dur i ng any gi ven mont h.

( 2) The unusual l y sever e weat her must act ual l y cause a del ay t o t he compl et i on of t he pr oj ect . The del ay must be beyond t he cont r ol and wi t hout t he f aul t or negl i gence of t he Cont r act or .

( b) The f ol l owi ng schedul e of mont hl y ant i c i pat ed adver se weat her del ays i s based on Nat i onal Oceani c and At mospher i c Admi ni st r at i on ( NOAA) or s i mi l ar dat a f or t he pr oj ect l ocat i on and wi l l const i t ut e t he base l i ne f or mont hl y weat her t i me eval uat i ons. The Cont r act or ' s pr ogr ess schedul e must r ef l ect t hese ant i c i pat ed adver se weat her del ays i n al l weat her dependent act i v i t i es.

MONTHLY ANTI CI PATED ADVERSE WEATHER DELAY

WORK DAYS BASED ON ( 5) DAY WORK WEEK

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

7 6 8 6 7 6 7 7 5 5 5 5

( c) Upon acknowl edgment of t he Not i ce t o Pr oceed ( NTP) and cont i nui ng t hr oughout t he cont r act , t he Cont r act or wi l l r ecor d on t he dai l y CQC r epor t , t he occur r ence of adver se weat her and r esul t ant i mpact t o nor mal l y schedul ed wor k. Act ual adver se weat her del ay days must pr event wor k on cr i t i cal act i v i t i es f or 50 per cent or mor e of t he Cont r act or ' s schedul ed wor k day.

( d) The number of act ual adver se weat her del ay days shal l i ncl ude days i mpact ed by act ual adver se weat her ( even i f adver se weat her occur r ed i n pr evi ous mont h) , be cal cul at ed chr onol ogi cal l y f r om t he f i r st t o t he l ast day of each mont h, and be r ecor ded as f ul l days. I f t he number of act ual adver se weat her del ay days exceeds t he number of days ant i c i pat ed i n par agr aph ( 2) , above, t he Cont r act i ng Of f i cer wi l l conver t any qual i f y i ng del ays t o cal endar days, gi v i ng f ul l consi der at i on f or equi val ent f ai r weat her wor k days, and i ssue a modi f i cat i on i n accor dance wi t h t he cont r act c l ause ent i t l ed " DEFAULT ( FI XED- PRI CE CONSTRUCTI ON) " .

( End of Cl ause)

1. 6 PERFORMANCE AND PAYMENT BONDS

Each bi dder shal l i ncl ude i n hi s bi d pr emi ums f or per f or mance and payment bonds. Payment shal l be made i n accor dance wi t h t he Cont r act Cl ause ent i t l ed " PAYMENTS UNDER FI XED- PRI CE CONSTRUCTI ON CONTRACTS. " Any addi t i onal amount bi d i n excess of t he act ual bond pr emi um wi l l be i ncl uded i n t he f i nal pay est i mat e f or t hi s cont r act .

( End of Cl ause)

1. 7 WATER CONSERVATI ON

Wat er i s one of our val uabl e nat ur al r esour ces. Accor di ngl y, t he Cont r act or shal l be j udi c i ous i n i t s use i n t he per f or mance of t he wor k as speci f i ed. Wat er needed f or compact i on of r oadway and/ or f oundat i on mat er i al s, and dust cont r ol shal l be obt ai ned f r om uncont r ol l ed st r eam f l ow i nst ead of pot abl e suppl y sour ces t o t he ext ent avai l abl e and sui t abl e as det er mi ned by t he Cont r act i ng Of f i cer or hi s/ her desi gnat ed r epr esent at i ve

SECTI ON 01 10 00. 10 38 Page 5

( End of Cl ause)

* * * AMENDMENT 0001* * *

1. 8 BULLETI N BOARD

Wi t hi n one ( 1) cal endar day af t er commencement of wor k under t hi s cont r act , t he Cont r act or shal l pr ovi de at t he j ob s i t e a weat her pr oof , gl ass- cover ed bul l et i n boar d f or di spl ayi ng t he Fai r Empl oyment post er , wage r at es, post er s and saf et y bul l et i ns as not ed i n Sect i on 01 35 26, par agr aph DI SPLAY OF SAFETY I NFORMATI ON. The Cont r act shal l f ur ni sh one bul l et i n boar d f or each pr oj ect ar ea at a l ocat i on subj ect t o t he appr oval of t he Cont r act i ng Of f i cer or hi s/ her desi gnat ed r epr esent at i ve. The bul l et i n boar d shal l be l ocat ed i n a conspi cuous pl ace, easi l y accessi bl e t o al l empl oyees, and l egi bl e copi es of t he af or ement i oned dat a shal l be di spl ayed unt i l wor k under t he cont r act i s compl et e. No di r ect payment wi l l be made f or t he bul l et i n boar d.

( End of Cl ause)

* * * AMENDMENT 0001* * *

1. 9 WORK PLAN

The Cont r act or shal l submi t a det ai l ed wor k pl an out l i ni ng t he Cont r act or ' s pr oposed met hods f or t he execut i on of al l wor k under t hi s cont r act . The wor k pl an shal l i ncl ude a schedul e t hat i ndi cat es t he ant i c i pat ed t i me f r ame t o accompl i sh each def i nabl e f eat ur e of wor k wi t hi n t he t i me speci f i ed i n t he cont r act . The wor k pl an shal l pr ovi de an over al l pr ogr am f or management of t hi s pr oj ect consi st i ng of t he f ol l owi ng r equi r ed pl ans:

a. The speci f i c r esour ces and equi pment pr oposed f or each def i nabl e f eat ur e of const r uct i on r equi r ed by t he cont r act . The Cont r act or shal l descr i be and document al l equi pment pr oposed t o demonst r at e abi l i t y t o per f or m t he wor k i n accor dance wi t h t he pr oposed schedul e.

b. An acci dent pr event i on pl an ( APP) as r equi r ed i n Sect i on 01 35 26 of t he speci f i cat i ons.

The of f er ed per f or mance schedul e wi l l be i ncor por at ed i nt o t he cont r act and wi l l become t he r equi r ed per f or mance per i od f or al l cont r act pur poses i ncl udi ng assessment of l i qui dat ed damages.

1. 10 RETAI NAGE FOR UNTI MELY SUBMI SSI ON OF SUBCONTRACTI NG REPORTS

( a) I n accor dance wi t h Cont r act Cl ause 52. 219- 9, Smal l Busi ness Subcont r act i ng Pl an, and 52. 219- 16, Li qui dat ed Damages - Subcont r act i ng Pl an, r et ai nage wi l l be wi t hhel d f r om pr ogr ess payment s i n an amount suf f i c i ent t o pr ot ect t he Gover nment ' s abi l i t y t o assess l i qui dat ed damages i n accor dance wi t h Cl ause 52. 219- 16 f or t he Cont r act or ' s f ai l ur e t o t i mel y submi t St andar d For m 294, Subcont r act i ng Repor t f or I ndi v i dual Cont r act s, and St andar d For m 295, Summar y Subcont r act Repor t , r epor t s.

( b) The r et ai nage wi l l be det er mi ned i n accor dance wi t h t he f ol l owi ng f or mul a:

Tot al dol l ar amount f or subcont r act i ng t o smal l busi ness mul t i pl i ed by per cent age of act ual pr ogr ess on t he cont r act shal l be wi t hhel d f r om t he next pr ogr ess payment due af t er t he Cont r act or f ai l s t o submi t a r equi r ed r epor t . I f one or mor e r epor t s have been submi t t ed bef or e such f ai l ur e, SECTI ON 01 10 00. 10 38 Page 6 f or mul a f or det er mi ni ng t he amount of r et ai nage wi l l be adj ust ed by deduct i ng any amount s r epor t ed as subcont r act ed t o smal l busi ness f r om t he t ot al dol l ar amount pr oposed t o be subcont r act ed and t he di f f er ence mul t i pl i ed by t he per cent age of act ual pr ogr ess.

( c) Subcont r act i ng pl ans ar e not r equi r ed- -

( 1) For cont r act s or cont r act modi f i cat i ons t hat wi l l be per f or med ent i r el y out s i de of any St at e, t er r i t or y, or possessi on of t he Uni t ed St at es, t he Di st r i c t of Col umbi a, and t he Commonweal t h of Puer t o Ri co; or

( 2) For modi f i cat i ons t o cont r act s t hat do not cont ai n t he c l ause 52. 219- 8, Ut i l i zat i on of Smal l Busi ness Concer ns ( or equi val ent pr i or DAR, FPR, or NASA cl auses) ; e. g. , cont r act s awar ded bef or e Pub. L.

95- 507 and whi ch ar e wi t hi n t he scope of t he cont r act .

( End of Cl ause)

1. 11 SAMPLI NG, CERTI FI CATES, AND TESTI NG

( a) Gener al . Wi t hi n 30 days af t er acknowl edgment of Not i ce t o Pr oceed, t he Cont r act or shal l submi t t o t he Cont r act i ng Of f i cer or hi s/ her desi gnat ed r epr esent at i ve f i ve ( 5) copi es of a l i s t of t he i t ems f or whi ch he pr oposes t o f ur ni sh manuf act ur er ' s cer t i f i cat es and/ or sampl es f or i nspect i on and t est i ng. The l i s t shal l i ncl ude, but i s not l i mi t ed t o t he f ol l owi ng i nf or mat i on:

( 1) Name of i t em

( 2) Speci f i cat i on par agr aph cover i ng t hi s i t em

( 3) Dat e sampl e wi l l be f ur ni shed

( 4) Del i ver y dat e of pr oduct

( 5) I t ems f or whi ch a cer t i f i cat e wi l l be f ur ni shed

( b) Submi t t al s. Any pr oduct or i t em ment i oned i n t hese speci f i cat i ons and r equi r ed t o meet Feder al , ASTM, AASHTO, U. S. Ar my or Navy, AREMA, AWWA, and UL Speci f i cat i ons or Codes, speci f i ed her ei n wi t h cer t ai n l i mi t i ng or qual i f y i ng r equi r ement s, or any pr oduct or i t em whi ch i s r equi r ed t o be s i mi l ar and equal t o a speci f i ed pr oduct or i t em may r equi r e t he submi ssi on, bef or e del i ver y of t he pr oduct or i t em t o t he j ob s i t e, of one or mor e of t he f ol l owi ng:

( 1) Cer t i f i cat e by t he manuf act ur er t hat t he i t em meet s t he cont r act r equi r ement s.

( 2) Sampl es f or i nspect i on, compar i son, and t est i ng, i ncl udi ng dest r uct i ve t est s.

( c) Sampl e del i ver y. Unl ess ot her wi se speci f i ed or aut hor i zed, al l sampl es shal l be del i ver ed ( wi t hout cost t o t he Gover nment ) t o:

U. S. Ar my Engi neer Di st r i c t , Wi l mi ngt on Cor ps of Engi neer s ATTENTI ON: Ci v i l Const r uct i on Sect i on 69 Dar l i ngt on Avenue

SECTI ON 01 10 00. 10 38 Page 7

Wi l mi ngt on, Nor t h Car ol i na 28403

I f r equi r ed by t he Cont r act i ng Of f i cer or hi s/ her desi gnat ed r epr esent at i ve, dupl i cat e sampl es shal l be shi pped t o t he Wi l mi ngt on Di st r i c t Of f i ce at no expense t o t he Gover nment .

( d) Test i ng. Al l t est s r equi r ed i n t he Techni cal Pr ovi s i ons shal l be made by and at t he expense of t he Cont r act or except t hose mat er i al t est s speci f i cal l y excl uded whi ch wi l l be made by and at t he expense of t he Gover nment . Al l i nst r ument s and per sonnel r equi r ed f or t he r equi r ed t est s shal l be f ur ni shed by t he Cont r act or . The Gover nment r eser ves t he r i ght t o i nt er r upt t he wor k t o make t est s on al l f acet s of concr et i ng and ot her oper at i ons. These t est s wi l l be made as necessar y t o i nsur e conf or mance t o appl i cabl e speci f i cat i ons and dr awi ngs and wi l l be made by and at t he expense of t he Gover nment except Cont r act or sampl i ng suppor t as r equi r ed by t he Techni cal Pr ovi s i ons. I n t hose i nst ances wher e t est i ng i s speci f i ed t o be made at t he Gover nment ' s expense, t he cost of t he i ni t i al t est i ng wi l l be at t he Gover nment ' s expense; however , any r et est i ng due t o f ai l ur e of t he mat er i al s t o meet t he r equi r ement s i n t he i ni t i al t est shal l be per f or med at t he Cont r act or ' s expense. The r et est s shal l be made at l abor at or i es appr oved by t he Cont r act i ng Of f i cer or hi s/ her desi gnat ed r epr esent at i ve. The cost s of r et est s made at Gover nment l abor at or i es wi l l be deduct ed f r om t he t ot al amount due t he Cont r act or , at act ual cost t o t he Gover nment , unl ess ot her wi se speci f i ed.

( End of Cl ause)

1. 12 CERTI FI CATES OF COMPLI ANCE

( l 969 MAY OCE)

Any cer t i f i cat es r equi r ed f or demonst r at i ng pr oof of compl i ance of mat er i al s wi t h speci f i cat i on r equi r ement s shal l be execut ed i n 3 copi es.

Each cer t i f i cat e shal l be s i gned by an of f i c i al aut hor i zed t o cer t i f y i n behal f of t he manuf act ur i ng company and shal l cont ai n t he name and addr ess of t he Cont r act or , t he pr oj ect name and l ocat i on, and t he quant i t y and dat e or dat es of shi pment or del i ver y t o whi ch t he cer t i f i cat es appl y. Copi es of l abor at or y t est r epor t s submi t t ed wi t h cer t i f i cat es shal l cont ai n t he name and addr ess of t he t est i ng l abor at or y and t he dat e or dat es of t he t est s t o whi ch t he r epor t appl i es. Cer t i f i cat i on shal l not be const r ued as r el i evi ng t he Cont r act or f r om f ur ni shi ng sat i sf act or y mat er i al , i f , af t er t est s ar e per f or med on sel ect ed sampl es, t he mat er i al i s f ound not t o meet t he speci f i c r equi r ement s.

( End of Cl ause)

1. 13 CONTRACTOR- PREPARED NETWORK ANALYSI S SYSTEM

( APR 1968)

The pr ogr ess char t t o be pr epar ed by t he Cont r act or pur suant t o t he Cont r act Cl ause ent i t l ed " SCHEDULES FOR CONSTRUCTI ON CONTRACTS" shal l consi st of a net wor k anal ysi s syst em as descr i bed bel ow. I n pr epar i ng t hi s syst em t he schedul i ng of const r uct i on i s t he r esponsi bi l i t y of t he Cont r act or . The r equi r ement f or t he syst em i s i nc l uded t o assur e adequat e pl anni ng and execut i on of t he wor k and t o assi st t he Cont r act i ng Of f i cer or hi s/ her desi gnat ed r epr esent at i ve i n appr ai s i ng t he r easonabl eness of t he pr oposed schedul e and eval uat i ng pr ogr ess of t he wor k.

( a) An exampl e of one of t he numer ous accept abl e t ypes of net wor k and anal ysi s syst ems i s shown i n Appendi x A of t he Cor ps of Engi neer s

SECTI ON 01 10 00. 10 38 Page 8

Regulation ER 1- 1- 11, s i ngl e copi es of whi ch ar e avai l abl e t o bona f i de bi dder s on r equest . Ot her syst ems whi ch ar e desi gned t o ser ve t he same pur pose and empl oy t he same basi c pr i nci pl es as ar e i l l ust r at ed i n Appendi x A wi l l be accept ed subj ect t o t he appr oval of t he Cont r act i ng Of f i cer or hi s/ her desi gnat ed r epr esent at i ve.

( b) The syst em shal l consi st of di agr ams and accompanyi ng mat hemat i cal anal yses. The di agr ams shal l show el ement s of t he pr oj ect i n det ai l and t he ent i r e pr oj ect i n summar y.

( 1) Di agr ams shal l show t he or der and i nt er dependence of act i v i t i es and t he sequence i n whi ch t he wor k i s t o be accompl i shed as pl anned by t he Cont r act or . The basi c concept of a net wor k anal ysi s di agr am wi l l be f ol l owed t o show how t he st ar t of a gi ven act i v i t y i s dependent on t he compl et i on of pr ecedi ng act i v i t i es and i t s compl et i on r est r i c t s t he st ar t of f ol l owi ng act i v i t i es.

( 2) Det ai l ed net wor k act i v i t i es shown on a det ai l ed or sub- net wor k di agr am shal l i ncl ude, i n addi t i on t o const r uct i on act i v i t i es, t he submi t t al and appr oval of sampl es of mat er i al s and shop dr awi ngs, t he pr ocur ement of cr i t i cal mat er i al s and equi pment , f abr i cat i on of speci al mat er i al and equi pment and t hei r i nst al l at i on and t est i ng. Al l act i v i t i es of t he Gover nment t hat af f ect pr ogr ess, and cont r act r equi r ed dat es f or compl et i on of al l or par t s of t he wor k wi l l be shown. The det ai l of i nf or mat i on shal l be such t hat dur at i on t i mes of act i v i t i es wi l l r ange f r om t hr ee ( 3) t o t hi r t y ( 30) days wi t h not over t wo per cent ( 2%) of t he act i v i t i es exceedi ng t hese l i mi t s. The act i v i t i es whi ch compr i se t he f ol l owi ng separ at e bui l di ngs and f eat ur es shal l be separ at el y i dent i f i abl e by codi ng or use of sub- net wor ks or bot h:

Bui l di ng or f eat ur e Mi ni mum number of act i v i t i es

The sel ect i on and number of act i v i t i es shal l be subj ect t o t he Cont r act i ng Of f i cer or hi s/ her desi gnat ed r epr esent at i ve' s appr oval . Det ai l ed net wor ks, when summar y net wor ks ar e al so f ur ni shed, need not be t i me scal ed but shal l be dr af t ed t o show a cont i nuous f l ow f r om l ef t t o r i ght wi t h no ar r ows f r om r i ght t o l ef t . The f ol l owi ng i nf or mat i on shal l be shown on t he di agr ams f or each act i v i t y: pr ecedi ng and f ol l owi ng event number s, descr i pt i on of t he act i v i t y, cost , and act i v i t y dur at i on.

( 3) Summar y Net wor k. I f t he pr oj ect i s of such s i ze t hat t he ent i r e net wor k cannot be r eadi l y shown on a s i ngl e sheet , a summar y net wor k di agr am shal l be pr ovi ded. The summar y net wor k di agr am shal l consi st of a mi ni mum of f i f t y act i v i t i es and a maxi mum of one hundr ed and f i f t y act i v i t i es, and shal l be based on and suppor t ed by det ai l ed di agr ams.

Rel at ed act i v i t i es shal l be gr ouped on t he net wor k. The cr i t i cal pat h shal l be pl ot t ed gener al l y al ong t he cent er of t he sheet wi t h channel s wi t h i ncr easi ng f l oat pl aced t owar ds t he t op or bot t om. The summar y net wor k shal l be t i me scal ed usi ng uni t s of appr oxi mat el y one- hal f i nch equal s one week or ot her sui t abl e scal e appr oved by t he Cont r act i ng Of f i cer or hi s/ her desi gnat ed r epr esent at i ve. Weekends and hol i days shal l be i ndi cat ed.

Wher e s l ack exi st s, t he act i v i t i es shal l be shown at t he t i me when t hey ar e schedul ed t o be accompl i shed.

( 4) The mat hemat i cal anal ysi s of t he net wor k di agr am shal l i ncl ude a t abul at i on of each act i v i t y shown on t he det ai l ed net wor k di agr ams. The f ol l owi ng i nf or mat i on wi l l be f ur ni shed as a mi ni mum f or each act i v i t y:

SECTI ON 01 10 00. 10 38 Page 9

( i ) pr ecedi ng and f ol l owi ng event number s ( number s shal l be sel ect ed and assi gned so as t o per mi t i dent i f i cat i on of t he act i v i t i es wi t h bi d i t ems) ;

( i i ) act i v i t y descr i pt i on;

( i i i ) est i mat ed dur at i on of act i v i t i es ( t he best est i mat e avai l abl e at t i me of comput at i on) ;

( i v) ear l i est s t ar t dat e ( by cal endar dat e) ;

( v) ear l i est f i ni sh dat e ( by cal endar dat e) ;

( v i ) schedul ed or act ual st ar t dat e ( by cal endar dat e) ;

( v i i ) schedul ed or act ual f i ni sh dat e ( by cal endar dat e) ;

( v i i i ) l at est st ar t dat e ( by cal endar dat e) ;

( i x) l at est f i ni sh dat e ( by cal endar dat e) ;

( x) s l ack or f l oat ;

( x i ) monet ar y val ue of act i v i t y;

( x i i ) r esponsi bi l i t y f or act i v i t y ( Pr i me Cont r act or , subcont r act or s, suppl i er s, Gover nment , et c. ) ;

( x i i i ) manpower r equi r ed;

( x i v) per cent age of act i v i t y compl et ed;

( xv) Cont r act or ' s ear ni ngs based on por t i on of act i v i t y compl et ed; and

( xvi ) bi d i t em of whi ch act i v i t y i s a par t .

( 5) The pr ogr am or means used i n maki ng t he mat hemat i cal comput at i on shal l be capabl e of compi l i ng t he t ot al val ue of compl et ed and par t i al l y compl et ed act i v i t i es and subt ot al s f r om separ at e bui l di ngs or f eat ur e l i s t ed i n par agr aph ( b) ( 2) .

( 6) I n addi t i on t o t he t abul at i on of act i v i t i es, t he comput at i on wi l l i nc l ude t he f ol l owi ng dat a:

( i ) i dent i f i cat i on of act i v i t i es whi ch ar e pl anned t o be expedi t ed by use of over t i me or doubl e shi f t s t o be wor ked i ncl udi ng Sat ur days, Sundays and hol i days;

( i i ) on- si t e manpower l oadi ng schedul e;

( i i i ) a descr i pt i on of t he maj or i t ems of const r uct i on equi pment pl anned f or oper at i ons of t he pr oj ect . ( The descr i pt i on shal l i ncl ude t he t ype, number of uni t s and uni t capaci t i es. A schedul e showi ng pr oposed t i me equi pment wi l l be on t he j ob keyed t o act i v i t i es on whi ch equi pment wi l l be used shal l be pr ovi ded) ; and

( i v) wher e por t i ons of t he wor k ar e t o be pai d by uni t

SECTI ON 01 10 00. 10 38 Page 10 cost s, t he est i mat ed number of uni t s i n an act i v i t y whi ch was used i n devel opi ng t he t ot al act i v i t y cost .

( 7) The anal ysi s shal l l i s t t he act i v i t i es i n sor t s or gr oups as f ol l ows:

( i ) by t he pr ecedi ng event number f r om l owest t o hi ghest and t hen i n t he or der of t he f ol l owi ng event number ;

( i i ) by t he amount of s l ack, t hen i n or der of pr ecedi ng event number ;

( i i i ) by r esponsi bi l i t y i n or der of ear l i est al l owabl e st ar t dat es; and

( i v) i n or der of l at est al l owabl e st ar t dat es, t hen i n or der of pr ecedi ng event number s, and t hen i n or der of succeedi ng event numbers.

( c) Submi ssi on and appr oval of t he syst em shal l be as f ol l ows:

( 1) A pr el i mi nar y net wor k def i ni ng t he Cont r act or ' s pl anned oper at i ons dur i ng t he f i r st s i xt y ( 60) cal endar days af t er r ecei pt of Not i ce t o Pr oceed wi l l be submi t t ed wi t hi n t en ( 10) days. The Cont r act or ' s gener al appr oach f or t he bal ance of t he pr oj ect shal l be i ndi cat ed. Cost of act i v i t i es expect ed t o be compl et ed or par t i al l y compl et ed bef or e submi ssi on and appr oval of t he whol e schedul e shoul d be i ncl uded.

( 2) The compl et e net wor k anal ysi s consi st i ng of t he det ai l ed net wor k mat hemat i cal anal ysi s ( on- si t e manpower l oadi ng schedul e, equi pment schedul e) and net wor k di agr ams shal l be submi t t ed wi t hi n f or t y ( 40) cal endar days af t er r ecei pt of Not i ce t o Pr oceed.

( d) The Cont r act or shal l par t i c i pat e i n a r evi ew and eval uat i on of t he pr oposed net wor k di agr ams and anal ysi s by t he Cont r act i ng Of f i cer or hi s/ her desi gnat ed r epr esent at i ve. Any r evi s i ons necessar y as a r esul t of t hi s r evi ew shal l be r esubmi t t ed f or appr oval of t he Cont r act i ng Of f i cer or hi s/ her desi gnat ed r epr esent at i ve wi t hi n t en ( 10) cal endar days af t er t he conf er ence. The appr oved schedul e shal l t hen be t he schedul e t o be used by t he Cont r act or f or pl anni ng, or gani z i ng and di r ect i ng t he wor k and f or r epor t i ng pr ogr ess. I f t he Cont r act or t her eaf t er desi r es t o make changes i n hi s met hod of oper at i ng and schedul i ng he shal l not i f y t he Cont r act i ng Of f i cer or hi s/ her desi gnat ed r epr esent at i ve i n wr i t i ng st at i ng t he r easons f or t he change. I f t he Cont r act i ng Of f i cer or hi s / her desi gnat ed r epr esent at i ve consi der s t hese changes t o be of a maj or nat ur e he may r equi r e t he Cont r act or t o r evi se and submi t f or appr oval , wi t hout addi t i onal cost t o t he Gover nment , al l or t he af f ect ed por t i on of t he det ai l ed di agr ams and mat hemat i cal anal ysi s and t he summar y di agr am t o show t he ef f ect on t he ent i r e pr oj ect . A change may be consi der ed of a maj or nat ur e i f t he t i me est i mat ed t o be r equi r ed or act ual l y used f or an act i v i t y or t he l ogi c of sequence of act i v i t i es i s var i ed f r om t he or i gi nal pl an t o a degr ee t hat t her e i s a r easonabl e doubt as t o t he ef f ect on t he cont r act compl et i on dat e or dat es. Changes whi ch af f ect act i v i t i es wi t h adequat e s l ack t i me shal l be consi der ed as mi nor changes, except t hat an accumul at i on of mi nor changes may be consi der ed a maj or change when t hei r cumul at i ve ef f ect mi ght af f ect t he cont r act compl et i on dat e.

( e) The Cont r act or shal l submi t at i nt er val s of f i f t een ( 15) cal endar days a r epor t of t he act ual const r uct i on pr ogr ess by updat i ng t he

SECTI ON 01 10 00. 10 38 Page 11 mat hemat i cal anal yses. Revi s i ons causi ng changes i n t he det ai l ed net wor k shal l be not ed on t he summar y net wor k, or a r evi sed i ssue of af f ect ed por t i ons of t he det ai l ed net wor k f ur ni shed. The summar y net wor k shal l be r evi sed as necessar y f or t he sake of c l ar i t y . However , onl y t he i ni t i al submi ssi on or compl et ed r evi s i ons need be t i me scal ed. Subsequent mi nor r evi s i ons need not be t i me scal ed.

( f ) The r epor t shal l show t he act i v i t i es or por t i ons of act i v i t i es compl et ed dur i ng t he r epor t i ng per i od and t hei r t ot al val ue as basi s f or t he Cont r act or ' s per i odi c r equest f or payment . Payment made pur suant t o t he Cont r act Cl ause ent i t l ed " PAYMENTS UNDER FI XED- PRI CE CONSTRUCTI ON CONTRACTS" wi l l be based on t he t ot al val ue of such act i v i t i es compl et ed or par t i al l y compl et ed af t er ver i f i cat i on by t he Cont r act i ng Of f i cer or hi s/ her desi gnat ed r epr esent at i ve. The r epor t wi l l s t at e t he per cent age of t he wor k act ual l y compl et ed and schedul ed as of t he r epor t dat e and t he pr ogr ess al ong t he cr i t i cal pat h i n t er ms of days ahead or behi nd t he al l owabl e dat es. I f t he pr oj ect i s behi nd schedul e, pr ogr ess al ong ot her pat hs wi t h negat i ve s l ack shal l al so be r epor t ed.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.