Questions.pdf

PDF 47 KB Posted

Attached to
W. Kerr Scott Gate Hoist
Solicitation number
W912PM-18-T-0105
Issued by

About this file

Questions

View the file

Other files

File Type Posted
Stop_Log.jpg JPG image
Questions-_Round_2.pdf PDF
Hoist_Details_Attachment_1.pdf PDF
Current_Hoist.jpg JPG image
A2_SOW_-_Hoist.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q1. Is this a replacement hoist that was mounted on the 6-inch beam?

Response: YES

Q2. What are the dimensions on the beam? Including the depth (top to bottom). We’ll need to know the dimensions so that the trolley will fit.

Response: Per calculations and drawings, beam is S 18 x 54.7 See Current Hoist image attached

Q3 If this is a Monorail, it need to get the centers of support for beam.

Response: see attached hoist details

Q4. Please supply pictures and dimensions of the beam and surroundings.

Response: See hoist details (Attachment 1) and image attached

Q5. We’re assuming that the Corps will install the hoist. Is that correct?

Response: Yes

Q6. It will be supplied via truck. Can the Corps unload the hoist off the truck (i.e. FOB)?

Response: To be unloaded by the contractor

Q7. Are we to supply the 3 Phase fused safety switch and contractors that connect to the electrical connection wire?

Response: Yes, the requirement should be ready to install (hoist and controls) upon delivery

File details come from the government source that posted it.