Questions.pdf
PDF 47 KB Posted
- Attached to
- W. Kerr Scott Gate Hoist Federal contract opportunity
- Solicitation number
- W912PM-18-T-0105
About this file
Questions
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions-_Round_2.pdf | ||
| Stop_Log.jpg | JPG image | |
| Hoist_Details_Attachment_1.pdf | ||
| Current_Hoist.jpg | JPG image | |
| A2_SOW_-_Hoist.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q1. Is this a replacement hoist that was mounted on the 6-inch beam?
Response: YES
Q2. What are the dimensions on the beam? Including the depth (top to bottom). We’ll need to know the dimensions so that the trolley will fit.
Response: Per calculations and drawings, beam is S 18 x 54.7 See Current Hoist image attached
Q3 If this is a Monorail, it need to get the centers of support for beam.
Response: see attached hoist details
Q4. Please supply pictures and dimensions of the beam and surroundings.
Response: See hoist details (Attachment 1) and image attached
Q5. We’re assuming that the Corps will install the hoist. Is that correct?
Response: Yes
Q6. It will be supplied via truck. Can the Corps unload the hoist off the truck (i.e. FOB)?
Response: To be unloaded by the contractor
Q7. Are we to supply the 3 Phase fused safety switch and contractors that connect to the electrical connection wire?
Response: Yes, the requirement should be ready to install (hoist and controls) upon delivery