Figure 1. Plan view of Falls Dam.

Conduit

Fishing Pier

Joint C7/C8, seepage noticed during inspection on the south side approximately 1 foot above conduit floor.

Figure 2. Conduit cross sections and joint location in dam.

The seepage is located at a transition point between two section forms.

Approximate elevation of seepage point in the conduit.

The seepage occurs at joint C7-C8 and is approximately 1 foot up the wall from the lowest point in the conduit.

The material here could be either Zone 2, 3 or 6 material.

Figure 3. Typical embankment section.

Approximate location of joint C7-C8.

Seepage is possibly through Zone 2 material.

Figure 4. Typical embankment section on abutment.

Figure 5. Soil cover and flow at joint C-7/ C-8.

Joint C-7/C-8.

Figure 6. Falls stilling basin from the conduit.

Figure 7. Entrance to conduit through the stilling basin.

Figure 8. Fishing pier and boat access area.

Figures Combined 4
Figures_GPR Contract 2017
Seepage Details
Slide Number 1
Slide Number 2
Slide Number 3
Slide Number 4

Photos to be added to FALLS Conduit Repair 8- 2017