A2_-_Figures_for_Fall_GPR.pdf
PDF 3 MB Posted
- Attached to
- Falls Lake - Ground Penetrating Radar
- Solicitation number
- W912PM-18-T-0033
About this file
Figures/Photos for Falls Lake Ground Penetrating Radar requirement.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Figure 1. Plan view of Falls Dam.
Conduit
Fishing Pier
Joint C7/C8, seepage noticed during inspection on the south side approximately 1 foot above conduit floor.
Figure 2. Conduit cross sections and joint location in dam.
The seepage is located at a transition point between two section forms.
Approximate elevation of seepage point in the conduit.
The seepage occurs at joint C7-C8 and is approximately 1 foot up the wall from the lowest point in the conduit.
The material here could be either Zone 2, 3 or 6 material.
Figure 3. Typical embankment section.
Approximate location of joint C7-C8.
Seepage is possibly through Zone 2 material.
Figure 4. Typical embankment section on abutment.
Figure 5. Soil cover and flow at joint C-7/ C-8.
Joint C-7/C-8.
Figure 6. Falls stilling basin from the conduit.
Figure 7. Entrance to conduit through the stilling basin.
Figure 8. Fishing pier and boat access area.
| Figures Combined 4 |
| Figures_GPR Contract 2017 |
| Seepage Details |
| Slide Number 1 |
| Slide Number 2 |
| Slide Number 3 |
| Slide Number 4 |
Photos to be added to FALLS Conduit Repair 8- 2017