PN85958_RTA_PLANS.pdf
PDF 38 MB Posted
- Attached to
- PN 85958 SOF Combat Medical Training Facility, Ft Bragg, NC Federal contract opportunity
- Solicitation number
- W912PM17R0021
About this file
PLANS
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A21.)_W912PM17R0021Amendment_0003_CC.PDF | ||
| A21.)_W912PM17R0021Amendment_0003.pdf | ||
| BVG_TS101_TS101_AMD-0003_2018-01-29.pdf | ||
| SOF_CMTF_Amendment_0002_DGNfiles.zip | ZIP file | |
| Amendment_0002.pdf | ||
| SOF_CMTF_Amendment_0002_PLANS.pdf | ||
| A21.)_Appendix_A,_Example_3_Key_Personnel_Resume_Experience.pdf | ||
| 912PM17R0021Amendment_0002_ConformedCopy.PDF | ||
| A21.)_W912PM17R0021Amendment_0001.pdf | ||
| A21.)_W912PM17R0021Amendment_0001_Conformed_Copy.pdf | ||
| Site_Visit_Sign-In.pdf | ||
| Ft_Bragg_SOF_CMTF_Specs_Vol_1of3.pdf | ||
| Ft_Bragg_SOF_CMTF_Specs_Vol_2of3.pdf | ||
| Ft_Bragg_SOF_CMTF_Specs_Vol_3of3.pdf | ||
| PN85958_RTA_DGNfiles.zip | ZIP file | |
| Appendix_A,_Eamples.zip | ZIP file |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C O
V E
R S
H E
E T
ISSUE DATE:
of Engineers
US Army Corps
Wilmington District
F
IL
E N
A M
E
D R
A W
IN
G C
O D
E
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S U
B M
IT
T E
D B
Y
D A
T E
C H
E C
K E
D B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
"x
S
IZ
E
FORT BRAGG, NORTH CAROLINA
J
M
IT
C H
E L L
J
M
IT
C H
E L L
N /A
W
IL
M
IN
G T
O N
N O
R T
H C
A R
O L
IN
A
D
A R
L
IN
G T
O N A
V E
N U
E W
IL
M
IN
G T
O N D
IS
T R
IC
T U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
G-001
P N
A d v C o v e r.
d g n
D E
C E
M B
E R
T B
D C
O N
T R
A C
T N o
W P
M
R
R F P N o
F E
S C
L U
S A
O F
R E
E M
A N
F O
R T B
R A
G G
N O
R T
H C
A R
O L
IN
A P
N
S O
F C
O M
B A
T M
E D
IC
T
R A
IN
IN
G F
A C
IL
IT
Y
CONTRACT No.: TBD
RFP No.: W912PM17R0021
DECEMBER 2017
SOF COMBAT MEDIC TRAINING FACILITY
PN 85958
US Army Corps of Engineers ®
FORT BRAGG, NORTH CAROLINA
DEVELOP REQUEST FOR PROPOSAL FOR THE
SOF COMBAT MEDIC TRAINING FACILITY; PN85958
SOLICITATION NO.:
CONTRACT NO.: TBD
VOLUME 1 OF 1
ISSUE DATE: 7 NOVEMBER 2017
Wilmington District
205 MICHIGAN AVE,
SUITE 3800
CHICAGO, IL 60601
T:312.616.7500 www.expfederal.com proj no: CHI-00236854-A0
SIGNATURES AFFIXED BELOW INDICATE OFFICIAL RECOMMENDATION AND
APPROVAL OF ALL DRAWINGS IN THIS SET AS INDEXED ON SHEET G-101.
Reviewed By: *
Quality Control DATE
Approval Recommended: *
PE/RA DATE
Approved: *
A-E Director DATE
* THIS PROJECT WAS DESIGNED BY EXP FEDERAL INC. INDIVIDUALS
WHOSE SIGNATURES AND REGISTRATION DESIGNATIONS APPEAR ON
THESE DOCUMENTS ARE OPERATING WITHIN THE SCOPE OF THEIR
EMPLOYMENT. SIGNATURES ARE REQUIRED BY ER 1110-1-8152
G-001
G E
N E
R A
L
C O
V E
R S
H E
E T
K S
K S
P Z
K S
B V
G G
-0
.D G
N A
N S
I D
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E
D A
T E
N
O V
E M
B E
R
T B
D
SHEET ID
READY TO ADVERTISE
F
IL
E N
A M
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
S O
L
IC
IT
A
T
IO
N N
O
D E
S
IG
N E
D B
Y
A
M A
R K
S
IZ
E
S U
B M
IT
T
E D
B Y
D A
T E
C O
N T
R A
C T
N O
US Army Corps of Engineers
C A
T E
G O
R Y
C O
D E
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
W
IL
M
IN
G O
T N
D
IS
T R
IC
T
D E
S C
R
IP
T
IO
N
M
IC
H
IG
A
N A
V E
S
U
IT
E
C H
IC
A
G O
T :3
.6
.7 w w w .e x p fe d e ra l.
c o m p ro j n o c h i-
-A
D A
R L
IN
G
T O
N A
V E
N U
E
W
IL
M
IN
G T
O N
N
O R
T H
C A
R O
L
IN
A
-3
-0
F O
R T
B R
A G
G
N O
R T
H C
A R
O L
IN
A D
E V
E L
O P
R E
Q U
E S
T F
O R
P R
O P
O S
A L F
O R
P N
S O
F C
O M
B A
T M
E D
IC
T
R A
IN
IN
G F
A C
IL
IT
Y
FOR OFFICIAL USE ONLY (FOUO)
FOR OFFICIAL USE ONLY (FOUO)
F O
R O
F F
IC
IA
L U
S E
O N
L Y
F
O U
O
F O
R O
F F
IC
IA
L U
S E
O N
L Y
F
O U
O
11/7/2017
11/7/2017
11/7/2017W912PM17R0021
W
2P M
R
2P M
R
CONSTRUCTION GENERAL NOTES:
PUBLIC SAFETY: IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE COMPLETE AND SAFE
SEPARATION BETWEEN THE PUBLIC AND THE CONSTRUCTION, COORDINATE ALL ACCESS REQUIREMENTS
WITH THE GOVERNMENT.
SECURITY - PHOTOS: IT IS A CRIME UNDER 18 USC 795 TO PHOTOGRAPH DEFENSE INSTALLATIONS
WITHOUT FIRST OBTAINING THE PERMISSION OF THE COMMANDING OFFICER OF THE MILITARY
INSTALLATION. IT IS ALSO A CRIME UNDER 18 USC 797 TO REPRODUCE, PUBLISH, SELL OR GIVE AWAY ANY
PHOTOGRAPH, PICTURE OR GRAPHIC REPRESENTATION OF A DEFENSE INSTALLATION WITHOUT FIRST
OBTAINING THE PERMISSION OF THE COMMANDING OFFICER OF THE MILITARY INSTALLATION.
THE INSTALLATION IS DESIGNATED AS A RESTRICTED AREA. RESTRICTING AREA POSTING RESTRICTS
PERSONS GAINING ACCESS TO MILITARY INSTALLATION FROM CONDUCTING IMAGERY SURVEILLANCE.
PHOTOGRAPHY AND VIDEO RECORDING WITHOUT THE INSTALLATION COMMANDER'S CONSENT.
THE INTRODUCTION OF WEAPONS, AMMUNITION, EXPLOSIVES OR OTHER PROHIBITED ITEMS AND
PHOTOGRAPHY OF THE FACILITIES IS PROHIBITED WITHOUT SPECIFIC AUTHORIZATION FROM THE
COMMANDER.
LIFTS: CONTRACTOR SHALL PROVIDE ACCESS AND THE MEANS AND EQUIPMENT OPERATOR FOR LIFT TO
REACH ALL PROJECT AREAS DURING THE DETERMINATION OF THE PUNCH LIST AND FOR THE INSPECTION
OF THE EXECUTION OF THE PUNCH LIST.
CODE COMPLIANCE: ALL WORK SHALL COMPLY WITH ALL APPLICABLE CODES, ORDINANCES, RULES, REGULATIONS, ORDERS AND OTHER LEGAL REQUIREMENTS OF PUBLIC AUTHORITIES WHICH BEAR ON
PERFORMANCE OF THE WORK. REFER TO CODE REQUIREMENTS ON SHEET GI101.
CONDUCT: WHILE IN OR ABOUT THE BUILDING, ALL TRADESPERSONS SHALL PERFORM IN A DIGNIFIED, QUIET, COURTEOUS AND PROFESSIONAL MANNER AT ALL TIMES. TRADESPERSONS SHALL WEAR CLOTHING
SUITABLE FOR THEIR WORK AND SHALL REMAIN FULLY ATTIRED AT ALL TIMES.
• THE GOVERNMENT RESERVES THE RIGHT TO REMOVE ANYONE WHO IS CAUSING A DISTURBANCE TO
ANY OCCUPANT OF THE BUILDING OR ANY OTHER PERSON USING OR SERVICING THE BUILDING; IS
INTERFERING WITH THE WORK OF OTHERS; OR IS ANY WAY DISPLAYING CONDUCT OR PERFORMANCE
NOT COMPATIBLE WITH THE GOVERNMENT’S STANDARDS.
• THE PLAYING OF RADIOS IN ANY SPACE IS STRICTLY FORBIDDEN. ANY TRADESPERSON FOUND
PLAYING A RADIO WILL BE ASKED TO TURN IT OFF OR REMOVE IT FROM THE PREMISES.
• SMOKING IS PROHIBITED IN ANY OF THE BUILDINGS.
NO TRADESPERSONS WILL BE PERMITTED TO ENTER ANY PRIVATE OR PUBLIC SPACE IN THE BUILDING, OTHER THAN THE WORK AREA OR COMMON AREAS OF THE BUILDING NECESSARY TO GIVE DIRECT ACCESS
TO THE PREMISES, WITHOUT THE PRIOR APPROVAL OF THE GOVERNMENT.
STORAGE AND PLACEMENT: ALL CONSTRUCTION MATERIALS SHALL BE STORED ONLY IN THE PREMISES OF
THE CONSTRUCTION LIMITS. NO STORAGE OF MATERIALS WILL BE PERMITTED IN ANY PUBLIC AREAS, LOADING DOCKS OR CORRIDORS LEADING TO THE PREMISES.
NO FLAMMABLE, TOXIC, OR OTHERWISE HAZARDOUS MATERIALS MAY BE BROUGHT IN OR ABOUT THE
BUILDING UNLESS AUTHORIZED BY THE GOVERNMENT, AND ALL APPLICABLE LAWS, ORDINANCES, RULES
AND REGULATIONS ARE COMPLIED WITH. ALL NECESSARY PRECAUTIONS SHALL BE TAKEN BY THE
CONTRACTOR HANDLING SUCH MATERIALS AGAINST DAMAGE OR INJURY CAUSED BY SUCH MATERIALS.
SALVAGE AND WASTE REMOVAL: ALL RUBBISH, WASTE AND DEBRIS SHALL BE NEATLY AND CLEANLY
REMOVED FROM THE BUILDING BY THE CONTRACTOR DAILY UNLESS OTHERWISE APPROVED BY THE
GOVERNMENT. FOR ANY DEMOLITION AND DEBRIS REMOVAL, EACH CONTRACTOR MUST MAKE
ARRANGEMENTS WITH THE GOVERNMENT FOR THE SCHEDULING AND LOCATION OF AN ADDITIONAL
DUMPSTER.
DIMENSIONS: PARTITIONS SHALL BE DIMENSIONED FROM FINISH TO FINISH, UNLESS OTHERWISE NOTED.
VERIFY ALL DIMENSIONS AND CONDITIONS SHOWN ON THE DRAWINGS AND NOTIFY THE GOVERNMENT OF
ANY OMISSIONS, DISCREPANCIES AND/OR CONFLICTS PRIOR TO BEGINNING ANY CONSTRUCTION. INCLUDE
ALL WORK INDICATED ON THE DRAWINGS AND ALL WORK IMPLIED BY THE EXISTING CONDITIONS TO FULLY
COMPLETE THIS PROJECT. NOTIFY GOVERNMENT BEFORE COMMENCING ANY WORK CONSIDERED AS
OUT-OF-SCOPE.
FIELD CHECK EXISTING CONDITIONS AND DIMENSIONS.
CLEAR DIMENSIONS: ALL DIMENSIONS NOTED AS "CLEAR" ARE TO BE MEASURED FROM FACE OF FINISH
MATERIALS OR TO THE EDGE OF THE FARTHEST PROTRUSION INTO A SPACE.
EXISTING SURFACES: PROTECT EXISTING SURFACES FROM ANY DAMAGE. ALL EXISTING SURFACES AND
FINISHES ON JOB SITE AND ADJOINING AREAS TO REMAIN.
UNINTERRUPTED OPERATIONS: PROVIDE DUST PROTECTION, CLEAN UP AND RUBBISH REMOVAL TO ALLOW
FOR UNINTERRUPTED OPERATIONS. REMOVE ALL RUBBISH AND DEBRIS FROM THE PROJECT AT THE END
OF EACH WORKING DAY. ALL SOLVENTS AND FLAMMABLE PAINTS, ETC. ARE TO BE STORED IN NPPA
APPROVED FIRE CABINETS OR DISPENSING CONTAINERS. ALL SOLVENTS OR FLAMMABLE LIQUID DEBRIS, STAINED RAGS, ETC. ARE TO BE REMOVED FROM THE PROJECT SITE DAILY.
REPAIRS AND PATCHING: PROVIDE ALL REPAIRS AND PATCHING FLUSH TO EXISTING FINISHES.
REPLACE/REPAIR ALL DAMAGED AREAS TO MATCH THE EXISTING AT NO EXPENSE TO THE GOVERNMENT.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COMPLETE REPAIR OF ANY DAMAGE TO ADJOINING
FINISHES CAUSED BY THE WORK.
ACCESS PANELS: PROVIDE ACCESS PANELS AT ALL VALVES, DAMPERS AND JUNCTION BOXES FOR
ELECTRICAL FIXTURES AND OTHER MECHANICAL AND PLUMBING EQUIPMENT REQUIRING ACCESS.
MATERIALS: ALL MATERIALS FURNISHED UNDER THIS CONTRACT SHALL BE NEW UNLESS NOTED
OTHERWISE. ALL WORK SHALL BE GUARANTEED AGAINST DEFECTIVE MATERIALS AND WORKMANSHIP FOR
THE SPECIFIED PERIOD, AFTER THE COMPLETION AND ACCEPTANCE BY THE GOVERNMENT. THE
CONTRACTOR SHALL REPAIR AND REPLACE AT HIS OWN EXPENSE, WHEN ORDERED TO DO SO, ALL WORK
THAT MAY DEVELOP DEFECTS IN MATERIAL OR WORKMANSHIP WITHIN THE SPECIFIED PERIOD OF TIME.
REINSTALLATION: EXISTING ITEMS TO BE REMOVED FOR REINSTALLATION ARE TO BE IDENTIFIED AND
ASSIGNED TO THE CONTRACTOR TO BE PROTECTED AND REFINISHED CORRECTING ANY DAMAGE TO THE
ITEM. ANY ITEMS NOTED TO BE SAVED OR SALVAGED BY THE GOVERNMENT SHALL BE IDENTIFIED AND
STORED IN A LOCATION ON SITE AS DIRECTED BY THE GOVERNMENT. REINSTALLATION IS TO BE
COMPLETED IN PLACE, INCLUDING CORRECTIONS OF AUXILIARY MATERIALS AND WORK REQUIRED FOR A
COMPLETE AND PROPERLY FUNCTIONING INSTALLATION.
CODE AND DRAWING CONFLICTS: WHERE WORK IS SHOWN IN THE CONTRACT DOCUMENTS IN EXCESS OF
THE ABOVE MINIMUM CODE REQUIREMENTS, THE WORK SHALL BE DONE IN ACCORDANCE WITH THE
CONTRACT DOCUMENTS. THE CONTRACTOR SHALL CAREFULLY STUDY AND COMPARE THE CONTRACT
DOCUMENTS WITH EACH OTHER AND SHALL REPORT TO THE GOVERNMENT OF ANY INCONSISTENCIES
DISCOVERED. THE CONTRACTOR SHALL BE LIABLE TO THE GOVERNMENT FOR PERFORMING ANY
CONSTRUCTION ACTIVITY KNOWING IT INVOLVES A RECOGNIZED ERROR, INCONSISTENCY OR OMISSION.
UNLESS INSTRUCTED BY THE GOVERNMENT, THE CONTRACTOR SHALL SELECT THE HIGHER LEVEL OF
MATERIAL, WORKMANSHIP, METHOD OF CONSTRUCTION AND MANUFACTURER IN AREAS OF CONFLICT.
MECHANICAL RUNS: ALL PIPING, DUCTS, CONDUIT, ETC. SHALL BE INSTALLED PARALLEL OR
PERPENDICULAR TO THE BUILDING CONSTRUCTION. CUT ACCURATELY TO FIT FROM DIMENSIONS
ESTABLISHED AT THE PROJECT SITE WITH ALLOWANCE MADE FOR THE CLEARANCE OF WINDOWS, DOORS, FIXTURES, AND OTHER OPENINGS.
PIPE SUPPORTS: ALL PIPES SHALL BE SUPPORTED FROM THE BUILDING IN A NEAT AND WORKMANLIKE
MANNER. WHEREVER POSSIBLE, PARALLEL RUNS OF HORIZONTAL PIPING SHALL BE GROUPED TOGETHER
ON ADJUSTABLE TRAPEZE HANGERS. SINGLE RUNS OF HORIZONTAL PIPING SHALL BE SUPPORTED WITH
CLEVIS-TYPE HANGERS. ON HORIZONTAL COLD PIPES THAT MAY PRODUCE CONDENSATION, THE HANGERS
SHALL BE ON THE OUTSIDE OF THE INSULATION. VERTICAL RISERS SHALL BE SUPPORTED AT EACH FLOOR
LINE WITH STEEL PIPE CLAMPS. ALL HANGERS SHALL BE IN CONTACT WITH A FERROUS METAL.
EQUIPMENT LOCATION: THE GOVERNMENT MAY CHANGE THE LOCATION OF ANY EQUIPMENT 5' AND ANY
PIPING, DUCTWORK, CONDUIT, ETC., 10' IN ANY DIRECTION WITHOUT EXTRA CHARGE, PROVIDED SUCH
CHANGES ARE MADE BEFORE INSTALLATION.
FIREPROOFING - GENERAL REQUIREMENTS OF WORK
FIRESTOPPING: FIRESTOPPING SHALL BE DESIGNED AND CONSTRUCTED TO CLOSE ALL CONCEALED
DRAFT OPENINGS TO FORM AN EFFECTIVE FIRE BARRIER AGAINST THE SPREAD OF FIRE AND SMOKE
BETWEEN ANY BUILDING OR MECHANICAL ASSEMBLE RATED OR NON-RATED AS REQUIRED BY AND
ACCEPTABLE TO ALL AUTHORITIES HAVING JURISDICTION.
FIRESTOPPING MATERIALS: ALL FIRESTOPPING MATERIALS SHALL CONSIST OF APPROVED
NON-COMBUSTIBLE MATERIALS SECURELY FASTENED IN PLACE ACCEPTABLE TO AUTHORITIES HAVING
JURISDICTION AND AS ESTABLISHED BY TESTING IDENTICAL ASSEMBLIES PER ASTM E 8L4 BY
UNDERWRITERS LABORATORY, INC. CONTRACTOR SHALL HAVE CHOICE OF ANY U.L. APPROVED SYSTEM
SUBJECT TO FINAL APPROVAL BY GOVERNMENT. ALL FIRESTOPPED PENETRATIONS ARE TO HAVE A UL
RATING EQUAL TO OR GREATER THAN THE ASSEMBLY WHICH IT PENETRATES.
SEALANTS - GENERAL REQUIREMENTS OF WORK
SEALANT: PROVIDE SEALANT TO FILL ALL GAPS AND UNEVEN ADJOINING MATERIALS. FILL ALL LINEAR AND
SPOT GAPS AT WALLS AND AT CEILINGS CHANNELS AND WALLS. SEALANT TO MATCH ADJOINING
SURFACES. PAINT TO CONCEAL SEALANT APPLICATION. SEE ASTM C920 FOR TYPE, USE AND GRADE
CLASSIFICATIONS AND DESCRIPTIONS. CONTRACTOR TO CHOOSE APPLICABLE SEALANT AND
MANUFACTURER ACCORDING TO SPECIFIED REQUIREMENTS FOR USE INTENDED.
SELECTIVE DEMOLITION
GENERAL: DEMOLISH AND REMOVE EXISTING CONSTRUCTION ONLY TO THE EXTENT REQUIRED BY NEW
CONSTRUCTION AND AS INDICATED. USE METHODS REQUIRED TO COMPLETE THE WORK WITHIN
LIMITATIONS OF GOVERNING REGULATIONS. NEATLY CUT OPENINGS AND HOLES PLUMB, SQUARE, AND
TRUE TO DIMENSIONS REQUIRED. USE CUTTING METHODS LEAST LIKELY TO DAMAGE CONSTRUCTION TO
REMAIN OR ADJOINING CONSTRUCTION. USE HAND TOOLS OR SMALL POWER TOOLS DESIGNED FOR
SAWING OR GRINDING, NOT HAMMERING AND CHOPPING, TO MINIMIZE DISTURBANCE OF ADJACENT
SURFACES. TEMPORARILY COVER OPENINGS TO REMAIN.
SCHEDULE OF SELECTIVE DEMOLITION ACTIVITIES: INDICATE DETAILED SEQUENCE OF SELECTIVE
DEMOLITION AND REMOVAL WORK, WITH STARTING AND ENDING DATES FOR EACH ACTIVITY, INTERRUPTION
OF UTILITY SERVICES AND LOCATIONS OF TEMPORARY PARTITIONS AND MEANS OF EGRESS.
GOVERNMENT WILL OCCUPY PORTIONS OF BUILDING IMMEDIATELY ADJACENT TO SELECTIVE DEMOLITION
AREA. CONDUCT SELECTIVE DEMOLITION SO GOVERNMENT'S OPERATIONS WILL NOT BE DISRUPTED. IF
MATERIALS SUSPECTED OF CONTAINING HAZARDOUS MATERIALS ARE ENCOUNTERED, DO NOT DISTURB;
• STORAGE OR SALE OF REMOVED ITEMS OR MATERIALS ON-SITE IS NOT PERMITTED.
• UTILITY SERVICE: MAINTAIN EXISTING UTILITIES INDICATED TO REMAIN IN SERVICE AND PROTECT
THEM AGAINST DAMAGE DURING SELECTIVE DEMOLITION OPERATIONS.
• MAINTAIN FIRE-PROTECTION FACILITIES IN SERVICE DURING SELECTIVE DEMOLITION OPERATIONS.
• VERIFY THAT UTILITIES HAVE BEEN DISCONNECTED AND CAPPED.
• SURVEY EXISTING CONDITIONS AND CORRELATE WITH REQUIREMENTS INDICATED TO DETERMINE
EXTENT OF SELECTIVE DEMOLITION REQUIRED.
• WHEN UNANTICIPATED MECHANICAL, ELECTRICAL, OR STRUCTURAL ELEMENTS THAT CONFLICT WITH
INTENDED FUNCTION OR DESIGN ARE ENCOUNTERED, INVESTIGATE AND MEASURE THE NATURE AND
EXTENT OF CONFLICT. PROMPTLY SUBMIT A WRITTEN REPORT TO GOVERNMENT.
EXISTING SERVICES/SYSTEMS: MAINTAIN SERVICES/SYSTEMS INDICATED TO REMAIN AND PROTECT THEM
AGAINST DAMAGE DURING SELECTIVE DEMOLITION OPERATIONS.
SERVICE/SYSTEM REQUIREMENTS: LOCATE, IDENTIFY, DISCONNECT, AND SEAL OR CAP OFF INDICATED
UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS SERVING AREAS TO BE SELECTIVELY
DEMOLISHED.
ARRANGE TO SHUT OFF INDICATED UTILITIES WITH UTILITY COMPANIES. IF SERVICES/SYSTEMS ARE
REQUIRED TO BE REMOVED, RELOCATED, OR ABANDONED, BEFORE PROCEEDING WITH SELECTIVE
DEMOLITION PROVIDE TEMPORARY SERVICES/SYSTEMS THAT BYPASS AREA OF SELECTIVE DEMOLITION
AND THAT MAINTAIN CONTINUITY OF SERVICES/SYSTEMS TO OTHER PARTS OF BUILDING. CUT OFF PIPE OR
CONDUIT IN WALLS OR PARTITIONS TO BE REMOVED. CAP, VALVE, OR PLUG AND SEAL REMAINING PORTION
OF PIPE OR CONDUIT AFTER BYPASSING.
SITE ACCESS AND TEMPORARY CONTROLS: CONDUCT SELECTIVE DEMOLITION AND DEBRIS-REMOVAL
OPERATIONS TO ENSURE MINIMUM INTERFERENCE WITH ROADS, STREETS, WALKS, WALKWAYS, AND
OTHER ADJACENT OCCUPIED AND USED FACILITIES.
TEMPORARY SHORING: PROVIDE AND MAINTAIN SHORING, BRACING, AND STRUCTURAL SUPPORTS AS
REQUIRED TO PRESERVE STABILITY AND PREVENT MOVEMENT, SETTLEMENT, OR COLLAPSE OF
CONSTRUCTION AND FINISHES TO REMAIN, AND TO PREVENT UNEXPECTED OR UNCONTROLLED MOVEMENT
OR COLLAPSE OF CONSTRUCTION BEING DEMOLISHED.
CUTTING AND PATCHING: APPROVAL OF PROCEDURES IS REQUIRED BEFORE PROCEEDING, SUBMIT A PLAN
FOR CUTTING AND PATCHING AS PART OF THE DEMOLITION PLAN.
INCLUDE THE FOLLOWING INFORMATION, AS APPLICABLE:
• DESCRIBE THE EXTENT OF CUTTING AND PATCHING REQUIRED AND HOW IT IS TO BE PERFORMED.
• DESCRIPTION SHALL INCLUDE CHANGES TO STRUCTURAL ELEMENTS AND OPERATING COMPONENTS
AND CHANGES IN THE BUILDING'S APPEARANCE AND OTHER VISUAL ELEMENTS.
• LIST PRODUCTS TO BE USED AND ENTITIES THAT WILL PERFORM WORK.
• INDICATE DATES WHEN CUTTING AND PATCHING IS TO BE PERFORMED.
• LIST UTILITIES THAT WILL BE DISTURBED, INCLUDING THOSE THAT WILL BE RELOCATED AND THOSE
THAT WILL BE TEMPORARILY OUT-OF-SERVICE.
• INDICATE HOW LONG SERVICE WILL BE DISRUPTED.
CUTTING: CUT EXISTING CONSTRUCTION USING METHODS LEAST LIKELY TO DAMAGE ELEMENTS TO BE
RETAINED OR ADJOINING CONSTRUCTION. WHERE POSSIBLE, REVIEW PROCEDURES WITH THE ORIGINAL
INSTALLER; COMPLY WITH THE ORIGINAL INSTALLER'S RECOMMENDATIONS.
• WHERE CUTTING IS REQUIRED, USE HAND OR SMALL POWER TOOLS DESIGNED FOR SAWING OR
GRINDING, NOT HAMMERING AND CHOPPING. CUT OR DRILL HOLES AND SLOTS TO SIZE REQUIRED
WITH MINIMUM DISTURBANCE OF ADJACENT SURFACES. TEMPORARILY COVER OPENINGS WHEN NOT
IN USE. TO AVOID MARRING EXISTING FINISHED SURFACES, CUT OR DRILL FROM THE EXPOSED OR
FINISHED SIDE INTO CONCEALED SURFACES.
• NO STRUCTURAL MEMBERS ARE TO BE CUT OR CORED WITHOUT PRIOR APPROVAL OF THE
GOVERNMENT.
PATCHING: PATCH WITH DURABLE SEAMS THAT ARE AS INVISIBLE AS POSSIBLE. COMPLY WITH SPECIFIED
TOLERANCES.
• WHERE FEASIBLE, INSPECT AND TEST PATCHED AREAS TO DEMONSTRATE INTEGRITY OF THE
INSTALLATION.
• RESTORE EXPOSED FINISHES OF PATCHED AREAS AND EXTEND FINISH RESTORATION INTO RETAINED
ADJOINING CONSTRUCTION IN A MANNER THAT WILL ELIMINATE EVIDENCE OF PATCHING AND
REFINISHING.
G-003
G E
N E
R A
L
C O
N S
T R
U C
T
IO
N G
E N
E R
A L N
O T
E S
V R
E K
J E
P Z
K S
B V
G G
-0
.D G
N A
N S
I D
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E
D A
T E
N
O V
E M
B E
R
T B
D
SHEET ID
READY TO ADVERTISE
F
IL
E N
A M
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
S O
L
IC
IT
A
T
IO
N N
O
D E
S
IG
N E
D B
Y
A
M A
R K
S
IZ
E
S U
B M
IT
T
E D
B Y
D A
T E
C O
N T
R A
C T
N O
US Army Corps of Engineers
C A
T E
G O
R Y
C O
D E
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
W
IL
M
IN
G O
T N
D
IS
T R
IC
T
D E
S C
R
IP
T
IO
N
M
IC
H
IG
A
N A
V E
S
U
IT
E
C H
IC
A
G O
T :3
.6
.7 w w w .e x p fe d e ra l.
c o m p ro j n o c h i-
-A
D A
R L
IN
G
T O
N A
V E
N U
E
W
IL
M
IN
G T
O N
N
O R
T H
C A
R O
L
IN
A
-3
-0
F O
R T
B R
A G
G
N O
R T
H C
A R
O L
IN
A D
E V
E L
O P
R E
Q U
E S
T F
O R
P R
O P
O S
A L F
O R
P N
S O
F C
O M
B A
T M
E D
IC
T
R A
IN
IN
G F
A C
IL
IT
Y
FOR OFFICIAL USE ONLY (FOUO)
FOR OFFICIAL USE ONLY (FOUO)
F O
R O
F F
IC
IA
L U
S E
O N
L Y
F
O U
O
F O
R O
F F
IC
IA
L U
S E
O N
L Y
F
O U
O
W
2P M
R
NOTICE OF PROPOSED CONSTRUCTION OR ALTERATION
FOR CONSTRUCTION OR ALTERATION GREATER THAN 200 FEET IN HEIGHT (AND USE WITH CRANES)
1. POPE ARMY AIRFIELD HAS REQUESTED THAT NOTICES OF PROPOSED CONSTRUCTION OR
ALTERATION ON FT. BRAGG BE FILED DIRECTLY WITH FAA. THIS INCLUDES NOTICES FOR CONSTRUCTION
CRANES.
2. IN A MEETING 25 MARCH 04 BETWEEN USACE AND POPE ARMY AIRFIELD REPRESENTATIVES IT WAS
AGREED THAT CONTRACTORS WOULD FILE THE REQUIRED FAA FORM 7460-1. APPLICATION COULD BE FILED
ELECTRONICALLY VIA THE FAA WEB SITE: HTTPS://OEAAA.FAA.GOV/OEAAA/EXTERNAL/PORTAL.JSP.
3. APPLICABLE REGULATIONS AR 95-2 PARA 8.6: HTTP://WWW.USAPA.ARMY.MIL/PDFFILES/R95_2.PDF
AND FAA 7400.2E, CHAPTERS 5 & 6 AND 7 HTTP://WWW.FAA.GOV/ATPUBS/AIR/INDEX.HTM.
4. FAA FORM 7460-1 IS AVAILABLE ON THE FAA WEB SITE HTTP://WWW.FAA.GOV. THIS WEB SITE AND THE
FORM DETAIL THE SPECIFIC CONDITIONS REQUIRING NOTICE AND INSTRUCTIONS ON HOW TO APPLY VIA
THE FAA WEB PORTAL HTTPS://OEAAA.FAA.GOV/OEAAA/EXTERNAL/PORTAL.JSP. NOTICES ARE REQUIRED
TO BE FILED A MINIMUM OF 30 DAYS PRIOR TO THE PROPOSED CONSTRUCTION OR ALTERATION IS TO
BEGIN.
5. THE FORT BRAGG POINT OF CONTACT FOR THESE ACTIONS IS THE INSTALLATION ATC CHIEF/AIR
TRAFFIC & AIRSPACE MANAGER (AT&A), MR. LEE VALLIANT 910-396-7725 OR E-MAIL:
LEE.VALLIANT@US.ARMY.MIL. COPIES OF ALL NOTICES SHOULD BE PROVIDED TO MR. VALLIANT.
AR 95-2 8-6. NOTICES OF PROPOSED CONSTRUCTION OR ALTERATION
a. NOTICE TO THE FAA IS REQUIRED FOR ANY PROPOSED--
(1) CONSTRUCTION OR ALTERATION OF MORE THAN 200 FEET IN HEIGHT ABOVE THE GROUND LEVEL
AT ITS SITE.
(2) CONSTRUCTION OR ALTERATION OF GREATER HEIGHT THAN AN IMAGINARY SURFACE EXTENDING
OUTWARD AND UPWARD AT ONE OF THE FOLLOWING SLOPES:
(a) ONE HUNDRED TO ONE FOR A HORIZONTAL DISTANCE OF 20,000 FEET FROM THE NEAREST
POINT OF THE NEAREST RUNWAY OF EACH AIRPORT SPECIFIED IN (5) BELOW, WITH AT LEAST ONE
RUNWAY MORE THAN 3,200 FEET IN ACTUAL LENGTH, EXCLUDING HELIPORTS.
(b) FIFTY TO ONE FOR A HORIZONTAL DISTANCE OF 10,000 FEET FROM THE NEAREST POINT OF THE
NEAREST RUNWAY OF EACH AIRPORT SPECIFIED IN (5) BELOW, WITH NO RUNWAY MORE THAN 3,200
FEET IN ACTUAL LENGTH, EXCLUDING HELIPORTS.
(c) TWENTY-FIVE TO ONE FOR A HORIZONTAL DISTANCE OF 5,000 FEET FROM THE NEAREST POINT
OF THE NEAREST LANDING AND TAKEOFF AREA OF EACH HELIPORT SPECIFIED IN(5) BELOW.
(3) HIGHWAY, RAILROAD, AND WATERWAY CROSSOVERS FOR SPECIAL HEIGHT CRITERIA. (SEE FAR, PART 77, FOR SPECIFIC INFORMATION.
(4) CONSTRUCTION OR ALTERATION THAT EXTENDS INTO TERMINAL OR EN ROUTE AIRSPACE USED
FOR INSTRUMENT FLIGHT AS IDENTIFIED BY CRITERIA IN TM 95-226.
(5) CONSTRUCTION OR ALTERATION ON ALL AIRPORTS (INCLUDING HELIPORTS) THAT ARE--
(a) AVAILABLE FOR PUBLIC USE AND LISTED IN THE DOD FLIP AIRPORT/FACILITIES DIRECTORY OR
SUPPLEMENT.
(b) OPERATED BY AN ARMED FORCE OF THE UNITED STATES.
(c) UNDER CONSTRUCTION THAT WILL BE AVAILABLE FOR PUBLIC USE AND FOR WHICH A NOTICE
OR PROPOSAL IS ON FILE WITH THE FAA. MILITARY AIRPORTS UNDER CONSTRUCTION THAT WILL
BE AVAILABLE FOR PUBLIC USE ARE EXCLUDED.
b. SUPPLEMENTAL NOTICES WILL BE PREPARED BY EACH SPONSOR UNDER THE FOLLOWING
CIRCUMSTANCES:
(1) CONSTRUCTION OR ALTERATION FOR WHICH A NOTICE HAS BEEN FILED AND WHEN ADVISED BY
THE FAA THAT A SUPPLEMENTAL NOTICE IS REQUIRED. SUCH NOTICE WILL BE SUBMITTED IN TIME
TO REACH THE FAA AT LEAST 48 HOURS BEFORE THE CONSTRUCTION OR ALTERATION BEGINS.
(2) CONSTRUCTION OR ALTERATION THAT REQUIRES A NOTICE UNDER THIS SECTION. THIS
SUPPLEMENTARY NOTICE GOES TO THE FAA REGION HAVING RESPONSIBILITY FOR THE AREA
INVOLVED AND MUST BE SENT WITHIN 5 DAYS AFTER CONSTRUCTION OR ALTERATION HAS
REACHED ITS GREATEST HEIGHT UNDER THE FOLLOWING CONDITIONS:
(a) CONSTRUCTION OR ALTERATION IS MORE THAN 200 FEET ABOVE THE SURFACE LEVEL OF ITS
SITE; OR
(b) THE FAA HAS ADVISED THE SPONSOR THAT A NOTICE IS REQUIRED.
c. NOTIFICATION TO THE FAA IS NOT NEEDED FOR CONSTRUCTION OR ALTERATION OF THE FOLLOWING:
(1) ANY STRUCTURE THAT WILL BE--
(a) SHIELDED BY EXISTING STRUCTURES OF A PERMANENT AND SUBSTANTIAL CHARACTER OR
NATURAL TERRAIN OF EQUAL OR GREATER HEIGHT.
(b) LOCATED IN THE CONGESTED AREAS OF A CITY, TOWN, OR SETTLEMENT WHERE IT IS EVIDENT
BEYOND ALL REASONABLE DOUBT THAT IT WILL BE SHIELDED AND WILL NOT AFFECT SAFETY OR
AIR NAVIGATION.
(2) ANY ANTENNA STRUCTURE OF 20 FEET OR LESS IN HEIGHT EXCEPT ONE THAT WOULD INCREASE
THE HEIGHT OF ANOTHER ANTENNA STRUCTURE.
(3) ARMY NAVAID, AIRPORT VISUAL APPROACH OR LANDING AID, AIRCRAFT ARRESTING DEVICE, OR
METEOROLOGICAL DEVICE (OF A TYPE APPROVED BY THE FAA OR MILITARY SERVICE) FOR
MILITARY AIRPORTS WHEN THE 16 AR 95-2 10 AUGUST 1990 LOCATION AND HEIGHT OF THE OBJECT
IS FIXED BY ITS FUNCTIONAL PURPOSE. THESE NOTICES DO NOT CANCEL THE NON-RULEMAKING
PROPOSALS REQUIRED IN PARAGRAPH 8-4.
(4) ANY CONSTRUCTION OR ALTERATION FOR WHICH NOTICE IS REQUIRED BY OTHER FAA
REGULATIONS.
G-004
G E
N E
R A
L
P E
R M
IT
S
A N
D
G E
N E
R A
L D
E S
IG
N
N O
T E
S
V R
E K
J E
P Z
K S
B V
G G
-0
.D G
N A
N S
I D
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E
D A
T E
N
O V
E M
B E
R
T B
D
SHEET ID
READY TO ADVERTISE
F
IL
E N
A M
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
S O
L
IC
IT
A
T
IO
N N
O
D E
S
IG
N E
D B
Y
A
M A
R K
S
IZ
E
S U
B M
IT
T
E D
B Y
D A
T E
C O
N T
R A
C T
N O
US Army Corps of Engineers
C A
T E
G O
R Y
C O
D E
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
W
IL
M
IN
G O
T N
D
IS
T R
IC
T
D E
S C
R
IP
T
IO
N
M
IC
H
IG
A
N A
V E
S
U
IT
E
C H
IC
A
G O
T :3
.6
.7 w w w .e x p fe d e ra l.
c o m p ro j n o c h i-
-A
D A
R L
IN
G
T O
N A
V E
N U
E
W
IL
M
IN
G T
O N
N
O R
T H
C A
R O
L
IN
A
-3
-0
F O
R T
B R
A G
G
N O
R T
H C
A R
O L
IN
A D
E V
E L
O P
R E
Q U
E S
T F
O R
P R
O P
O S
A L F
O R
P N
S O
F C
O M
B A
T M
E D
IC
T
R A
IN
IN
G F
A C
IL
IT
Y
FOR OFFICIAL USE ONLY (FOUO)
FOR OFFICIAL USE ONLY (FOUO)
F O
R O
F F
IC
IA
L U
S E
O N
L Y
F
O U
O
F O
R O
F F
IC
IA
L U
S E
O N
L Y
F
O U
O
PERMITS:
INSTALLATION PERMITS:
• BOILERS & GENERATORS PERMIT - DPW ECB AIR QUALITY - MIKE FISHER, REM
• BORROW PIT PERMIT - DPW ENVIRONMENTAL BRANCH (SUBMIT 14 CALENDAR DAYS PRIOR TO WORK) -
BORROW PIT HAS BEEN CLOSED BY DPW UNTIL FURTHER NOTICE.
• CONSTRUCTION & DEMOLITION (C&D) WASTE PERMIT FOR FORT BRAGG LAMONT ROAD
CONSTRUCTION & DEMOLITION LANDFILL FACILITY - DPW ENVIRONMENTAL BRANCH. NOTE: LANDFILL
HAS REACHED ITS CAPACITY TO ACCEPT CONSTRUCTION & DEMOLITION WASTE AND WILL NO LONGER
ACCEPT CONSTRUCTION & DEMOLITION WASTE (TO INCLUDE FRIABLE ASBESTOS CONTAINING
MATERIALS). CONTRACTORS NEED TO MAKE ARRANGEMENTS TO HAUL CONSTRUCTION & DEMOLITION
WASTE OFF THE INSTALLATION TO A STATE CERTIFIED C&D LANDFILL OR SUB TITLE "D" LANDFILL, UNTIL A NEW PHASE III SECTION OF THE LANDFILL IS OPEN AND OPERATING. SEE DPW'S SOLID WASTE
AND RECYCLING REQUIREMENTS, DATED 6 OCT 2016, OR CONTACT JEFF SLOOP AT
jeffery.w.sloop.ctr@mail.mil OR FAX TO (910) 396-4188, ATTN: SOLID WASTE OFFICE.
• DIGGING/EXCAVATION PERMIT (FB FORM 1605-E) - DPW FACILITIES ENGINEER (SUBMIT 15 CALENDAR
DAYS PRIOR TO WORK).
• ENVIRONMENTAL PERMITS (POSSIBLE 180 DAY PROCESS). SEE SPECIFICATION SECTION 01 57 19.
• REGULATORY PERMITS
• CLEAN AIR ACT (CAA) [FEDERAL, STATE & LOCAL] - DPW INSTALLATION ENVIRONMENTAL OFFICE (AIR
PROGRAM MANAGER).
• GENERAL US PERMITTED EQUIPMENT (SEE FAR 52.236-7).
• STREAM CROSSING (SEE CLEAN WATER ACT SECTION 404 AND SECTION 401 (WATER QUALITY).
• TRANSPORTER AND DISPOSAL FACILITIES PERMITS.
• IRRIGATION - DPW WATER QUALITY PROGRAM MANAGER, ERIC TORRES, (910) 432-8450, CHENEGA
GLOBAL SERVICES, LLC, STORAGE TANKS AND WATER QUALITY PROGRAM, FORT BRAGG DPW ECB, eric.m.torres24.ctr@mail.mil.
• LANDFILL DISPOSAL PERMIT - DPW ENVIRONMENTAL SUSTAINMENT DIVISION (ESD), (910) 396-3372.
• PHOTOGRAPHY - INSTALLATION, DIRECTOR OPERTIONS DIRECTORATE DCS G3/5/7 - POC IS MR.
DREDDRICK BROWN, DSN 225-8469 OR COM (703) 695-8469.
• TITLE V AIR PERMITS (BASED ON TYPE OF MATERIAL DUST, BOILERS, AND DOMESTIC WATER
HEATERS) - DPW ENVIRONMENTAL BRANCH, ENVIRONMENTAL COMPLIANCE BRANCH (ECB).
• TRAFFIC CONTROL PERMIT - DPW TRANSPORTATION ENGINEER, RAY GOFF, (910) 907-1759.
FEDERAL PERMIT:
• NOTICE OF PROPOSED CONSTRUCTION OR ALTERATION - FAA FORM 7460-1.
COUNTY PERMITS:
• WATER WELL
NC STATE PERMITS:
• DEMOLITION
• ASBESTOS REMOVAL OR DEMOLITION/RENOVATION - NCPH, RALEIGH (10 WORKING DAYS PRIOR
TO REMOVAL).
• EROSION & SEDIMENTATION CONTROL (E&sc) PERMIT - NC DENR DEPARTMENT OF WATER QUALITY
(DWQ).
• GENERAL STORMWATER DISCHARGE
• GEOTHERMAL (COUNTY)
• SEPTIC SYSTEM (COUNTY)
• STORMWATER MANAGEMENT
ONUS PERMIT:
• WATER AND SANITARY SEWER
COE SAFETY:
• CONFINED SPACE ENTRY PERMIT - (SEE EM 385-1-1, DATED 30 NOV 2014, SECTION 34 (PAGE 34-1).
• ENERGIZED WORK PERMIT - MUST BE SUBMITTED TO THE COR IN ADVANCE FOR ACCEPTANCE. (SEE
EM 385-1-1, DATED 30 NOVE 14, PARAGRAPH 11.A.02C.
• HOT WORK PERMIT - (SEE EM 385-1-1, DATED 15 SEP 08, PARAGRAPH 06.C.01 (PAGE 93) & PARAGRAPH
10.C.01 (PAGE 207) FORT BRAGG FIRE DEPARTMENT. (SUBMIT 14 CALENDAR DAYS PRIOR TO WORK.)
• WELDING
• CUTTING
• HEATING
OBTAIN ALL APPLICABLE PERMITS AS PART OF THE DESIGN PROCESS AND SECURE ALL PERMITS
NECESSARY FOR CONSTRUCTION OF THE PROJECT. DETERMINE FEE BASIS AND PAY ALL FILING FEES AT
NO ADDITIONAL COST TO THE GOVERNMENT.
PERMITS ARE TO BE MAINTAINED IN THE CONTRACTOR'S ON SITE CONSTRUCTION OFFICE, ORGANIZED IN A
THREE RING BINDER, TABBED AND WITH A TABLE OF CONTENTS FOR INSPECTION BY THE GOVERNMENT.
CONSTRUCTION WILL NOT BEGIN ON ANY PHASE WITHOUT THE APPROPRIATE PERMIT.
THE PERMITS, AS LISTED ABOVE, ARE NOT INTENDED TO BE A COMPLETE LIST OF PERMITS. CONTRACTOR IS
TO ADD ANY ADDITIONAL PERMITS AS THEY BECOME KNOWN, AND IS TO BE MODIFIED AND SUBMITTED TO
THE GOVERNMENT FOR REVIEW AND APPROVAL. IF A PERMIT IS "NOT APPLICABLE", INDICATE AS SUCH.
POINT OF CONTACT: PAUL CUDNEY, SOCOM RESIDENT OFFICE, FORT BRAGG, NC, (910) 391-0829.
GENERAL DESIGN NOTES:
1. A/E/C CAD STANDARD, RELEASE 6.0, SHALL BE USED WHEN PREPARING DRAWINGS (OR MOST CURRENT
EDITION EXISTING AT THE BEGINNING OF THE DESIGN SHALL BE USED.
2. CORPS OF ENGINEER, SAVANNAH DISTRICT DESIGN MANUAL FOR MILITARY CONSTRUCTION: VOLUME 1, GENERAL ADMINISTRATIVE REQUIREMENTS, 17TH EDITION, DATED NOVEMBER 2011, (OR CURRENT
EDITION), AND VOLUME 2, TECHNICAL AND VALUE ENGINEERING REQUIREMENTS FOR REQUEST FOR
PROPOSAL AND FULL DESIGN PREPARATION, 17TH EDITION REVISION, DATED JANUARY 2013, WITH RELATED
UPDATED, OR CURRENT EDITION, IS IN EFFECT FOR THIS DESIGN.
3. DRAWING MEDIA. DRAWINGS ARE TO BE PLOTTED ON BOND PAPER, ENGLISH INCH POUND UNIT PROJECTS
DRAWING SIZE D (22" X 34" OVERALL). SAVANNAH DISTRICT EN SECTION PROVIDES THESE BORDERS, TITLEBLOCKS AND ZONING TO A/Es. A NEW BORDER SHEET FILE IS TO BE OBTAINED EACH TIME A NEW
PROJECT IS BEGUN DUE TO CHANGES IN BORDER REQUIREMENTS.
4. OTHER MEDIA. THERE ARE VARIOUS ELECTRONIC FILES AVAILABLE FROM THE SAVANNAH DISTRICT, ENGINEERING SECTION. THE CONTRACTOR'S A-E SHOULD REQUEST A CD-ROM WITH FILES THROUGH THE
PM, OR ASK FOR THE CURRENT WEB PAGE WHERE THEY CAN BE FOUND. FORMATS AVAILABLE ON CD ARE
THE FOLLOWING: a) BORDER SHEETS, b) COVER SHEETS, c) INDEX OF DRAWINGS, AND d) LOCATION PLANS.
5. ALL DRAWINGS WILL BE PREPARED ELECTRONICALLY WITH SOFTWARE COMPATIBLE AND APPROVED BY
WILMINGTON DISTRICT, UNLESS A SPECIAL WAIVER HAS BEEN OBTAINED FROM PROJECT MANAGEMENT.
COLOR PLOTTING IS NOT ACCEPTABLE FOR CONTRACT DRAWINGS.
6. CODES. THE DESIGN-BUILD GENERAL CONTRACTOR A-E SHALL LIST ON THE DRAWINGS ALL APPROPRIATE
CODES IN EFFECT FOR THE DESIGN.
7. THE SPECIFICATIONS GOVERN.
8. RFI PROCESS: THE CONTRACTOR SHALL INITIATE AN RFI AND THEN CONTACT THE ARCHITECT/ENGINEER
FOR CLARIFICATION. RFIS WILL INCLUDE THE FOLLOWING INFORMATION, AT A MINIMUM: SPECIFICATION, DRAWING, SPECIFIC QUESTION, AND CONTRACTOR'S RECOMMENDATION FOR RESOLVING THE QUESTION.”
CROSS REFERENCE TO APPROPRIATE DOCUMENT.
9. QUALITY CONTROL PREPARATORY PHASE MEETING IS REQUIRED FOR THIS PROJECT. WORK IS NOT
PERMITTED TO BEGIN PRIOR TO THIS MEETING.
10. SHOP DRAWINGS PREPARED BY SUPPLIERS AND SUBCONTRACTORS SHALL BE REVIEWED AND STAMPED
"APPROVED" BY THE GENERAL CONTRACTOR'S QUALITY CONTROL PRIOR TO SUBMISSION TO THE
ENGINEER/ARCHITECT.
11. ALL SUBMITTALS AND SUBSTITUTIONS MUST BE PROPERLY APPROVED AND AUTHORIZED PRIOR TO THE
PREPARATORY PHASE MEETING.
12. THE DRAWINGS AND SPECIFICATIONS ARE A PORTION OF THE CONSTRUCTION DOCUMENTS AND ARE
SUBORDINATE TO THE SOLICITATION DOCUMENTS. THE CONTRACTOR AND SUBCONTRACTORS SHALL
REFERENCE AND COORDINATE WITH ALL OTHER DISCIPLINES' DRAWINGS. ANY DISCREPANCIES OR
OMISSIONS SHALL BE REPORTED TO THE CONTRACTOR AND A-E VIA THE RFI SYSTEM TO OBTAIN
CLARIFICATION ON PARTICULAR MATTERS.
W
2P M
R
2P M
R
GI101
G E
N E
R A
L
C O
D E
A N
A L Y
S
IS
V R
E K
J E
P Z
K S
B V
G
G I1
.D
G N
CODE REQUIREMENTS:
APPLICABLE CODES AND STANDARDS
A. UFC 3-600-01, FIRE PROTECTION ENGINEERING FOR FACILITIES 28 NOVEMBER 2016
B. ARCHITECTURAL BARRIERS ACT (ABA) - 1 JAN 2015
C. INTERNATIONAL BUILDING CODE (IBC) -2015 EDITION
D. NFPA 101, LIFE SAFETY CODE (LSC) -2015 EDITION
E. UFC 1-200-01, GENERAL BUILDING REQUIREMENTS (AS ADOPTED BY UFC 3-600-01) - 20 JUNE 2016
F. NFPA 10, PORTABLE FIRE EXTINGUISHERS -2013 EDITION
G. NFPA 13, STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS -2016 EDITION
H. NFPA 70, NATIONAL ELECTRICAL CODE - 2014 EDITION
I. NFPA 72, NATIONAL FIRE ALARM CODE - 2016 EDITION
J. UFC 4-021-01 DESIGN AND O&M: MASS NOTIFICATION SYSTEMS -1 JANUARY 2010
K. UFC 4-010-01 DoD MINIMUM ANTITERRORISM STANDARDS FOR BUILDINGS, CHANGE 1 -1 OCTOBER 2013
BUILDING CODE AND LIFE SAFETY CODE SUMMARY
A. CLASSIFICATION OF OCCUPANCY: MIXED USE (NON-SEPARATED) IBC-TABLE 508.4
1. BUSINESS GROUP B PER IBC SECTION 304.1
2. ASSEMBLY GROUP A-3 PER IBC SECTION 303.1
3. MODERATE-HAZARD STORAGE GROUP S-1 PER IBC SECTION 311.2
B. CONSTRUCTION TYPE: TYPE II B (NON COMBUSTIBLE, UNPROTECTED CONSTRUCTION) 602.2
C. HEIGHT AND AREA:
ALLOWABLE HEIGHT: 3 STORIES, 75 FEET-IBC TABLE 504.3, 504.4
ACTUAL BUILDING HEIGHT: 2 STORIES, LESS THAN 34 FEET
ALLOWABLE AREA PER FLOOR CALCULATIONS:
Ao = (At + (At x If) + (At x Is))
WHERE:
Aa = ALLOWABLE BUILDING AREA PER STORY
At = TABULAR BUILDING AREA PER STORY PER IBC TABLE 503
If = AREA INCREASE FACTOR DUE TO FRONTAGE PER IBC SECTION 506.2 s = AREA INCREASE FACTOR DUE TO SPRINKLERS PER IBC SECTION 506.3
At = 9,500 SQUARE FEET (ASSEMBLY A-3 OCCUPANCY OF TYPE lIB CONSTRUCTION)
If = NOT USED
Is = 2 (200%)
Ao = (9,500 + (9,500 x 0.23) + (9,500 x 2)) = 30,685 SQUARE FEET
ACTUAL AREA OF FLOOR: 21,548 SQUARE FEET (FIRST FLOOR) -THEREFORE, CODE COMPLIANT
If= 100 (F/P-0.25)W/30
WHERE:
If = INCREASE DUE TO FRONTAGE
F=BUILDING PERIMETER THAT FRONTS ON PUBLIC WAY OR OPEN SPACE>20 FEET (FEET)
P= ENTIRE BUILDING PERIMETER (FEET)
W=WIDTH OF PUBLIC WAY (FEET)
Weighted Average (W)= (L1xW1+L2xW2+L3xW3...)/F
W=(82x14+53'X30'+13'X30'+25'X24+25'X30)/627'=7
If=100(627 282 -0.25)7/30=0.23
D. PROTECTION OF CONSTRUCTION ELEMENTS:
FIRE RESISTANCE RATING
REQUIREMENTS
PRIMARY STRUCTURAL FRAME 0 HOUR
BEARING WALLS AND PARTITIONS
INTERIOR 0 HOUR
EXTERIOR 0 < 10 FEET SEPARATION 0 HOUR
0 HOUR 1 HOUR EXTERIOR 10 FEET OR GREATER SEPARATION
0 HOUR NONBEARING WALLS AND PARTITIONS INTERIOR EXTERIOR 0 < 10 FEET SEPARATION
0 HOUR 1 HOUR EXTERIOR 10 FEET OR GREATER SEPARATION 0 HOUR FLOOR CONSTRUCTION *
0 HOUR ROOF CONSTRUCTION * STAIR/SHAFT ENCLOSURE
E. FIRE RATED SEPARATIONS:
1. OCCUPANCY SEPARATIONS: NOT REQUIRED. NON-SEPARATED MIXED USE AS PERMITIED BY IBC
SECTION 508.3.3.
2. SUPPORT SPACES: ENCLOSE MECHANICAL ROOMS, TELECOM ROOMS, ELECTRICAL ROOMS, AND
STORAGE ROOMS AS INDICATED ON SHEETS GI102 AND GI103 WITH 1-HOUR FIRE RESISTANCE RATED
PARTITIONS.
3. CORRIDOR WALLS: CORRIDOR WALLS IN A FULLY SPRINKLERED BUILDING ARE NOT REQUIRED TO BE
FIRE RESISTANCE RATED IN ACCORDANCE WITH LSC 12.3.6 (2).
4. CONTRACTOR SHALL PERMANENTLY IDENTIFY ALL RATINGS AT RATED PARTITIONS, SMOKESTOP
PARTITIONS, HORIZONTAL EXIT PARTITIONS AND EXIT ENCLOSURES BY EITHER INSTALLING SIGNS OR
STENCIL PAINTING IN CONCEALED SPACES PER FIRE MARSHAL.
5. SEE U.L. DETAILS FOR SPECIFIC RATED PARTITION CONSTRUCTION DETAILS
6. ELEVATOR HOISTWAY ENLOSURE -PROVIDE 1-HOUR FIRE BARRIERS AS PER NFPA 101 SECTION 8.6.
F. PORTABLE FIRE EXTINGUISHERS:
PORTABLE FIRE EXTINGUISHERS ARE REQUIRED THROUGHOUT BUSINESS OCCUPANCIES AND SHALL BE
PROVIDED IN ACCORDANCE WITH NFPA 10. PROVIDE CLASS ABC PORTABLE FIRE EXTINGUISHERS
WHERE INDICATED ON THE EGRESS PLAN DRAWINGS
G.OCCUPANT LOAD: (AS PER NFPA 101 TABLE 7.3.1.2) OCCUPANT LOAD FACTORS BASED ON USE
1. ASSEMBLY USE (TABLES AND CHAIRS; NOT FIXED): 1 PERSON PER 15 NET SQUARE FEET
2. BUSINESS USE: 1 PERSON PER 100 GROSS SQUARE FEET
3. CLASSROOM USE: 1 PERSON PER 20 NET SQUARE FEET
4. STORAGE/MECHANICAL/ELECTRICAL USE: 1 PERSON PER 500 GROSS SQUARE FEET
5. CALCULATED OCCUPANT LOAD:
FIRST FLOOR = 307 PERSONS
SECOND FLOOR = 79 PERSONS
I.EGRESS CAPACITY
1. DOORS AND LEVEL COMPONENTS: 0.2 INCHES PER PERSON
2. STAIRS: 0.3 INCHES PER PERSON
3. FIRST FLOOR EGRESS CAPACITY:
EXTERIOR DOORS: APPROXIMATELY 102 INCHES OF EXTERIOR DOOR/0.20 INCHES PER PERSON =
510 PERSONS
STAIRWAY (RESTRICTED BY STAIR TREAD): APPROXIMATELY 49 INCHES OF TREAD/0.30 INCHES
PER PERSON = 163 PERSONS
TOTAL FIRST FLOOR EGRESS CAPACITY: 510 + 163 = 673 PERSONS
4. SECOND FLOOR EGRESS CAPACITY: APPROXIMATELY 170 INCHES OF DOOR/0.20 INCHES PER PERSON
= 850 PERSONS
L. ARRANGEMENT OF MEANS OF EGRESS (COVERED SHELTER)
1. MAXIMUM PERMITIED COMMON PATH OF TRAVEL:
FROM ASSEMBLY OCCUPANCY: 20 FEET (NOT EXCEEDED)
FROM BUSINESS OCCUPANCY: 100 FEET (NOT EXCEEDED)
FROM STORAGE OCCUPANCY: 100 FEET (NOT EXCEEDED)
2. MAXIMUM PERMITIED TRAVEL DISTANCE:
FROM ASSEMBLY OCCUPANCY: 250 FEET (NOT EXCEEDED)
FROM BUSINESS OCCUPANCY: 300 FEET (NOT EXCEEDED)
FROM STORAGE OCCUPANCY: 400 FEET (NOT EXCEEDED)
3. MAXIMUM PERMITIED DEAD END CORRIDORS
FROM ASSEMBLY OCCUPANCY: 20 FEET (NOT EXCEEDED)
FROM BUSINESS OCCUPANCY: 50 FEET (NOT EXCEEDED)
FROM STORAGE OCCUPANCY: 100 FEET (NOT EXCEEDED)
M.INTERIOR FINISH
1. INTERIOR WALL AND CEILING:
LOBBIES AND EXIT ACCESS CORRIDORS: CLASS A OR B
ENCLOSED STAIRWAY: CLASS A OR B (SERVES BUSINESS OCCUPANCY)
ASSEMBLY OCCUPANCY: CLASS A, B, OR C.
PROJECTOR SCREENS SHALL COMPLY WITH REQUIREMENTS OF CLASS A OR B ALL OTHER AREAS:
CLASS A, B, OR C
2. INTERIOR FLOOR FINISH: SHALL BE NOT LESS THAN CLASS II IN EXIT ENCLOSURES AND EXIT ACCESS
CORRIDORS
3. INSULATING MATERIALS INSTALLED IN ANY CONSTRUCTION TYPE, CONCEALED OR EXPOSED, SHALL
HAVE A FLAMESPREAD
RATING NO GREATER THAN 25 AND A SMOKE DEVELOPED RATING NO GREATER THAN 450 AS
DETERMINED IN ACCORDANCE WITH ASTM E 84.
N. FIRE SPRINKLER SYSTEM: A COMPLETE AUTOMATIC WET-PIPE FIRE SPRINKLER SYSTEM WILL BE
PROVIDED THROUGHOUT THE NEW FACILITY IN COMPLIANCE WITH NFPA 13 AND UFC 3-600-01.
ABBREVIATIONS:
ASM -ASSEMBLY USE
BUS -BUSINESS USE
CLS -CLASSROOM USE
STO -STORAGE USE
GSF -GROSS SQUARE FOOTAGE
NSF -NET SQUARE FOOTAGE
CP -COMMON PATH OF TRAVEL DISTANCE
A N
S I D
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E
D A
T E
N
O V
E M
B E
R
T B
D
SHEET ID
READY TO ADVERTISE
F
IL
E N
A M
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
S O
L
IC
IT
A
T
IO
N N
O
D E
S
IG
N E
D B
Y
A
M A
R K
S
IZ
E
S U
B M
IT
T
E D
B Y
D A
T E
C O
N T
R A
C T
N O
US Army Corps of Engineers
C A
T E
G O
R Y
C O
D E
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
W
IL
M
IN
G O
T N
D
IS
T R
IC
T
D E
S C
R
IP
T
IO
N
M
IC
H
IG
A
N A
V E
S
U
IT
E
C H
IC
A
G O
T :3
.6
.7 w w w .e x p fe d e ra l.
c o m p ro j n o c h i-
-A
D A
R L
IN
G
T O
N A
V E
N U
E
W
IL
M
IN
G T
O N
N
O R
T H
C A
R O
L
IN
A
-3
-0
F O
R T
B R
A G
G
N O
R T
H C
A R
O L
IN
A D
E V
E L
O P
R E
Q U
E S
T F
O R
P R
O P
O S
A L F
O R
P N
S O
F C
O M
B A
T M
E D
IC
T
R A
IN
IN
G F
A C
IL
IT
Y
FOR OFFICIAL USE ONLY (FOUO)
FOR OFFICIAL USE ONLY (FOUO)
F O
R O
F F
IC
IA
L U
S E
O N
L Y
F
O U
O
F O
R O
F F
IC
IA
L U
S E
O N
L Y
F
O U
O
W
2P M
R
EXIT 1
EXIT 2
EXIT 5
EXIT 6 1
EXIT 3
EXIT 4
CORRIDOR
100B
CORRIDOR
100A
CLASSROOM
550 SF
CLASSROOM
550 SF
CLASSROOM
550 SF
CLASSROOM
552 SF
CLASSROOM
550 SF
CLASSROOM
548 SF
STAIRS
185 SF
TESTING
CENTER
ADMIN
279 SF
TESTING
CENTER
523 SF
GENERAL
STORAGE
518 SF
TELECOM
ROOM
193 SF
ELEV
MACH
ROOM
132 SF
RECEIVING
265 SF
MECHANICAL
ROOM
576 SF
ELEC.
ROOM
286 SF
STAIRS
216 SF
FIRE RISER
ROOM
328 SF
MAINT.
STORAGE
238 SF
WOMEN'S
LATRINE
210 SF
JAN
CLST
51 SF
MEN'S
LATRINE
243 SF
WOMEN'S SHOWER
& LOCKER ROOM
155 SF
MEN'S SHOWER &
LOCKER ROOM
635 SF
STUDENT
BREAK
ROOM
297 SF
CLASSROOM
619 SF
CLASSROOM
550 SF
CLASSROOM
618 SF
CLASSROOM
552 SF
CLASSROOM
550 SF
CLASSROOM
548 SF
LIBRARY
66 SF
VEND.
LARGE
CLASSROOM
2567 SF
C O
R R
ID
O
R
C
FECFECFEC
F E
C F
E C
FEC FEC
FE FE
F E
F A
C P
A N
N
KX
32"= 160 occupants
64"= 320 occupants
64"= 320 occupants
32"= 160 occupants
32"= 160 occupants
32"= 160 occupants cpt 60' c p t cpt 43'
A E
D
GI102
G E
N E
R A
L
L
IF
E S
A F
E T
Y P
L A
N
F
IR
S T
F L O
O R
V R
E K
J E
P Z
K S
B V
G
G I1
.D
G N
A N
S I D
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E
D A
T E
N
O V
E M
B E
R
T B
D
SHEET ID
READY TO ADVERTISE
F
IL
E N
A M
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
S O
L
IC
IT
A
T
IO
N N
O
D E
S
IG
N E
D B
Y
A
M A
R K
S
IZ
E
S U
B M
IT
T
E D
B Y
D A
T E
C O
N T
R A
C T
N O
US Army Corps of Engineers
C A
T E
G O
R Y
C O
D E
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
W
IL
M
IN
G O
T N
D
IS
T R
IC
T
D E
S C
R
IP
T
IO
N
M
IC
H
IG
A
N A
V E
S
U
IT
E
C H
IC
A
G O
T :3
.6
.7 w w w .e x p fe d e ra l.
c o m p ro j n o c h i-
-A
D A
R L
IN
G
T O
N A
V E
N U
E
W
IL
M
IN
G T
O N
N
O R
T H
C A
R O
L
IN
A
-3
-0
F O
R T
B R
A G
G
N O
R T
H C
A R
O L
IN
A D
E V
E L
O P
R E
Q U
E S
T F
O R
P R
O P
O S
A L F
O R
P N
S O
F C
O M
B A
T M
E D
IC
T
R A
IN
IN
G F
A C
IL
IT
Y
FOR OFFICIAL USE ONLY (FOUO)
FOR OFFICIAL USE ONLY (FOUO)
F O
R O
F F
IC
IA
L U
S E
O N
L Y
F
O U
O
F O
R O
F F
IC
IA
L U
S E
O N
L Y
F
O U
O
NTS
FIRST FLOOR LIFE SAFETY PLAN
EXIT ACCESS TRAVEL DISTANCE
COMMON PATH OF TRAVEL (cpt)
SURFACE MOUNTED FIRE EXTINGUISHER
FIRE EXTINGUISHER CABINET
1 HR RATED INTERIOR FIRE BARRIER
FIRE ALARM CONTROL PANEL
FIRE ALARM ANNUNCIATOR
KNOX BOX
AUTOMATED EXTERNAL DEFIBRILLATOR
LIFE SAFETY AND EGRESS
LEGEND
as per NFPA 101
OCCUPANCY
B (BUSINESS)
I (INDUSTRIAL) -GENERAL
S (STORAGE)
A (ASSEMBLY)
NO. ROOM NAME FUNCTION OF THE SPACE (NFPA 101)
Gross
Area (SF)
Net Area
(SF)
MAX FLOOR AREA
PER PERSON (SF)
TOTAL OCCUPANTS FOR
EGRESS CALCULATION
FIRST FLOOR
100 CORRIDOR A+B+C BUSINESS AREA 3,038 2,738 100 25
101 TESTING CENTER ADMIN BUSINESS AREA 327 279 100 3
102 TESTING CENTER BUSINESS AREA 611 523 100 6
103 STAIRS BUSINESS AREA 200 185 100 2
104 LARGE CLASSROOM BUSINESS AREA 2,709 2,567 20 net 129
105 CLASSROOM BUSINESS AREA 572 550 20 net 29
106 CLASSROOM BUSINESS AREA 594 550 20 net
107 CLASSROOM BUSINESS AREA 619 550 20 net
108 CLASSROOM BUSINESS AREA 672 619 20 net 33
110 CLASSROOM BUSINESS AREA 670 618
111 CLASSROOM BUSINESS AREA 599 552
112 CLASSROOM BUSINESS AREA 597
113 CLASSROOM BUSINESS AREA 624
114 CLASSROOM BUSINESS AREA 599
115 CLASSROOM BUSINESS AREA 573
116 CLASSROOM BUSINESS AREA 575
117 CLASSROOM BUSINESS AREA 573
118 STUDENT BREAK ROOM ASSEMBLY-WITHOUT FIXED SEATING 320 297 15 net 19
119 MEN’S SHOWER & LOCKER ROOM LOCKER ROOM 671 603 50 13
120 MEN’S LATRINE BUSINESS AREA 278 243 100 3
121 WOMEN’S LATRINE BUSINESS AREA 245 210 100 2
122 WOMEN’S SHOWER & LOCKER ROOM LOCKER ROOM 175 155 50 4
123 JAN CLST STORAGE AREA 59 51 500 1
124 MAINT. STORAGE STORAGE AREA 261 238 500 1
125 FIRE RISER ROOM STORAGE AREA 368 328 500 1
127 STAIRS BUSINESS AREA 218 185 100 2
128 ELEC. ROOM STORAGE AREA 334 286 500 1
129 MECHANICAL ROOM STORAGE AREA 633 576 500 1
130 ELEV. MACH. ROOM STORAGE AREA 158 132 500 1
132 TELECOM ROOM IT EQUIPMENT ROOM 213 193 300 1
133 GENERAL STORAGE STORAGE AREA 589 518 500 1
134 RECEIVING STORAGE AREA 312 265 500 1
½ CANOPY EXTERIOR AREA
TOTAL FIRST FLOOR OCCUPANT LOAD (MAX ALLOWED) 573
109 LIBRARY LIBRARY STACK AREA 78 66 3
50 net
20 net
20 net
20 net
20 net
20 net
20 net
20 net
20 net
EGRESS TRAVEL DISTANCES
MAXIMUM TRAVEL DISTANCE
REFERENCE POINT
121 FT
EXIT E4
51FT - -
4 119 FT
EXIT E5
121 FT
EXIT E6
5 46FT
north
PLAN NOTES:
1. AED DEVICE IS PART OF THE FF&E
PACKAGE BID OPTION. PROVIDE
THE INFRASTRUCTUREONLY FOR
THE AED DEVICE AS PART OF THE
BASE BID,
W
2P M
R
STAIRS
OPEN
OFFICE
AREA
756 SF
CORRIDOR
200A
OPEN
OFFICE
AREA
1156 SF
CADRE
CONF.
ROOM
632 SF
SECURITY
TELECOM
ROOM
232 SF
TELECOM
ROOM
113 SF
CADRE
WORK
ROOM
141 SF
CADRE
BREAKROOM
299 SF
SENIOR
CADRE
ROOM
666 SF
STORAGE
ROOM
354 SF
CORRIDOR
200B
CADRE
MEN'S
LATRINE
244 SF
CADRE
WOMEN'S
LATRINE
215 SF
JAN
CLST.
51 SF
OPEN
OFFICE
AREA
518 SF
STAIRS
216 SF
ELEC.
ROOM
168 SF
MECHANICAL
ROOM
480 SF
CADRE WOMEN'S
SHOWER&LOCKER
ROOM
160 SF
CADRE MEN'S
SHOWER & LOCKER
ROOM
377 SF
211A
210A209A
B
201A
202A
A
221A
220A
A
A
A
A
A
217A
A
A
A
DN
DN
ELEV
LACTATION
ROOM
98 SF
221B
VEND.
B
223A
206A
EXIT 1
EXIT 2
FECFEC
F E
Ccpt 52' cpt 33' cpt 64'
32"= 160 occupants
32"= 160 occupants
GI103
G E
N E
R A
L
L
IF
E S
A F
E T
Y P
L A
N
S E
C O
N D
F L O
O R
V R
E K
J E
P Z
K S
B V
G
G I-
.D
G N
A N
S I D
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E
D A
T E
N
O V
E M
B E
R
T B
D
SHEET ID
READY TO ADVERTISE
F
IL
E N
A M
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
S O
L
IC
IT
A
T
IO
N N
O
D E
S
IG
N E
D B
Y
A
M A
R K
S
IZ
E
S U
B M
IT
T
E D
B Y
D A
T E
C O
N T
R A
C T
N O
US Army Corps of Engineers
C A
T E
G O
R Y
C O
D E
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
W
IL
M
IN
G O
T N
D
IS
T R
IC
T
D E
S C
R
IP
T
IO
N
M
IC
H
IG
A
N A
V E
S
U
IT
E
C H
IC
A
G O
T :3
.6
.7 w w w .e x p fe d e ra l.
c o m p ro j n o c h i-
-A
D A
R L
IN
G
T O
N A
V E
N U
E
W
IL
M
IN
G T
O N
N
O R
T H
C A
R O
L
IN
A
-3
-0
F O
R T
B R
A G
G
N O
R T
H C
A R
O L
IN
A D
E V
E L
O P
R E
Q U
E S
T F
O R
P R
O P
O S
A L F
O R
P N
S O
F C
O M
B A
T M
E D
IC
T
R A
IN
IN
G F
A C
IL
IT
Y
FOR OFFICIAL USE ONLY (FOUO)
FOR OFFICIAL USE ONLY (FOUO)
F O
R O
F F
IC
IA
L U
S E
O N
L Y
F
O U
O
F O
R O
F F
IC
IA
L U
S E
O N
L Y
F
O U
O
NTS
SECOND FLOOR LIFE SAFETY PLAN
EXIT ACCESS TRAVEL DISTANCE
COMMON PATH OF TRAVEL (cpt)
SURFACE MOUNTED FIRE EXTINGUISHER
FIRE EXTINGUISHER CABINET
1 HR RATED INTERIOR FIRE BARRIER
LIFE SAFETY AND EGRESS
LEGEND
as per NFPA 101
OCCUPANCY
B (BUSINESS)
I (INDUSTRIAL) -GENERAL
S (STORAGE)
A (ASSEMBLY)
NO. ROOM NAME FUNCTION OF THE SPACE (NFPA 101)
Gross
Area (SF)
Net Area
(SF)
MAX FLOOR AREA
PER PERSON (SF)
TOTAL OCCUPANTS FOR
EGRESS CALCULATION
SECOND FLOOR
200 CORRIDOR A+B BUSINESS AREA 1,048 937 100 11
201 OPEN OFFICE AREA BUSINESS AREA 844 756 100 8
202 OPEN OFFICE AREA BUSINESS AREA 1,274 1,156 100 13
205 CADRE CONF. ROOM BUSINESS AREA 693 632 100 7
206 CADRE WORK ROOM BUSINESS AREA 158 141 100 2
207 CADRE BREAKROOM ASSEMBLY-WITHOUT FIXED SEATING 325 299 15 net 19
208 CADRE MEN’S SHOWER & LOCKER ROOM LOCKER ROOM 427 377 50 8
209 CADRE MEN’S LATRINE BUSINESS AREA 289 245 100 3
210 CADRE WOMEN’S LATRINE BUSINESS AREA 257 215 100 2
CADRE WOMEN’S SHOWER & LOCKER
ROOM
LOCKER ROOM 186 152 50 4
212 JAN CLST. STORAGE 59 51 500 1
213 OPEN OFFICE AREA BUSINESS AREA 581 518 100 6
216 ELEC. ROOM STORAGE AREA 186 160 500 1
217 MECHANICAL ROOM STORAGE AREA 530 480 500 1
218 STORAGE ROOM STORAGE AREA 420 354 500 1
219 OPEN OFFICE AREA BUSINESS AREA 729 666 100 8
220 TELCOM ROOM IT EQUIPMENT ROOM 128 113 300 1
221 SECURITY TELECOM ROOM STORAGE 274 232 300 1
223 LACTATION ROOM BUSINESS AREA 112 128 100 1
TOTAL SECOND FLOOR OCCUPANT LOAD (MAX ALLOWED) 106
MAXIMUM TRAVEL DISTANCE
REFERENCE POINT
EGRESS TRAVEL DISTANCES
north
W
2P M
R
2P M
R
2P M
R
2P M
R
2P M
R
2P M
R
A
B C D E F G
154'-8"
L O
C K
E R
S
57'-4"
72'-8"
CORRIDOR
100B
CORRIDOR
100A
CLASSROOM
550 SF
CLASSROOM
550 SF
CLASSROOM
550 SF
CLASSROOM
552 SF
CLASSROOM
550 SF
CLASSROOM
548 SF
STAIRS
185 SF
TESTING
CENTER
ADMIN
279 SF
TESTING
CENTER
523 SF
GENERAL
STORAGE
518 SF
TELECOM
ROOM
193 SF
ELEV
MACH
ROOM
132 SF
RECEIVING
265 SF
MECHANICAL
ROOM
576 SF
ELEC.
ROOM
286 SF
STAIRS
216 SF
FIRE RISER
ROOM
328 SF
MAINT.
STORAGE
238 SF
WOMEN'S
LATRINE
210 SF
JAN
CLST
51 SF
MEN'S
LATRINE
243 SF
WOMEN'S SHOWER
& LOCKER ROOM
155 SF
MEN'S SHOWER &
LOCKER ROOM
635 SF
STUDENT
BREAK
ROOM
297 SF
A
A
A
A
A
A
A
A
A
A
132A
A
A
A
A
A
104C
CLASSROOM
619 SF
CLASSROOM
550 SF
CLASSROOM
618 SF
CLASSROOM
552 SF
CLASSROOM
550 SF
CLASSROOM
548 SF
LIBRARY
66 SF
B
101A
133A
104B
101B
A
134A
127B
126A
128A
121A
122A
120A
A
A
100C 100B
UP
UP
103A
ELEV
104A
24'-8"
134C
A
4 L C
K R
S
VEND.
UP
A B C D E F G
A
A
100A
24'x10' LOADING
DOCK CANOPY
ABOVE
02 TANK
STORAGE
CABINET
5'x5' LANDING
42" HIGH
GUARDRAIL
36" HIGH
HANDRAIL
DOCK LEVELER
AND BUMPERS
12" CONCRETE
FILLED STL PIPE
BOLLARD
18"x18"x12"
ELEVATOR
SUMP PIT
LARGE
CLASSROOM
2567 SF
6" HIGH RAISED ACCESS
FLOORING SYSTEM OVER
DEPRESSED FLOOR SLAB
THROUGHOUT ROOM 104
C O
R R
ID
O
R
C
W1
W1
W1 W1 W1 W1 W2
W3
1'-8" MIN.
12 11
12 11
1. TABULATION OF OCCUPANCY (ACTUAL):
87 STUDENTS
17 CADRE
12 VISITORS
= 116 TOTAL OCCUPANTS
2. STUDENT POPULATION:
90% MALE AND 10% FEMALE
3. NO COMBUSTIBLES ARE TO BE STORED IN
THE RECEIVING ROOM 134.
4. LAVATORY DRAINS SHALL BE EXPOSED,
BUT INSULATED. DO NOT CONCEAL WITH
MILLWORK PANELS.
5. GYPSUM WALLBOARD PARTITIONS, SHALL
BE MOISTURE-RESISTANT TYPE AT
LOCATIONS ADJACENT TO WET AREAS
WATER FIXTURES.
6. ELECTRIC WATER COOLERS SHALL BE
EQUIPPED WITH BOTTLE FILL FEATURE
AND A SWITCH FOR ACCESSIBLE
OPERATION.
7. WATER CLOSETS, URINALS AND
LAVATORIES SHALL BE MANUALLY
OPERATED.
8. LARGE CLASSROOM 104 SHALL HAVE A
COLUMN-FREE INTERIOR.
SHEET NOTES
ELECTRICALLY OPERATED ACOUSTICAL
FOLDING PARTITION, STC-50 MIN, AND
NRC VALUE NOT LESS THAN .65.
PROVIDE WITH TOP AND BOTTOM
SEALS AND PANEL STORAGE IN
CONCEALED POCKET.
PROVIDE WATER CLOSET
ACCESSORIES AS NOTED IN THE RFP
(INCLUDING TOILET PAPER ROLL
HOLDERS)
PROVIDE ADA SHOWER ACCESSORIES
AS NOTED IN THE RFP (INCLUDING
BENCH AND GRAB BARS)
ONE-WAY MIRROR; MIRRORED SIDE AT
TESTING CENTER ROOM 102.
PROVIDE ELEVATOR PIT ESCAPE AREA
PER THE RFP REQUIREMENTS.
DASHED LINE INDICATES LOCATION OF
PRE-ENGINEERED METAL CANOPY
ABOVE, TYP. AT ALL EXTERIOR DOORS.
LINE INDICATES LOCATION OF
CONCRETE STOOP, TYP. AT ALL
EXTERIOR DOORS.
RECESSED WALK-OFF FLOOR MAT
MILLWORK: SOLID SURFACE
COUNTERTOP, PALM BASE CABINET
AND PALM WALL CABINETS.
HOLE-LESS HYDRAULIC ELEVATOR,
3500 LB CAPACITY.
LOCKER ROOM WOOD BENCH
LOCKERS, REFER TO RFP FOR
REQUIREMENTS.
KEY NOTES
north A-101
A R
C H
IT
E
C T
U R
A L
F
IR
S T
F L
O O
R P
L A
N
K S
K S
P Z
K S
B V
G A
-1
.D G
N A
N S
I D
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E
D A
T E
N
O V
E M
B E
R
T B
D
SHEET ID
READY TO ADVERTISE
F
IL
E N
A M
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
S O
L
IC
IT
A
T
IO
N N
O
D E
S
IG
N E
D B
Y
A
M A
R K
S
IZ
E
S U
B M
IT
T
E D
B Y
D A
T E
C O
N T
R A
C T
N O
US Army Corps of Engineers
C A
T E
G O
R Y
C O
D E
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
W
IL
M
IN
G O
T N
D
IS
T R
IC
T
D E
S C
R
IP
T
IO
N
M
IC
H
IG
A
N A
V E
S
U
IT
E
C H
IC
A
G O
T :3
.6
.7 w w w .e x p fe d e ra l.
c o m p ro j n o c h i-
-A
D A
R L
IN
G
T O
N A
V E
N U
E
W
IL
M
IN
G T
O N
N
O R
T H
C A
R O
L
IN
A
-3
-0
F O
R T
B R
A G
G
N O
R T
H C
A R
O L
IN
A D
E V
E L
O P
R E
Q U
E S
T F
O R
P R
O P
O S
A L F
O R
P N
S O
F C
O M
B A
T M
E D
IC
T
R A
IN
IN
G F
A C
IL
IT
Y
FOR OFFICIAL USE ONLY (FOUO)
FOR OFFICIAL USE ONLY (FOUO)
F O
R O
F F
IC
IA
L U
S E
O N
L Y
F
O U
O
F O
R O
F F
IC
IA
L U
S E
O N
L Y
F
O U
O
16'0 4' 8'SCALE 1/8" = 1' - 0"
FIRST FLOOR PLAN
A-301
A-302
A-302
A-301
A-201
A-201
A-202
A-202
REINFORCED CMU EXTERIOR
WALLS AT TRUE NORTH AND WEST
SIDES OF BUILDING. SEE A-501.
W
2P M
R
"STAIRS
OPEN
OFFICE
AREA
756 SF
CORRIDOR
200A
OPEN
OFFICE
AREA
1156 SF
CADRE
CONF.
ROOM
632 SF
SECURITY
TELECOM
ROOM
232 SF
TELECOM
ROOM
113 SF
CADRE
WORK
ROOM
141 SF
CADRE
BREAKROOM
299 SF
SENIOR
CADRE
ROOM
666 SF
STORAGE
ROOM
354 SF
CORRIDOR
200B
CADRE
MEN'S
LATRINE
244 SF
CADRE
WOMEN'S
LATRINE
215 SF
JAN
CLST.
51 SF
OPEN
OFFICE
AREA
518 SF
STAIRS
216 SF
ELEC.
ROOM
168 SF
MECHANICAL
ROOM
480 SF
CADRE WOMEN'S
SHOWER&LOCKER
ROOM
160 SF
CADRE MEN'S
SHOWER & LOCKER
ROOM
377 SF
211A
210A209A
B
201A
202A
A
221A
220A
A
A
A
A
A
217A
A
A
A
DN
DN
ELEV
LACTATION
ROOM
98 SF
221B
VEND.
B
223A
206A
23'-5" 23'-3" 108'-0"
154'-8"
A B C D E F G
W1
W1
W1
W1
W1
W1
W1W1W1W1W1
11 11 north A-102
A R
C H
IT
E
C T
U R
A L
S E
C O
N D
F L
O O
R P
L A
N
V R
E K
J E
P Z
K S
16'0 4' 8'SCALE 1/8" = 1' - 0"
SECOND FLOOR PLAN
A N
S I D
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E
D A
T E
N
O V
E M
B E
R
T B
D
SHEET ID
READY TO ADVERTISE
F
IL
E N
A M
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
S O
L
IC
IT
A
T
IO
N N
O
D E
S
IG
N E
D B
Y
A
M A
R K
S
IZ
E
S U
B M
IT
T
E D
B Y
D A
T E
C O
N T
R A
C T
N O
US Army Corps of Engineers
C A
T E
G O
R Y
C O
D E
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
W
IL
M
IN
G O
T N
D
IS
T R
IC
T
D E
S C
R
IP
T
IO
N
M
IC
H
IG
A
N A
V E
S
U
IT
E
C H
IC
A
G O
T :3
.6
.7 w w w .e x p fe d e ra l.
c o m p ro j n o c h i-
-A
D A
R L
IN
G
T O
N A
V E
N U
E
W
IL
M
IN
G T
O N
N
O R
T H
C A
R O
L
IN
A
-3
-0
F O
R T
B R
A G
G
N O
R T
H C
A R
O L
IN
A D
E V
E L
O P
R E
Q U
E S
T F
O R
P R
O P
O S
A L F
O R
P N
S O
F C
O M
B A
T M
E D
IC
T
R A
IN
IN
G F
A C
IL
IT
Y
FOR OFFICIAL USE ONLY (FOUO)
FOR OFFICIAL USE ONLY (FOUO)
F O
R O
F F
IC
IA
L U
S E
O N
L Y
F
O U
O
F O
R O
F F
IC
IA
L U
S E
O N
L Y
F
O U
O
A-201
A-201
A-202
A-201
A-301
A-302
A-302
PROVIDE WATER CLOSET
ACCESSORIES AS NOTED IN THE
RFP (INCLUDING TOILET PAPER
ROLL HOLDERS)
PROVIDE ADA SHOWER
ACCESSORIES AS NOTED IN THE
RFP (INCLUDING BENCH AND
GRAB BARS)
LINE INDICATED LOCATION OF
PRE-ENGINEERED METAL
CANOPY BELOW, TYP. AT ALL
EXTERIOR DOORS.
MILLWORK: SOLID SURFACE
COUNTERTOP. PALM BASE
CABINET AND PALM WALL
CABINETS.
HOLE-LESS HYDRAULIC
ELEVATOR, 3500 LB CAPACITY.
ELEVATOR PIT ESCAPE AREA,
EXTEND TO TOP OF HOISTWAY.
LOCKER ROOM WOOD BENCH
OVER-SIZED LOCKERS, REFER
TO RFP REQUIREMENTS.
WALL BRACED SOLID SURFACE
COUNTERTOP AND BACKSPLASH
WITH BOWL SINK. INSULATE ALL
EXPOSED PIPING BELOW THE
SINK. SINK SHALL BE OFFSET
TO ONE SIDE TO ACCOMMODATE
SPACE FOR A SMALL
REFRIGERATOR BELOW THE
COUNTERTOP (PART OF THE
FF&E PACKAGE). LOCATE GFI
RECEPTACLE BELOW THE
COUNTERTOP FOR THE
REFRIGERATOR. PROVIDE
MIRROR ABOVE THE
COUNTERTOP. PROVIDE A
SEMI-RECESSED PAPER TOWEL
DISPENSER/DISPOSAL UNIT
ADJACENT TO THE SINK.
OVERHEAD BRACED LAMINATE
PARTITION WITH PRIVACY
CURTAIN AND ROD.
KEY NOTES
REINFORCED CMU EXTERIOR
WALLS AT TRUE NORTH AND WEST
SIDES OF BUILDING, SEE A-501.
NO. ROOM NAME
Gross
Area (SF)
Net Area
(SF)
100 CORRIDOR A+B 3,038 2,738
101 TESTING CENTER ADMIN 327 279
102 TESTING CENTER 611 523
103 STAIRS 200 185
104 LARGE CLASSROOM 2,709 2,567
105 CLASSROOM 572 550
106 CLASSROOM 594 550
107 CLASSROOM 619 550
108 CLASSROOM 672 619
110 CLASSROOM 670 618
111 CLASSROOM 599 552
112 CLASSROOM 597
113 CLASSROOM 624
114 CLASSROOM 599
115 CLASSROOM 573
116 CLASSROOM 575
117 CLASSROOM 573
118 STUDENT BREAK ROOM 320 297
119 MEN’S SHOWER & LOCKER ROOM 671 603
120 MEN’S LATRINE 278 243
121 WOMEN’S LATRINE 245 210
109 LIBRARY 162 146
122 WOMEN’S SHOWER & LOCKER ROOM 175 155
123 JAN CLST 59 51
124 MAINT. STORAGE 261 238
125 FIRE RISER ROOM 368 328
127 STAIRS 218 185
128 ELEC. ROOM 334 286
129 MECHANICAL ROOM 633 576
130 ELEV. MACH. ROOM 158 132
132 TELECOM ROOM 128 113
133 GENERAL STORAGE 589 518
134 RECEIVING 312 265
½ CANOPY
FIRST FLOOR TOTAL
NO. ROOM NAME
Gross
Area (SF)
Net Area
(SF)
200 CORRIDOR A+B 1,048 937
201 OPEN OFFICE AREA 844 756
202 OPEN OFFICE AREA 1,274 1,156
205 CADRE CONF. ROOM 693 632
206 CADRE WORK ROOM 158 141
207 CADRE BREAKROOM 325 299
208 CADRE MEN’S SHOWER & LOCKER ROOM 427 377
209 CADRE MEN’S LATRINE 289 245
210 CADRE WOMEN’S LATRINE 257 215
CADRE WOMEN’S SHOWER & LOCKER
ROOM
186 152
212 JAN CLST. 59 51
213 OPEN OFFICE AREA 581 518
216 ELEC. ROOM 186 160
217 MECHANICAL ROOM 530 480
218 STORAGE ROOM 420 354
219 OPEN OFFICE AREA 729 666
220 TELCOM ROOM 128 113
221 SECURITY TELECOM ROOM 274 232
223 LACTATION ROOM 112 128
SECOND FLOOR TOTAL
19,268 17,448
9,185 7,802
BUILDING TOTAL 28,453 25,250
TYP.
A
-1 .D
G N
B V
G
W
2P M
R
A-103
A R
C H
IT
E
C T
U R
A L
R O
O F
P L A
N
V R
E K
J E
P Z
K S
B V
G A
-1
.D G
N A
N S
I D
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E
D A
T…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.