Amendment_0003_SF-00005-16.pdf

PDF 386 KB Posted

Attached to
Renovate Building O-1908, SOTF, Ft Bragg, NC
Solicitation number
W912PM-16-B-0028
Issued by

About this file

Amendment 0003

View the file

Other files

File Type Posted
16-B-0028_Renovate_O-1908_Signed.pdf PDF
Sign_in.pdf PDF
AMD0004_PLANS_SF-00005-16_DGNfiles.zip ZIP file
Amendment_0004-SF-005-16.pdf PDF
AMD0004_PLANS_SF-00005-16.pdf PDF
Site_Visit_Sign-In_Sheet.pdf PDF
AMD0003_PLANS_SF-00005-16.pdf PDF
AMD0003_PLANS_SF-00005-16_DGNfiles.zip ZIP file
W912PM-16-B-0028-0002.pdf PDF
W912PM-16-B-0028-0002_Conformed.pdf PDF
W912PM-16-B-0028-0001.pdf PDF
W912PM-16-B-0028-0001_Conformed.pdf PDF
ADV_PLANS_SF-00005-16.pdf PDF
ADV_PLANS_SF-00005-16_DGNfiles.zip ZIP file
ADV_SPECS_SF-00005-16.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Solicitation W912PM-16-B-0028 is hereby amended for the follow ing reasons:

a) To incorporate additional specification sections and revised plan sheets. See the Technical Summary of Changes, attached.

b) The date and time for receipt of bids is not changed by this modification .

c) All other terms, provisions, and conditions of the solicitation remain unchanged.

///////////////////////////////////////////////////////// LAST ITEM \\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 31-Aug-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912PM-16-B-0028

X 9B. DATED (SEE ITEM 11)

23-Aug-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

31-Aug-2016

CODE

U S ARMY CORPS OF ENGINEERS

ATTN: JERE F. WEST, 69 DARLINGTON AVE

WILMINGTON NC 28403

W912PM 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912PM-16-B-0028

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SECTION 00 00 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

SUMMARY OF CHANGES

(End of Summary of Changes)

W912PM-16-B-0028

Amendment 0003

TECHNICAL SUMMARY OF CHANGES

SPECIFICATIONS:

The revised Sections and/or Attachments listed below (revised by Amendment No. 0003) is hereby added to and made a part of the solicitation.

Revised Section Revised Attachment Project Table of Contents 01 33 00 – Attachment 1 ENG Form 4288

Following sections were inadvertently omitted from 100% Advertise Specifications and have been added to and made a part of the solicitation.

03 30 53 MISCELLANEOUS CAST-IN-PLACE CONCRETE

05 51 00 METAL STAIRS

05 52 00 METAL RAILINGS

07 21 19 RETROFIT BLANKET INSULATION SYSTEM

07 42 13 METAL WALL PANELS

08 11 13 STEEL DOORS AND FRAMES

08 71 00 DOOR HARDWARE

31 00 00 EARTHWORK

31 32 11 SOIL SURFACE EROSION CONTROL

32 92 19 SEEDING

33 11 00 WATER UTILITY DISTRIBUTION PIPING

The following section has been deleted:

07 21 29 SPRAY APPLIED FOAM INSULATION

DRAWINGS:

Delete existing Sheet Numbers E-602, E-701, ED101 and EP101 in their entirety and replace with revised enclosed Sheets.

Summary of Scope included in Drawing Revisions:

Remove the existing 200A service disconnect and feeder from SUS transformer to panel 'B'. Provide new 200A, 3-pole breaker in panel 'A' and install a new 200A feeder from panel 'A' to panel 'B'. Install new 600A service entrance rated fused disconnect on exterior wall of building near panel 'A'. New 600A secondary from SUS transformer will connect to new 600A disconnect and feed new panel 'A'. Panel 'A' will change from a service entrance rated MCB panel to a standard main lug only panel.

SF-00005-16 - Renovate Storage Bldg O-1908, SOTF W912PM-16-B-0028 Fort. Bragg, NC

PROJECT TABLE OF CONTENTS

****Amendment 0003****

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

STANDARD FORM 1442

00 10 00 SOLICITATION, CONTRACT LINE ITEM NUMBER (CLIN) SCHEDULE

00 21 00 INSTRUCTIONS

00 21 13 INSTRUCTIONS TO BIDDERS

00 45 00 REPRESENTATIONS AND CERTIFICATIONS

00 70 00 CONDITIONS OF THE CONTRACT

00 73 00 SUPPLEMENTARY CONDITIONS

00 01 15 LIST OF DRAWINGS

DIVISION 01 - GENERAL REQUIREMENTS

01 00 05 GENERAL AND SPECIAL PROVISIONS

01 00 60 SECURITY PROCEDURES GUIDE

01 10 00.10 38 SUPPLEMENTARY SPECIAL CONTRACT REQUIREMENTS

01 14 00 WORK RESTRICTIONS

01 30 00 ADMINISTRATIVE REQUIREMENTS

01 32 01.00 10 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 33 29 SUSTAINABILITY REPORTING

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 10 QUALITY CONTROL

01 45 00.10 10 QUALITY CONTROL SYSTEM (QCS)

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION

DIVISION 03 - CONCRETE

03 30 53 MISCELLANEOUS CAST-IN-PLACE CONCRETE

DIVISION 05 - METALS

05 50 13 MISCELLANEOUS METAL FABRICATIONS

05 51 00 METAL STAIRS

05 52 00 METAL RAILINGS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 21 19 RETROFIT BLANKET INSULATION SYSTEM

07 42 13 METAL WALL PANELS

07 92 00 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 33 23 OVERHEAD COILING DOORS

08 71 00 DOOR HARDWARE

PROJECT TABLE OF CONTENTS Page 1 (Revised by Amendment 0003)

DIVISION 09 - FINISHES

09 90 00 PAINTS AND COATINGS

DIVISION 10 - SPECIALTIES

10 44 16 FIRE EXTINGUISHERS

DIVISION 21 - FIRE SUPPRESSION

21 13 00.00 40 FIRE-SUPPRESSION SPRINKLER SYSTEMS

21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS

23 05 48.00 40 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND

EQUIPMENT

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC

23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC

23 09 23.01 LONWORKS DIRECT DIGITAL CONTROL FOR HVAC AND OTHER

BUILDING CONTROL SYSTEMS

23 23 00 REFRIGERANT PIPING

DIVISION 26 - ELECTRICAL

26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS

26 05 00.00 40 COMMON WORK RESULTS FOR ELECTRICAL

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 24 16.00 40 PANELBOARDS

26 53 00.00 40 EXIT SIGNS

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

31 32 11 SOIL SURFACE EROSION CONTROL

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 92 19 SEEDING

DIVISION 33 - UTILITIES

33 11 00 WATER UTILITY DISTRIBUTION PIPING

****Amendment 0003****

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 2 (Revised by Amendment 0003)

SUBMITTAL REGISTER (ER 415-1-10) TITLE AND LOCATION DATE

CONTRACTOR CONTRACT NUMBER

ACTIVITY

No.

TRANS-

MITTAL

No.

ITEM

No.

SPEC

PARAGRAPH

No.

DESCRIPTION OF

SUBMITTAL

TYPE OF SUBMITTAL

CLASSI-

FICATION

FIO

GA, DA,

CR, or S

REVIEWER

OFFICE / NAME

CONTRACTOR

SCHEDULE DATES

CONTRACTOR

ACTION

GOVERNMENT

ACTION

SUBMIT

NEEDED

BY

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

CODE

CORPS

RECEIVED

DATE

CODE

CORPS

RETURNED

DATE

SF-00005-16,RENOVATE STORAGE BLDG 0-1908

W912PM-16-B-0028 NA

30 Aug 2016

SORT : SECTION & ITEMRANGE : ALL

SECTION - 01 10 00.10 38 SUPPLEMENTARY SPECIAL CONTRACT REQUIREMENTS

1 01 10 00.10 38 1.10 List of Subcontractors PRECON SUBMTL FIO

2 01 10 00.10 38 1.2 Progress Chart PRECON SUBMTL GA

3 01 10 00.10 38 1.10 Quality Control Plan PRECON SUBMTL GA

4 01 10 00.10 38 1.10 Certificate of Insurance PRECON SUBMTL FIO

5 01 10 00.10 38 1.5 PROGRESS SCHEDULE PRODUCT DATA FIO

6 01 10 00.10 38 1.10 Completion of Corps CQC Course CERTIFICATES FIO

7 01 10 00.10 38 1.10 Letter Appointing Superintendent CERTIFICATES FIO

8 01 10 00.10 38 1.9 Contractor testing laboratory CERTIFICATES GA

9 01 10 00.10 38 1.9 Commercial testing laboratory CERTIFICATES GA

SECTION - 01 14 00 WORK RESTRICTIONS

1 01 14 00 1.3.1.1 List of Contact Personnel PRECON SUBMTL FIO

SECTION - 01 32 01.00 10 PROJECT SCHEDULE

1 01 32 01.00 10 1.3 Project Scheduler Qualifications PRECON SUBMTL GA

2 01 32 01.00 10 3.4.1 Preliminary Project Schedule PRECON SUBMTL GA

3 01 32 01.00 10 3.4.2 Initial Project Schedule PRECON SUBMTL GA

4 01 32 01.00 10 3.6.2 Periodic Schedule Update PRECON SUBMTL GA

SECTION - 01 33 00 SUBMITTAL PROCEDURES

1 01 33 00 1.7 Submittal Register PRECON SUBMTL GA

SECTION - 01 33 29 LEED(TM) DOCUMENTATION

1 01 33 29 1.5.3.1 Preliminary Sustainability Notebook PRECON SUBMTL GA

2 01 33 29 1.5.3.1 Preliminary High Performance and Sustain PRECON SUBMTL FIO

3 01 33 29 1.5.3.1 Final Sustainability Notebook CLOSEOUT SUBMTL GA

4 01 33 29 1.5.3.1 Final High Performance and Sustainable B CLOSEOUT SUBMTL GA

SECTION - 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

1 01 35 26 1.7 Accident Prevention Plan (APP) PRECON SUBMTL GA

2 01 35 26 1.4 Monthly Exposure Reports TEST REPORTS FIO

3 01 35 26 1.12 Notifications and Reports TEST REPORTS FIO

4 01 35 26 1.12.2 Accident Reports TEST REPORTS GA

5 01 35 26 1.12.3 LHE Inspection Reports TEST REPORTS FIO

6 01 35 26 1.6.1.5 Crane Operators/Riggers CERTIFICATES FIO

7 01 35 26 1.7.2.2 Standard Lift Plan CERTIFICATES GA

8 01 35 26 1.7.2.3 Critical Lift Plan CERTIFICATES GA

9 01 35 26 1.8 Activity Hazard Analysis (AHA) CERTIFICATES FIO

10 01 35 26 1.9.1 Confined Space Entry Permit CERTIFICATES FIO

ACTIVITY

No.

TRANS-

MITTAL

No.

ITEM

No.

SPEC

PARAGRAPH

No.

DESCRIPTION OF

SUBMITTAL

TYPE OF SUBMITTAL

CLASSI-

FICATION

FIO

GA, DA,

CR, or S

REVIEWER

OFFICE / NAME

CONTRACTOR

SCHEDULE DATES

CONTRACTOR

ACTION

GOVERNMENT

ACTION

SUBMIT

NEEDED

BY

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

CODE

CORPS

RECEIVED

DATE

CODE

CORPS

RETURNED

DATE

SF-00005-16,RENOVATE STORAGE BLDG 0-1908

W912PM-16-B-0028 NA

30 Aug 2016

SORT : SECTION & ITEMRANGE : ALL

11 01 35 26 1.9.1 Hot Work Permit CERTIFICATES FIO

12 01 35 26 1.12.4 Certificate of Compliance CERTIFICATES FIO

SECTION - 01 45 00.00 10 QUALITY CONTROL

1 01 45 00.00 10 3.2 Contractor Quality Control (CQC) Plan PRECON SUBMTL GA

2 01 45 00.00 10 3.9 Verification Statement TEST REPORTS FIO

SECTION - 01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROL

1 01 50 00 1.3 Construction Site Plan PRECON SUBMTL FIO

2 01 50 00 3.4.1 Traffic Control Plan PRECON SUBMTL FIO

SECTION - 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

1 01 57 19 1.5.1 Preconstruction Survey PRECON SUBMTL FIO

2 01 57 19 1.8 Solid Waste Management Permit PRECON SUBMTL GA

3 01 57 19 1.5.2 Regulatory Notifications PRECON SUBMTL GA

4 01 57 19 1.6 Environmental Protection Plan PRECON SUBMTL GA

5 01 57 19 1.6.9.1 Dirt and Dust Control Plan PRECON SUBMTL GA

6 01 57 19 1.5.4 Employee Training Records PRECON SUBMTL GA

7 01 57 19 1.5.4 Employee Training Records CERTIFICATES FIO

8 01 57 19 3.7.1 Waste Determination Documentation CLOSEOUT SUBMTL FIO

9 01 57 19 3.7.2.6 Disposal Documentation for Hazardous and CLOSEOUT SUBMTL FIO

10 01 57 19 1.5.4 Assembled Employee Training Records CLOSEOUT SUBMTL GA

11 01 57 19 1.8 Solid Waste Management Permit CLOSEOUT SUBMTL GA

12 01 57 19 3.7.2.1 Hazardous Waste/Debris Management CLOSEOUT SUBMTL GA

13 01 57 19 1.5.2 Regulatory Notifications CLOSEOUT SUBMTL GA

SECTION - 01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

1 01 74 19 1.6 Waste Management Plan PRECON SUBMTL GA

2 01 74 19 1.7 Records CLOSEOUT SUBMTL FIO

SECTION - 01 78 00 CLOSEOUT SUBMITTALS

1 01 78 00 1.7.1 Warranty Management Plan PRODUCT DATA FIO

2 01 78 00 1.7.5 Warranty Tags PRODUCT DATA FIO

3 01 78 00 1.5 Spare Parts Data PRODUCT DATA FIO

4 01 78 00 1.7.1 Instructions MFRS INSTR FIO

5 01 78 00 3.6 Operation and Maintenance Manuals O&M DATA GA

6 01 78 00 3.3 Record Drawings CLOSEOUT SUBMTL GA

7 01 78 00 2.3 Certification of EPA Designated Items CLOSEOUT SUBMTL GA

8 01 78 00 3.8 Interim DD FORM 1354 CLOSEOUT SUBMTL GA

9 01 78 00 3.8 Checklist for DD FORM 1354 CLOSEOUT SUBMTL GA

ACTIVITY

No.

TRANS-

MITTAL

No.

ITEM

No.

SPEC

PARAGRAPH

No.

DESCRIPTION OF

SUBMITTAL

TYPE OF SUBMITTAL

CLASSI-

FICATION

FIO

GA, DA,

CR, or S

REVIEWER

OFFICE / NAME

CONTRACTOR

SCHEDULE DATES

CONTRACTOR

ACTION

GOVERNMENT

ACTION

SUBMIT

NEEDED

BY

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

CODE

CORPS

RECEIVED

DATE

CODE

CORPS

RETURNED

DATE

SF-00005-16,RENOVATE STORAGE BLDG 0-1908

W912PM-16-B-0028 NA

30 Aug 2016

SORT : SECTION & ITEMRANGE : ALL

SECTION - 02 41 00 DEMOLITION

1 02 41 00 1.2.1 Demolition Plan PRECON SUBMTL GA

2 02 41 00 1.8 Existing Conditions PRECON SUBMTL FIO

3 02 41 00 1.6 Notification CERTIFICATES GA

SECTION - 03 30 53 MISCELLANEOUS CAST-IN-PLACE CONCRETE

1 03 30 53 1.4 Installation Drawings SHOP DRAWINGS GA

2 03 30 53 2.2.3.1 Air-Entraining Admixture PRODUCT DATA FIO

3 03 30 53 2.2.3.2 Accelerating Admixture PRODUCT DATA FIO

4 03 30 53 2.2.3.3 Water-Reducing or Retarding Admixture PRODUCT DATA FIO

5 03 30 53 2.2.10 Curing Materials PRODUCT DATA FIO

6 03 30 53 2.2.6 Expansion Joint Filler Strips, Premolded PRODUCT DATA FIO

7 03 30 53 2.2.7 Joint Sealants - Field Molded Sealants PRODUCT DATA FIO

8 03 30 53 3.2 Conveying and Placing Concrete PRODUCT DATA FIO

9 03 30 53 2.2.8 Formwork PRODUCT DATA FIO

10 03 30 53 2.3 Mix Design Data PRODUCT DATA GA

11 03 30 53 2.3 Ready-Mix Concrete PRODUCT DATA GA

12 03 30 53 2.4.1 Curing Compound PRODUCT DATA GA

13 03 30 53 2.2.5 Mechanical Reinforcing Bar Connectors PRODUCT DATA FIO

14 03 30 53 2.2.2 Aggregates TEST REPORTS FIO

15 03 30 53 2.1.3 Concrete Mixture Proportions TEST REPORTS GA

16 03 30 53 3.3.3.2 Measurement of Floor Tolerances TEST REPORTS FIO

17 03 30 53 3.8.3 Compressive Strength Testing TEST REPORTS GA

18 03 30 53 3.8.3 Slump TEST REPORTS GA

19 03 30 53 3.8.3 Air Content TEST REPORTS FIO

20 03 30 53 2.2.4 Water TEST REPORTS FIO

21 03 30 53 2.2.1 Cementitious Materials CERTIFICATES FIO

22 03 30 53 2.2.2 Aggregates CERTIFICATES FIO

23 03 30 53 2.3 Delivery Tickets CERTIFICATES FIO

24 03 30 53 2.4.1 Curing Compound MFRS INSTR FIO

SECTION - 05 50 13 MISCELLANEOUS METAL FABRICATIONS

1 05 50 13 2.3 Guard posts SHOP DRAWINGS FIO

2 05 50 13 2.4 Angles and Plates SHOP DRAWINGS FIO

SECTION - 05 51 00 METAL STAIRS

1 05 51 00 2.13 Metal Stair System SHOP DRAWINGS GA

2 05 51 00 2.13 Stair framing calculations SHOP DRAWINGS GA

ACTIVITY

No.

TRANS-

MITTAL

No.

ITEM

No.

SPEC

PARAGRAPH

No.

DESCRIPTION OF

SUBMITTAL

TYPE OF SUBMITTAL

CLASSI-

FICATION

FIO

GA, DA,

CR, or S

REVIEWER

OFFICE / NAME

CONTRACTOR

SCHEDULE DATES

CONTRACTOR

ACTION

GOVERNMENT

ACTION

SUBMIT

NEEDED

BY

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

CODE

CORPS

RECEIVED

DATE

CODE

CORPS

RETURNED

DATE

SF-00005-16,RENOVATE STORAGE BLDG 0-1908

W912PM-16-B-0028 NA

30 Aug 2016

SORT : SECTION & ITEMRANGE : ALL

3 05 51 00 2.15 Steel Stairs PRODUCT DATA GA

4 05 51 00 1.3 Welder Qualification CERTIFICATES GA

5 05 51 00 2.15 Steel Stairs MFRS INSTR FIO

SECTION - 05 52 00 METAL RAILINGS

1 05 52 00 2.1 Fabrication Drawings SHOP DRAWINGS GA

2 05 52 00 1.3.1 Welder Qualification CERTIFICATES GA

3 05 52 00 3.2 Installation Instructions MFRS INSTR GA

SECTION - 07 21 19 Foamed-in-Place Insulation 1 07 21 19 2.5 Pressure Sensitive Tape PRODUCT DATA FIO

2 07 21 19 2.7 Accessories PRODUCT DATA FIO

3 07 21 19 2.4 Fabric Liner PRODUCT DATA GA

4 07 21 19 Insulation MFRS INSTR FIO

5 07 21 19 3.3.1 Manufacturers Written Directions MFRS INSTR FIO

6 07 21 19 2.1.1 Recycled Content for Insulation Material CLOSEOUT SUBMTL FIO

7 07 21 19 2.1.2 Reduce Volatile Organic Compounds (VOC) CLOSEOUT SUBMTL FIO

SECTION - 07 42 13 METAL WALL PANELS

1 07 42 13 1.5.3 Qualification of Manufacturer PRECON SUBMTL GA

2 07 42 13 1.5.4 Qualification of Installation Contractor PRECON SUBMTL GA

3 07 42 13 1.8 Warranty PRECON SUBMTL GA

4 07 42 13 1.5.1.1 Installation Drawings SHOP DRAWINGS GA

5 07 42 13 2.1 Recycled Content; PRODUCT DATA FIO

6 07 42 13 2.2.1 Exterior Wall Panel PRODUCT DATA GA

7 07 42 13 2.2.1 Wall Liner Panel PRODUCT DATA GA

8 07 42 13 2.2.2 Factory Color Finish PRODUCT DATA GA

9 07 42 13 1.5.5 Closure Materials PRODUCT DATA FIO

10 07 42 13 2.5.4.4 Pressure Sensitive Tape PRODUCT DATA FIO

11 07 42 13 2.5.4.1 Sealants and Caulking PRODUCT DATA FIO

12 07 42 13 1.5.3.1 Galvanizing Repair Paint PRODUCT DATA FIO

13 07 42 13 1.5.3.1 Enamel Repair Paint PRODUCT DATA FIO

14 07 42 13 2.5 Accessories PRODUCT DATA FIO

15 07 42 13 2.2.1 Exterior Wall Panel SAMPLES GA

16 07 42 13 2.2.1 Wall Liner Panel SAMPLES GA

17 07 42 13 2.2.2.5 Color chart SAMPLES GA

18 07 42 13 1.5.1.2 Wind load design analysis DESIGN DATA GA

19 07 42 13 3.7.2 Leakage Tests TEST REPORTS GA

ACTIVITY

No.

TRANS-

MITTAL

No.

ITEM

No.

SPEC

PARAGRAPH

No.

DESCRIPTION OF

SUBMITTAL

TYPE OF SUBMITTAL

CLASSI-

FICATION

FIO

GA, DA,

CR, or S

REVIEWER

OFFICE / NAME

CONTRACTOR

SCHEDULE DATES

CONTRACTOR

ACTION

GOVERNMENT

ACTION

SUBMIT

NEEDED

BY

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

CODE

CORPS

RECEIVED

DATE

CODE

CORPS

RETURNED

DATE

SF-00005-16,RENOVATE STORAGE BLDG 0-1908

W912PM-16-B-0028 NA

30 Aug 2016

SORT : SECTION & ITEMRANGE : ALL

20 07 42 13 1.3.2 Wind Load Tests TEST REPORTS GA

21 07 42 13 2.2.2.6 Coating TEST REPORTS GA

22 07 42 13 2.2.2.6 Chalking TEST REPORTS GA

23 07 42 13 1.3.2 Seismic Tests TEST REPORTS GA

24 07 42 13 1.5.3.1 Coil Stock CERTIFICATES GA

25 07 42 13 1.5.3.1 Fasteners CERTIFICATES GA

26 07 42 13 1.5.3.1 Galvanizing Repair Paint CERTIFICATES GA

27 07 42 13 1.5.3.1 Enamel Repair Paint CERTIFICATES GA

28 07 42 13 3.3 Installation MFRS INSTR GA

29 07 42 13 3.8.1 Manufacturer's Field Reports MFRS FLD REPT GA

30 07 42 13 1.8 Warranty CLOSEOUT SUBMTL GA

31 07 42 13 1.5.6 Maintenance Instructions CLOSEOUT SUBMTL GA

32 07 42 13 1.8.1 20 year 'No Dollar Limit' warranty for l CLOSEOUT SUBMTL FIO

SECTION - 07 92 00 JOINT SEALANTS

1 07 92 00 2.1 Sealants PRODUCT DATA GA

2 07 92 00 2.2 Primers PRODUCT DATA GA

3 07 92 00 2.3 Bond Breakers PRODUCT DATA GA

4 07 92 00 2.4 Backstops PRODUCT DATA GA

5 07 92 00 3.1 Field Adhesion PRODUCT DATA GA

6 07 92 00 3.4.7 Sealant CERTIFICATES FIO

7 07 92 00 2.2 Primers CERTIFICATES FIO

8 07 92 00 2.3 Bond Breakers CERTIFICATES FIO

9 07 92 00 1.4 Volatile Organic Compounds (VOC) Content CERTIFICATES FIO

10 07 92 00 2.1.1 Volatile Organic Compounds (VOC) Content CERTIFICATES FIO

11 07 92 00 1.4 Volatile Organic Compounds (VOC) Content CLOSEOUT SUBMTL FIO

12 07 92 00 2.1.1 Volatile Organic Compounds (VOC) Content CLOSEOUT SUBMTL FIO

SECTION - 08 11 13 STEEL DOORS AND FRAMES

1 08 11 13 2.1 Doors SHOP DRAWINGS GA

2 08 11 13 2.3 Frames SHOP DRAWINGS GA

3 08 11 13 2.1 Doors PRODUCT DATA GA

4 08 11 13 2.3 Frames PRODUCT DATA GA

SECTION - 08 33 23 OVERHEAD COILING DOORS

1 08 33 23 2.2.1 Overhead Coiling Doors SHOP DRAWINGS GA

2 08 33 23 2.2.3 Counterbalancing Mechanism SHOP DRAWINGS GA

3 08 33 23 2.2.4 Electric Door Operators SHOP DRAWINGS GA

ACTIVITY

No.

TRANS-

MITTAL

No.

ITEM

No.

SPEC

PARAGRAPH

No.

DESCRIPTION OF

SUBMITTAL

TYPE OF SUBMITTAL

CLASSI-

FICATION

FIO

GA, DA,

CR, or S

REVIEWER

OFFICE / NAME

CONTRACTOR

SCHEDULE DATES

CONTRACTOR

ACTION

GOVERNMENT

ACTION

SUBMIT

NEEDED

BY

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

CODE

CORPS

RECEIVED

DATE

CODE

CORPS

RETURNED

DATE

SF-00005-16,RENOVATE STORAGE BLDG 0-1908

W912PM-16-B-0028 NA

30 Aug 2016

SORT : SECTION & ITEMRANGE : ALL

4 08 33 23 2.2.1.3 Bottom Bars SHOP DRAWINGS GA

5 08 33 23 2.1.1.1 Guides SHOP DRAWINGS GA

6 08 33 23 2.2.3.1 Mounting Brackets SHOP DRAWINGS GA

7 08 33 23 2.2.1.8 Overhead Drum SHOP DRAWINGS GA

8 08 33 23 3.3.2 Hood SHOP DRAWINGS GA

9 08 33 23 2.1.1.1 Installation Drawings SHOP DRAWINGS GA

10 08 33 23 2.2.1 Overhead Coiling Doors PRODUCT DATA GA

11 08 33 23 2.2.2 Hardware PRODUCT DATA GA

12 08 33 23 2.2.3 Counterbalancing Mechanism PRODUCT DATA GA

13 08 33 23 2.2.4 Electric Door Operators PRODUCT DATA GA

14 08 33 23 2.2.1 Overhead Coiling Doors DESIGN DATA GA

15 08 33 23 2.2.2 Hardware DESIGN DATA GA

16 08 33 23 2.2.3 Counterbalancing Mechanism DESIGN DATA GA

17 08 33 23 2.2.4 Electric Door Operators DESIGN DATA GA

18 08 33 23 1.3.1 Powder Coatings Certificate DESIGN DATA GA

19 08 33 23 3.3.2 Operation and Maintenance Manuals O&M DATA GA

20 08 33 23 3.3.2 Materials O&M DATA GA

21 08 33 23 3.3.2 Devices O&M DATA GA

22 08 33 23 3.3.2 Procedures O&M DATA GA

23 08 33 23 3.3.2 Manufacture's Brochures O&M DATA GA

24 08 33 23 3.3.2 Parts Lists O&M DATA GA

25 08 33 23 3.3.1 Warranty CLOSEOUT SUBMTL GA

SECTION - 08 71 00 DOOR HARDWARE

1 08 71 00 1.3 Manufacturer's Detail Drawings SHOP DRAWINGS GA

2 08 71 00 1.3 Verification of Existing Conditions SHOP DRAWINGS GA

3 08 71 00 1.5 Hardware Schedule SHOP DRAWINGS GA

4 08 71 00 2.3.5 Keying System SHOP DRAWINGS GA

5 08 71 00 2.3 Hardware Items PRODUCT DATA GA

6 08 71 00 3.1 Installation MFRS INSTR FIO

7 08 71 00 1.5 Hardware Schedule O&M DATA GA

8 08 71 00 1.6.1 Key Bitting CLOSEOUT SUBMTL FIO

SECTION - 09 90 00 PAINTS AND COATINGS

1 09 90 00 1.4.2 Certification PRODUCT DATA FIO

2 09 90 00 2.1 Coating PRODUCT DATA GA

3 09 90 00 2.1 Manufacturer's Technical Data Sheets PRODUCT DATA FIO

ACTIVITY

No.

TRANS-

MITTAL

No.

ITEM

No.

SPEC

PARAGRAPH

No.

DESCRIPTION OF

SUBMITTAL

TYPE OF SUBMITTAL

CLASSI-

FICATION

FIO

GA, DA,

CR, or S

REVIEWER

OFFICE / NAME

CONTRACTOR

SCHEDULE DATES

CONTRACTOR

ACTION

GOVERNMENT

ACTION

SUBMIT

NEEDED

BY

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

CODE

CORPS

RECEIVED

DATE

CODE

CORPS

RETURNED

DATE

SF-00005-16,RENOVATE STORAGE BLDG 0-1908

W912PM-16-B-0028 NA

30 Aug 2016

SORT : SECTION & ITEMRANGE : ALL

4 09 90 00 1.10 Color SAMPLES GA

5 09 90 00 1.3 Applicator's qualifications CERTIFICATES FIO

6 09 90 00 1.4.1.2 Qualification Testing CERTIFICATES GA

7 09 90 00 3.2.1 Application instructions MFRS INSTR FIO

8 09 90 00 3.4.2 Mixing MFRS INSTR FIO

9 09 90 00 1.7.2 Manufacturer's Material Safety Data Shee MFRS INSTR FIO

10 09 90 00 2.1 Coatings O&M DATA FIO

11 09 90 00 1.9.1 Local/Regional Materials CLOSEOUT SUBMTL FIO

12 09 90 00 2.1 Materials CLOSEOUT SUBMTL FIO

SECTION - 10 44 16 FIRE EXTINGUISHERS

1 10 44 16 2.2.1 Cabinets SHOP DRAWINGS GA

2 10 44 16 2.1.2 Extinguishers PRODUCT DATA GA

3 10 44 16 2.1.3 Accessories PRODUCT DATA GA

4 10 44 16 2.2.1 Cabinets PRODUCT DATA GA

5 10 44 16 3.2.1 Replacement Parts List PRODUCT DATA GA

SECTION - 21 13 00.00 40 FIRE-SUPPRESSION SPRINKLER SYSTEMS

1 21 13 00.00 40 1.2 Record of Existing Conditions PRECON SUBMTL GA

2 21 13 00.00 40 2.2.2 Supporting Elements SHOP DRAWINGS GA

3 21 13 00.00 40 2.2.3 Fire-Department Connections SHOP DRAWINGS GA

4 21 13 00.00 40 2.2.5 Sprinkler Heads SHOP DRAWINGS GA

5 21 13 00.00 40 2.2.6 Valves SHOP DRAWINGS GA

6 21 13 00.00 40 2.2.1 Aboveground Piping Materials PRODUCT DATA GA

7 21 13 00.00 40 2.2.6 Valves PRODUCT DATA GA

8 21 13 00.00 40 2.2.4 Riser Alarm Equipment PRODUCT DATA GA

9 21 13 00.00 40 2.2.5 Sprinkler Heads PRODUCT DATA GA

10 21 13 00.00 40 2.3 Materials PRODUCT DATA GA

11 21 13 00.00 40 2.2.2 Supporting Elements PRODUCT DATA GA

12 21 13 00.00 40 2.1 Equipment and Performance Data PRODUCT DATA GA

13 21 13 00.00 40 Part 2 Design Analysis and Calculations DESIGN DATA GA

14 21 13 00.00 40 3.3.5 Pressure Tests TEST REPORTS GA

SECTION - 21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

1 21 13 13.00 10 1.4.3 Shop Drawings SHOP DRAWINGS GA

2 21 13 13.00 10 3.6 As-Built Drawings SHOP DRAWINGS GA

3 21 13 13.00 10 1.4.1 Fire Protection Related Submittals PRODUCT DATA FIO

4 21 13 13.00 10 2.3 Materials and Equipment PRODUCT DATA GA

ACTIVITY

No.

TRANS-

MITTAL

No.

ITEM

No.

SPEC

PARAGRAPH

No.

DESCRIPTION OF

SUBMITTAL

TYPE OF SUBMITTAL

CLASSI-

FICATION

FIO

GA, DA,

CR, or S

REVIEWER

OFFICE / NAME

CONTRACTOR

SCHEDULE DATES

CONTRACTOR

ACTION

GOVERNMENT

ACTION

SUBMIT

NEEDED

BY

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

CODE

CORPS

RECEIVED

DATE

CODE

CORPS

RETURNED

DATE

SF-00005-16,RENOVATE STORAGE BLDG 0-1908

W912PM-16-B-0028 NA

30 Aug 2016

SORT : SECTION & ITEMRANGE : ALL

5 21 13 13.00 10 1.6 Spare Parts PRODUCT DATA FIO

6 21 13 13.00 10 3.5 Preliminary Tests PRODUCT DATA GA

7 21 13 13.00 10 3.6 Final Acceptance Test PRODUCT DATA GA

8 21 13 13.00 10 1.4.1 Fire Protection Specialist PRODUCT DATA GA

9 21 13 13.00 10 1.4.2 Sprinkler System Installer PRODUCT DATA GA

10 21 13 13.00 10 1.4.3 Sway Bracing DESIGN DATA GA

11 21 13 13.00 10 1.2.1.3 Hydraulic Calculations DESIGN DATA GA

12 21 13 13.00 10 3.5 Preliminary Test Report TEST REPORTS GA

13 21 13 13.00 10 3.6 Final Acceptance Test Report TEST REPORTS GA

14 21 13 13.00 10 3.6 Operating and Maintenance Manuals O&M DATA GA

SECTION - 23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

1 23 00 00 1.4.5 Detail Drawings SHOP DRAWINGS GA

2 23 00 00 2.9.1.1 Metallic Flexible Duct PRODUCT DATA FIO

3 23 00 00 2.9.1.2 Insulated Nonmetallic Flexible Duct Runo PRODUCT DATA FIO

4 23 00 00 2.9.1.2 Duct Connectors PRODUCT DATA FIO

5 23 00 00 2.9.2 Duct Access Doors PRODUCT DATA GA

6 23 00 00 2.9.3 Fire Dampers PRODUCT DATA FIO

7 23 00 00 2.9.4 Manual Balancing Dampers PRODUCT DATA GA

8 23 00 00 2.9.7 Sound Attenuation Equipment PRODUCT DATA FIO

9 23 00 00 2.9.7 Acoustical Duct Liner PRODUCT DATA FIO

10 23 00 00 2.9.8.1 Diffusers PRODUCT DATA FIO

11 23 00 00 2.9.8.2 Registers and Grilles PRODUCT DATA FIO

12 23 00 00 2.9.9 Louvers PRODUCT DATA FIO

13 23 00 00 2.10.1.1 Centrifugal Fans PRODUCT DATA FIO

14 23 00 00 2.11 Air Handling Units PRODUCT DATA GA

15 23 00 00 2.12 Energy Recovery Devices PRODUCT DATA GA

16 23 00 00 1.4.6 Test Procedures PRODUCT DATA FIO

17 23 00 00 1.2.1.2 Diagrams PRODUCT DATA GA

18 23 00 00 3.12 Performance Tests TEST REPORTS GA

19 23 00 00 3.10 Damper Acceptance Test TEST REPORTS GA

20 23 00 00 3.2 Manufacturer's Installation Instructions MFRS INSTR FIO

21 23 00 00 3.14.2 Operation and Maintenance Training MFRS INSTR FIO

22 23 00 00 3.14.1 Operation and Maintenance Manuals O&M DATA FIO

23 23 00 00 2.9.3 Fire Dampers O&M DATA GA

24 23 00 00 2.9.4 Manual Balancing Dampers O&M DATA GA

ACTIVITY

No.

TRANS-

MITTAL

No.

ITEM

No.

SPEC

PARAGRAPH

No.

DESCRIPTION OF

SUBMITTAL

TYPE OF SUBMITTAL

CLASSI-

FICATION

FIO

GA, DA,

CR, or S

REVIEWER

OFFICE / NAME

CONTRACTOR

SCHEDULE DATES

CONTRACTOR

ACTION

GOVERNMENT

ACTION

SUBMIT

NEEDED

BY

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

CODE

CORPS

RECEIVED

DATE

CODE

CORPS

RETURNED

DATE

SF-00005-16,RENOVATE STORAGE BLDG 0-1908

W912PM-16-B-0028 NA

30 Aug 2016

SORT : SECTION & ITEMRANGE : ALL

25 23 00 00 2.10.1.1 Centrifugal Fans O&M DATA GA

26 23 00 00 2.11 Air Handling Units O&M DATA GA

SECTION - 23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS

1 23 03 00.00 20 2.1.1 Energy Efficient Equipment for Motors CLOSEOUT SUBMTL FIO

2 23 03 00.00 20 2.1.2 Reduce Volatile Organic Compounds (VOC) CLOSEOUT SUBMTL FIO

SECTION - 23 05 48.00 40 VIBRATION AND SEISMIC CTRLS/HVAC PIPING

1 23 05 48.00 40 1.2 Installation Drawings SHOP DRAWINGS GA

2 23 05 48.00 40 1.2 Outline Drawings SHOP DRAWINGS GA

3 23 05 48.00 40 1.2 Equipment and Performance Data PRODUCT DATA GA

4 23 05 48.00 40 2.2.5 Isolators PRODUCT DATA GA

5 23 05 48.00 40 2.4 Type of Isolator TEST REPORTS GA

6 23 05 48.00 40 2.4 Type of Base TEST REPORTS GA

7 23 05 48.00 40 2.4 Allowable Deflection TEST REPORTS GA

8 23 05 48.00 40 2.4 Measured Deflection TEST REPORTS GA

SECTION - 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

1 23 05 93 1.3 Records of Existing Conditions PRECON SUBMTL GA

2 23 05 93 1.3.2 Records of Existing Conditions PRECON SUBMTL GA

3 23 05 93 1.5.3.1 TAB Firm PRECON SUBMTL GA

4 23 05 93 1.2 TAB team assistants PRECON SUBMTL GA

5 23 05 93 1.2 TAB team engineer PRECON SUBMTL GA

6 23 05 93 1.5.3.2 TAB Specialist PRECON SUBMTL GA

7 23 05 93 1.2 TAB team field leader PRECON SUBMTL GA

8 23 05 93 1.3.2 TAB Schematic Drawings and Report Forms SHOP DRAWINGS GA

9 23 05 93 1.3 Equipment and Performance Data PRODUCT DATA GA

10 23 05 93 1.5.3.4 TAB Related HVAC Submittals PRODUCT DATA GA

11 23 05 93 1.5.2 TAB Procedures PRODUCT DATA GA

12 23 05 93 1.5.2 Calibration PRODUCT DATA GA

13 23 05 93 1.3.2 Systems Readiness Check PRODUCT DATA GA

14 23 05 93 1.5.4 TAB Execution PRODUCT DATA GA

15 23 05 93 1.5.4.3 TAB Verification PRODUCT DATA GA

16 23 05 93 1.3.2 Design review report TEST REPORTS GA

17 23 05 93 1.3.2 Design review report TEST REPORTS GA

18 23 05 93 1.7.2.1 Design review report TEST REPORTS GA

19 23 05 93 1.7.2.1 Design review report TEST REPORTS GA

20 23 05 93 1.7.2 Pre-Final DALT report TEST REPORTS GA

ACTIVITY

No.

TRANS-

MITTAL

No.

ITEM

No.

SPEC

PARAGRAPH

No.

DESCRIPTION OF

SUBMITTAL

TYPE OF SUBMITTAL

CLASSI-

FICATION

FIO

GA, DA,

CR, or S

REVIEWER

OFFICE / NAME

CONTRACTOR

SCHEDULE DATES

CONTRACTOR

ACTION

GOVERNMENT

ACTION

SUBMIT

NEEDED

BY

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

CODE

CORPS

RECEIVED

DATE

CODE

CORPS

RETURNED

DATE

SF-00005-16,RENOVATE STORAGE BLDG 0-1908

W912PM-16-B-0028 NA

30 Aug 2016

SORT : SECTION & ITEMRANGE : ALL

21 23 05 93 3.3.5 Pre-Final DALT report TEST REPORTS GA

22 23 05 93 1.7.2 Final DALT report TEST REPORTS GA

23 23 05 93 3.3.8 Final DALT report TEST REPORTS GA

24 23 05 93 1.5.5.2 TAB report for Season 1 TEST REPORTS GA

25 23 05 93 1.5.5.2 TAB report for Season 2 TEST REPORTS GA

26 23 05 93 1.5.3.1 TAB Firm TEST REPORTS GA

27 23 05 93 1.5.1 Independent TAB Agency and Personnel QuaTEST REPORTS GA

28 23 05 93 1.7.2 DALT and TAB Submittal and Work ScheduleTEST REPORTS GA

29 23 05 93 1.7.2.2 Pre-field DALT preliminary notification TEST REPORTS GA

30 23 05 93 1.7.2.3 Pre-field TAB engineering report TEST REPORTS GA

31 23 05 93 1.7.2 Advanced notice for Season 1 TAB field TEST REPORTS GA

SECTION - 23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

1 23 07 00 3.2 Duct Insulation Systems SHOP DRAWINGS FIO

2 23 07 00 1.4.2 Certification PRODUCT DATA FIO

3 23 07 00 3.2 Duct Insulation Systems PRODUCT DATA GA

4 23 07 00 2.2.1.3 Thermal Insulation SAMPLES GA

5 23 07 00 3.2 Duct Insulation Systems MFRS INSTR GA

SECTION - 23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC

1 23 09 00 3.2 DDC Contractor Design Drawings SHOP DRAWINGS GA

2 23 09 00 3.2 Final As-Built Drawings SHOP DRAWINGS GA

3 23 09 00 1.8.4 Certificate of Networthiness Documentati PRODUCT DATA GA

4 23 09 00 1.8.1 Programming Software PRODUCT DATA GA

5 23 09 00 1.8.2 Controller Application Programs PRODUCT DATA GA

6 23 09 00 2.2 Manufacturer's Product Data PRODUCT DATA GA

7 23 09 00 2.2.1 XIF files PRODUCT DATA GA

8 23 09 00 3.4.3 Draft LNS Database PRODUCT DATA GA

9 23 09 00 3.5.4 Final LNS Database PRODUCT DATA GA

10 23 09 00 1.8.3 LNS Plug-ins PRODUCT DATA GA

11 23 09 00 3.4.2 Start-Up Testing Report TEST REPORTS GA

12 23 09 00 3.5.1 PVT Procedures TEST REPORTS GA

13 23 09 00 3.5.3 PVT Report TEST REPORTS GA

14 23 09 00 1.9.1 Pre-Construction Quality Control (QC) Ch TEST REPORTS GA

15 23 09 00 1.9.2 Post-Construction Quality Control (QC) C TEST REPORTS GA

16 23 09 00 3.6 Operation and Maintenance (O&M) Instruct O&M DATA GA

17 23 09 00 3.8.1 Training Documentation O&M DATA GA

ACTIVITY

No.

TRANS-

MITTAL

No.

ITEM

No.

SPEC

PARAGRAPH

No.

DESCRIPTION OF

SUBMITTAL

TYPE OF SUBMITTAL

CLASSI-

FICATION

FIO

GA, DA,

CR, or S

REVIEWER

OFFICE / NAME

CONTRACTOR

SCHEDULE DATES

CONTRACTOR

ACTION

GOVERNMENT

ACTION

SUBMIT

NEEDED

BY

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

CODE

CORPS

RECEIVED

DATE

CODE

CORPS

RETURNED

DATE

SF-00005-16,RENOVATE STORAGE BLDG 0-1908

W912PM-16-B-0028 NA

30 Aug 2016

SORT : SECTION & ITEMRANGE : ALL

18 23 09 00 2.5 Enclosure Keys CLOSEOUT SUBMTL GA

19 23 09 00 3.1.6.1 Password Summary Report CLOSEOUT SUBMTL GA

20 23 09 00 1.9.3 Closeout Quality Control (QC) Checklist CLOSEOUT SUBMTL GA

SECTION - 23 23 00 REFRIGERANT PIPING

1 23 23 00 2.3 Refrigerant Piping System SHOP DRAWINGS GA

2 23 23 00 2.3 Refrigerant Piping System PRODUCT DATA FIO

3 23 23 00 1.5.2 Spare Parts PRODUCT DATA FIO

4 23 23 00 1.3.1 Qualifications PRODUCT DATA FIO

5 23 23 00 3.5 Refrigerant Piping Tests PRODUCT DATA FIO

6 23 23 00 3.1 Verification of Dimensions PRODUCT DATA FIO

7 23 23 00 3.5 Refrigerant Piping Tests TEST REPORTS FIO

8 23 23 00 2.1 Service Organization CERTIFICATES FIO

9 23 23 00 1.5 Maintenance O&M DATA GA

10 23 23 00 3.4 Operation and Maintenance Manuals O&M DATA GA

11 23 23 00 3.4 Demonstrations O&M DATA GA

SECTION - 26 05 00.00 40 COMMON WORK RESULTS FOR ELECTRICAL

1 26 05 00.00 40 2.1 Material, Equipment, and Fixture Lists PRECON SUBMTL GA

2 26 05 00.00 40 2.1.1 Conduits and Raceways PRODUCT DATA GA

3 26 05 00.00 40 2.1.2 Wire and Cable PRODUCT DATA GA

4 26 05 00.00 40 3.2.1.8 Splices and Connectors PRODUCT DATA GA

5 26 05 00.00 40 2.1.3 Switches PRODUCT DATA GA

6 26 05 00.00 40 2.1.4 Receptacles PRODUCT DATA GA

7 26 05 00.00 40 2.1.5 Outlets, Outlet Boxes, and Pull Boxes PRODUCT DATA GA

8 26 05 00.00 40 2.1.7 Circuit Breakers PRODUCT DATA GA

9 26 05 00.00 40 2.1.6 Panelboards PRODUCT DATA GA

10 26 05 00.00 40 2.1.8 Lamps and Lighting Fixtures PRODUCT DATA GA

11 26 05 00.00 40 3.3 Continuity Test TEST REPORTS GA

12 26 05 00.00 40 3.3 Phase-Rotation Tests TEST REPORTS GA

13 26 05 00.00 40 3.3 Insulation Resistance Test TEST REPORTS GA

14 26 05 00.00 40 1.4 Certification CERTIFICATES GA

15 26 05 00.00 40 Part 2 Manufacturer's Instructions MFRS INSTR GA

SECTION - 26 20 00 INTERIOR DISTRIBUTION SYSTEM

1 26 20 00 2.12 Panelboards SHOP DRAWINGS GA

2 26 20 00 3.1.8.1 Marking strips SHOP DRAWINGS GA

3 26 20 00 2.11 Receptacles PRODUCT DATA GA

ACTIVITY

No.

TRANS-

MITTAL

No.

ITEM

No.

SPEC

PARAGRAPH

No.

DESCRIPTION OF

SUBMITTAL

TYPE OF SUBMITTAL

CLASSI-

FICATION

FIO

GA, DA,

CR, or S

REVIEWER

OFFICE / NAME

CONTRACTOR

SCHEDULE DATES

CONTRACTOR

ACTION

GOVERNMENT

ACTION

SUBMIT

NEEDED

BY

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

CODE

CORPS

RECEIVED

DATE

CODE

CORPS

RETURNED

DATE

SF-00005-16,RENOVATE STORAGE BLDG 0-1908

W912PM-16-B-0028 NA

30 Aug 2016

SORT : SECTION & ITEMRANGE : ALL

4 26 20 00 2.12.3 Circuit breakers PRODUCT DATA GA

5 26 20 00 2.9 Switches PRODUCT DATA GA

6 26 20 00 2.13 Enclosed circuit breakers PRODUCT DATA GA

7 26 20 00 2.14 Manual motor starters PRODUCT DATA GA

8 26 20 00 3.5.2 600-volt wiring test TEST REPORTS GA

9 26 20 00 3.5.4 Grounding system test TEST REPORTS GA

10 26 20 00 3.5.3 Ground-fault receptacle test TEST REPORTS GA

11 26 20 00 2.10 Fuses CERTIFICATES GA

12 26 20 00 1.5.1 Electrical Systems CERTIFICATES GA

SECTION - 26 24 16.00 40 PANELBOARDS

1 26 24 16.00 40 2.1.1 Detail Drawings SHOP DRAWINGS GA

2 26 24 16.00 40 2.1.1 Outline Drawings SHOP DRAWINGS GA

3 26 24 16.00 40 1.3 Panelboards PRODUCT DATA GA

4 26 24 16.00 40 2.1.1 Panelboards PRODUCT DATA GA

5 26 24 16.00 40 2.1.3 Directory Card and Holder PRODUCT DATA GA

6 26 24 16.00 40 3.2 Continuity Tests TEST REPORTS GA

7 26 24 16.00 40 3.2 Insulation Tests TEST REPORTS GA

8 26 24 16.00 40 1.4 Statements CERTIFICATES GA

9 26 24 16.00 40 1.3 Panelboards MFRS INSTR GA

10 26 24 16.00 40 2.1.1 Panelboards MFRS INSTR GA

SECTION - 26 53 00.00 40 EXIT SIGNS

1 26 53 00.00 40 1.2.1 Material, Equipment, and Fixture Lists PRECON SUBMTL GA

2 26 53 00.00 40 1.2.1 Exit Lighting Units SHOP DRAWINGS GA

3 26 53 00.00 40 1.2.1 Exit Lighting Units Outline Drawings SHOP DRAWINGS FIO

4 26 53 00.00 40 1.2.1 Exit Lighting Units PRODUCT DATA GA

5 26 53 00.00 40 1.2.1 Accessories PRODUCT DATA GA

6 26 53 00.00 40 3.2.1 Operational Tests TEST REPORTS GA

7 26 53 00.00 40 1.2.1 Energy Efficiencies CERTIFICATES GA

SECTION - 28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

1 28 31 76 2.1.2 Nameplates SHOP DRAWINGS GA

2 28 31 76 2.13.10 Instructions SHOP DRAWINGS GA

3 28 31 76 3.2.1 Wiring Diagrams SHOP DRAWINGS GA

4 28 31 76 1.2.1 System Layout SHOP DRAWINGS GA

5 28 31 76 2.3 System Operation SHOP DRAWINGS GA

6 28 31 76 2.16 Notification Appliances SHOP DRAWINGS GA

ACTIVITY

No.

TRANS-

MITTAL

No.

ITEM

No.

SPEC

PARAGRAPH

No.

DESCRIPTION OF

SUBMITTAL

TYPE OF SUBMITTAL

CLASSI-

FICATION

FIO

GA, DA,

CR, or S

REVIEWER

OFFICE / NAME

CONTRACTOR

SCHEDULE DATES

CONTRACTOR

ACTION

GOVERNMENT

ACTION

SUBMIT

NEEDED

BY

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

CODE

CORPS

RECEIVED

DATE

CODE

CORPS

RETURNED

DATE

SF-00005-16,RENOVATE STORAGE BLDG 0-1908

W912PM-16-B-0028 NA

30 Aug 2016

SORT : SECTION & ITEMRANGE : ALL

7 28 31 76 2.14 Amplifiers SHOP DRAWINGS GA

8 28 31 76 1.6 Technical Data And Computer Software PRODUCT DATA GA

9 28 31 76 2.13 Fire Alarm Control Unit and Mass Notific PRODUCT DATA GA

10 28 31 76 3.2.2 Terminal cabinets PRODUCT DATA GA

11 28 31 76 2.15 Manual stations PRODUCT DATA GA

12 28 31 76 2.12.1 Batteries PRODUCT DATA GA

13 28 31 76 2.12.2 Battery chargers PRODUCT DATA GA

14 28 31 76 2.10 Smoke sensors PRODUCT DATA GA

15 28 31 76 2.16 Notification appliances PRODUCT DATA GA

16 28 31 76 2.7 Addressable interface devices PRODUCT DATA GA

17 28 31 76 2.14 Amplifiers PRODUCT DATA GA

18 28 31 76 2.14 Tone generators PRODUCT DATA GA

19 28 31 76 2.14 Digitalized voice generators PRODUCT DATA GA

20 28 31 76 1.4.4 Local Operating Console (LOC) PRODUCT DATA GA

21 28 31 76 2.12.1.2 Battery power DESIGN DATA GA

22 28 31 76 2.12.2 Battery chargers DESIGN DATA GA

23 28 31 76 3.7 Field Quality Control TEST REPORTS FIO

24 28 31 76 3.7.1 Testing Procedures TEST REPORTS GA

25 28 31 76 2.10.4 Smoke sensor testing TEST REPORTS GA

26 28 31 76 1.7.1.4 Installer CERTIFICATES FIO

27 28 31 76 3.7.2.2 Formal Inspection and Tests CERTIFICATES FIO

28 28 31 76 3.7.2.3 Final Testing CERTIFICATES FIO

29 28 31 76 2.3 System Operation MFRS FLD REPT GA

30 28 31 76 1.7.2.2 Fire Alarm/Mass Notification System MFRS FLD REPT FIO

31 28 31 76 3.10 Operation and Maintenance (O&M) Instruct O&M DATA GA

32 28 31 76 3.8 Instruction of Government Employees O&M DATA GA

33 28 31 76 3.7.2.4 As-Built Drawings CLOSEOUT SUBMTL FIO

SECTION - 31 00 00 EARTHWORK

1 31 00 00 3.8 Utilization of Excavated Materials PRODUCT DATA GA

2 31 00 00 3.15 Testing TEST REPORTS FIO

3 31 00 00 2.1 Borrow Site Testing TEST REPORTS FIO

4 31 00 00 3.15 Testing CERTIFICATES FIO

SECTION - 31 32 11 SOIL SURFACE EROSION CONTROL

1 31 32 11 2.1.3 Mulch Control Netting and Filter Fabric PRODUCT DATA FIO

2 31 32 11 2.3 Erosion Control Blankets PRODUCT DATA FIO

ACTIVITY

No.

TRANS-

MITTAL

No.

ITEM

No.

SPEC

PARAGRAPH

No.

DESCRIPTION OF

SUBMITTAL

TYPE OF SUBMITTAL

CLASSI-

FICATION

FIO

GA, DA,

CR, or S

REVIEWER

OFFICE / NAME

CONTRACTOR

SCHEDULE DATES

CONTRACTOR

ACTION

GOVERNMENT

ACTION

SUBMIT

NEEDED

BY

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

CODE

CORPS

RECEIVED

DATE

CODE

CORPS

RETURNED

DATE

SF-00005-16,RENOVATE STORAGE BLDG 0-1908

W912PM-16-B-0028 NA

30 Aug 2016

SORT : SECTION & ITEMRANGE : ALL

3 31 32 11 2.2 Geotextile Fabrics PRODUCT DATA FIO

4 31 32 11 1.2 Equipment PRODUCT DATA FIO

SECTION - 32 92 19 SEEDING

1 32 92 19 2.2.1 Topsoil composition tests TEST REPORTS FIO

2 32 92 19 2.1 seed CERTIFICATES FIO

SECTION - 33 11 00 WATER DISTRIBUTION

1 33 11 00 2.2 Pipe, Fittings, Joints and Couplings PRODUCT DATA GA

2 33 11 00 2.3 Valves PRODUCT DATA GA

3 33 11 00 2.3.3 Valve Boxes PRODUCT DATA FIO

4 33 11 00 2.4.1 Hydrants PRODUCT DATA GA

5 33 11 00 2.5.1 Tapping Sleeves PRODUCT DATA GA

6 33 11 00 3.2.7 Bacteriological Samples TEST REPORTS GA

7 33 11 00 2.2 Pipe, Fittings, Joints and Couplings CERTIFICATES FIO

8 33 11 00 2.2.1.1 Lining CERTIFICATES FIO

9 33 11 00 2.2.1.1 Lining CERTIFICATES FIO

10 33 11 00 2.2.2.1.1 Lining for Fittings CERTIFICATES FIO

11 33 11 00 2.3 Valves CERTIFICATES FIO

12 33 11 00 2.4.1 Hydrants CERTIFICATES FIO

13 33 11 00 1.3.2.1.2 Backflow Prevention Training Certificate CERTIFICATES FIO

14 33 11 00 1.3.2.1.1 Backflow Tester CERTIFICATES FIO

15 33 11 00 3.2.7 Disinfection Procedures CERTIFICATES FIO

16 33 11 00 3.2.1 Manufacturer's Instructions MFRS INSTR FIO

SECTION TABLE OF CONTENTS

DIVISION 03 - CONCRETE

SECTION 03 30 53

MISCELLANEOUS CAST-IN-PLACE CONCRETE

05/14

PART 1 GENERAL

1.1 SUMMARY

1.2 REFERENCES

1.3 SUBMITTALS

1.4 QUALITY ASSURANCE

1.4.1 Regulatory Requirements

1.4.2 Flatness and Levelness of Floor Slabs

PART 2 PRODUCTS

2.1 SYSTEM DESCRIPTION

2.1.1 Strength

2.1.2 Construction Tolerances

2.1.3 Concrete Mixture Proportions

2.2 MATERIALS

2.2.1 Cementitious Materials

2.2.1.1 Portland Cement

2.2.1.2 Pozzolan

2.2.2 Aggregates

2.2.3 Admixtures

2.2.3.1 Air-Entraining Admixture

2.2.3.2 Accelerating Admixture

2.2.3.3 Water-Reducing or Retarding Admixture

2.2.4 Water

2.2.5 Reinforcing Steel

2.2.6 Expansion Joint Filler Strips, Premolded

2.2.7 Joint Sealants - Field Molded Sealants

2.2.8 Formwork

2.2.9 Form Coatings

2.2.10 Curing Materials

2.3 READY-MIX CONCRETE

2.4 ACCESSORIES

2.4.1 Curing Compound

PART 3 EXECUTION

3.1 PREPARATION

3.1.1 Embedded Items

3.1.2 Formwork Installation

3.1.3 Production of Concrete

3.1.3.1 Ready-Mixed Concrete

3.1.3.2 Concrete Made by Volumetric Batching and Continuous Mixing

3.2 CONVEYING AND PLACING CONCRETE

3.2.1 Cold-Weather Requirements

3.2.2 Hot-Weather Requirements

SECTION 03 30 53 Page 1 (ADDED: Amendment 0003)

3.3 FINISHING

3.3.1 Temperature Requirement

3.3.2 Finishing Formed Surfaces

3.3.3 Finishing Unformed Surfaces

3.3.3.1 Flat Floor Finishes

3.3.3.2 Measurement of Floor Tolerances

3.3.3.3 Expansion and Contraction Joints

3.4 CURING AND PROTECTION

3.5 FORM WORK

3.5.1 Removal of Forms

3.6 STEEL REINFORCING

3.6.1 Fabrication

3.6.2 Splicing

3.6.3 Supports

3.7 EMBEDDED ITEMS

3.8 TESTING AND INSPECTING

3.8.1 Field Testing Technicians

3.8.2 Preparations for Placing

3.8.3 Sampling and Testing

3.8.4 Action Required

3.8.4.1 Placing

3.8.4.2 Air Content

3.8.4.3 Slump

-- End of Section Table of Contents --

SECTION 03 30 53 Page 2

****Amendment 0003****

SECTION 03 30 53

MISCELLANEOUS CAST-IN-PLACE CONCRETE

05/14

PART 1 GENERAL

1.1 SUMMARY

Perform all work in accordance with ACI 318.

1.2 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN CONCRETE INSTITUTE INTERNATIONAL (ACI)

ACI 117 (2010; Errata 2011) Specifications for Tolerances for Concrete Construction and Materials and Commentary

ACI 301 (2010; ERTA 2015) Specifications for Structural Concrete

ACI 302.1R (2015) Guide for Concrete Floor and Slab Construction

ACI 304R (2000; R 2009) Guide for Measuring, Mixing, Transporting, and Placing Concrete

ACI 305R (2010) Guide to Hot Weather Concreting

ACI 306R (2010) Guide to Cold Weather Concreting

ACI 318 (2014; Errata 1-2 2014; Errata 3-5 2015;

Errata 6 2016) Building Code Requirements for Structural Concrete and Commentary

ACI 347 (2004; Errata 2008; Errata 2012) Guide to Formwork for Concrete

ACI SP-66 (2004) ACI Detailing Manual

ASTM INTERNATIONAL (ASTM)

ASTM A1064/A1064M (2015) Standard Specification for Carbon-Steel Wire and Welded Wire Reinforcement, Plain and Deformed, for Concrete

ASTM A615/A615M (2015a; E 2015) Standard Specification for Deformed and Plain Carbon-Steel Bars for Concrete Reinforcement

SECTION 03 30 53 Page 3

ASTM C1064/C1064M (2011) Standard Test Method for Temperature of Freshly Mixed Hydraulic-Cement Concrete

ASTM C1260 (2014) Standard Test Method for Potential Alkali Reactivity of Aggregates (Mortar-Bar Method)

ASTM C143/C143M (2012) Standard Test Method for Slump of Hydraulic-Cement Concrete

ASTM C150/C150M (2015) Standard Specification for Portland Cement

ASTM C1567 (2013) Standard Test Method for Potential Alkali-Silica Reactivity of Combinations of Cementitious Materials and Aggregate (Accelerated Mortar-Bar Method)

ASTM C1602/C1602M (2012) Standard Specification for Mixing Water Used in Production of Hydraulic Cement Concrete

ASTM C172/C172M (2014a) Standard Practice for Sampling Freshly Mixed Concrete

ASTM C173/C173M (2014) Standard Test Method for Air Content of Freshly Mixed Concrete by the Volumetric Method

ASTM C231/C231M (2014) Standard Test Method for Air Content of Freshly Mixed Concrete by the Pressure Method

ASTM C260/C260M (2010a) Standard Specification for Air-Entraining Admixtures for Concrete

ASTM C309 (2011) Standard Specification for Liquid Membrane-Forming Compounds for Curing Concrete

ASTM C31/C31M (2015a; E 2016) Standard Practice for Making and Curing Concrete Test Specimens in the Field

ASTM C33/C33M (2013) Standard Specification for Concrete Aggregates

ASTM C39/C39M (2015a) Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens

ASTM C494/C494M (2015a) Standard Specification for Chemical Admixtures for Concrete

ASTM C618 (2012a) Standard Specification for Coal Fly Ash and Raw or Calcined Natural Pozzolan for Use in Concrete

SECTION 03 30 53 Page 4

ASTM C685/C685M (2014) Concrete Made by Volumetric Batching and Continuous Mixing

ASTM C920 (2014a) Standard Specification for Elastomeric Joint Sealants

ASTM C94/C94M (2015) Standard Specification for Ready-Mixed Concrete

ASTM D1752 (2004a; R 2013) Standard Specification for Preformed Sponge Rubber Cork and Recycled PVC Expansion

ASTM D75/D75M (2014) Standard Practice for Sampling Aggregates

ASTM D98 (2015) Calcium Chloride

ASTM E1155 (2014) Standard Test Method for Determining Floor Flatness and Floor Levelness Numbers

ASTM E1155M (2014) Standard Test Method for Determining Floor Flatness and Floor Levelness Numbers (Metric)

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

40 CFR 247 Comprehensive Procurement Guideline for Products Containing Recovered Materials

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability Notebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-02 Shop Drawings

Installation Drawings; G

SD-03 Product Data

Air-Entraining Admixture Accelerating Admixture Water-Reducing or Retarding Admixture Curing Materials Expansion Joint Filler Strips, Premolded Joint Sealants - Field Molded Sealants Conveying and Placing Concrete Formwork Mix Design Data; G Ready-Mix Concrete; G Curing Compound; G Mechanical Reinforcing Bar Connectors

SECTION 03 30 53 Page 5

SD-06 Test Reports

Aggregates Concrete Mixture Proportions; G Measurement of Floor Tolerances Compressive Strength Testing; G Slump; G Air Content Water

SD-07 Certificates

Cementitious Materials Aggregates Delivery Tickets

SD-08 Manufacturer's Instructions

Curing Compound

1.4 QUALITY ASSURANCE

Indicate specific locations of Concrete Placement, Steel Reinforcement, Expansion Joints, and Control Joints on installation drawings and include, but not be limited to, square feet of concrete placements, thicknesses and widths, plan dimensions, and arrangement of cast-in-place concrete section.

1.4.1 Regulatory Requirements

The state statutory and regulatory requirements form a part of this specification to the extent required.

1.4.2 Flatness and Levelness of Floor Slabs

Conduct floor flatness and levelness test, (FF and FL respectively), on floor slabs in accordance with the provisions set forth in ASTM E1155M or ASTM E1155. Make floor tolerance measurements by the approved laboratory and inspection service within 24 hours after completion of final troweling operation and before forms and shores have been removed. Provide results of floor tolerance tests, including formal notice of acceptance or rejection of the work, to the Contracting Officer within 24 hours after data collection.

PART 2 PRODUCTS

2.1 SYSTEM DESCRIPTION

The Government retains the option to sample and test aggregates and concrete to determine compliance with the specifications. Provide facilities and labor as may be necessary to assist the Government in procurement of representative test samples. Obtain samples of aggregates at the point of batching in accordance with ASTM D75/D75M. Sample concrete in accordance with ASTM C172/C172M. Determine slump and air content in accordance with ASTM C143/C143M and ASTM C231/C231M, respectively, when cylinders are molded. Prepare, cure, and transport compression test specimens in accordance with ASTM C31/C31M. Test compression test specimens in accordance with ASTM C39/C39M. Take samples for strength tests not less than once each shift in which concrete is produced. Provide

SECTION 03 30 53 Page 6 a minimum of five specimens from each sample; two to be tested at 28 days (90 days if pozzolan is used) for acceptance, two will be tested at 7 days for information and one held in reserve.

2.1.1 Strength

Acceptance test results are the average strengths of two specimens tested at 28 days (90 days if pozzolan is used). The strength of the concrete is considered satisfactory so long as the average of three consecutive acceptance test results equal or exceed the specified compressive strength, f'c, but not more than 20 percent, and no individual acceptance test result falls below f'c by more than 500 psi.

2.1.2 Construction Tolerances

Apply a Class "C" finish to all surfaces except those specified to receive a Class "D" finish. Apply a Class "D" finish to all post-construction surfaces which will be permanently concealed. Surface requirements for the classes of finish required are as specified in ACI 117.

2.1.3 Concrete Mixture Proportions

Concrete mixture proportions are the responsibility of the Contractor.

Mixture proportions must include the dry weights of cementitious material(s); the nominal maximum size of the coarse aggregate; the specific gravities, absorptions, and saturated surface-dry weights of fine and coarse aggregates; the quantities, types, and names of admixtures; and quantity of water per yard of concrete. Provide materials included in the mixture proportions of the same type and from the same source as will be used on the project. The specified compressive strength f'c is 3,000 psi at 28 days (90 days if pozzolan is used). The maximum nominal size coarse aggregate is 3/4 inch, in accordance with ACI 304R.