FY14_EII_Amd2_Plans.pdf
PDF 1 MB Posted
- Solicitation number
- W912PM-13-B-0006
About this file
AMENDMENT PLANS
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid_Abstract_Afetr_Bid_Opening.pdf | ||
| W912PM-13-B-0006-0002_Conformed_Copy.pdf | ||
| FY14_EII_Amendment0002.pdf | ||
| Site_Visit_Sign-In.pdf | ||
| EI_FY14_Amd1_Plans.pdf | ||
| EII_FY14_Amendment0001.pdf | ||
| FY14_EagleIsland_AdvPlans.pdf | ||
| FY14_EI_ADV_SPECS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
E F
D
C L D
A U
G
G-1
SHEET 1 OF 21
IN
D
X
O
R
A W
IN
G S
A D
D
S H
E E T S
C L D
C
K
B Y
D E S
IG
N
A
B C D
E F G H
D E S
C R
IP
T
IO
N D
A T E
A P P
R O
V E
D S
Y M
B O
L
F
IL
N
M E
W
IL
M
IN
G T
O N
N O
R T
C
R O
L
IN
A
C O
R P
E
N G
IN
E E
R S
U .S
A R
M Y
E
N G
IN
E
IS
T R
IC
T
D A T E
R E
V
IE
W
D R
A W
IN
G
D E
NUMBER
PLATE
A P P
R O
V
C H
IE
S
IG
C T
IO
N
C H
IE
F E
N G
IN
E E
R
A N
C H
W H
B R
U N
S W
IC
U N
T Y
N O
R
R O
L
IN
A
W
IL
M
IN
G T
R B
O R
F Y
E
A G
L E
IS
L A
IM
P R
O V E
M E
N T S
REFERENCE DRAWINGS
R-1
R-2
R-3
INDEX OF DRAWINGS
LOCATION MAP
SITE PLAN - SPILLWAY 7
DEMOLITION PROFILE AND NEW PROFILE - SPILLWAY 7
SITE PLAN - SPILLWAY 8
SITE PLAN - SPILLWAY 9
SPILLWAY DETAILS
STEEL WALKWAY DETAILS
STEEL WALKWAY SUPPORT DETAILS
SEDIMENT AND EROSION CONTROL - DETAILS
PIPE SADDLE DETAILS
MISCELLANEOUS DETAILS
SADDLE SUPPORT DETAIL
SEDIMENT AND EROSION CONTROL PLAN - CELL 3 SPILLWAYS
PROFILE - SPILLWAY 8
PROFILE - SPILLWAY 9
SPILLWAY DETAILS, EXCAVATION
4X8 SPILLWAY DETAILS - SHEET 1 OF 4
4X8 SPILLWAY DETAILS - SHEET 2 OF 4
4X8 SPILLWAY DETAILS - SHEET 3 OF 4
4X8 SPILLWAY DETAILS - SHEET 4 OF 4
SPILLWAY DETAILS EXCAVATION
DEMOLITION PROFILE AND NEW PROFILE SPILLWAY 3
SITE PLAN - SPILLWAY 3
Plate No. Title
INDEX OF DRAWING
E I_
IN
D E
X .d g n
Sheet No.
G-1
G-2
C-1
C-2
C-3
C-4
C-5
C-6
C-7
C-8
S-1
S-2
S-3
S-4
S-5
S-7
S-8
18S-6
S-9
C-9
C-10
01_EI_14_INDEX.dgn 9/10/2013 11:05:22 AM
IE
F
D E S
C T
IO
N
ANCHORAGE BASIN
ACCESS ROAD
BETWEEN CHANNEL
N 160,000
E 2,310,000 N 170,000
E 2,310,000
BRUNSWICK R
IVER
NORTH CAROLINA STATE PORTS AUTHORITY
NC STATE PORTS AUTHORITY DOCKS
ACCESS ROAD
ACCESS ROAD
ACCESS ROAD
WETLANDS
WETLANDS WETLANDS
WETLANDS
WETLANDS
DISPOSAL SITE
OF GATE TO EAGLE ISLAND
APPROXIMATE LOCATION
DIKE
CELL NO. 3
EXISTING
DISPOSAL AREA
CELL NO. 2
SCALE: 1"=800’
800’800’
YARD
REPAIR
ENGINEER
US ARMY
ELEV.=5.18 NAVD 88
E=2315621.55
N=174691.12
PID: EA3063
"8120 C 1976 NO1 1986"
CONTROL POINT #4
ELEV.=20.04 NAVD 88
E=2305275.60
N=157642.27
PID: EA0580
"JOHNSON 2 1965"
CONTROL POINT #1
ELEV.=43.31 NAVD 88
E=2322247.68
N=162378.76
PID: EA3092
"MCDONALDS 1980"
CONTROL POINT #9
ELEV.=32.41 NAVD 88
E=2318380.99
N=162523.85
PID: DJ5930
"PORT 2006"
CONTROL POINT #8
ELEV.=18.37 NAVD 88
E=2318057.65
N=163894.21
PID: DJ5931
"LENFESTEY 2006"
CONTROL POINT #7
DIKE 1-2
CROSS
EXISTING
ROAD
ACCESS
ROAD
ACCESS
DIKE
CELL 1
EXISTING
LANDS
WET-
SPILLWAY NO. 8
CONSTRUCT NEW
SPILLWAY NO. 9
CONSTRUCT NEW
PERIOD SEPTEMBER 2013 THRU JANUARY 2014.
MATERIAL IN THE CELL NO. 2 DISPOSAL AREA DURING THE
SPILLWAY INSTALLATION WORK AND DISPOSAL OF DREDGED
GOVERNMENT CONTRACT ARE PLANNED WHICH WILL REQUIRE
6. DREDGING AND DISPOSAL OPERATIONS UNDER SEPARATE
CONTRACTING OFFICER.
DAMAGE TO THE WETLANDS TO THE SATISFACTION OF THE
CONTRACTOR SHALL BE RESPONSIBLE FOR RESTORING ANY
TEMPORARILY, IN AREAS DEFINED AS WETLANDS. THE
OF ANY KIND SHALL BE PLACED AT ANY TIME, INCLUDING
AND 3 DIKES ARE PROTECTED BY LAW. NO FILL MATERIAL
5. THE WETLANDS LOCATED OUTSIDE OF CELLS 1, 2.
SPILLWAYS 7, 8 AND 9 CONSTRUCTION DETAILS
4. SEE PLATES C-1 THRU C-8 FOR EAGLE ISLAND CELL 3
3. CONTROL POINTS ARE NOTED ON DRAWING
2. VERITICAL DATUM NAVD 88
1. HORIZONTAL DATUM NAD 1983
NOTES:
DIKE 2-3
CROSS
EXISTING
RISER
SPILLWAY NO. 6
MODIFY EXISTING
RISER
SPILLWAY NO. 5
MODIFY EXISTING
RISER
SPILLWAY NO. 4
MODIFY EXISTING
RISER
SPILLWAY NO. 1
MODIFY EXISTING
NO. 2
SPILLWAY
EXISTING SPILLWAY NO. 3
MODIFY EXISTING
N
X
WETLANDS
WETLANDS
G-2
SHEET 2 OF 21
L O
C A T
IO
M
P
S P
IL
L W
A Y S
1, A N
D
A D
D
IL
L W
A Y
R
IS
D
IF
IC
A T
IO
N S
F
O R
C L D
C
A
B C D
E F G H
D E S
C R
IP
T
IO
N D
A T E
A P P
R O
V E
D S
Y M
B O
L
F
M E
W
IL
M
IN
G T
O N
N O
R
R O
L
IN
A
C O
R
E
N G
IN
E E
R S
U .S
A R
M Y
E
N G
IN
E
T R
IC
T
D A T E
R E
V
IE
W
D R
A W
D E
NUMBER
PLATE
S Y
M B
O L
D E S
C R
IP
T
IO
N D
A T E
A P P
R O
V E
D
D E S
IG
N
SHEET OF
W H
G
C L D
E F
D
B R
U N
S W
U N
T Y
N O
R
R O
L
IN
A
W
IL
M
IN
G T
R B
O R
F Y
E
A G
L E
IS
L A
IM
P R
O V E
M E
N T S
B B
B B
B B
B B
B B
B B
B B
B B
B B
B
B B
E 2,315,000
N 175,000
FOURTH EAST JETTY CHANNEL
WETLANDS
WETLANDS
WETLANDS
WETLANDS
U.S. 74, 76, 17 & 421
MEMORIAL BRIDGE
CAPE FEAR
ELEV.=11.99 NAVD 88
E=2311564.90
N=177996.70
PID: EA1250
"BRU 21 1979"
CONTROL POINT #12
E L
E V
E
N
T R
A V
E R
I
L
C O
N T
R
L
I
AREA
DISPOSAL
CELL NO. 1
DISPOSAL AREA
CELL NO. 3
NO. 7
SPILLWAY
REPLACE
LIMITS
BORROW AREA
300’(TYP.)
1_
E I_
IN
D E
X .d g n
CAPE FEAR RIVER
HWY 421
TO US
ON WALKWAY
ON WALKWAY
ON WALKWAY
ON WALKWAY
ON WALKWAY
LEGEND
ACCESS ROAD
BORROW AREA LIMITS
DIKE CENTERLINE
02_EI_14_LOCATION_MAP.dgn 9/10/2013 3:14:59 PM
LEGEND
ACCESS ROAD
DIKE CENTERLINE
N
EXCAVATION LIMITS
MAJOR CONTOUR
MINOR CONTOUR
SCALE IN FEET
SCALE: 1" = 40’
40 80 12040
NOTES:
3.
2.
1.
DESIGNATED REPRESENTATIVE.
TO THE SATISFACTION OF THE CONTRACTING OFFICER OR HIS/HER
WETLANDS DAMAGED BY THE CONTRACTOR’S OPERATION SHALL BE RESTORED
BY LAW. EXCAVATION AND/OR FILLING OF WETLANDS WILL NOT BE ALLOWED.
THE WETLANDS LOCATED OUTSIDE THE DISPOSAL AREA DIKE ARE PROTECTED
AT NO ADDITIONAL EXPENSE TO THE GOVERNMENT.
OF THE CONTRACTOR SHALL BE REPAIRED OR REPLACED BY THE CONTRACTOR
DESIGNATED REPRESENTATIVE, RESULTED FROM LACK OF CARE ON THE PART
ANY NEW DAMAGE THAT, IN THE OPINION OF THE CO OR HIS/HER
BE NOTED.
THE CO OR HIS/HER DESIGNATED REPRESENTATIVE. ANY DAMAGE SHALL
OR HDPE PIPE, THE CONTRACTOR SHALL INSPECT THE HDPE PIPE WITH
BEFORE BEGINNING ANY DEMOLITION/ALTERATIONS TO THE SPILLWAY
SPILLWAY 3 - WORK SITE PLAN
C H
IE
F
D E S
C T
IO
N
S
IT
E
P L A
N
S P
IL
L W
A Y
30" HDPE PIPE
> FACE OF SPILLWAY RISER
SPILLWAY RISER
S T
30" STEEL PIPE
P
E I_
S P
W Y P L A
N .d g n
A D
D
W
E E T E
X C
A V
A T
L
IM
IT
S
S P
IL
L W
A Y
C-9
SHEET 11 OF 21
D R
O
S E P
C L D
C
A
B C D
E F G H
D E S
C R
IP
T
IO
N D
A T E
A P P
R O
V E
D S
Y M
B O
L
F
M E
W
IL
M
IN
G T
O N
N O
R
R O
L
IN
A
C O
R
E
N G
IN
E E
R S
U .S
A R
M Y
E
N G
IN
E
T R
IC
T
D A T E
R E
V
IE
W
D R
A W
D E
NUMBER
PLATE
S Y
M B
O L
D E S
C R
IP
T
IO
N D
A T E
A P P
R O
V E
D
D E S
IG
N
W H
C L D
B R
U N
S W
U N
T Y
N O
R
R O
L
IN
A
W
IL
M
IN
G T
R B
O R
F Y
E
A G
L E
IS
L A
IM
P R
O V E
M E
N T S
A A
A
X X
XX
XX
TEMPORARY SILT FENCE
N 165,712.9
E 2,312,211.13
21_EI_14_SPWY3_PLAN.dgn 9/10/2013 11:01:39 AM
SPILLWAY No. 3 - DEMOLITION PROFILE
EL. 35.4’
7.0’ 88.0’
78.0’
INV. EL. 12.0’
EXISTING GRADE
AND CONCRETE SADDLE
EXISTING 30" STEEL PIPE 22.5°
ELBOW
STEP IN >
EL 27.5’ APPROX. LEVEL OF
3’ 3’
8 SPACED @ 9’ = 72’
SPILLWAY FOUNDATION
SADDLE
CONCRETE
SEEPAGE CUTOFF
BENT (TYP)
SUPPORT
SEEPAGE COLLAR
30" HDPE
EXISTING PIPE
4’ GAP
SPILLWAY No. 3 - NEW WORK PROFILE
EL. 35.4’
SCALE IN FEET
VERTICAL SCALE: 1" = 10’
10 20 301020
HORIZONTAL SCALE: 1" = 20’
40 20 20 40 60
EL. 13.4’
EL 27.5’ APPROX. LEVEL OF
INV. EL. 13.9’
30" STEEL PIPE
STEP IN >
SPILLWAY FOUNDATION
OPENING (SEE NOTE 6)
TO COVER 30" PIPE
NEW STEEL PLATE
C H
IE
F
D E S
C T
IO
N
-2+47 -2+00 -1+00 0+00 1+00 1+50
LOCATION OF SPILLWAY
E l e v a t i o n
V D
EL. 6.65’
C-10
S P
IL
L W
A Y
A
O F
IL
E D
E M
O L
IT
O F
IL
E
SHEET 12 OF 21
P 1_
E I_
S P
W Y D
E M
O P
R O .d g n
A D
D
E E T
D E
IL
L W
A Y
P
IP
E
D R
O
S E P
C L D
C
A
B C D
E F G H
D E S
C R
IP
T
IO
N D
A T E
A P P
R O
V E
D S
Y M
B O
L
F
M E
W
IL
M
IN
G T
O N
N O
R
R O
L
IN
A
C O
R
E
N G
IN
E E
R S
U .S
A R
M Y
E
N G
IN
E
T R
IC
T
D A T E
R E
V
IE
W
D R
A W
D E
NUMBER
PLATE
S Y
M B
O L
D E S
C R
IP
T
IO
N D
A T E
A P P
R O
V E
D
D E S
IG
N
W H
C L D
B R
U N
S W
U N
T Y
N O
R
R O
L
IN
A
W
IL
M
IN
G T
R B
O R
F Y
E
A G
L E
IS
L A
IM
P R
O V E
M E
N T S
EL. 13.4’
EXISTING GRADE
BACKFILL TO
EL. 39.0
30" HDPE
EXISTING PIPE
PIPE AT FLANGE
PIPE FROM HDPE
DISCONNECT STEEL
-2+47 -2+00 -1+00 0+00 1+00 1+50
LOCATION OF SPILLWAY
E l e v a t i o n
V D
EL. 6.65’
1.
2.
3.
4.
5.
NEW STEEL PLATE SHALL BE BOLTED TO PLATE STEEL OF RISER BOX.
PPE OPENING OF SPILLWAY RISER BOX SHALL BE COVERED WITH 1/4-INCH THICK STEEL PLATE.
SEE REFERENCE DRAWINGS FOR DETAILS OF ITEMS TO BE REMOVED.
FOR DEMOLITION REQUIREMENTS SEE SECTION 02 41 00 OF THE SPECIFICATIONS.
AND CRIBBING SHALL BE REPAIRED AT THE CONTRACTOR’S EXPENSE.
HDPE PIPE AND TIMBER CRIBBING. ANY DAMAGE OR ALTERATION CAUSED TO THE HDPE PIPE
THE STEEL PIPE SHALL BE REMOVED WITHOUT ANY DAMAGE OR ALTERATION TO THE EXISTING
SEE EXCAVATION DETAIL ON SHEET S-1.
AT LEAST 10-FEET OF UNDAMAGED GEOTEXTILE FABRIC TO OVERLAP WITH NEW GEOTEXTILE FABRIC.
THE CONTRACTOR SHALL CUT AND PULL BACK THE GEOTEXTILE FABRIC AS NECESSARY TO RETAIN
THREE LAYERS OF HIGH STRENGTH GEOTEXTILE WILL BE ENCOUNTERED DURING EXCAVATION.
DIVERSIONS TO PROVIDE A DRY WORK AREA.
& SOFT, CONSTRUCTION MAY REQUIRE DEWATERING AND USE OF COFFER CELLS AND/OR DITCH
THE CONTRACTOR SHOULD NOTE THAT WATER LEVEL IS HIGH & FOUNDATION MATERIAL IS WET
GENERAL NOTES:
6.
GEOTEXTILE
GEOGRID
22_EI_14_SPWY3_DEMO_PRO.dgn 9/10/2013 11:49:41 AM
SEPARATING THE SAND (SW/SP FILTER) AND THE SUBGRADE SOILS.
3. THE CONTRACTOR SHALL INSTALL A GEOTEXTILE THAT IS APPROPRIATE FOR
FROM WHERE PIPE DAYLIGHTS OUT DIKE EMBANKMENT.
PIPE DAYLIGHTS OUT DIKE EMBANKMENT AND EXTEND TO POINT 10’ DOWN SLOPE
2. BEGIN 4" SOLID CORRUGATED PLASTIC DRAIN PIPE 10’ FROM WHERE DRAIN
UP TO 10’ FROM WHERE DRAIN PIPE DAYLIGHTS OUT DIKE EMBANKMENT.
1. USE 4" PERFORATED CORRUGATED PLASTIC DRAIN PIPE WITH SOCK SLEEVE
FRENCH DRAIN NOTES:
GOOD CONDITION WITH NO TEARS OR HOLES.
GEOTEXTILE SHALL OVERLAP EXISTING GETEXTILE THAT IS IN
EQUIPMENT ON BOTH SIDES OF THE EXCAVATION. THE NEW
OF GEOTEXTILE MATERIAL WITHOUT TEARS OR HOLES FROM
AT ELEV. +24 NAVD88 IN A MANNER THAT SHALL RETAIN 10-FEET
3. THE CONTRACTOR SHALL EXCAVATE TO EXISTING GEOTEXTILE
FABRIC SEAMS ARE NOT REQUIRED TO BE SEWN.
OVERLAP 10-FEET. NEW TO NEW AND NEW TO EXISTING GEOTEXTILE
NEW GEOTEXTILE FABRIC TO EXISTING GEOTEXTILE FABRIC SHALL
FABRIC TO NEW GEOTEXTILE FABRIC SHALL OVERLAP 3-FEET.
SPECIFICATION SECTION 31 05 22 GEOTEXTILE. NEW GEOTEXTILE
2. GEOTEXTILE FOR DIKE EMBANKMENT SHALL COMPLY WITH
WITH SPECIFICATION SECTION 31 01 00 DIKE EMBANKMENT.
1. EXCAVATION AND BACKFILL OF DIKE EMBANKMENT SHALL COMPLY
DIKE EMBANKMENT NOTES:
SPILLWAY 7 - FRENCH DRAIN DETAIL
N.T.S.
12’ (TYP)
SADDLE AND CAP
REMOVE CONCRETE
SPILLWAY 7 - HDPE PIPE DETAIL
SW / SP
PLASTIC DRAIN PIPE
4" DIA. CORRUGATED
N.T.S.
6" TYP.
2" TYP.
(TYP.)
2’-3"
SDR 11
12" HDPE
(SEE FRENCH DRAIN NOTE 3)
GEOTEXTILE FILTER FABRIC
8’
EL 24’
OR EXTRACT PILES
3-FT BELOW GEOTEXTILE
CUT TOP OF H-PILES TO MIN.
SDR 26
30" HDPE PIPE
SDR 11
12" HDPE PIPE
30-INCH HDPE PIPE
15-FEET INSIDE THE
EXTEND A MINIMUM OF
12-INCH HDPE PIPE SHALL
C H
IE
F
D E S
C T
IO
N
PIPE
NEW
2’
VARIES
VARIES
30’
4’ TYP
EXISTING ALIGNMENT
TO COINCIDE WITH
NEW 12" HDPE PIPE
30" O.D. STEEL PIPE
REMOVE EXISTING
(SEE NOTE 3)
EXISTING GEOTEXTILE BY 10’.
GEOTEXTILE MUST OVERLAP THE
THE TOP LAYER OF THE NEW
EXISTING GRADE
BACKFILL TO
E F
D
E X
C A
V A T
IO
N .d g n
E I_
S P
W A
Y D
E T
A
IL
S
S-1
SHEET 11 OF 21
E X
C A
V A T
IO
N
S P
IL
L W
T
A
IL
S R
E V
IS
O T E
X T
IL
E
F
A B
T E
C L D
C
A
B C D
E F G H
D E S
C R
IP
T
IO
N D
A T E
A P P
R O
V E
D S
Y M
B O
L
F
M E
W
IL
M
IN
G T
O N
N O
R
R O
L
IN
A
C O
R
E
N G
IN
E E
R S
U .S
A R
M Y
E
N G
IN
E
T R
IC
T
D A T E
R E
V
IE
W
D R
A W
D E
NUMBER
PLATE
S Y
M B
O L
D E S
C R
IP
T
IO
N D
A T E
A P P
R O
V E
D
D E S
IG
N
W H
G
C L D
B R
U N
S W
U N
T Y
N O
R
R O
L
IN
A
W
IL
M
IN
G T
R B
O R
F Y
E
A G
L E
IS
L A
IM
P R
O V E
M E
N T S
GEOTEXTILE
12H TO 4V (TYP.)
STEP SLOPED AT
SPILLWAY 7 - TYPICAL DIKE EMBANKMENT EXCAVATION SECTION
N.T.S.
11_EI_14_SPWAY_DETAILS_EXCAVATION.DGN 9/10/2013 10:57:01 AM
IE
F
D E S
C T
IO
N E F
D
E I_
S P
W A
Y D
E T
A
IL
S .d g n
S H
E E
X
S P
IL
L W
T
A
IL
S
S H
E E T
L A
Y O
U T
R
E A
R R
A N
G
L E T
T E
A D
D
L L
P
R O
T E
C T
IO
N R
E V
H A T
IZ
E
C L D
S P
IL
L W
A Y S
1, D
A D
D
IL
L W
A Y
R
IS
D
IF
IC
A T
IO
N S
F
C L D
S-6
SHEET 16 OF 21
C
A
B C D
E F G H
D E S
C R
IP
T
IO
N D
A T E
A P P
R O
V E
D S
Y M
B O
L
F
M E
W
IL
M
IN
G T
O N
N O
R
R O
L
IN
A
C O
R
E
N G
IN
E E
R S
U .S
A R
M Y
E
N G
IN
E
T R
IC
T
D A T E
R E
V
IE
W
D R
A W
D E
NUMBER
PLATE
S Y
M B
O L
D E S
C R
IP
T
IO
N D
A T E
A P P
R O
V E
D
D E S
IG
N
W H
G
C L D
B R
U N
S W
U N
T Y
N O
R
R O
L
IN
A
W
IL
M
IN
G T
R B
O R
F Y
E
A G
L E
IS
L A
IM
P R
O V E
M E
N T S
BANDED END
(TYP.)
C 5x6.7
(TYP.)
C 5x6.7
C 5x6.7C 5x6.7
C 5x6.7 C 5x6.7
STEEL SPILLWAY
M
IR
E C
T
IO
N
CROSS BARS SPAN THIS DIRECTION
CROSS BARS SPAN THIS DIRECTION
8’-2"
0’-2"
3’-11�" (GRATING DIMENSION)
3’-11�" (GRATING DIMENSION)
G
R A
T
IM
E N
S
IO
N
MIN
MIN
M
IN
HANDRAIL DETAIL
SHALL BE GALVANIZED IN ACCORDANCE WITH ASTM A 123.
POUNDS PER SQUARE FOOT ON A 48�" SPAN AND DEFLECT LESS THAN �". GRATING
CROSS BARS. GRATING IS TO SAFELY SUSTAIN A UNIFORMLY DISTRIBUTED LOAD OF 200
MAIN BARS TO BE "DOVETAIL" SLOTTED AND HAVE THEIR SLOTS SOLIDLY FILLED BY THE
SO AS NOT TO REMOVE EXCESSIVE MATERIAL FROM THE LOAD SUSTAINING MEMBERS.
CENTER. MAIN BARS AND CROSS BARS TO BE SLOTTED AT THEIR INTERSECTIONS
TO BE RECTANGULAR CROSS SECTION, FLUSH TOP AND SPACED AT 4" CENTER TO
BARS TO BE SERRATED 1�" x�" SPACED AT 1�" CENTER TO CENTER. CROSS BARS
BY IKG INDUSTRIES, A DIVISION OF HARSCO CORPORATION, OR APPROVED EQUAL. MAIN
GRATING TO BE PRESSURE LOCKED RECTANGULAR DESIGN, TYPE B, AS MANUFACTURED
RAILING AND GRATING.
CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS, PRIOR TO FABRICATION OF THE
WITH ASTM A 123.
ALL STEEL RAILING, CONNECTION PLATES, ETC. SHALL BE GALVANIZED IN ACCORDANCE
NOTES
1.
2.
3.
4. ALL STEEL HARDWARE SHALL BE GALVANIZED IN ACCORDANCE WITH ASTM A 153.
N.T.S.
1’-9"
1’-9"
1�"
3’-6"
L 3x3x�
(TYP.)
L 3x3x�
L 3x3x�
(TYP.)
MITER CORNERS
(TYP.)
�" DIA. A325 GALV.
BOLT (TYP.)
STEEL GRATING MAIN
BAR �x 1 �
GRATING, BANDED END (TYP.)
P �X 1�L
MAIN BAR �x 1�
(TYP.)
BEARING P �x 1 x 1�L
N.T.S.
BEARING PLATE DETAIL
�" BANDING BAR
STEEL WALKWAY
3"
M
IN
DRILL BOLT HOLES.
CONTRACTOR TO FIELD
SIDES)
HANDRAIL (TYP. 3
C 5x6.7
GRATING CONNECTION DETAIL
N.T.S.
L
C 5x6.7
(TYP.)
(TYP.)
�" DIA. A325 BOLT
AT EACH CORNER
AND 12" MAX.
NOTE: BANDING BAR NOT SHOWN
MAIN GRATING BAR, �x 1�
BEARING P �x 1 x 1�
STRUCTURES, SECTION 1080.
WITH NCDOT STANDARD SPECIFICATIONS FOR ROADS AND
BE PAINTED WITH TWO COATS OF ZINC RICH PAINT, IN ACCORDANCE
REQUIRED. EXPOSED STEEL FROM FIELD DRILLING HOLES TO
CONTRACTOR TO FIELD DRILL BOLT HOLES IN C 5X6.7 WHERE
(HINGE SIDE)
(LOCK SIDE)
MODIFICATION NOTES
2.
1.
N.T.S.
MODIFICATION NOTES
NEW HATCH (2’ X 3’) SEE
MODIFICATION NOTES
SPACE ENTRY DAVIT SEE
NEW BASE FOR CONFINED
3.
4.
1 1
5. 2
2 PLAN - SPILLWAY RISER MODIFICATIONS
TO SPILLWAY RISER STRUCTURES FOR SPILLWAYS 1, 4, 5, 6, 7, 8, AND 9.
OF THE RISER STRUCTURE. SPILLWAY RISER ACCESS MODIFICATIONS SHALL BE MADE
LOCATED ON THE INTERIOR OF THE BACKSIDE (SIDE WITH ‰-INCH PLATE STEEL)
ENTRY AND RESCUE SYSTEM EQUIPMENT. THE FIXED VERTICAL LADDER SHALL BE
INCLUDE: AN ACCESS HATCH DOOR, A FIXED VERTICAL LADDER, AND CONFINED SPACE
THE CONTRACTOR SHALL MODIFY EXISTING SPILLWAY RISER STRUCTURES TO
COMPLY WITH THE REQUIREMENTS OF SPEC SECTION 33 40 02 SPILLWAY SYSTEM.
ENTRY POST AND DAVIT. THE CONFINED SPACE ENTRY BASE AND DAVIT SHALL
CONTRACTOR SHALL BOLT MANUFACTURED BASE FOR A CONFINED SPACE
FRAMING FOR 2-FT X 3-FT ACCESS DOOR.
MODIFY TOP STEEL RISER TO INCLUDE L2x2x1/4 STEEL MEMBERS TO PROVIDE
VALVE STEM.
ALLOW ACCES FOR A "T" HANDLE VALVE WRENCH TO OPERATE THE GATE
THE CONTRACTOR SHALL MODIFY THE GRATING FOR SPILLWAY 7 RISER TO
RISER. ACCESS DOOR SHALL BE STAINLESS STEEL WITH HINGES AND LOCKING DEVICE.
INSTALLATION OF A 2-FT X 3-FT ACCESS DOOR ON THE TOP OF THE SPILLWAY
THE CONTRACTOR SHALL MODIFY THE GRATING FOR EACH SPILLWAY TO ALLOW
15_EI_14_SPWAY_DETAILS4.dgn 9/10/2013 3:17:06 PM
PARAGRAPH FILL ABOVE GEOGRID.
COMPLY WITH SPECIFICATION SECTION 31 01 00 DIKE EMBANKMENT,
5. FILL MATERIAL BETWEEN GEOTEXTILE AND GEOGRID AT ELEV. 15 SHALL
SECTION 31 05 21 GEOGRID.
4. GEOGRID FOR DIKE EMBANKMENT SHALL COMPLY WITH SPECIFICATION
THAT IS IN GOOD CONDITION WITH NO TEARS OR HOLES.
EXCAVATION. THE NEW GEOTEXTILE SHALL OVERLAP EXISTING GEOTEXTILE
WITHOUT TEARS OR HOLES FROM EQUIPMENT ON BOTH SIDES OF THE
IN A MANNER THAT SHALL RETAIN 10-FEET OF GEOTEXTILE MATERIAL
3. THE CONTRACTOR SHALL EXCAVATE TO EXISTING GEOTEXTILE LAYERS
NEW TO EXISTING GEOTEXTILE FABRIC SEAMS ARE NOT REQUIRED TO BE SEWN.
EXISTING GEOTEXTILE FABRIC SHALL OVERLAP 10-FEET. NEW TO NEW AND
GEOTEXTILE FABRIC SHALL OVERLAP 3-FEET. NEW GEOTEXTILE FABRIC TO
SECTION 31 05 22 GEOTEXTILE. NEW GEOTEXTILE FABRIC TO NEW
2. GEOTEXTILE FOR DIKE EMBANKMENT SHALL COMPLY WITH SPECIFICATION
SPECIFICATION SECTION 31 01 00 DIKE EMBANKMENT.
1. EXCAVATION AND BACKFILL OF DIKE EMBANKMENT SHALL COMPLY WITH
DIKE EMBANKMENT NOTES:
12’ (TYP)
SADDLE AND CAP
REMOVE CONCRETE
N.T.S.
EL 27’
EL 19’
EL 15’
CONCRETE CRADLE
BELOW BOTTOM OF
CUT PILES 1-FOOT
C H
IE
F
D E S
C T
IO
N
PIPE
VARIES
VARIES
30’
4’ TYP
PIPE
30" O.D. STEEL
REMOVE EXISTING
1’
(SEE NOTE 3)
THE EXISTING GEOTEXTILE BY 10’.
NEW GEOTEXTILE MUST OVERLAP
(APPROX ELEV +39 NAVD88)
TOP OF DIKE
BACKFILL TO EXISTING
D R
O
E X
C A
V A T
IO
N .d g n
P E I_
S P
W A
Y D
E T
A
IL
S
S-9
SHEET 21 OF 21
E X
C A
V A T
IO
N
S P
IL
L W
T
A
IL
S
S E P
A D
D
E E T
C L D
C
A
B C D
E F G H
D E S
C R
IP
T
IO
N D
A T E
A P P
R O
V E
D S
Y M
B O
L
F
M E
W
IL
M
IN
G T
O N
N O
R
R O
L
IN
A
C O
R
E
N G
IN
E E
R S
U .S
A R
M Y
E
N G
IN
E
T R
IC
T
D A T E
R E
V
IE
W
D R
A W
D E
NUMBER
PLATE
S Y
M B
O L
D E S
C R
IP
T
IO
N D
A T E
A P P
R O
V E
D
D E S
IG
N
W H
C L D
B R
U N
S W
U N
T Y
N O
R
R O
L
IN
A
W
IL
M
IN
G T
R B
O R
F Y
E
A G
L E
IS
L A
IM
P R
O V E
M E
N T S
SPILLWAY 3 - TYPICAL DIKE EMBANKMENT EXCAVATION SECTION
GEOTEXTILE
12H TO 4V (TYP.)
STEP SLOPED AT
GEOTEXTILE
GEOGRID
1-FOOT LAYER
FILL MATERIAL
23_EI_14_SPWAY_3_DETAILS_EXCAVATION.DGN 9/10/2013 10:59:22 AM
| REVISED------ G-1 INDEX OF DRAWINGS |
| REVISED------ G-2 LOCATION MAP |
| ADDED------ C-9 SITE PLAN - SPILLWAY 3 |
| ADDED------ C-10 DEMOLITION PROFILE AND NEW PROFILE SPILLWAY 3 |
| REVISED------ S-1 SPILLWAY DETAILS EXCAVATION |
| REVISED------ S-6 4X8 SPILLWAY DETAILS SHEET 4 OF 4 |
| ADDED------ S-9 SPILLWAY DETAILS EXCAVATION |
File details come from the government source that posted it. Updated .