About this file

This is an Industry Day presentation from the EPA regarding the Iron King Mine/Humboldt Smelter Superfund Site cleanup project in Dewey-Humboldt, Arizona. The presentation outlines the operational history, site features, and remediation plans for a former mining and smelting operation that operated from 1910-1970 (mine) and 1880s-1960s (smelter).

The cleanup project involves 15 different areas requiring remediation, with two main repositories planned - one containing 5.2 million cubic yards of waste on the west side (mine) and another with 1.1 million cubic yards on the east side (smelter). The selected remedy includes consolidation of various waste types (mine tailings, waste rock, slag, dross) into repositories and removal/replacement of surface soils in residential areas. The presentation includes before/after visualizations showing the planned remediated state with covered, vegetated repository areas. The EPA has divided this into two contracts: Contract 1 for Remedial Design and Contract 2 for Remedial Action, with the waste planned to remain on its original side of the highway that divides the site.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Jeff Dhont, Remedial Project Manager U.S. EPA Region IX

Iron King Mine / Humboldt Smelter Superfund Site Industry Day Remedial Design / Remedial Construction

January 28, 2025

Flagstaff

Phoenix

Tucson

Prescott

ARIZONA

Site Location: Dewey-Humboldt, Arizona

Prescott

Dewey-Humboldt

Operational History

Former Iron King Mine Property

Former Humboldt Smelter Property

Chaparral Gulch

Humboldt Town Proper

Agua Fria River

Iron King Mine:

Operated 1910 -1970 Zinc, Copper, Lead, Gold, Silver Biggest Production 1940s-1950s

Humboldt Smelter

– Making Pure Metals from Ore

Smelting Copper and Lead 2 Predecessor Smelters 1880s - 1904 Main facilities 1905-1937 Biggest Production 1914-1918 Other Operations 1940s, 1950s, 1960s

Val Verde Predecessor Smelter Destroyed by Fire 1904

Non-residential / Waste Areas

Residential Areas

Site Features

Former Iron King Mine Property

Former Humboldt Smelter Property

Waste Types

Mine tailings Waste rock Waste Dross Slag Mixed up tailings, sediments & soils

Wastes

15 Different Areas of Concern Requiring Cleanup

CONTRACT 1:Remedial Design CONTRACT 2: Remedial Action

Open Land North of Pile

Open Land South of Pile

ON THE WEST: THE FORMER IRON KING MINE

Waste Rock

Mine Tailings Pile

Small Tailings Deposits

Small Slag Pile

South Smelter Plateau

ON THE EAST: THE FORMER HUMBOLDT SMELTER PROPERTY

Smelter Tailings Depression

Slag Wall

Dross Waste and Former Smelter

Operations

Heavily Eroded Tailings Depression

Fine-Grained Waste Dross Posi-Shell Cover

Lower Gulch

Upper Gulch

CHAPPARAL GULCH

Tailings Floodplain

Dam

Middle Gulch

Mine Drainage Pathway

Flood Plain (~9 football fields) filled with tailings

Selected Remedy

Waste Areas: Consolidation in Repositories

Residential Areas: Remove and replace surface soils

Selected Alternative: East-West-Based Waste Repositories

R

R

(Waste stays on its side of the highway)

TWO REPOSITORIES

1.1 Million Cubic Yards of Waste

5.2 Million Cubic Yards of Waste

What Might the Mine Tailings Pile Look Like After Cleanup?

BeforeAfter

What Might the Smelter and Gulch Look Like After Cleanup?

Before After

Jeff Dhont, Remedial Project Manager U.S. EPA Region IX

Iron King Mine / Humboldt Smelter Superfund Site Industry Day

January 28, 2025

Slide Number 1
Slide Number 2
Slide Number 3
Slide Number 4
Slide Number 5
Slide Number 6
Slide Number 7
Slide Number 8
Slide Number 9
Slide Number 10
Slide Number 11
Slide Number 12
Slide Number 13
Slide Number 14
Slide Number 15

File details come from the government source that posted it. Updated .