This document contains bidding information for the Riverside Levees 1 and 2 Rehabilitation Project solicitation. The solicitation seeks bids for rehabilitation work on two levees along the Santa Ana River adjacent to Riverside, California. The scope of work includes dewatering, removal and replacement of existing riprap with grouted and ungrouted stone, adding bedding and filter layers, installing sub-drain systems and weep holes, constructing levee crest maintenance roads, and installing temporary diversion channels and fencing. The estimated value of construction is between $25-100 million and the period of performance is 1460 calendar days. The solicitation will be issued as an unrestricted acquisition allowing full and open competition, and will apply the HUBZone price evaluation preference. The acquisition will use FAR Part 15 for a low price technically acceptable award based on technical and price proposals. The solicitation is expected to be available on or around February 28, 2022, though the project may be delayed, cancelled or revised.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912PL22B0002_AM0002_.pdf | ||
| B.08 W912PL22B0002_AM0001_.pdf | ||
| Riverside Levees_Pre-bid Site Visit_Trip Report.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quantity Unit Unit Price Amount Quantity Unit Unit Price Amount Quantity Unit
Unit Price Amount Quantity Unit
Unit Price Amount Quantity Unit Unit Price Amount Quantity Unit Unit Price Amount Quantity Unit Unit Price Amount
0001 Dewatering, Diversion and Control of Wtae 1 Job JA 2,268,008$ 1 Job JA 6,300,000$ 1 Job JA 6,292,200$ 1 Job JA 4,630,000$ 1 Job JA 3,000,000$ 1 Job JA 3,082,929$ 1 Job JA 4,300,000$ 1 Job JA $3,905,300.69
0002 Clearing and Grubbing 31 AC $4,218.00 130,758$ 31 AC $17,000.00 527,000$ 31 AC $47,350.00 1,467,850$ 31 AC $8,000.00 248,000$ 31 AC $15,000.00 465,000$ 31 AC $135,000.00 4,185,000$ 31 AC $18,000.00 558,000$ 31 AC $6,364.92 $197,312.52
0003 Diversion Channels 1 Job JA 1,158,810$ 1 Job JA 2,200,000$ 1 Job JA 3,336,220$ 1 Job JA 2,000,000$ 1 Job JA 1,250,000$ 1 Job JA 2,000,000$ 1 Job JA 3,200,000$ 1 Job JA $3,823,591.69
0004 Stripping and Stockpiling Topsoil 50,400 CY $10.29 518,616$ 50,400 CY $5.00 252,000$ 50,400 CY $4.30 216,720$ 50,400 CY $5.00 252,000$ 50,400 CY $20.00 1,008,000$ 50,400 CY $21.00 1,058,400$ 50,400 CY $8.71 438,984$ 50,400 CY $17.64 $889,056.00
0005 Removal and Salvage of Existing Riprap 145,000 TON $7.20 1,044,000$ 145,000 TON $15.00 2,175,000$ 145,000 TON $12.15 1,761,750$ 145,000 TON $5.00 725,000$ 145,000 TON $26.00 3,770,000$ 145,000 TON $9.00 1,305,000$ 145,000 TON $10.00 1,450,000$ 145,000 TON $18.72 $2,714,400.00
0006 Shoring 1 Job JA 321,694$ 1 Job JA 310,000$ 1 Job JA 469,000$ 1 Job JA 25,000$ 1 Job JA 250,000$ 1 Job JA 225,000$ 1 Job JA 400,000$ 1 Job JA $812,043.16
0007 Excavation 240,000 CY $7.98 1,915,200$ 240,000 CY $10.00 2,400,000$ 240,000 CY $4.63 1,111,200$ 240,000 CY $10.00 2,400,000$ 240,000 CY $9.00 2,160,000$ 240,000 CY $11.00 2,640,000$ 240,000 CY $13.00 3,120,000$ 240,000 CY $16.05 $3,852,000.00
0008 Levee Fill 5,100 CY $5.02 25,602$ 5,100 CY $15.00 76,500$ 5,100 CY $24.17 123,267$ 5,100 CY $4.00 20,400$ 5,100 CY $17.00 86,700$ 5,100 CY $4.00 20,400$ 5,100 CY $16.00 81,600$ 5,100 CY $73.16 $373,116.00
0009 Toe Backfill 257,000 CY $7.21 1,852,970$ 257,000 CY $4.00 1,028,000$ 257,000 CY $7.78 1,999,460$ 257,000 CY $14.00 3,598,000$ 257,000 CY $24.00 6,168,000$ 257,000 CY $10.00 2,570,000$ 257,000 CY $12.00 3,084,000$ 257,000 CY $12.02 $3,089,140.00
0010 Stone for Riprap Grouted Stone Revet 88,500 TON $63.46 5,616,210$ 88,500 TON $12.00 1,062,000$ 88,500 TON $53.70 4,752,450$ 88,500 TON $92.00 8,142,000$ 88,500 TON $70.00 6,195,000$ 88,500 TON $80.00 7,080,000$ 88,500 TON $98.00 8,673,000$ 88,500 TON $108.88 $9,635,880.00
0011 Bedding Material 21,300 TON $44.60 949,980$ 21,300 TON $65.00 1,384,500$ 21,300 TON $66.60 1,418,580$ 21,300 TON $78.00 1,661,400$ 21,300 TON $40.00 852,000$ 21,300 TON $27.00 575,100$ 21,300 TON $83.00 1,767,900$ 21,300 TON $41.39 $881,607.00
0012 Geotextile Filter Fabric 12,000 SY $6.38 76,560$ 12,000 SY $5.00 60,000$ 12,000 SY $6.04 72,480$ 12,000 SY $16.00 192,000$ 12,000 SY $5.00 60,000$ 12,000 SY $5.00 60,000$ 12,000 SY $3.00 36,000$ 12,000 SY $4.85 $58,200.00
0013 Grout for Grouting Stone 22,000 CY $248.49 5,466,780$ 22,000 CY $20.00 440,000$ 22,000 CY $230.00 5,060,000$ 22,000 CY $290.00 6,380,000$ 22,000 CY $268.00 5,896,000$ 22,000 CY $335.00 7,370,000$ 22,000 CY $450.00 9,900,000$ 22,000 CY $389.42 $8,567,240.00
0014 Mass Concrete Wall 1 Job JA 101,211$ 1 Job JA 100,000$ 1 Job JA 221,000$ 1 Job JA 10,000$ 1 Job JA 46,500$ 1 Job JA 75,000$ 1 Job JA 250,000$ 1 Job JA $72,814.12
0015 Maintenance Road 8,990 LF $32.80 294,872$ 8,990 LF $30.00 269,700$ 8,990 LF $24.00 215,760$ 8,990 LF $40.00 359,600$ 8,990 LF $17.00 152,830$ 8,990 LF $25.00 224,750$ 8,990 LF $50.00 449,500$ 8,990 LF $106.07 $953,569.30
0016 Temporary Access Ramps 1 Job JA 72,601$ 1 Job JA 300,000$ 1 Job JA 702,250$ 1 Job JA 100,000$ 1 Job JA 275,000$ 1 Job JA 150,000$ 1 Job JA 250,000$ 1 Job JA $325,901.60
Item Description Quantity Unit Unit Price Amount Quantity Unit Unit Price Amount Quantity Unit
Unit Price Amount Quantity Unit
Unit Price Amount Quantity Unit
Unit Price Amount Quantity Unit Unit Price Amount Quantity Unit Unit Price Amount Quantity Unit Unit Price Amount
0017 Weep Hole Subdrainage System 18,000 LF $25.02 450,360$ 18,000 LF $15.00 270,000$ 18,000 LF $33.27 598,860$ 18,000 LF $6.00 108,000$ 18,000 LF $24.00 432,000$ 18,000 LF $55.00 990,000$ 18,000 LF $7.00 126,000$ 18,000 LF $20.77 $373,860.00
0018 Geotechnical Information 1 Job JA 169,771$ 1 Job JA 100,000$ 1 Job JA 127,050$ 1 Job JA 60,000$ 1 Job JA 95,000$ 1 Job JA 100,000$ 1 Job JA 650,000$ 1 Job JA $281,410.51
0019 Temporary Sound Barrier Wall 9,300 LF $83.73 778,689$ 9,300 LF $120.00 1,116,000$ 9,300 LF $51.00 474,300$ 9,300 LF $58.00 539,400$ 9,300 LF $65.00 604,500$ 9,300 LF $135.00 1,255,500$ 9,300 LF $62.00 576,600$ 9,300 LF $64.96 $604,128.00
0020 Topsoil Placement 50,400 CY $10.79 543,816$ 50,400 CY $4.00 201,600$ 50,400 CY $3.85 194,040$ 50,400 CY $2.00 100,800$ 50,400 CY $10.00 504,000$ 50,400 CY $13.00 655,200$ 50,400 CY $7.00 352,800$ 50,400 CY $29.11 $1,467,144.00
0021 Landscaping Planting 28 AC $8,345.75 233,681$ 28 AC $42,000.00 1,176,000$ 28 AC $25,350.00 709,800$ 28 AC $12,000.00 336,000$ 28 AC $26,000.00 728,000$ 28 AC $25,000.00 700,000$ 28 AC $35,000.00 980,000$ 28 AC $33,772.96 $945,642.88
0022 Temporary Irrigation 28 AC $21,181.00 593,068$ 28 AC $30,000.00 840,000$ 28 AC $9,925.00 277,900$ 28 AC $8,000.00 224,000$ 28 AC $27,000.00 756,000$ 28 AC $30,000.00 840,000$ 28 AC $35,000.00 980,000$ 28 AC $47,471.09 $1,329,190.52
0023 Landscape Establishment 28 AC $8,211.00 229,908$ 28 AC $12,000.00 336,000$ 28 AC $13,230.00 370,440$ 28 AC $2,800.00 78,400$ 28 AC $15,000.00 420,000$ 28 AC $7,500.00 210,000$ 28 AC $44,000.00 1,232,000$ 28 AC $10,505.09 $294,142.52
0024 Dewatering, Diversion and Control of Wtae 1 Job JA 1,265,874$ 1 Job JA 4,750,000$ 1 Job JA 1,710,000$ 1 Job JA 2,000,000$ 1 Job JA 2,500,000$ 1 Job JA 1,650,000$ 1 Job JA 2,250,000$ 1 Job JA $1,814,506.66
0025 Clearing and Grubbing 14 AC $4,219 59,066$ 14 AC $23,000 322,000$ 14 AC $47,350 662,900$ 14 AC $7,000 98,000$ 14 AC $15,000 210,000$ 14 AC $100,000 1,400,000$ 14 AC $22,000 308,000$ 14 AC $6,228.84 $87,203.76
0026 Diversion Channels 1 Job JA 433,597$ 1 Job JA 1,200,000$ 1 Job JA 1,825,000$ 1 Job JA 1,800,000$ 1 Job JA 565,000$ 1 Job JA 650,000$ 1 Job JA 1,200,000$ 1 Job JA $1,708,101.32
0027 Stripping and Stockpiling Topsoil 30,000 CY $9.20 276,000$ 30,000 CY $5.00 150,000$ 30,000 CY $4.54 136,200$ 30,000 CY $4.00 120,000$ 30,000 CY $20.00 600,000$ 30,000 CY $20.00 600,000$ 30,000 CY $8.00 240,000$ 30,000 CY $17.02 $510,600.00
0028 Removal and Salvage of Existing Riprap 57,200 TON $7.27 415,844$ 57,200 TON $15.00 858,000$ 57,200 TON $12.00 686,400$ 57,200 TON $4.00 228,800$ 57,200 TON $10.00 572,000$ 57,200 TON $8.00 457,600$ 57,200 TON $10.00 572,000$ 57,200 TON $20.00 $1,144,000.00
0029 Excavation 88,000 CY $6.99 615,120$ 88,000 CY $10.00 880,000$ 88,000 CY $4.98 438,240$ 88,000 CY $10.00 880,000$ 88,000 CY $9.00 792,000$ 88,000 CY $10.00 880,000$ 88,000 CY $13.00 1,144,000$ 88,000 CY $23.90 $2,103,200.00
0030 Levee Fill 4,000 CY $6.40 25,600$ 4,000 CY $15.00 60,000$ 4,000 CY $23.10 92,400$ 4,000 CY $4.00 16,000$ 4,000 CY $17.00 68,000$ 4,000 CY $4.00 16,000$ 4,000 CY $16.00 64,000$ 4,000 CY $79.78 $319,120.00
0031 Toe Backfill 74,000 CY $7.95 588,300$ 74,000 CY $6.00 444,000$ 74,000 CY $8.39 620,860$ 74,000 CY $12.00 888,000$ 74,000 CY $20.00 1,480,000$ 74,000 CY $9.00 666,000$ 74,000 CY $12.00 888,000$ 74,000 CY $16.30 $1,206,200.00
0032 Stone for Riprap Grouted Stone Revet 34,200 TON $63.46 2,170,332$ 34,200 TON $12.00 410,400$ 34,200 TON $52.70 1,802,340$ 34,200 TON $90.00 3,078,000$ 34,200 TON $70.00 2,394,000$ 34,200 TON $70.00 2,394,000$ 34,200 TON $105.00 3,591,000$ 34,200 TON $112.18 $3,836,556.00
0033 Bedding Material 8,200 TON $42.99 352,518$ 8,200 TON $65.00 533,000$ 8,200 TON $64.63 529,966$ 8,200 TON $72.00 590,400$ 8,200 TON $30.00 246,000$ 8,200 TON $25.00 205,000$ 8,200 TON $85.00 697,000$ 8,200 TON $39.91 $327,262.00
0034 Geotextile Filter Fabric 6,000 SY $6.49 38,940$ 6,000 SY $5.00 30,000$ 6,000 SY $5.49 32,940$ 6,000 SY $14.00 84,000$ 6,000 SY $8.00 48,000$ 6,000 SY $4.50 27,000$ 6,000 SY $3.00 18,000$ 6,000 SY $5.12 $30,720.00
0035 Grout for Grouting Stone 8,300 CY $248.49 2,062,467$ 8,300 CY $20.00 166,000$ 8,300 CY $231.57 1,922,031$ 8,300 CY $260.00 2,158,000$ 8,300 CY $265.00 2,199,500$ 8,300 CY $300.00 2,490,000$ 8,300 CY $450.00 3,735,000$ 8,300 CY $409.81 $3,401,423.00
Item Description Quantity Unit Unit Price Amount Quantity Unit Unit Price Amount Quantity Unit
Unit Price Amount Quantity Unit
Unit Price Amount Quantity Unit
Unit Price Amount Quantity Unit Unit Price Amount Quantity Unit Unit Price Amount Quantity Unit Unit Price Amount
0036 Bike Path 3,995 LF $66.00 263,670$ 3,995 LF $120.00 479,400$ 3,995 LF $57.10 $228,114.50 3,995 LF $90.00 359,550$ 3,995 LF $75.00 299,625$ 3,995 LF $90.00 359,550$ 3,995 LF $125.00 499,375$ 3,995 LF $202.07 $807,269.65
0037 Temporary Access Ramps 1 Job JA 88,456$ 1 Job JA 325,000$ 1 Job JA 461,500$ 1 Job JA 60,000$ 1 Job JA 180,000$ 1 Job JA 75,000$ 1 Job JA 150,000$ 1 Job JA $238,056.34
0038 Weep Hole Subdrainage System 8,000 LF $30.10 240,800$ 8,000 LF $15.00 120,000$ 8,000 LF $37.27 298,160$ 8,000 LF $5.00 40,000$ 8,000 LF $35.00 280,000$ 8,000 LF $45.00 360,000$ 8,000 LF $7.00 56,000$ 8,000 LF $21.51 $172,080.00
0039 Geotechnical Information 1 Job JA 56,669$ 1 Job JA 150,000$ 1 Job JA 56,500$ 1 Job JA 40,000$ 1 Job JA 80,000$ 1 Job JA 75,000$ 1 Job JA 450,000$ 1 Job JA $190,454.68
0040 Temporary Sound Barrier Wall 9,800 LF $83.08 814,184$ 9,800 LF $65.00 637,000$ 9,800 LF $38.00 372,400$ 9,800 LF $80.00 784,000$ 9,800 LF $50.00 490,000$ 9,800 LF $50.00 490,000$ 9,800 LF $61.00 597,800$ 9,800 LF $72.70 $712,460.00
0041 Topsoil Placement 30,000 CY $9.70 291,000$ 30,000 CY $4.00 120,000$ 30,000 CY $4.44 133,200$ 30,000 CY $1.75 52,500$ 30,000 CY $10.00 300,000$ 30,000 CY $13.00 390,000$ 30,000 CY $7.00 210,000$ 30,000 CY $30.08 $902,400.00
0042 Landscaping Planting 9 AC $9,227.00 83,043$ 9 AC $48,000.00 432,000$ 9 AC $29,770.00 267,930$ 9 AC $14,000.00 126,000$ 9 AC $44,000.00 396,000$ 9 AC $25,000.00 225,000$ 9 AC $40,000.00 360,000$ 9 AC $45,463.60 $409,172.40
0043 Temporary Irrigation 9 AC $21,696.00 195,264$ 9 AC $50,000.00 450,000$ 9 AC $18,750.00 168,750$ 9 AC $10,000.00 90,000$ 9 AC $45,000.00 405,000$ 9 AC $30,000.00 270,000$ 9 AC $45,000.00 405,000$ 9 AC $73,476.53 $661,288.77
0044 Landscape Establishment 9 AC $12,235.00 110,115$ 9 AC $17,000.00 153,000$ 9 AC $22,050.00 198,450$ 9 AC $4,800.00 43,200$ 9 AC $20,000.00 180,000$ 9 AC $7,500.00 67,500$ 9 AC $60,000.00 540,000$ 9 AC $20,519.21 $184,672.89
0045 Bike Path Detour 1 Job JA 815,190$ 1 Job JA 400,000$ 1 Job JA 401,700$ 1 Job JA 200,000$ 1 Job JA 250,000$ 1 Job JA 565,000$ 1 Job JA 1,250,000$ 1 Job JA $1,521,823.30
36,075,214$ 35,994,100$ $45,018,558.50 45,926,450$ 49,709,655$ 51,684,929$ 62,081,559$ $67,735,261.28
HubZone 10% 39,593,510.0$ HubZone 10% $49,520,414.35 HubZone HubZone 10% 54,680,620.5$ HubZone 10% 56,853,421.90$ HubZone 10% $74,508,787.41
TOTAL AMOUNT: TOTAL AMOUNT:
Malone‐Odin W4‐Michels JV1
LEFT LEVEE
Skanska USA Civil West CA District Griffith Company CJW Construction Stronghold Engineering Walsh Construction
(Line Items 0001 through 0045)
Bidding Schedule
SECTION 00 10 00
Solicitation Contract Line Item (CLIN) Schedule
RIGHT LEVEE
IGE
TOTAL AMOUNT: TOTAL AMOUNT: TOTAL AMOUNT: TOTAL AMOUNT: TOTAL AMOUNT: TOTAL AMOUNT:
W912PL22B0002, Santa Ana River Mainstem Riverside Levees Rehabilitation - Riverside, California
James Costantino Contracting Officer