Amd 0002 Moffett W912PL-20-R-0052 final.pdf
PDF 1 MB Posted
- Solicitation number
- W912PL20R0052
About this file
This is a performance work statement for environmental remediation services to close underground storage tanks at the Defense Fuel Support Point at Moffett Field in California. The services include sheet pile shoring, dewatering, removal and disposal of five underground storage tanks, and backfilling excavated areas. The period of performance is 365 calendar days from award. The estimated cost range for the work is between $5 million and $10 million. Site visits are scheduled for an announced date. The solicitation is expected to be issued on May 7th with a proposal due date of June 19th. Proposals will be evaluated based on technical excellence, management capability, personnel qualifications, and past performance. The award will be a firm-fixed-price contract.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION ( Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
1 112
0002 Jun 12, 2020
USACE-LOS ANGELES DISTRICT
CONTRACTING DIVISION, WEST REGION BRANCH
915 WILSHIRE BLVD, SUITE 1440
LOS ANGELES, CA 90017
W912PL20R0052
May 7, 2020
Closure of Underground Storage Tanks (USTs), Defense Fuel Supply Point (DFSP) Moffett Field Moffett Federal Airfield (MFA), CA
Amendment issued to revise the date for receipt of proposals to July 24, 2020, 2:00 PM Pacific time and to provide revised sections to the RFP as per Table of Contents/Instructions.
Closure of Underground Storage Tanks (USTs), Defense Fuel Supply Point (DFSP) Moffett Field Moffett Federal Airfield (MFA), CA W912PL-20-R-0052
SF‐30, PAGE 2
TABLE OF CONTENTS OF AMENDMENT 0002 AND INSTRUCTIONS
SF‐30 AMENDMENT OF SOLICITATION/TABLE OF CONTENTS OF AMENDMENT
SF‐33 SOLICITATION OFFER AND AWARD‐remove and replace entire form
SECTION B CLIN/PRICING SCHEDULE, remove entire section and replace
SECTION C PERFORMANCE WORK STATEMENT, remove entire section and replace
SECTION F DELIVERIES OR PERFORMANCE, remove entire section and replace
SECTION I CONTRACT CLAUSES – see changed clauses
SECTION K REPRESENTATIONS AND CERTIFICATIONS – See changed clause
SECTION L INSTRUCTIONS TO OFFERORS‐See changed clauses
SECTION M EVALUATION FACTORS FOR AWARD‐remove entire section and replace
SOLICITATION, OFFER AND AWARD 1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
RATING PAGE OF PAGES
2. CONTRACT NUMBER 4. TYPE OF SOLICITATION 5. DATE ISSUED 6. REQUISITION/PURCHASE NUMBER
CODE7. ISSUED BY 8. ADDRESS OFFER TO (If other than item 7)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
9. Sealed offers in original and copies for furnishings the supplies or services in the Schedule will be received at the place specified in item 8, or if hand carried, in the depository located in until local time
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. FOR
INFORMATION
CALL:
A. NAME B. TELEPHONE (NO COLLECT CALLS)
AREA CODE NUMBER EXTENSION
C. E-MAIL ADDRESS
11. TABLE OF CONTENTS
(X) SEC. DESCRIPTION PAGE(S) (X) SEC. PAGE(S)DESCRIPTION
A B C D E F G H
I
J
K
L
M EVALUATION FACTORS FOR AWARD
INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
REPRESENTATIONS, CERTIFICATIONS AND OTHER
STATEMENTS OF OFFERORS
PART IV - REPRESENTATIONS AND INSTRUCTIONS
LIST OF ATTACHMENTS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACH.
CONTRACT CLAUSESSOLICITATION/CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/COSTS
DESCRIPTION/SPECS./WORK STATEMENT
PACKAGING AND MARKING
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
CONTRACT ADMINISTRATION DATA
SPECIAL CONTRACT REQUIREMENTS
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
OFFER (Must be fully completed by offeror)
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
10 CALENDAR DAYS (%) 20 CALENDAR DAYS (%) 30 CALENDAR DAYS (%) CALENDAR DAYS(%)
DATEAMENDMENT NO.AMENDMENT NO. DATE
15A. NAME AND
ADDRESS
OF OFFEROR
CODE FACILITY 16. NAME AND THE TITLE OF PERSON AUTHORIZED TO SIGN
OFFER(Type or print)
15B. TELEPHONE NUMBER
AREA CODE NUMBER EXTENSION
15C. CHECK IF REMITTANCE ADDRESS IS
DIFFERENT FROM ABOVE - ENTER SUCH
ADDRESS IN SCHEDULE.
17. SIGNATURE 18. OFFER DATE
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL OPEN COMPETITION:
10 U.S.C. 2304 (c) ( )41 U.S.C. 3304(a)
24. ADMINISTERED BY (If other than Item 7)
26. NAME OF CONTRACTING OFFICER (Type or print)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is unusable
23. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
25. PAYMENT WILL BE MADE BY
27. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
28. AWARD DATE
CODE
ITEM
STANDARD FORM 33 (REV. 6/2014)
Prescribed by GSA - FAR (48 CFR) 53.214 (c)
SEALED BID (IFB)
NEGOTIATED (RFP)
(Hour) (Date)
PART I - THE SCHEDULE PART II - CONTRACT CLAUSES
none 1 284
SEE SECTION L
W912PL
USACE, LOS ANGELES DISTRICT, CONTRACTING DIV
915 WILSHIRE BLVD, LOS ANGELES, CA 90017
3. SOLICITATION NUMBER
W912PL20R0052 Amd 0002
SECTION M
11TH FLOOR, 915 WILSHIRE BLVD 2:00 PM
Wendell Mendoza/Pat Bonilla Wendell.L.Mendoza@usace.mil
1-3 4-6 7-57
58-59 62-67 253-284
244-252
211-223
68-210
7/24/2020
213 452 3308
5/7/2020
224-243
Amendment 0002
SECTION B
CLIN/PRICING SCHEDULE
SECTION B - CLIN/PRICING SCHEDULE
CLIN/Sub-
CLIN
Number
CLIN/Sub-CLIN Amount
BASE ITEMS
0001 Project Meetings $
0001AA Post Award and Kick Off Meetings $
0001AB Project Meetings (Periodic Progress and Regulatory) $
0002 Project Documents $
0002AA PMP/QASP $
0002AB Work Plans $
0003 Field Activities for Closure $
0003AA Mobilization (Pre-mobilization; Mobilization; and Site Preparation Set Up) $
0003AB Install/Extract Shoring (Groundwater Dewatering; Sheet Pile Shoring) $
0003AC Install Dewatering System (Groundwater Dewatering) $
0003AE
Install Vertical Groundwater Extraction System (Groundwater Dewatering;
Sheet Pile Shoring) $
0003AF Dewatering System Operation (Groundwater Dewatering) $
0003AG
Excavation Soil incl T&D (Removal and Closure for Area USTs; Manifest, Disposal, and Salvage Documentation) $
0003AH
Remove Concrete incl T&D (Removal and Closure for Area USTs; Manifest, Disposal, and Salvage Documentation) $
0003AI
Remove Tanks incl T&D (Removal and Closure for Area USTs; Manfiest, Disposal, and Salvage Documentation) $
0003AJ
Backfill and Grading, and Vegetation Restoration (Backfill, Grading, and Final Restoration) $
0003AK Decomission Dewatering System (Groundwater Dewatering) $
0003AL Field Office Management (All subtasks) $
0003AM Demobilization (Mobilization) $
0004 Additional Sampling $
0004AA Sample at Secondary Containment Pad Discharge Valve/Drain $
0004AB Sample at Emergency Generator Footprint $
0004AC Sample Under Vaults or Other Low Points Within the Containment Pad $
0004AD Additional Samples Between 1.5 to 3 feet bgs $
0004AE Water Samples Colected in Conjunction with Disposal Facility Requirements $
0005 Project Closure and Completion Reports $
TOTAL AMOUNT OF BASE ITEMS $
OPTIONS
0006 Dewatering System Operation HAZ Groundwater $
0007 Dewatering System Operation HAZ Groundwater $
0008 Dewatering System Operation HAZ Groundwater $
0009 Dewatering System Operation HAZ Groundwater $
0010 Excavation Haz Soil incl Waste Characterization Sampling and T&D $
0011 Excavation Haz Soil incl Waste Characterization Sampling and T&D $
0012 Excavation Haz Soil incl Waste Characterization Sampling and T&D $
0013 Excavation Haz Soil incl Waste Characterization Sampling and T&D $
TOTAL AMOUNT OF OPTIONS $
TOTAL AMOUNT OF BASE ITEMS AND OPTIONS $
OFFERORS NOTES
CONTRACT LINE ITEMS/PRICING SCHEDULES.
a. The Government's payment for the items listed in the Bidding Schedule shall constitute full compensation to the Contractor for --
(1) Furnishing all plant, labor, equipment, appliances, and materials; and
(2) Performing all operations required to complete the work in conformity with the drawings and specifications.
b. The Contractor shall include in the prices for the items listed in the Bidding Schedule all costs for work in the specifications, whether or not specifically listed in the Bidding Schedule.
(End of provision)
52.217-5 -- EVALUATION OF OPTIONS (JUL 1990)
Except when it is determined in accordance with FAR 17.206(b) not to be in the Government’s best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).
(End of Provision)
1. Prices must be submitted on all individual items of the Solicitation, Contract Line Item Number (CLIN) Schedule. Failure to do so may cause the bid to be determined “non-responsive.”
2. For the purpose of initial evaluation of bids, the following will be utilized in resolving arithmetic discrepancies found on the face of the Price Schedule as submitted by the bidder:
a. Obviously misplaced decimal points will be corrected;
b. In case of discrepancy between the unit price and the extended price, the unit price will govern;
c. Apparent errors in extensions of unit prices will be corrected;
d. Apparent errors in addition of lump sum and extended prices will be corrected.
3. Principal Contracting Officer. The Contracting Officer who signs this contract will be the Principal Contracting Officer for this contract. However, any Contracting Officer assigned to the Los Angeles District, Contracting within his authority, may take formal action on this contract when the Principal Contracting Officer is unavailable and the action needs to be taken.
4. Amounts and prices shall be indicated in either words or figures, NOT BOTH.
5. The bidder/offeror shall distribute indirect costs (overhead, profit, bond, etc) over all items in the Contract Line
Item Number (CLIN) Schedule. The Government will review all submitted Solicitation, Contract Line Item Number (CLIN) Schedules for any unbalancing of the items. Any submitted Solicitation, Contract Line Item Number (CLIN) Schedule determined to be unbalanced may cause the bidder to be ineligible for award.
6. The bidder shall furnish all plant, labor, material, equipment, etc., necessary to perform all work in strict accordance with the terms and conditions set forth in the contract in include all attachments thereto.
7. Contractor is required to fill in Cage code, TIN and DUNS Number in Block No. 15A on Standard Form 33, the Name and Address Block.
8. The Government reserves the right to request cost/price details in accordance with FAR Part 15.4, if it is concluded that additional data are necessary to determine the reasonableness of price.
-End of Section-
THIS PAGE LEFT INTENTIONALLY BLANK
Closure of Underground Storage Tanks (USTs) W912PL‐20‐R‐0052 Defense Fuel Supply Point (DFSP) Moffett Field Moffett Federal Airfield (MFA), CA
SECTION C
DESCRIPTION AND SPECIFICATIONS
Performance Work Statement (PWS)
Closure of Underground Storage Tanks (USTs)
Solicitation No. W912PL‐20‐R‐0052
28 May 2020
1.0 Background and Introduction
The project site is the former Defense Fuel Support Point (DFSP) fuel facility at Moffett Field, Santa Clara County, California, and borders the cities of Mountain View and Sunnyvale. The fuel facility is on the northeast portion of the National Aeronautics and Space Administration (NASA) Ames Research Center (ARC) Property, formerly called Naval Air Station (NAS) Moffett Field. The fuel facility encompasses approximately 4 acres and is bordered by the Moffett Field Golf Club, Hangars 2 and 3, the airfield, and industrial and commercial buildings. DFSP Moffett Field is a former industrial facility that received, stored, transferred, and delivered fuel until operations ceased in December 2003.
This Performance Work Statement (PWS) describes activities in support of regulatory closure of the DFSP fuel facility, as detailed in the Closure Plan Former Defense Fuel Support Point at Moffett Field, Santa Clara County, California, (May 2016), approved by Santa Clara County Department of Environmental Health (DEH), Hazardous Materials Compliance Division (HMCD) (see Attachment A). The fuel facility includes five (5) inactive bulk field constructed underground storage tanks (USTs) and has approximately 56,500 barrels (bbl) (2,373,000 gallons) of storage capacity.
The purpose of this project is to permanently close the fuel tanks and piping in accordance with CCR Title 23, Division 3, Chapter 16, Article 7: Underground Storage Tank Requirements; UFC‐460‐01, Chapter 14; and other applicable Federal, State and local laws and regulations, by completely demolishing and removing the tanks, with resulting excavations backfilled and compacted for future use.
This PWS covers closure of two primary components and six secondary components of DFSP Moffett Field. The objective is to receive official closure documentation and acceptance by the regulatory body.
In order to receive official closure documentation, all components must be compliant for closure and meet regulatory compliant standards.
The two primary components are:
1. Bulk Storage Tank Area (including USTs 137, 138, 139, 140), also referred to as “fuel farm area” is on East Patrol Road just north of Building 545. Each fuel farm UST is field-constructed (cut-and-over), vertical-type, welded steel cylinder with a steel top and bottom and ‘I’ beam-column supports. The 15,170 barrel (bbl) cylinder’s inside measurements are 88-feet in diameter and 13-feet-high. Groundwater was measured approximately between 7.5 and 8.0 feet below ground surface (bgs) during the geotechnical and hydrogeological investigation in April 2019 (Geotechnical and Hydrogeology Report. [AECOM], 2019).
2. The Day Tank Area on Macon Road, east of Building 686. The day tank (UST 253) is a field constructed (cut-and-cover), vertical-type, welded steel cylinder with a steel top and bottom and ‘I’ beam-column supports. The 15,170 barrel (bbl) cylinder’s inside measurements are 21-feet in diameter and 11.6-feet-high. Groundwater was measured approximately between 7.0 and 8.0 feet below ground surface (bgs) during the geotechnical and hydrogeological investigation in April 2019 (Geotechnical and Hydrogeology Report. [AECOM], 2019).
The following six secondary components have been inspected and are presumed to be compliant for closure. Although these components have been inspected, no official closure documentation has been provided. Therefore the project objective includes any further additional work associated with the following components that may be required by the HMCD to achieve official closure.
3. The Truck Loading Facility (truck rack) Building 141, is located west of the intersection of East
Patrol Road and Macon Road. The truck rack has four (4) islands within a bermed secondary containment area with drainage troughs under a canopy.
4. Fuel Hydrant Stations includes, four (4) high-speed aircraft fueling hydrant stations and manifold piping located on the airfield ramp west of Building 686. The hydrant stations are located on concrete pads surrounded with concrete berms. The hydrants were constructed in two phases;
originally in 1976, and reconfigured in 1983 to replace the original skid-mounted hydrant stations. The original hydrants were located northeast of the existing hydrant stations, in the center of each aircraft lane.
5. Fuel Dock Pipelines includes two (2) parallel ten-inch butt-welded steel pipelines originally ran from the fuel pier, located in the Guadalupe Slough, south to the four bulk fuel USTs at the fuel farm in a 3,010 foot corridor. The two (2) ten-inch fuel dock pipelines which ran aboveground from the fuel dock to North Patrol Road were removed in 2012 (NASA – ARC, 2012). The remaining length of piping, running underground from North Patrol Road to the four USTs at the fuel farm is scheduled for closure.
6. Day Tank Pipeline includes; one 8-inch underground pipeline in a 2,100 foot corridor; an eight-inch butt-welded steel pipeline runs underground from the fuel farm northwest to the day tank area, terminating aboveground at the day tank area.
7. Truck Loading Facility Pipeline includes; one 6-inch underground pipeline in a 1,165 foot corridor; and two (2) six-inch butt-welded steel pipelines run parallel underground from the fuel farm south and west to the truck loading facility, terminating at the aboveground manifold on the west end side of the truck loading facility.
8. Fuel Hydrant Pipelines include; two (2) underground pipelines (6”- and 14”-diameter) in a 2,270 foot corridor.
The fuel facility was established by the Navy in 1951, and operated by the Navy from 1951 to 1994.
NASA‐ARC currently owns the property where the fuel facility is located. Defense Logistics Agency (DLA) has been a tenant since 1994, and operated the fuel facility under a Host Tenant Real Estate Agreement and a Memorandum of Agreement. DLA ceased fuel operations at DFSP Moffett Field in 2003, and the fuel facility is currently in caretaker status and is the responsibility of the DLA Energy Division. In June 2005, the UST and associated pipelines were emptied and cleaned (Innovative Technical Solutions, Inc.
[ITSI], 2005).
The Hazardous Materials Program within Santa Clara County Department of Environmental Health (HMCD) is the Certified Unified Program Agency (CUPA) for Moffett Federal Airfield. CUPAs are agencies certified by the California Environmental Protection Agency (EPA) to administer certain hazardous materials program areas, including USTs operation and UST closure. Select portions of the fuel facility have been closed with Santa Clara County DEH (HMCD). In July of 2016, Oneida Total Integrated Enterprises (OTIE) was contracted by the US Army Corps of Engineers (USACE) to close the Bulk Storage Tank area, Day Tank Area, Truck Loading Facility, Fuel Hydrant Stations, and their associated pipelines.
As of date to the 2018 January Interim Closure Report, all surficial positioned tank materials including pipelines were removed or closed‐in‐place under observation and to the satisfaction of the HMCD (Underground Storage Tank and Appurtenances Closure Report (Interim). [OTIE]. 2018).
The following elements listed below have been either closed or prepared for closure to the satisfaction of the HMCD inspector, but may still require official closure documentation:
Remaining Pipeline corridors (Fuel Dock, Truck Loading, Day Tank, Fuel Hydrant) were prepared for closure by removal and closure-in-place (CIP) in 2017.
Four Fuel Hydrant Stations located on the airfield ramp west of Building 686 were prepared for closure by removal and CIP in 2017.
The Truck Loading Facility (including Building 141 and islands) located west of intersection of East Patrol Road and Macon Road was prepared for closure by reassembly to remain on-site as clean steel in 2017.
Aboveground storage tank (AST) 253 at the Day Tank Area was removed in 2015 under HMCD Service Request 084761.
ASTs 328, 360, 361, 362 at the Fuel Farm Area were removed in 2015 under HMCD Service Request 084761.
The NASA Pipeline that ran from the day tank area to the west side of the air field was closed in 2009 under HMCD Service Request SR0832536.
The aboveground portion of fuel dock pipelines was closed in 2012 under HMCD Service Request
SR0837933.
Five drywells were removed from the fuel farm area in 2001 – referred to as the Moffett Federal Airfield Site 5 North Fuel Farm Dry Wells under GeoTracker ID T10000000191.
UST 26 was removed from the fuel farm area in 1991– referred to as Moffett Field NAS UST 26 under GeoTracker Global ID T10000002831.
UST 17 was removed from the day tank area in 1993 – referred to as MFA Tank 17 under GeoTracker Global ID T0607592374.
Initial attempts by OTIE to remove the tanks were discontinued in 2017 due to unexpected high levels of groundwater encountered at the Bulk Storage Tank Area. USACE then contracted AECOM to conduct a geotechnical and hydrogeological study that was completed in 2019 to support the required design of dewatering and shoring systems for the removal of the five USTs.
Under this closure effort the remaining fuel facility infrastructure will be inspected, cleaned of fuel product (as necessary), physically disconnected, and portions dismantled and/or demolished for removal and disposal off‐site utilizing the geotechnical and hydrogeological recommendations in the 2019 Geotechnical and Hydrogeological Report(AECOM, August 2019); pursuant to State of California Underground Storage Tank Requirements, California Code of Regulations (CCR) Title 23, Division 3, Chapter 16, Article 7 and Unified Code of Regulations (UFC)‐460‐01, Chapter 14.
The Contractor shall support technical oversight of subcontractors including laboratory quality assurance oversight and assessments, initial analysis and recommendations for technical response to unscheduled changing conditions or impacts, and alternatives for revised compliance requirements. This may include efforts such as engineering troubleshooting, initial technical evaluation of new or proposed changes to regulations, and evaluation of impacts.
The Contractor shall be responsible for fully executing the firm fixed price type contract under a Performance‐Based Acquisition (PBA) approach by conducting required environmental services for which the United States Department of the Army (the “Army”) is statutorily responsible; addressing any and all environmental, scheduling, and regulatory issues; and, assuming contractual liability and responsibility for the achievement of the performance objectives for the support of the permanent closure of DFSP Moffett Field USTs and fuel facilities at NASA Ames Research Center.
The Contractor must possess all the required expertise, knowledge, equipment and tools required to meet or exceed the government’s objectives identified in this PWS in accordance with established industry standards. The Contractor must have the capability and experience to perform, or provide, a wide range of investigative services required for hazardous substance and regulated waste sites.
It is the Contractor's responsibility to comply with all applicable federal, state and local laws and regulations and to fulfill the performance objectives of this PWS in a manner that is consistent with any applicable orders or permits or guidance for the Site, and relevant DoD and Army policy, for the duration of the contract.
The Contractor must perform all the necessary environmental work as required to meet the performance objectives of this PWS.
This PWS does not cover developed mitigation or remediation activities at DFSP Moffett Field. If contamination is encountered, interim measures may be implemented as part of the required process to conduct such activities to facilitate the removal aspects. In the event conditions suggest remedial action is necessary, it will be developed independent of the UST system closure by DLA. This PWS acknowledges the possibility that environmental remediation activities could become necessary based on conditions encountered. During implementation of the removal effort, interim measures may be performed to mitigate impacts as conditions are encountered. If post‐closure remediation is necessary, disclosure of the release will be reported and a Corrective Action Plan will be prepared by DLA or their designated representative.
2.0 Types of Services Required
This PWS includes broad‐spectrum environmental services. These services may include, but are not limited to scoping; interim site characterization; sampling and analysis; and evaluation of site geology and hydrology.
The Contractor shall provide all necessary personnel, equipment, and materials required to perform environmental services at DFSP Moffett Field including sampling and reporting as described in this PWS and those actions detailed in the Closure Plan – Former Defense Fuel Support Point at Moffett Field, Santa Clara County, California, provided in Attachment A, and in accordance with the cited references and guidance.
2.1 Task 1 – Project Meetings
2.1.1 Project Kick‐off and Pre‐Construction Meeting
The Contractor shall coordinate, attend, and take meeting minutes for the Project Kick-Off Meeting and Pre-Construction Meeting with the USACE Contracting Officer’s Representative (COR) and staff, Technical & Environmental Support Branch representative(s), and other members of the Project Delivery Team (PDT) prior to the start of work.
2.1.2 Periodic Progress Meetings
The Contractor shall conduct periodic conference calls, not to exceed one (1) hour in length for each occurrence, to update the project delivery team (PDT) of current status and scheduling of tasks to be performed. The Contractor shall prepare meeting agenda, meeting invitation, and meeting minutes for all periodic meetings. The conference calls will occur monthly during the period of performance (POP) and weekly during field activities. The Contractor may assume that one of these meetings will be in-person at the project site.
2.1.3 Regulatory Review Meetings
The Contractor shall participate in regulatory review meetings. The Contractor shall assume a minimum of two (2) meetings to be in-person for pre- and post-inspection of the former DFSP Fuel Facility Closure.
The Contractor shall provide and maintain a Share Point or File Transfer Protocol (FTP) site containing an updated calendar and relevant documents and submittals. Files exceeding 10 mega bites in size shall be sent to recipient(s) via DoD Safe at https://safe.apps.mil.
2.2 Task 2 – Project Documents
2.2.1 Site Specific Project Plan
The Contractor shall prepare a consolidated project plan (in Draft, Draft Final, and Final versions) that incorporates all work to be performed under this PWS, approved and/or accepted by USACE within 48 days of contract award. All work shall be performed in accordance with Federal, State of California, and Local regulations. The project plans shall include the Contractor’s approach, data quality objectives, preliminary alternatives, and deliverables in support of the Closure Plan for DFSP Moffett Field (see Attachment A) reviewed and approved by Santa Clara County and the Regional Water Quality Control Board (RWQCB). The project plans need to include;
1. Site Specific Work Plan (work implementation plan, including excavation/grading plan, waste management plan [WMP], and environmental protection plan [EPP]);
2. Storm Water Pollution Prevention Plan for construction activities (SWPPP);
Either as an appendix to the work plan or as a separate submission, the Contractor shall also prepare a detailed Site‐Specific Sampling and Analysis Plan and a site‐specific and task‐specific Health and Safety Plan (HASP), Accident Prevention Plan (APP), with Activity Hazardous Analyses (AHAs), Confined Space Entry Plan for permit, Critical Lift Plan, and Abatement Plan (as necessary) in accordance with USACE Manual EM 385‐1‐1, November 2014 titled “Safety and Health Requirements” and 29 CFR 1910.120 that addresses all work to be performed. The Health and Safety Plan prepared by the Contractor is subject to approval by the USACE Safety Office. The Contractor shall distribute the draft project plans for DLA, NASA, and USACE review only as per the distribution list as described in the deliverables section of this PWS.
Additionally, a Quality Assurance Surveillance Plan (QASP) (reference Attachment F) shall be prepared for this contract.
The Contractor shall prepare a written response to all comments received on the Draft Project Work Plan. Comments and Contractor responses shall be incorporated in the Draft Final Project Work Plan. As directed by the Contracting Officer’s Representative (COR), the Contractor shall incorporate changes to the Draft Project Work Plan and shall distribute copies of the Draft Final Project Work Plan for USACE, DLA, NASA, and stakeholder review as per the distribution list. The work plans will need to be accepted/approved by the USACE.
The Contractor shall prepare a written response to all comments received on the Draft Final Project Work Plan. Comments and Contractor responses shall be incorporated in the Final Project Work Plan. As directed by the Contracting Officer’s Representative (COR), the Contractor shall incorporate changes to the Draft Final Project Work Plan and shall distribute copies of the Final Project Work Plan as per the distribution list to include signatures.
2.2.2 Monthly Project Progress Reports
The Contractor shall prepare a consolidated progress report each month, documenting the work progress. The report shall be provided by the 15th day of each month. The monthly report shall include an updated project schedule. The report shall be clear and concise covering all major work activities and deliverables, and identifying potential issues with a plan to resolve such issues. The report shall include progress towards achievement of the performance objectives and delineate proposed actions to accomplish future project milestones, and Safety Exposure Report (SER).
2.3 Task 3 – Field Activities for Closure
2.3.1 Pre‐Mobilization
The Contractor shall be responsible for all their staff and their subcontractors to be documented workers as U.S. Citizens or under U.S. Government permit. The Contractor will provide schedules for gaining access to the site to USACE and NASA on company letterhead.
2.3.1.1 Permits and Fees
The Contractor shall prepare applications, acquire all permits, and pay associated fees, and make notifications (to include signage) in compliance with Local, State, Federal, USACE, DLA, and NASA requirements.
These permits may include, but are not limited to;
Santa Clara County HMCD Permits Bay Area Air Quality Management District (BAAQMD) Permits General Permit for Discharge of Storm Water Associated with Construction Water Discharge Permits (NPDES) Subsurface Excavations Spill Prevention, Control, and Countermeasure Plan NASA – ARC Permits and Notifications Moffett Airfield Access and Travel Confined Space Entry Permit
This effort also includes preparing necessary documentation and payment of associated fees for well registration, and/or removal/destruction under controlling regulatory guidelines. The groundwater monitoring wells and cathodic protection wells are shown in Attachment A, Closure Plan, Tables 4 and 5.
2.3.1.2 Inspection
Areas where work is conducted will be inspected and documented prior to work initiation each day and in each area. All areas will be kept free of debris, dusts, loose fibers or chips, etc. Proper containment will be utilized as required. Work will be conducted in manner that will provide NO EXPOSURE at any time. Work areas will be inspected again for cleanliness and documented prior to moving to another area to work by all individuals performing this function and at the end of each work day. Work will be performed during normal duty hours based on the needs of DLA (the Customer).
Tank system elements (e.g., tanks, pipelines, filter and surge vessels), will be inspected and measured for conditions and certification as applicable. Tank elements shall be free of product, sludge, rinseate, and debris to the extent that no material can be poured or drained from them when held in any orientation (e.g. tilted, inverted, etc.). A thorough visual inspection of the tank interior and exterior will be performed by a qualified and experienced practitioner to confirm the tank element is cleaned or requires ‘cleaning’ to comport to the appropriate ‘clean’ standard.
2.3.1.3 Abatement/Encapsulation and Removal
The Contractor’s approach and methodology will be developed based on the findings and recommendations of the materials inspection report, interim closure report, geotechnical and hydrogeological report, and those provided in Attachment A, Closure Plan, Tables 8, 9 and 10.
Given that substantial portions of the fuel system are buried, certain fuel system elements may only be accessible for abatement after the NASA‐ARC permit is issued;
select preconstruction events have been completed, and at various stages of intrusive effort (e.g., excavation) has finished. Consequently, the sequence of work may include a pre‐construction abatement and controls effort for accessible fuel system elements, followed by additional abatement and controls efforts during construction. The analytical results will be used to support or adjust the removal, handling and disposition aspects.
2.3.2 Mobilization
The Contractor’s mobilization efforts shall include delivery of the equipment and material necessary for performance of the project. The Contractor may choose to place a temporary trailer office and storage containers at fuel facility area. The areas will be presented in Task 1 Project Kick-Off Meeting and approved by USACE, DLA, and NASA prior to mobilizing.
2.3.3 Site Preparation and Setup
The Contractor’s site preparation shall include delineating work areas, staging areas, material consolidation areas, the decontamination area, and staging and storage areas. Preparatory measures for site construction tasks, temporary environmental protection measures, waste management procedures, site security controls, health and safety, and quality control will be put into place.
Facility improvements included as UST appurtenances (e.g., equipment and associated electrical, water lines, control/alarm lines and assemblies, power supplies, transformers, emergency generator, cathodic protection assemblies, lighting, and piping, thoroughfares, fencing, surface storm‐water controls) will be identified for protection, removal or scheduled outage. Elements will be identified, traced, and mapped to document systems to be removed and establish the appropriate methods and points of isolation. Utilities that will not be removed but may present workplace hazards (e.g., water lines, power lines, control circuits, communication lines) will also be identified with NASA (as part of the permit process) to determine the need for temporary outages or implementation of special control measures.
Additional preparation and set‐up activities may include: 1) placement of materials for water resource protection and sediment controls (e.g., best management practices under the SWPPP) and 2) protective for resource element protection (e.g., burrowing owl elements, protected vegetation, protected buildings).
The Contractor shall include biological monitoring, inspection, implementation of mitigation measures, and pest management for compliance with Migratory Bird Treaty Act (MBTA), protected species, and other natural resources support necessary to achieve no impact for interim UST, piping and appurtenance closure.
2.3.4 Groundwater Dewatering
Considering the depth of the UST and elevation of groundwater, removal will extend into the saturated zone. Dewatering and liquid disposition will be necessary for the removal of USTs.
The Contractor should base dewatering design on the data in the 2019 Geotechnical and Hydrogeology Report. At a minimum, the dewatering system should include shoring and vertical groundwater extraction wells. For cost estimating purposes, excavations may have a plan dimension of 120 feet by 475 feet, and be 15 feet deep at the Bulk Storage Tank Area, and 75 feet by 75 feet and be 15 feet deep at the Day Tank site to provide adequate access for equipment to demolish and remove USTS (Geotechnical and Hydrogeology Report. [AECOM], 2019). It is estimated that the Bulk Storage Tank Area would require a total of 14 to 16 pumping wells pumping at a total rate of 240 to 350 gallons per minute (gpm) to dewater the Bulk Storage Tank Area and 6 pumping wells pumping at at a total rate of approximately 96 gpm to lower the groundwater to 3 feet below excavation (Geotechnical and Hydrogeology Report.
[AECOM], 2019).
To reduce the total dewatering demand from the Bulk Storage Tank Area, the excavation could be divided in half by installing a sheet pile partition through the center of the site (Geotechnical and Hydrogeology Report. [AECOM], 2019).
When groundwater is encountered, groundwater samples may be required as described in the Recommended Minimum Verification Analyses for Underground Tank Leaks (available at www.unidocs.org) and applicable Regional Water Quality Control Board guidelines.
2.3.5 Sheet Pile Shoring and Cutoff Wall Design
Based on the geotechnical and hydrogeological analysis, a temporary sheet pile wall is the recommended method to shore the temporary excavation and to control the volume of groundwater that the dewatering system will discharge (Geotechnical and Hydrogeology Report.
[AECOM], 2019). It is estimated that the sheet piles will need to extend approximately 30 feet below the bottom of the excavation in order to retain the 15 feet vertical cut and adequately control groundwater flow into the excavation.
The sheet piles will provide the following:
Grade barrier to reduce groundwater flow into excavation during dewatering;
Mitigate potential to draw possible contaminant plumes in surrounding area by confining the dewatering system locally;
Shoring system to support the side of excavation and accessibility to the tank Stability to both sides bottoms of excavation to support removal and backfilling operations
The sheet pile design engineer must be qualified and have a thorough understanding of the subsurface conditions and recommended soil parameters presented in the 2019 Geotechnical and Hydrogeological Report. The Contractor will submit their design to USACE and AECOM for review. The contractor may propose reasonable alternatives to sheet piles if other cost effective methods for shoring and seepage cutoff wall can meet the objectives above.
2.3.6 Removal and Closure for Area USTs
The Contractor shall remove by deconstruction and/or demolition the areas listed below in accordance with the HMCD approved Closure Plan provided in Attachment A.
Fuel Farm Area Day Tank Area
If applicable, the Contractor shall remove and/or demolition any remaining surficial elements at the areas listed above. This may or may not include:
Three (3) Portland concrete cement (PCC) vaults positioned above UST 253.
One (1) dead transformer at the Bulk Storage approximately 20 ft by 20 ft.
2.3.7 Manifest, Disposal, and Salvage Documentation
The Contractor shall utilize the discharge alternatives for the groundwater dewatering effort outlined in the 2019 Geotechnical and Hydrogeological report.
The Contractor shall provide manifests and documentation regarding the disposal of hazardous materials from the site a minimum of 72 hours prior to expected transport to designated representative of DLA for review, approval and signature. Demolition materials shall be recycled as appropriate and in accordance with DOD pollution prevention guidelines and requirements, as well as all local, state, and federal laws and regulations. The Contractor shall maintain type of material/salvage, weight, and the salvage funds received in a daily transport log. See Attachment A, Closure Plan, Table 6 for more information regarding anticipated waste streams and quantities.
2.3.8 Backfill, Grading and Final Restoration
The Contractor shall backfill and grade excavation as specified in the approved removal work plan prepared as part of Task 2 Project Plans. The American Society for Testing and Materials (ASTM) Method D1557 shall be met for fill, and compaction.
The grades contours will meet the surrounding lines, elevations and grades to support the sheet flow drainage to existing drainage swales and ditched. Seed selection for revegetation will be completed in consultation with NASA‐ARC natural resource manager.
2.4 Task 4 – Additional Sampling
The Contractor shall provide a cost by location listed below, where the HMCD Inspector may require additional soil samples and associated lab analysis for verification of content or constituents of concern shown in Attachment A, Closure Plan, Table 7.
A sample at the secondary containment pad discharge valve/drain Emergency Generator footprint Under vaults or other low points within the containment pad where fluids may have been collected, (if failure in the pad are evident or there is evidence of staining) In the event that soil in soil samples collected between 0-1 foot bgs exhibits a noticeable presence of formally stored fuels (e.g., discoloration or petroleum odor); an additional sample may be required collected from a depth between 1.5 to 3 feet bgs.
Water samples will be collected at a frequency in conjunction with the disposal facility requirements.
2.5 Task 5 – Project Closure and Completion Reports
The Contractor shall prepare and submit to HMCD within 60-days of completing the UST removal project. The report shall comply with Santa Clara County DEH HMCD content requirements as the final action for HMCD acceptance and approval for No Further Action and/or permanent closure of the former DFSP Moffett Field. The Contractor shall allow time in their schedule for USACE and DLA review of the Project Closure Report and provide comment for changes to be applied prior to submission to HMCD.
The Contractor shall prepare and submit to USACE a Project Completion Report, containing drawings indicating the location of capped utilities, shut-off valves and other critical disconnects.
All Quality Control Reports (daily field reports) shall be included in the Draft Project Completion Report prepared by the Contractor, to include digital photos of significant events and observations, and sampling analysis. The Draft Project Completion Report is to be submitted to the USACE only. The Contractor shall prepare all reports following regulatory guidelines, in accordance with USACE Manual EM 385-1-1, November 2014, and any other Federal, State, and Local regulation.
The Contractor shall prepare drawings and maps to depict the areas/locations were environmental hazards were removed indicating the type and amount. Digital data shall include photos taken pre-, during, and post. Digital data shall be prepared utilizing AutoCAD, MS Office 2013, JPG and Adobe Acrobat XI. The Contractor shall distribute the Draft Completion Report for USACE review in electronic media format (via Compact Disk-Recordable (CD-R) or downloaded from Contractor’s designated FTP site) compatible with AutoCAD, MS Office 2013, JPG and Adobe Acrobat XI only as per the distribution list.
The Contractor shall prepare a written response to all comments received on the Draft Project Completion Report. Comments and Contractor responses shall be incorporated into the final report. As directed by the Contracting Officer’s Representative, the Contractor shall incorporate changes to the Draft Project Completion Report and shall distribute electronic copies of the
Draft Final Project Completion Report for USACE and DLA review as per the distribution list.
2.6 Option Task 6 – Dewatering System Operation HAZ Groundwater
If groundwater contamination above action levels is encountered during the dewatering process, the Contractor will implement interim measures such as an appropriate water treatment system prior to discharge to meet regulatory compliant standards. This optional task includes water sampling analysis for hazardous waste disposal characterization and amendments to project plans.
For cost estimating purposes, the Contractor may assume 5% of groundwater discharge (approximately 2,320,013 gallons) will be treated.
2.7 Option Task 7 – Dewatering System Operation HAZ Groundwater
This is a repeat of Option Task 6.
2.8 Option Task 8 – Dewatering System Operation HAZ Groundwater
2.9 Option Task 9 – Dewatering System Operation HAZ Groundwater
2.10 Option Task 10 – Soil Contamination Transfer and Disposal
The Contractor shall review the 2018 Interim Closure Report (OTIE) for constituents of concern that have been detected above Environmental Screening Levels (ESL) along the pipeline corridors. The Contractor shall perform verification sampling of these areas, and if necessary, properly dispose of contaminated soil, and restore the excavated locations in accordance with applicable local, state, and federal regulations. These constituents (petroleum hydrocarbons, volatile organic compounds) may or may not include gasoline, jet fuel (or jet propellant), 1,2‐ Dibromoethane, Naphthalene, tert‐Butyl Alcohol, Ethylbenzene, Benzene, and Methyl Tert‐Butyl Ether. These locations shall be restored to match ‘in kind’ the surrounding conditions and grade discussed in 2.3.8 Backfill, Grading and Final Restoration.
Additionally, if soil contamination above action levels is encountered during the excavation process, the Contractor will properly dispose of the material in accordance to local, state, and federal laws. This optional task includes amendments to project plans. For cost estimating purposes, the Contractor may assume 5% (approximately 852 bank cubic yards (bcy) of contaminated soil shall be properly transferred and disposed of.
2.11 Option Task 11 – Soil Contamination Transfer and Disposal
This is a repeat of Option Task 10.
2.12 Option Task 12 – Soil Contamination Transfer and Disposal
2.13 Option Task 13 – Soil Contamination Transfer and Disposal
3.0 Performance Objectives and Standards
The Contractor shall be required to furnish all labor, materials and equipment necessary to meet the performance objectives and standards identified in Table 1 below.
Table 1: Performance Objectives Summary
Performance Objectives Performance Standards
TASK 1: Project Meetings Army approval through the Contracting Officer’s Representative (COR).
TASK 2: Project Documents Army approval through the Contracting Officer’s Representative (COR).
Approval/acceptance of Project Work Plan and monthly progress reports.
TASK 3: Field Activities for Closure Army approval through the Contracting Officer’s Representative (COR).
TASK 4: Additional Sampling Army approval through the Contracting Officer’s Representative (COR).
TASK 5: Project Closure and Completion Reports Army approval through the Contracting Officer’s Representative (COR).
OPTION TASK 6: Pre‐treatment of Groundwater Army approval through the Contracting Officer’s Representative (COR).
OPTION TASK 7: Pre‐treatment of Groundwater Army approval through the Contracting Officer’s Representative (COR).
OPTION TASK 8: Pre‐treatment of Groundwater Army approval through the Contracting Officer’s Representative (COR).
Performance Objectives Performance Standards
OPTION TASK 9: Pre‐treatment of Groundwater Army approval through the Contracting Officer’s Representative (COR).
OPTION TASK 10: Soil Contamination Transfer and Disposal
Army approval through the Contracting Officer’s Representative (COR).
OPTION TASK 11: Soil Contamination Transfer and Disposal
Army approval through the Contracting Officer’s Representative (COR).
OPTION TASK 12: Soil Contamination Transfer and Disposal
Army approval through the Contracting Officer’s Representative (COR).
OPTION TASK 13: Soil Contamination Transfer and Disposal
Army approval through the Contracting Officer’s Representative (COR).
There may be multiple milestones and/or deliverables for each performance objective (see Section 4.2 of this PWS). Payments will be based on successful completion of the milestones.
This is the start of the file's text. The full file is on GovTribe.