B.08.03 Solicitation Amendment.pdf

PDF 754 KB Posted

Attached to
Quality Assurance Testing Federal contract opportunity
Solicitation number
W912PL20Q0001
Issued by
Department of the Army Corps of Engineers Engineering District Los Angeles

View the file

Other files for this federal contract opportunity

Other files attached to Quality Assurance Testing, newest first.
File Type Posted
20191021_TF_Barrier_284_2808_Project_Wall_Map.pdf PDF
B.08.02 Solicitation.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to answ er questions from industry and to extend the solicitation due date to 16 February 2020..

All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 07-Feb-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912PL20Q0001

X 9B. DATED (SEE ITEM 11)

17-Jan-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

07-Feb-2020

CODE

CONTRACTING DIVISION

915 WILSHIRE BLVD.

LOS ANGELES CA 90017

W912PL 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912PL20Q0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

QUESTIONS AND ANSWERS

Q: Do we only fill in the unit prices for the Sectors we feel we can cover and leave the other sectors blank?

A: Yes

Q: At the top of page 7 of the price schedule there is the following text, "System). Direct Shear Test, Controlled Strain - 3 Specimens: Compacted (2.8" or 24" diameter)." This does not have a Line Item No. Is this a test that is required?

A: The wording at the top of page 7: "System). Direct Shear Test, Controlled Strain - 3 Specimens: Compacted (2.8" or 24" diameter)" is part of the bottom of page 6. It is all line item 20.

Q: To clarify the contract will pay for the travel time to get to the location and then will pay for the particular test to be formed. Does this mean that any time associated with the sampling and testing on site should be built into the unit prices?

A: Whether test is done on site or back in lab, all costs shall be included for invoicing and paying for the service & report.

Q: Is per diem an option or are all testing calls assumed to be from our office to the site and back to the office each day?

A: In accordance with paragraph 1.6 of the Performance Work Statement, Price Schedules shall include all costs associated with performance of the required service, to include all labor, materials, travel, per diem, and any other direct, indirect or incidental costs necessary for performance of the ordered services.

Q: In paragraph 1.12. TRAVEL TIME - limited to 3 hours per order. Is this roundtrip or each way travel time?

A: Roundtrip. Travel Time shall not exceed three hours per order.

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 07-Feb-2020 04:00 PM to 16-Feb-2020 04:00 PM.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .