This solicitation seeks proposals for the Newport Bay Harbor - Entrance Channel Maintenance Dredging and East Jetty Repairs project in Orange County, California. The project consists of dredging approximately 62,000 cubic yards of material from the federal channel and placing it in the nearshore off Balboa Beach, with options to dredge an additional 65,000 cubic yards for offshore disposal. The project also includes concrete repairs to the existing concrete structure portion of the East Jetty and placement of 3,500 tons of 4-ton armor stone to repair the revetment on the channel side. The magnitude of the proposed project is estimated between $1,000,000 to $5,000,000. This is a small business set-aside solicitation with a NAICS code of 237990 and size standard of $39,500,000. Proposals are due by September 18, 2020 at 1:00 PM local time and must be submitted electronically through DoD Safe. The solicitation is subject to environmental considerations that may result in amendments, delays, cancellations or revisions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912PL20B0011_Bid_Abstract.pdf | ||
| W912PL20B0011_Am07.pdf | ||
| W912PL20B0011_Am06.pdf | ||
| SF-30_W912PL20B0011_Am5.pdf | ||
| W912PL20B0011_AM4.pdf | ||
| W912PL20B0011_Am2.pdf | ||
| Am001_W912PL20B0011.pdf | ||
| FIO_7_NBH2016_eelgrass_Am001.zip | ZIP file | |
| Site visit sign-insheet_Newport_Dredging_EJetty_200901.pdf | ||
| FIO_3_NB2020_04_NSP_cond 3ft.txt | TXT text file | |
| Plans_W912PL20B0011_NBH_Dredging_and_Jetty_Repairs.pdf | ||
| Spec_W912PL20B0011_NBH_Dredging_and_Jetty_Repairs.pdf | ||
| FIO_1_NB2020_04_cond-3ft.txt | TXT text file | |
| FIO_2_NB2020_04_cond-2.pdf | ||
| FIO_6_NB2019_07_cond_3.pdf | ||
| FIO_4_NB2020_04_NSP_cond.pdf | ||
| FIO_5_NB2019_07_cond-3ft-Sheet 3.txt | TXT text file |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION ( Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
0003 Sep 11, 2020
USACE-LOS ANGELES DISTRICT
CONTRACTING DIVISION, WEST REGION BRANCH
915 WILSHIRE BLVD, SUITE 1440
LOS ANGELES, CA 90017
W912PL20B0011
Aug 14, 2020
Newport Harbor Entrance Channel Maintenance Dredging and East Jetty Repairs, Orange County, CA
Due date for receipt of bids is September 18, 2020 at 1:00 PM local time.
NOTE: The only authorized transmission method for bids in response to this solicitation is electronically via SAFE online submission. NO OTHER TRANSMISSION METHODS (EMAIL, FACSIMILE, REGULAR MAIL, HAND CARRIED, ETC.) WILL BE ACCEPTED.
See SF30 Continuation Page for Revisions.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
Amendment 003
INSTRUCTIONS
Instructions for items other than those that are self-explanatory, are as follows:
Item 1 (Contract ID Code) . Insert the contract type identification code that appears in the title block of the contract being modified.
Item 3 (Effective date) .
(1)
(2)
(3)
(4)
(5)
For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.
For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.
For a modification issued as an initial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.
For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.
For a modification confirming the contacting officer's determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision.
(a)
(b)
(c)
(d)
(e)
(f)
Item 6 (Issued By) . Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.
Item 8 (Name and Address of Contractor) . For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.
Item 9, (Amendment of Solicitation No. - Dated), and 10, (Modification of Contract/Order No. - Dated ). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order.
Item 12 (Accounting and Appropriation Data) .
When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries.
(2) Accounting classification Net decrease $
Include subject matter or short title of solicitation/contract where feasible.
Item 16B . The contracting officer's signature is not required on solicitation amendments. The contracting offier's signature is normally affixed last on supplemental agreements.
(i)
NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation sheet".
Item 13 . Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)
Item 14 (Description of Amendment/Modification) .
Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:
Total contract price increased by $
Total contract price decreased by $
Total contract price unchanged.
State reason for modification.
When removing, reinstating, or adding funds, identify the contract items and accounting classifications.
When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to --
A reference to the letter determination; and
A statement of the net amount determined to be due in settlement of the contract.
(g)
(h)
(i)
(ii)
(1)
(2)
(3)
(4)
(5)
(6)
(i)
(ii)
(iii)
STANDARD FORM 30 (REV. 10-83) BACK
(1) Accounting classification Net increase $
Newport Bay Harbor Maintenance Dredging and East Jetty Repairs W912PL20B0011 Orange County, CA
Amendment 003
SF 30 (Continuation Page)
NOTICE TO BIDDERS:
This Amendment forms a part of the Covered Contract Documents and modifies the original Bidding Documents dated August 14, 2020, and as noted below. This Amendment shall become part of the Contract Documents to the same extent as though it had been written into the body thereof and bound therein. This Amendment is applicable to the items affected and all Bidders are held responsible for the contents herein. Acknowledgement of receipt of this Amendment shall be so noted in the space provided on Standard Form 1442, Solicitation, Offer and Award. Failure to do so may subject the Bidder to disqualification.
Revised Pages/Sections:
The following revised pages and/or sections, noted as Amendment 0003 and as listed below, are to replace the original pages/sections from Bid Documents dated August 14, 2020:
* SF1442 - Revisions to Box 10
* Section 35 31 26 - Jetties - revised Paragraph 2.1.6.2 Gradation Compilation, subparagraph a
00 00 01 Amendment 03
PROJECT TABLE OF CONTENTS
DIVISION 00 - BIDDING REQUIREMENTS, CONTRACT FORMS AND CONTRACT CONDITIONS
SF-1442 Solicitation, Offer and Award Am02 Am03
00 01 05 Certification Page 00 10 00 CLIN Schedule / Bidders Notes Am01 00 21 00 Instructions 00 21 13 Instructions to Bidders
00 45 00 Representations and Certifications 00 70 00 Conditions of the Contract 00 73 00 Supplementary Conditions 00 73 46 Wage Rates Am01
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 Summary of Work 01 22 00 Price and Payment Procedures 01 32 01 Project Schedule 01 33 00 Submittal Procedures 01 33 00a Submittal Register
01 35 26 Governmental Safety Requirements 01 42 00 Sources for Reference Publications 01 45 00 Quality Control 01 45 01 Resident Management System Contractor Quality Control (RMS CM)
01 50 00 Temporary Construction Facilities and Controls 01 57 19 Temporary Environmental Controls Am02 01 74 19 Construction Waste Management and Disposal 01 78 00 Closeout Submittals
DIVISION 03 – CONCRETE
03 01 32 Concrete Rehabilitation for Civil Works Am01 03 30 53 Miscellaneous Cast-in-Place Concrete
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
35 20 23 Dredging Am01 35 20 23a Sediment Sample Logs 35 20 24 National Dredging Quality Management Program – Scow 35 31 26 Jetties Am02 Am03
-- End of Project Table of Contents –-
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED PAGE OF PAGES
IMPORTANT - The "offer" section on the reverse must be fully completed by the offeror.
4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER
7. ISSUED BY CODE 8. ADDRESS OFFER TO
9. FOR INFORMATION CALL
A. NAME B. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
11. The Contractor shall begin performance within calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable. (See .)
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
12B. CALENDAR DAYS
YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and copies to perform the work required are due at the place specified in Item 8 by (hour) (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, is not required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-3212
Designed using Perform Pro, WHS/DIOR, Oct 96
1442-103 STANDARD FORM 1442 (REV. 4-85) (EG)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d)
Amendment 003
W912PL-20-B-0011 x 14 AUG 2020 1 OF 2
U.S.Army Corps of Engineers, Los Angeles Dist Attn:Contracting Division CESPL-CT-W 915 Wilshire Boulevard, Suite 930 Los Angeles, California 90017-3401
DoD Secure Access File Exchange (DoD Safe) at https://safe.apps.mil/
See Section 00 21 13, Special Instructions Pertaining to Submission of Electronic Bids
Pat Bonilla 213-452-3255
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date):
Newport Bay Harbor - Entrance Channel Maintenance Dredging and East Jetty Repairs Orange County, California
Project consists of dredging approximately 62,000 cubic yards of material from the Federal channel and placement in the nearshore off Balboa Beach with options for an additional 65,000 cubic yards of material and placement at offshore disposal site LA-3. The project also includes concrete repairs to the existing concrete structure portion of the East Jetty and placement of 3,500 tons of 4 ton armor stone to repair the revetment on the channel side of the structure.
Magnitude of the Proposed Project: $1,000,000 to $5,000,000.
This solicitation is Small Business Set-Aside The NAICS Code is 237990, Dredging, the small business size standard is $30,000,000.00.
BIDDERS PLEASE NOTE: This project contains environmental considerations not finalized at the time of issuance. Upon finalization of these considerations, the solicitation may be amended as needed, to provide additional environmental considerations for the performance of work. This project may be delayed, canceled or revised at any time prior to award.
10 see 007300
X X *Section 00 73 00
X 10
0 1:00 PM
local time 18 September 2020
X
OFFER (Must be fully completed by offeror)
STANDARD FORM 1442 BACK (REV. 4-85)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14)
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within calendar days after the date offers are due. (Insert any number equal or greater than the minimum requirement stated in 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20B. SIGNATURE 20C. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24.SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) ( ) 41 U.S.C. 253(c) ( )
26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BYCODE
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to the issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and
(c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
29. AWARD. (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN
(Type or print)
30B. SIGNATURE 30C. DATE
31A. NAME OF CONTRACTING OFFICER (Type or print)
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
Amendment 003
DUNS NO.: TAX ID NO.:
CAGE CODE NO.:
( ) - ; FAX ( ) -
See Section 00 10 00 Solicitation Contract Line Item Number (CLIN) Schedule
USACE Los Angeles District Santa Ana Dams Resident Office 2493 Pomona Rincon Road Corona, CA 92880
USACE, Finance Center
ATTN: CEFCO-AO-D
5722 Integrity Drive Millington, TN 38054-5005
SECTION TABLE OF CONTENTS
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
SECTION 35 31 26
JETTIES
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
PART 2 PRODUCTS
2.1 STONE
2.1.1 General
2.1.2 Stone Sources
2.1.2.1 Stone Source Authorization
2.1.2.2 Stone Authorization Criteria
2.1.2.3 Potential Stone Sources
2.1.2.4 Stone Source Inspection
2.1.3 Stone Quality
2.1.3.1 Quality Compliance Sampling and Testing
2.1.3.2 Materials Testing Laboratory
2.1.3.3 Stone Source Quality Control
2.1.3.4 Stone Quality Testing Requirements
2.1.3.5 Stone Acceptance Criteria
2.1.3.6 Stone Source Demonstration Stockpile
2.1.4 Quarry Operations
2.1.5 Proportional Dimension Limitations
2.1.6 Gradation
2.1.6.1 General
2.1.6.2 Gradation Compilation
2.1.6.3 Stone Gradation Testing
2.1.6.4 Stone Gradation Reports
2.1.6.5 Gradation of A-4 Armor Stone
2.1.6.6 Weight Verification
2.1.7 Rejected Stone
2.2 FILL MATERIAL
2.2.1 General
2.2.2 Gradation Testing
2.2.3 Chemistry Testing
PART 3 EXECUTION
3.1 CONSTRUCTION PLAN
3.2 DAILY REPORT OF OPERATIONS
3.3 STONE DELIVERY
3.3.1 Waybills and Delivery Tickets for Truck or Rail Transport
3.3.2 Scale Tickets and Records for Barge Transportation
3.3.3 Stockpiling
3.4 PLACEMENT OF STONE
3.4.1 Unsatisfactory Materials
3.4.2 Armor Stone
3.4.3 Reset Existing Stone
35 31 26 - 1
3.5 CONTRACTOR'S STAGING AND STORAGE AREAS
3.6 LIMITS OF WORK
3.6.1 Corona Del Mar Beach
3.6.2 Work Seaward of MHHW
3.7 RESTRICTIONS
3.7.1 Work Hours and Schedule
3.7.2 Construction Equipment on Corona Del Mar Beach
3.7.3 East Jetty Concrete Structure
3.7.4 Water Access
3.7.5 Federal Navigation Channel
3.8 SURVEYS
3.9 FINAL EXAMINATION AND ACCEPTANCE
-- End of Section Table of Contents --
35 31 26 - 2
SECTION 35 31 26
JETTIES
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM C88 (2013) Standard Test Method for Soundness of Aggregates by Use of Sodium Sulfate or Magnesium Sulfate
ASTM C127 (2015) Standard Test Method for Density, Relative Density (Specific Gravity), and Absorption of Coarse Aggregate
ASTM C295/C295M (2012) Petrographic Examination of Aggregates for Concrete
ASTM C535 (2016) Standard Test Method for Resistance to Degradation of Large-Size Coarse Aggregate by Abrasion and Impact in the Los Angeles Machine
ASTM D1141 (2013) Standard Practice for the Preparation of Substitute Ocean Water
ASTM D4791 (2010) Flat Particles, Elongated Particles, or Flat and Elongated Particles in Coarse Aggregate
ASTM D5313 (2013) Standard Test Method for Evaluation of Durability of Rock for Erosion Control Under Wetting and Drying Conditions
ASTM D5519 (2015) Particle Size Analysis of Natural and Man-Made Riprap Materials
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Office symbols are as follows: EDG: Engineering Division, Geotechnical Branch. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals Construction Plan; G
35 31 26 - 3
Stone Source Quality Control Plan; G, EDG Daily Report Form; G Daily Stone Quality Control (QC) Inspection Report
SD-06 Test Reports Stone Quality Testing Results; G, EDG Stone Gradation Reports; G, EDG Contractor Survey; G Chemical Test Results; G, EDG-G
SD-07 Certificates Stone Source(s); G Gradation Compilation; G Daily Report Of Operations Waybills And Delivery Tickets; G Scale Tickets And/Or Records Of Weights; G
PART 2 PRODUCTS
2.1 STONE
2.1.1 General
a. Shape: All stone must be sub-angular to angular quarried material with a shape that assures interlocking with adjacent stone.
b. All stone must be durable material approved in advance. In case an unlisted source is to be used, demonstrate that an adequate quantity of material is available and provide quality test data. Stone must be of a suitable quality to ensure permanence in the structure and in the climate in which it is to be used. Vary the quarrying, processing, loading and placing operations to produce the sizes and quality of stone specified. If the furnished stone does not fully meet all the requirements of these specifications, provide, at no additional cost to the Government, other stone meeting the requirements of these specifications.
c. Stone must be free from cracks, blast fractures, bedding, seams and other defects that would tend to increase its deterioration from natural causes. Inspections for cracks, fractures, seams and defects must be made by visual examination during Contractor Daily Stone Quality Control Inspections.
2.1.2 Stone Sources
2.1.2.1 Stone Source Authorization
a. Before stone is produced from any source, the source of stone must be approved. Submit the name and location of the proposed Stone Source(s) in writing at least 15 days prior to the stone source inspection date.
b. The Government will conduct a stone source investigation and evaluate the quality test data provided by the Contractor to determine whether acceptable stone can be produced from the proposed source. Notify and schedule the stone source inspection and submit stone quality test results. A stone source may be one or a combination of the following types of sources of stone:
(1) Stone source listed within the specifications herein.
35 31 26 - 4
(2) Stone source proposed by the Contractor and not listed within the specifications herein.
c. Authorization of a stone source is not be construed as a waiver of the right of the Government to require the Contractor to furnish stone which complies with these specifications. Materials produced from localized areas, intervals, or strata will be rejected when such materials do not comply with the specifications. Before a proposed source of stone will be considered for evaluation and approval, the Contractor must demonstrate that the source is capable of providing the quality, quantities and gradation needed and at the rate needed to maintain the scheduled progress of the work. If sufficient amounts of stone conforming to these specifications are not available from a source or sources used in the work, the Contractor must submit stone from another source for authorization.
2.1.2.2 Stone Authorization Criteria
Authorization of a proposed stone source will be based on test results and stone source inspection. Government approved stone quality tests are required for all stone sources, as outlined in paragraph, Quality Compliance Sampling and Testing. The Contracting Officer will approve the source based on stone quality, stone source inspection and the stone source demonstration stockpile inspection.
2.1.2.3 Potential Stone Sources
a. On the basis of information and data available to the Government, the following sources located near the project have in the past produced stone meeting the quality requirements of these specifications:
Quarry Name Nearest City
3M Corona Corona, California Pebbly Beach Avalon, California
b. Listing of a stone source is not to be construed as current or future availability of the source, authorization of all materials from the source, nor as a waiver of inspection and testing of the source. Stone produced from any source must meet all the requirements set forth in these specifications. Listing of a stone source is also not to be construed as an indication that the source can produce the total quantity or size of stone required for the project. Stone may be furnished from other sources designated by the Contractor and authorized by the Contracting Officer.
2.1.2.4 Stone Source Inspection
The proposed stone source must be inspected and approved prior to source authorization. The inspection must be performed at the quarry/stone source by the Contracting Officer, Contractor, a materials laboratory technician from the approved laboratory described in paragraph Materials Testing Laboratory, a representative of the quarry, and a Geologist from the Geotechnical Branch, Geology Section, of the Los Angeles District. Provide notification of the stone source inspection to all required attendees a minimum of 15 days prior to the inspection date. The inspection date must be a minimum of 45 days in advance of the time when the stone will be required in the work. During the stone source inspection, the Contracting
35 31 26 - 5
Officer will select the samples to be collected for quality testing in accordance with paragraph Stone Quality.
2.1.3 Stone Quality
2.1.3.1 Quality Compliance Sampling and Testing
a. Collect a minimum of two stone samples from each separate rock-type lithology for each proposed source and perform the complete list of stone quality evaluation tests twice for each separate rock-type lithology. One poor quality and one good quality sample must be collected separately and tested for the full suite of rock quality tests. The complete list of stone quality evaluation tests are referred to as the full suite. The full suite of stone quality evaluation tests are presented in a table under paragraph Stone Quality Testing Requirements.
b. During the stone source inspection, collect all stone samples at each stone source with samples selected and approved by the Contracting Officer. The laboratory technician from the MTC approved laboratory is required to collect and ship all samples to the approved laboratory at the Contractor's expense. Perform sample selection and collection on the same date.
c. On average, one to two separate rock types exist at typical stone sources. A stone source may require between two to eight stone quality evaluation tests because of varying lithologies.
d. Each stone sample must consist of 300 pounds each of representative stone from the proposed stone source. The quarry/stone source faces and the stockpiles to be used for the project must be examined and sampled.
e. Acceptance of the stone source is based on the results of the stone quality evaluation tests. Submit the Stone Quality Testing Results for all collected samples in one comprehensive report a minimum of 30 days before initial placement.
2.1.3.2 Materials Testing Laboratory
Perform the full suite of stone quality evaluation tests using a materials laboratory that is currently validated by the USACE Material Testing Center (MTC), as specified in Section 01 45 00 QUALITY CONTROL, paragraph Testing Laboratories, and that meets the following requirements:
a. Within the past two years, has successfully performed the full suite of stone quality tests and successfully reported results to the Corps of Engineers Los Angeles District Geologist per the specifications herein.
b. All stone quality tests, results and reporting are supervised and stamped by a California state registered Civil Engineer or Geologist, with a minimum of two years working experience in stone quality testing and petrography analysis.
c. Performs all stone quality tests and results at one laboratory location that is MTC validated for the full suite of stone quality tests.
35 31 26 - 6
d. Prepares one comprehensive report of tests and results at one laboratory location.
2.1.3.3 Stone Source Quality Control
a. Submit the Stone Source Quality Control Plan (QC Plan) a minimum of 10 days in advance of the stone source inspection meeting. The QC Plan must include, at a minimum:
(1) Schedule for the stone source inspection.
(2) Contractor's QC inspection procedure covering production of the stone throughout the duration of the project.
(2) Contact and coordination details.
(4) Description of quarrying methods and means for preparing the stone source for this project
b. The QC Plan must include an example Daily Stone Quality Control (QC) Inspection Report. The Stone Source QC Inspection Report must include, at a minimum, the following information:
(1) Name and location of stone source.
(2) Name of the project stone size/category being inspected (i.e. A-4 Armor stone, etc.).
(3) Daily colored photographs of stone being inspected.
(4) Photographs of rejected stone and rejected stone stockpile.
Rejected stone is to be documented according to paragraph 2.1.3.5, Stone Acceptance Criteria, marked with a red "X" and shown in a photograph.
(5) Inspection results of quality of stone according to paragraph 2.1.3.5, Stone Acceptance Criteria.
c. Perform daily stone quality inspections during stone production and submit the Stone QC Inspection report signed by an authorized CQC Personnel as specified in Section 01 45 00. Include visual examination for cracks, fractures, seams and defects during the daily stone quality inspections. If, by visual examination, it is determined that 1 percent or more of the stone produced contains hairline cracks, then all stone produced by the means and measures which caused the fractures must be rejected.
2.1.3.4 Stone Quality Testing Requirements
a. Subject stone to such tests as are necessary to demonstrate to the satisfaction of the Contracting Officer that the materials are acceptable for use in the work. At a minimum, the stone must meet the following full suite of test requirements:
35 31 26 - 7
Test Test Method Requirement
Petrographic Analysis ASTM C295/C295M (4 and 5) Good quality and acceptable for use as stone protection
Wetting and Drying ASTM D5313 (1 and 5) No fracturing (2)
Specific Gravity (Bulk
SSD)
ASTM C127 (5) 2.65 minimum
Absorption ASTM C127 (5) 2.0% maximum
Magnesium Sulfate Soundness
ASTM C88 (2 and 5) 10% max loss (3)
Abrasion Loss ASTM C535 (5 and 6) 20% max loss after 500 revolutions
b. All stone samples tested for Specific Gravity, Absorption, Magnesium Sulfate Soundness and Abrasion must be collected as a composite sample with a size range graded from approximately 3 to 4 inches diameter and have a combined total weight of approximately 150 pounds, in lieu of the size gradation and weights given in the ASTM C535, ASTM C88 and ASTM C127. In addition to the above tests, subject the stone to a petrographic and X-ray diffraction analysis, in accordance with ASTM C295/C295M (5). The stone must not contain any expansive clays.
c. Specific Testing Procedures
(1) Wetting and drying test. Perform this test using all procedures according to ASTM D5313 and in accordance with the following specific procedures:
(a) Entire sample must be carefully examined and four representative test specimen slabs selected and produced. The specimen slabs must be large enough to produce four separate cut slabs, each a minimum of 2-1/4 inches thick, with a minimum total surface area of 25 square inches on the slab side. The slab must not be less than 5 inches length per side.
(b) The test samples must be color photographed four times to show all surface features, before each slab is produced. After the slabs are produced and prior to performing the first cycle of the test, the slabs must be individually photographed to show all surface features and then examined under a low-power microscope of at least 20X magnification. All visible surface features must be noted and recorded. A length scale must be included and shown in all color photographs of slabs.
(c) Subject the slabs to a maximum of thirty cycles of wetting and drying. Two of the four slabs must be soaked in fresh tap water with 0.5 percent ethyl alcohol added by mass; the remaining two slabs must be soaked in salt water, in accordance with ASTM D1141, if a source of nearby natural salt water is not available.
(d) At intervals of every four cycles, the slabs must again be individually color photographed and examined with the low-power microscope to check for openings or movement of fractures, disintegration, spalling, splitting, flaking along edges, swelling
35 31 26 - 8 of clays, softening of rock surfaces, heaving of micaceous minerals, breakdown of matrix material, and any other evidence of weakness developing in the rock. Observation or worsening of any of the aforementioned flaws must be recorded and the cycle at which they are first observed must be included.
(e) After thirty cycles, the slabs and chunks must again be examined, and all changes must be noted and recorded. The test slabs, together with all particles broken-off during the test, must be oven-dried, weighed, and color photographed. The test may be terminated prior to the completion of thirty cycles, if the mass of the largest remaining fragment of the slab amounts to less than half of the mass of the original slab specimen.
(2) Weakening and loss of individual surface particles is permissible, unless bonding of the surface grains softens and causes general disintegration of the surface material.
(3) The test procedure for Petrographic and X-ray Diffraction is performed according to ASTM C295/C295M, except for the following:
(a) Prepare a color, magnified photograph of each stone type using a microscope, and identify the individual minerals within the stone by labels and arrows, upon the photograph.
(b) Develop a very detailed macroscopic and microscopic description of the stone, to include all the mineral constituents, individual sizes, their approximate percentages, and mineralogical histories. Include a description of stone hardness, texture, weathering, and durability factors.
(c) Present a written summary of the suitability of stone for use as stone protection, based on the Petrographic and X-ray tests and the results of ASTM C535, in the final laboratory report on stone quality.
(4) Provide a minimum of two color photographs for each individual stone quality test. Take one of the two photos prior to commencement of each test, and the other after completion of any of each test. Include a suitable length scale in each color photograph. Label each photo "prior to testing" and "after testing" as appropriate. Label each photo with the name of the test and the name of the sample.
(5) Test procedure for LA Abrasion test. Perform this test using all procedures according to ASTM C535, but the following specific procedures for LA Abrasion testing must be performed: The entire sample must be run for 500 revolutions on rock particles in the size range graded from approximately 3 to 4 inches in diameter.
2.1.3.5 Stone Acceptance Criteria
a. All stone is subject to approval. The Contracting Officer will perform visual inspections and measurements of the stone at any point, including before and during delivery to the job site and up to and including placement.
b. If, by visual examination, it is determined that 4 percent or more of the stone produced contains hairline cracks, then all stone produced
35 31 26 - 9 by the means and measures which caused the fractures must be rejected.
Observed deviations of gradation, weight or quality of stone from the specified requirements or stone considered by the Contracting Officer to be questionable will lead to the stone being rejected and re-sampling and re-testing will be required.
(1) Detrimental hairline cracks are defined as being a minimum width of 4 mil (0.1 mm) and are seen continuously running along one-third the dimension of at least two sides of the stone.
c. Additional sampling and testing of the stone, including the type and quantity of sampling, is at the discretion of the Contracting Officer.
Acceptance of any stone does not constitute acceptance of all stone from a source. All accepted stone must be as follows:
(1) Accepted by the Contracting Officer from an authorized source.
(2) Of the same lithology as the original stone from which test results or quarry records were taken as a basis for authorization of the source.
(3) Sound, durable, hard, and free of laminations, weak cleavages, undesirable weathering, or blasting or handling-induced fractures which subtend more than 1/3 of the total circumference of the stone along the plane of fracturing and which would tend to increase its deterioration from natural causes and hairline cracks that are detrimental.
(4) Of such character that the stone will not disintegrate from the action of air, water, or the conditions of handling and placing.
(5) Clean and free from earth, clay, refuse, or adherent coatings.
(6) Meet all the prescribed stone acceptance criteria and pass all stone quality tests.
2.1.3.6 Stone Source Demonstration Stockpile
a. Following submittal of the Contractor's Stone Source Quality Control (QC) Plan and selection of a source, but prior to the Government's approval of a source, make arrangements to provide a pre-production demonstration stockpile for each stone source according to each specific stone gradation class for the project. Submit notification and schedule Government inspection of demonstration stockpile. All stockpiles must be evaluated for quality and gradation by the Contracting Officer. The stockpile will contain 48 stones and must be located at the source of the stone and be shaped in windrow fashion.
b. Place stones with a size range greater than 15 inches in a single layer with 5 foot of clear space around each stone. Turn individual stones as directed to accommodate the Contracting Officers inspection.
Do not stack stones under 15 inches in size higher than 2 feet. All stones placed in the demonstration stockpiles must be representative of the overall quality of materials in the source and should not consist of the best specimens, unless it is reasonable to determine that the source will provide the required amount of stone of the applicable size range with a degree of quality no less than that existent in the demonstration stockpile.
35 31 26 - 10
c. Preselect all stones placed in the stockpile consistent with what is described in the Contractor's QC Plan and:
(1) Eight stones ranging in weight from 4 to 6 tons,
(2) Eight stones ranging in weight from 2 to 4 tons,
(3) Eight stones ranging in weight from 1 to 2 tons,
(4) Ensure that each stone does not exceed the maximum aspect ratio criteria as described in paragraph 2.1.5, Proportional Dimension Limitations.
d. The Contracting Officer will inspect stone in the stockpiles according to the stone quality and gradation criteria of these specifications.
An entire stockpile will be rejected if more than 8 percent of the stones in the stockpile are rejected. If a stockpile is rejected, prepare a replacement stockpile for re-evaluation by the Contracting Officer and revise and resubmit the Stone Source QC Plan. If the replacement stockpile is rejected, the stone source will be rejected for the corresponding size range that is rejected.
e. Stockpiles of representative reject stones from the demonstration stockpile(s) must be marked with a red "X" and set aside to a separate stockpile. The Contractor may choose a replacement stone source if a first or second stockpile is found to be unacceptable. Replacement of the stockpiles or stone sources will be at no additional cost to the Government and with no change in submittal schedule or time of completion of project.
2.1.4 Quarry Operations
a. Conduct quarry operations in a manner that produces stone conforming to the requirements specified. Producing the stone may involve selective quarrying, handling, processing, blending, and loading as necessary.
b. Any stone found to not meet the minimum acceptance criteria as specified in paragraph Stone Acceptance Criteria must be marked with a red "X" and set aside in a stockpile separate from the acceptable stone to be used in the work.
2.1.5 Proportional Dimension Limitations
A flat and elongated piece of stone is defined as having a ratio of width to thickness or length to width greater than 3:1. Use ASTM D4791 as a guide to perform the test. Not more than 20 percent of the stones within a gradation range are to have an aspect ratio greater than 2.5:1 and not more than 5 percent of stones within a gradation class range are to have an aspect ratio greater than 3:1.
2.1.6 Gradation
2.1.6.1 General
a. All new stone must meet the gradation requirements as specified both at the source and as delivered to the project. Stone not meeting the required grading due to segregation or degradation during placement will be rejected. If test results indicate that stone does not meet
35 31 26 - 11 the required gradation, the hauling operation will be stopped immediately and will not resume until processing procedures are adjusted and a gradation test is completed showing gradation requirements are met. All gradation tests are at the expense of the Contractor.
b. New armor stone furnished for repair of the east jetty revetment is designated "A-4 class armor stone". A-4 designation indicates a median stone weight of 4 tons.
2.1.6.2 Gradation Compilation
a. Pr ovi de pr oof of gr adat i on compl i ance by speci f y i ng t he i ndi v i dual wei ght s of each ar mor st one f or each bar ge or t r uck/ l oad. I f t r uck or r ai l i s used t o move st one f r om a quar r y t o a bar ge l oadi ng ar ea, t hi s same document at i on ( t ot al number of st ones and i ndi v i dual wei ght of each st one) must be suppl i ed f or each t r uck or r ai l l oad or st ockpi l e pr i or t o l oadi ng of any bar ge.
b. Use scale to weigh each individual stone from each stone gradation class. Add together individual stone weights and obtain total weight from each class. Record individual and total weight for each stone class separately from other stone class types. Submit results in a Stone Gradation Report prior to stone being placed.
c. Measure and determine the greatest and least dimension of each stone larger than 2 tons or 36 inches, if the stone is determined to be elongated, with an aspect ratio of 2 to 1, based on visual estimates.
d. Report the proportional dimension characteristics for each stone weighed that is greater than 2.5 to 1 and 3 to 1 ratios. No more than 20 percent of the total weight of stone per stone gradation class can be greater than 2.5 to 1 ratio. No more than 5 percent of the total weight of stone per gradation class can be greater than a 3 to 1 ratio.
2.1.6.3 Stone Gradation Testing
a. If at any time the Contracting Officer determines that weight determination of the stones is necessary on any barge load or other delivery unit, this action will constitute a formal gradation test.
All formal gradation tests must be at the expense of the Contractor and conducted in accordance with ASTM D5519, Test Method A.
b. Perform a formal gradation testing on samples selected in the presence of the Contracting Officer. Testing may be performed by the Contractor, subject to approval by the Contracting Officer. Testing must be supervised by a California registered Civil Engineer or geologist, experienced in rock gradation testing.
c. Plot the gradation results on gradation curves, all data points representative of the stone must be between the boundary limits, as defined by smooth curves drawn through specified grading limits and plotted on a mechanical analysis diagram. The individual grading curves must not exhibit abrupt changes in slope, denoting skip-grading or scalping of certain sizes. If gradation test results show that stone does not meet the required gradation, the hauling and/or barging and placement operations will be stopped immediately and will not resume until processing procedures are adjusted and a passing gradation test is completed, showing that gradation requirements are
35 31 26 - 12 met.
2.1.6.4 Stone Gradation Reports
Submit Stone Gradation Reports for the initial gradation tests. Submit stone gradation reports following gradation testing performed at the direction of the Contracting Officer. The stone test gradation reports contain the following:
a. Date of test and sample location.
b. Size of sample in pounds and, where applicable, dimensions of the area sampled.
c. The greatest dimension and least dimension, of each stone larger than 36 inches or 2 tons, if the stone is determined to be elongated, with an aspect ratio of 1:1.5 based on visual estimates.
d. Weight of material not measured in c) above.
e. Weight of each stone larger than 36 inches or 2 tons.
f. Gradation plot.
g. The type of stone gradation class tested (i.e. A-4 Armor stone)
h. Calculate the percent by weight of stone with a greatest dimension of 2-1/2 or more times the least dimension.
2.1.6.5 Gradation of A-4 Armor Stone
New armor stone is required for reconstructing the revetment as indicated.
Class A-4 armor stone must be quarried, angular stone reasonably well distributed within the limits specified in the below table.
Weight of Individual Pieces (ton) Percent Smaller (by weight)
6.0 100
4.0 50-100
2.0 0-50
1.0 0
2.1.6.6 Weight Verification
Provide a visual sample palette of individual stones, each weighing nearest to 6, 4, 2, and 1 tons, that is representative of the weight distribution amongst all of the stone gradation classes required in the specifications. This sample palette must be located on the project site and be visible to aid the Contracting Officer in determining the onsite gradation of stone during continuous Quality Assurance Inspections. Mark each stone with its measured weight in tons such that the marked weight of every stone is clearly visible.
35 31 26 - 13
2.1.7 Rejected Stone
New stone of unsuitable quality and/or size distribution, as required by these specifications, will be rejected. Any rejected stone must be promptly removed from the project at no expense to the Government. Any portions of the work covered by these specifications containing rejected stone will be considered incomplete.
2.2 FILL MATERIAL
2.2.1 General
Provide fill material as needed to construct a temporary ramp/workspace to support equipment operations seaward of the mean higher high water line (MHHW). Use of existing sand on the beach of Corona Del Mar as fill material is prohibited. Following completion of the east jetty revetment armor stone placement, the fill material becomes the property of the Contractor and the top layers must be removed from the site unless the fill material is determined to be beach compatible sand.
2.2.2 Gradation Testing
Fill for ramp or platform must be composed of poorly graded sand with approximately 10 percent of fines passing a U.S. no. 200 sieve (fines must be non-plastic) and in accordance with the following gradation:
4.75 2.0 0.5 0.25 0.13 0.08 Diameter in mm
#4 #10 #35 #60 #120 #200 U.S. Sieve size
100 90-100 86-100 51-71 14-34 0-10 Percent Passing
2.2.3 Chemistry Testing
All sandy fill must be free of any RCRA solid waste, man-made chemical contamination, organics and vegetation and must consist of native sand only. The sandy fill must be tested according to the USEPA Methods and the latest Southern California Dredge Materials Management (SCDMMT) Guidance Document for the following:
a. CA List of Toxic Metals (Title 22 List) according to USEPA 6020 and
b. Phenols and Phthalates and Pyrethroid Pesticieds and Organochlorine Pesticides and PAHs and PCBs and their congeners
c. Butyltins according to Krone et al 1899
d. Total petroleum hydrocarbons according to USEPA 8015
The tests must be run according to the reporting limits listed in the SCDMMT Guidance Document. A minimum of one sample must be collected and Chemical Test Results must be submitted for approval by the Contracting Officer.
35 31 26 - 14
PART 3 EXECUTION
3.1 CONSTRUCTION PLAN
Submit a Construction Plan indicating the methods and equipment proposed to conduct all construction related operations. Submit the plan to the Contracting Officer for approval, at least 30 days prior to start of construction operations and also include, as a minimum, the following information:
a. Project schedule showing the order of all rock placement operations, and the anticipated dates of completion of the salient features of the work. Submit the project schedule and progress updates in accordance with Section 01 32 01 PROJECT SCHEDULE.
b. Layout of all cranes, vessels, barges, buoys, anchors, and ancillary equipment.
c. Staging area layout and operation.
d. Method and equipment for transporting and placing material at the work site, and equipment that will be utilized on the work site.
e. All barge names, dimensions, and capacities.
f. Methods for access, i.e. roads, proposed haul route from quarry to site, water access, and any excavation required.
g. Lighting plan for night work.
h. A copy of the Daily Report Form to be used for construction operations.
i. Methods for performing work seaward of the MHHW line, including materials, erosion protection, equipment, and material removal, as necessary.
3.2 DAILY REPORT OF OPERATIONS
Prepare and maintain a Daily Report of Operations and submit copies on a daily basis. The daily reports must document all construction related operations for all shifts in a 24-hour period.
3.3 STONE DELIVERY
3.3.1 Waybills and Delivery Tickets for Truck or Rail Transport
Submit copies of delivery tickets to the Contracting Officer during the progress of the work. Furnish scale tickets for each load of material weighed. These tickets must include tare weight, identification mark of each vehicle weighed, date, time, and location of the loading. A master log of all vehicle loading must be furnished for each day of loading operation. File with the Contracting Officer the master log of loadings, certified waybills and/or certified tickets as part of the Daily Report of Operations. For each progress payment request, furnish written certification that the material recorded on the submitted certified tickets was actually used in the construction covered by the Contract.
35 31 26 - 15
3.3.2 Scale Tickets and Records for Barge Transportation
Submit copies of Scale Tickets and/or Records of Weights, including displacement weight date, for each load of stone delivered to the site.
Load each barge with only one gradation class. Prior to the commencement of work, submit the barge physical dimensions and weights and barge volume displacement charts for each barge intended for use for approval.