This solicitation document describes a federal dredging and jetty repair project in Newport Bay Harbor, Orange County, California. The project requires dredging approximately 62,000 cubic yards of material from the federal channel and placement nearshore, with options to dredge an additional 65,000 cubic yards for offshore placement. It also includes concrete repairs to an existing east jetty and placement of 3,500 tons of armor stone to repair the channel-side revetment. The solicitation is set aside for small businesses with a NAICS code of 237990 and size standard of $39.5 million. The U.S. Army Corps of Engineers Engineering District in Los Angeles issued the solicitation, with bids due on December 10, 2020. The projected value is between $1-5 million. The document notes that environmental considerations are not final and the solicitation may be amended accordingly.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912PL20B0011_Bid_Abstract.pdf | ||
| W912PL20B0011_Am06.pdf | ||
| SF-30_W912PL20B0011_Am5.pdf | ||
| W912PL20B0011_AM4.pdf | ||
| W912PL20B0011_Am3.pdf | ||
| W912PL20B0011_Am2.pdf | ||
| Am001_W912PL20B0011.pdf | ||
| FIO_7_NBH2016_eelgrass_Am001.zip | ZIP file | |
| Site visit sign-insheet_Newport_Dredging_EJetty_200901.pdf | ||
| FIO_3_NB2020_04_NSP_cond 3ft.txt | TXT text file | |
| Plans_W912PL20B0011_NBH_Dredging_and_Jetty_Repairs.pdf | ||
| Spec_W912PL20B0011_NBH_Dredging_and_Jetty_Repairs.pdf | ||
| FIO_1_NB2020_04_cond-3ft.txt | TXT text file | |
| FIO_2_NB2020_04_cond-2.pdf | ||
| FIO_6_NB2019_07_cond_3.pdf | ||
| FIO_4_NB2020_04_NSP_cond.pdf | ||
| FIO_5_NB2019_07_cond-3ft-Sheet 3.txt | TXT text file |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION ( Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
0007 Dec 4, 2020
USACE-LOS ANGELES DISTRICT
CONTRACTING DIVISION, WEST REGION BRANCH
915 WILSHIRE BLVD, SUITE 1440
LOS ANGELES, CA 90017
W912PL20B0011
Aug 14, 2020
Newport Harbor Entrance Channel Maintenance Dredging and East Jetty Repairs, Orange County, CA
Due date for receipt of bids is December 10, 2020 at 1:00 PM local time.
NOTE: The only authorized transmission method for bids in response to this solicitation is electronically via SAFE online submission. NO OTHER TRANSMISSION METHODS (EMAIL, FACSIMILE, REGULAR MAIL, HAND CARRIED, ETC.) WILL BE ACCEPTED.
See SF30 Continuation Page for Revisions.
INSTRUCTIONS
Instructions for items other than those that are self-explanatory, are as follows:
Item 1 (Contract ID Code) . Insert the contract type identification code that appears in the title block of the contract being modified.
Item 3 (Effective date) .
(1)
(2)
(3)
(4)
(5)
For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.
For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.
For a modification issued as an initial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.
For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.
For a modification confirming the contacting officer's determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision.
(a)
(b)
(c)
(d)
(e)
(f)
Item 6 (Issued By) . Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.
Item 8 (Name and Address of Contractor) . For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.
Item 9, (Amendment of Solicitation No. - Dated), and 10, (Modification of Contract/Order No. - Dated ). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order.
Item 12 (Accounting and Appropriation Data) .
When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries.
(2) Accounting classification Net decrease $
Include subject matter or short title of solicitation/contract where feasible.
Item 16B . The contracting officer's signature is not required on solicitation amendments. The contracting offier's signature is normally affixed last on supplemental agreements.
(i)
NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation sheet".
Item 13 . Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)
Item 14 (Description of Amendment/Modification) .
Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:
Total contract price increased by $
Total contract price decreased by $
Total contract price unchanged.
State reason for modification.
When removing, reinstating, or adding funds, identify the contract items and accounting classifications.
When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to --
A reference to the letter determination; and
A statement of the net amount determined to be due in settlement of the contract.
(g)
(h)
(i)
(ii)
(1)
(2)
(3)
(4)
(5)
(6)
(i)
(ii)
(iii)
STANDARD FORM 30 (REV. 10-83) BACK
(1) Accounting classification Net increase $
Newport Bay Harbor Maintenance Dredging and East Jetty Repairs W912PL20B0011 Orange County, CA
Amendment 07
SF 30 (Continuation Page)
NOTICE TO BIDDERS:
This Amendment forms a part of the Covered Contract Documents and modifies the original Bidding Documents dated August 14, 2020, and as noted below. This Amendment shall become part of the Contract Documents to the same extent as though it had been written into the body thereof and bound therein. This Amendment is applicable to the items affected and all Bidders are held responsible for the contents herein. Acknowledgement of receipt of this Amendment shall be so noted in the space provided on Standard Form 1442, Solicitation, Offer and Award. Failure to do so may subject the Bidder to disqualification.
Revised Pages/Sections:
The following revised pages and/or sections, noted as Amendment 07 and as listed below, are to replace the original pages/sections from Bid Documents dated August 14, 2020:
* SF1442 - Revised bid opening date to 10 December 2020.
* Section 00 21 13 - Instructions to Bidders, replace entire section, updated Virtual Bid Opening call-in number.
* Section 00 73 46 - Davis Bacon Wage Determinations, replace entire section, updated wage rate determinations on 27 November 2020.
* Section 35 31 26 - Jetties, replace entire section, updated paragraph: Construction Equipment on
Corona Del Mar Beach.
00 00 01 Amendment 07
PROJECT TABLE OF CONTENTS
DIVISION 00 - BIDDING REQUIREMENTS, CONTRACT FORMS AND CONTRACT CONDITIONS
SF-1442 Solicitation, Offer and Award Am02 Am03 Am06 Am07
00 01 05 Certification Page 00 10 00 CLIN Schedule / Bidders Notes Am01 00 21 00 Instructions 00 21 13 Instructions to Bidders Am07
00 45 00 Representations and Certifications 00 70 00 Conditions of the Contract 00 73 00 Supplementary Conditions 00 73 46 Wage Rates Am01 Am06 Am07
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 Summary of Work 01 22 00 Price and Payment Procedures 01 32 01 Project Schedule 01 33 00 Submittal Procedures 01 33 00a Submittal Register Am06
01 35 26 Governmental Safety Requirements 01 42 00 Sources for Reference Publications 01 45 00 Quality Control 01 45 01 Resident Management System Contractor Quality Control (RMS CM)
01 50 00 Temporary Construction Facilities and Controls 01 57 19 Temporary Environmental Controls Am02 Am06 01 74 19 Construction Waste Management and Disposal 01 78 00 Closeout Submittals
DIVISION 03 – CONCRETE
03 01 32 Concrete Rehabilitation for Civil Works Am01 03 30 53 Miscellaneous Cast-in-Place Concrete
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
35 20 23 Dredging Am01 35 20 23a Sediment Sample Logs 35 20 24 National Dredging Quality Management Program – Scow 35 31 26 Jetties Am02 Am03 Am06 Am07
-- End of Project Table of Contents –-
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED PAGE OF PAGES
IMPORTANT - The "offer" section on the reverse must be fully completed by the offeror.
4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER
7. ISSUED BY CODE 8. ADDRESS OFFER TO
9. FOR INFORMATION CALL
A. NAME B. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date):
11. The Contractor shall begin performance within calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable. (See .)
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
12B. CALENDAR DAYS
YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and copies to perform the work required are due at the place specified in Item 8 by (hour) (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, is not required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-3212
Designed using Perform Pro, WHS/DIOR, Oct 96
1442-103 STANDARD FORM 1442 (REV. 4-85) (EG)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d)
Amendment 0
W912PL-20-B-0011 x 14 AUG 2020 1 OF 2
U.S.Army Corps of Engineers, Los Angeles Dist Attn:Contracting Division CESPL-CT-W 915 Wilshire Boulevard, Suite 930 Los Angeles, California 90017-3401
DoD Secure Access File Exchange (DoD Safe) at https://safe.apps.mil/
See Section 00 21 13, Special Instructions Pertaining to Submission of Electronic Bids
Pat Bonilla 213-452-3255
Newport Bay Harbor - Entrance Channel Maintenance Dredging and East Jetty Repairs Orange County, California
Project consists of dredging approximately 62,000 cubic yards of material from the Federal channel and placement in the nearshore off Balboa Beach with options for an additional 65,000 cubic yards of material and placement at offshore disposal site LA-3. The project also includes concrete repairs to the existing concrete structure portion of the East Jetty and placement of 3,500 tons of 4 ton armor stone to repair the revetment on the channel side of the structure.
Magnitude of the Proposed Project: $1,000,000 to $5,000,000.
This solicitation is Small Business Set-Aside The NAICS Code is 237990, Dredging, the small business size standard is $30,000,000.00.
BIDDERS PLEASE NOTE: This project contains environmental considerations not finalized at the time of issuance. Upon finalization of these considerations, the solicitation may be amended as needed, to provide additional environmental considerations for the performance of work. This project may be delayed, canceled or revised at any time prior to award.
10 see 007300
X X *Section 00 73 00
X 10
0 1:00 PM
local time 10 December 2020
X
OFFER (Must be fully completed by offeror)
STANDARD FORM 1442 BACK (REV. 4-85)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14)
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within calendar days after the date offers are due. (Insert any number equal or greater than the minimum requirement stated in 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20B. SIGNATURE 20C. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24.SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) ( ) 41 U.S.C. 253(c) ( )
26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BYCODE
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to the issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and
(c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
29. AWARD. (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN
(Type or print)
30B. SIGNATURE 30C. DATE
31A. NAME OF CONTRACTING OFFICER (Type or print)
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
Amendment 0
DUNS NO.: TAX ID NO.:
CAGE CODE NO.:
( ) - ; FAX ( ) -
See Section 00 10 00 Solicitation Contract Line Item Number (CLIN) Schedule
USACE Los Angeles District Santa Ana Dams Resident Office 2493 Pomona Rincon Road Corona, CA 92880
USACE, Finance Center
ATTN: CEFCO-AO-D
5722 Integrity Drive Millington, TN 38054-5005
00 21 13 - 1
SECTION 00 21 13
INSTRUCTIONS TO BIDDERS
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)—ALTERNATE I (FEB 1995)
52.0000-4010 INQUIRIES
SPECIAL INSTRUCTIONS PERTAINING TO SUBMISSION OF ELECTRONIC BIDS (APR 2020):
INSTRUCTIONS FOR SUBMITTING ELECTRONIC BIDS:
INSTRUCTIONS TO FOLLOW ON THE SAFE WEBSITE:
RECEIPT OF SUBMISSIONS:
FORMAT AND CONTENTS OF ELECTRONIC BID
VIRTUAL BID OPENING PROCEDURES AND INSTRUCTIONS FOR BIDDER’S PARTICIPATION
CONTRACTOR RESPONSIBILITY, PRE-AWARD SURVEY
OFFEROR'S CHECKLIST
00 21 13 - 2
SECTION 00 21 13
INSTRUCTIONS TO BIDDERS
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)—ALTERNATE I
(FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions
Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) A site visit is scheduled for 1 September, 2020 commencing at 10:00 a.m. The meeting will begin in the
Corona Del Mar Municipal Lot at 3000 Breakers Drive, Newport Beach, CA 92661.
(c) People interested in attending the site visit should contact Fernando Cano with an e-mail, and cc: Mark
Golay and Chris Hayward. The e-mail is to be received by Corps of Engineers personnel no later than 10:00 a.m. two (2) days preceding the site visit. The e-mail shall include a day-time telephone number. If there are any changes to the site visit date or location, people who have registered to attend the site visit will be informed. Following are the USACE e-mail addresses:
Fernando.B.Cano@usace.army.mil Mark.P.Golay@usace.army.mil Christopher.A.Hayward@usace.army.mil
(End of provision)
52.0000-4010 INQUIRIES
Any prospective offeror desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request it in writing soon enough to allow a reply to reach all prospective bidders/offerors before submission of their bids/offers. Oral explanations or instructions given before award of a contract are not binding. Any information given to a prospective offeror concerning a solicitation will be furnished promptly to all other prospective offerors as an amendment to the solicitation, if that information is necessary in submitting offers or if lack of it would be prejudicial to other prospective bidders/offerors.
1. All inquiries relating to this solicitation are to be submitted via Bidder Inquiry in ProjNet at https://www.projnet.org/projnet/
A. To submit and review bid inquiry items, offerors will need to be a current registered user, self-register into the ProjNet system.
To access the Bid Inquiry system, go to the ProjNet web page and fill in:
- Managing Agency – USACE
- Email address
- Key Access (this is the Bidder Inquiry Key – see below for key)
- Click on “Sign In”
- You will be prompted for the answer to your secret question on the next screen https://www.projnet.org/projnet/
00 21 13 - 3 Amendment 07
If this is your first time accessing ProjNet, you will be directed to a screen titled, “User account not found. Please create one using the form below.” Fill in the requested information (name, company, city, phone #, etc.).
B. From this page, you may view all bidder inquiries or add an inquiry. Please note: Offerors shall only submit one question per inquiry. All inquiries containing multiple questions may be rejected.
C. Offerors will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.
The Solicitation Number is: W912PL20B0011 The Bidder Inquiry Key is: 4AJG52-9AT446
2. The Bidder Inquiry System will be unavailable for new inquires up to 5 business days prior to bid/proposal submission in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation if necessary.
3. Offerors are requested to review the specifications in its entirety, review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
4. The ProjNet call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the ProjNet Call Center is 800-428-HELP.
5. Responses on the Bidder Inquiry System do not revise, change, amend or supersede the provisions of the solicitation. Changes to the solicitation must be by written amendment thereto. Any Bidder Inquiry System response that can be interpreted to be in conflict with the solicitation or amendment, shall be subordinate to the conflicting provision, term, and/or note, wherever it appears in the solicitation, until revised or altered by a written amendment to the solicitation.
Additionally, offerors may not anticipate a change to the solicitation until the change, revision, correction, or alteration of the solicitation is actually made, in writing and published as an amendment to the solicitation.
SPECIAL INSTRUCTIONS PERTAINING TO SUBMISSION OF ELECTRONIC BIDS
(APR 2020):
The Bidder’s bid shall be submitted electronically, as described below. The IFB will provide the Government address and receipt date for bid submittal. The Bidder’s bid shall not contain classified data. The use of hyperlinks in bids is prohibited.
NOTE: The only authorized transmission method for bids in response to this solicitation is electronically via SAFE online submission. NO OTHER TRANSMISSION METHODS (EMAIL, FACSIMILE, REGULAR MAIL, HAND CARRIED, ETC.) WILL BE ACCEPTED.
The Bidder’s bid must be received by the Government by the date/time specified in the solicitation.
Bidders shall email their bid using the following link: https://safe.apps.mil/
Please send bids using the link above to:
https://safe.apps.mil/
00 21 13 - 4 Amendment 07
Contract Specialist Wendell.L.Mendoza@usace.army.mil AND to Contracting Officer Patricia.B.Bonilla@usacearmy.mil
INSTRUCTIONS FOR SUBMITTING ELECTRONIC BIDS:
In an effort to reduce paperwork and cost, all bids shall be submitted electronically through the SAFE site. Submission shall be in Adobe PDF format. You are limited to five (5) maximum files per upload (total size cannot exceed 2GB). If you have a large number of files, recommend that you combine or ZIP your files before uploading to the SAFE site. Bidders may use compression utility software such as WinZip or PKZip to reduce file size and facilitate transmission.
REQUEST FOR UPLOAD CODE: Bidders must email Contract Specialist Wendell.L.Mendoza@usace.army.mil and to Contracting Officer Patricia.B.Bonilla@usace.army.mil no later than five (5) working days prior to the bid due date to receive a request code which will allow for file uploads via the SAFE site. Bidders who fail to email for a request code five (5) working days before bid submission date may not be able to receive a request code in time to upload their submission.
FILE DESCRIPTION: Include a “File Description” for each file(s) you upload. The “File Description” will be included in the email notice to each of the recipients you choose to have access your file(s). NOTE: Do NOT enter Privacy Act Data (Personal Identification Information (PII)) in the File Description.) Submission shall be in Adobe PDF format.
INSTRUCTIONS TO FOLLOW ON THE SAFE WEBSITE:
1. Once at the SAFE website select the “Drop-off” icon. This allows users without a CAC or users whose computer is not configured to read a CAC the option to access the SAFE site as a guest.
2. After selecting the “Click Here” link you will be prompted to add your personal information, file information, recipient (Government representative) information and email settings.
3. When completing your file information for transmittal via the SAFE website, you will be required to enter the email address for all recipients. For this solicitation, the recipients are the Contract Specialist and the Contracting Officer. The Contract Specialist for this solicitation is Wendell.L.Mendoza@usace.army.mil and the Contracting Officer is Patricia.B.Bonilla@usace.army.mil. The E-Mail address of the Government Employee who initiated the request code will be automatically entered. The Proposer must enter the E-Mail address for both the Contracting Officer and Specialist. The Proposer can enter an additional E-Mail address if desired. After entering the email address, click the ADD button to add the person(s) email to the “Recipients List” of your response. When your proposal is submitted, a notification will be sent to the recipients you added.
NOTE: Do NOT send the SAFE site packages to group email accounts. Even if you successfully upload your bid to the SAFE site, notification will not be sent to the government recipients until you verify your email address. Entering an incorrect email may result in the rejection of your submission mailto:Wendell.L.Mendoza@usace.army.mil mailto:Patricia.B.Bonilla@usacearmy.mil mailto:%20Wendell.L.Mendoza@usace.army.mil mailto:%20Wendell.L.Mendoza@usace.army.mil mailto:Patricia.B.Bonilla@usace.army.mil mailto:%20Wendell.L.Mendoza@usace.army.mil mailto:%20Wendell.L.Mendoza@usace.army.mil
00 21 13 - 5 Amendment 07 for lateness. A Proposer can confirm proper submission by the ‘Drop-Off Completed” screen which generates based on proper file submission.
NOTE: It has been reported that documents are more quickly uploaded into the SAFE website when using a Firefox web browser. The Government cannot verify that this is true and offers no guarantee that Bidders will have more success utilizing any particular browser.
RECEIPT OF SUBMISSIONS:
For the purposes of establishing whether a bid submission is considered timely, the government considers the date and time the submission is completely uploaded into the SAFE website. For bids larger than the 2GB capacity of the SAFE website and require multiple submissions, the Government will consider the date and time the last submission is completely uploaded into the SAFE website. Do not assume that electronic communication is instantaneous. It can take several minutes or even hours in some cases.
The government will not be responsible for submissions delivered to any location or to anyone other than those designated to receive bids. Bidders are responsible for ensuring that bids are submitted so as to reach the designated recipient. Bidders are responsible for allowing sufficient time for the bid to be received in accordance with the instructions provided.
(End of statement)
FORMAT AND CONTENTS OF ELECTRONIC BID
The only authorized transmission method for bids in response to this solicitation is electronically via SAFE online submission. NO OTHER TRANSMISSION METHODS (EMAIL, FACSIMILE, REGULAR MAIL, HAND CARRIED, ETC.) WILL BE ACCEPTED.
The Bidder’s bid must be received by the Government by the date/time specified in the solicitation.
Bidders shall email their bid using the following link: https://safe.apps.mil/
The bid shall be organized as indicated below, and shall be comprised of the following items.
#1 A completed SF 1442, “Solicitation, Offer and Award” including the Certifications, Section 00 01 05. The SF 1442 and the Certifications shall be completed by the bidder and duly executed with an original signature by an official authorized to bind the company in accordance with instructions at
FAR 4.102.
#2 Section 00 10 00, Solicitation, Contract Line Item Number (CLIN) Schedule. The complete Solicitation, Contract Line Item Number (CLIN) Schedule with the bidder’s proposed contract line item prices inserted in the appropriate spaces. Prices must be proposed for all contract line items and prices sub-line items, if any. Unit prices are to be extended to the actual “dollar and cents” amounts (i.e., to two decimal places). Do not round off to the nearest dollar. Check your pricing submissions very carefully for mathematical and clerical errors prior to submission.
https://safe.apps.mil/
00 21 13 - 6 Amendment 07
#3 Official Online System for Award Management Representations & Certifications or completed Section 00 45 00.
#4 A Bid Guarantee, Standard Form 24, “Bid Bond.”
(End of statement)
VIRTUAL BID OPENING PROCEDURES AND INSTRUCTIONS FOR BIDDER’S
PARTICIPATION
a. The electronic bids for this project are due on the date and time as specified on the SF 1442, block 13.
b. In order to allow the bid opening officer sufficient time to download the bids after bids are due, the virtual bid opening will be one hour after the time bids are due.
c. At the bid opening teleconference, bids and the Independent Government Estimate will be read aloud, just as in a traditional bid opening.
d. The Abstract of Bids will be posted to beta.SAM.gov as soon as practicable, typically within 24 hours of bid opening.
e. To participate in the Virtual Bid Opening, the following information is provided:
Call-in toll-free number (Cisco Webex Audio Conference):
Call-in: 1-844-800-2712 Access Code: 199 853 6825
CONTRACTOR RESPONSIBILITY, PRE-AWARD SURVEY
In accordance with FAR 9.103(a)…”contracts shall be awarded to responsible, prospective contractors only.” In order to determine a contractor’s responsibility for purposes of contract award in accordance with FAR Part 9, a statement regarding previous experience in performing comparable work, and/or plant to be used in performing the work is required. After the bid opening, the Government will request this information and set a due date for its submission.
00 21 13 - 7 Amendment 07
OFFEROR'S CHECKLIST
All information required by the terms of the Solicitation must be furnished. MISTAKES OR OMISSIONS CAN BE COSTLY. Important items for you to check are included in but not limited to, those listed below.
This checklist is furnished only to assist you in submitting a complete Bid. Check as you read.
[ ] Have you acknowledged all amendments?
[ ] Is your SF-1442, Certificate of Corporate Principal and CLIN Schedule (Section 00 10 00), properly completed and signed?
[ ] Is a SF-24 bid bond included with your bid? (A late bid bond is treated the same as a late bid.)
[ ] Is your bid bond in the proper amount? (20% of total bid price or $3,000,000 whichever is less)
[ ] Is the bond properly signed by both the Offeror and Surety and are all required seals affixed?
[ ] Is the name in which you submitted the bid the same on your bid as on your bid bond?
[ ] Are all erasures or corrections initialed by the person signing the bid?
[ ] Have you restricted your bid by altering the provisions of the solicitation?
[ ] Have you completed the Representations, Certifications, and Other Statements of Bidders/Offerors
(Section 00 45 00) or copy of your ORCA.
[ ] Will your bid arrive on time? Late bids or modifications will be handled in accordance with 52.214-7
Late Submissions, Modifications, and Withdrawals of bids.
00 73 46 - 1
SECTION 00 73 46
DAVIS BACON WAGE DETERMINATIONS
"General Decision Number: CA20200024 11/27/2020
Superseded General Decision Number: CA20190024
State: California
Construction Types: Building, Heavy (Heavy and Dredging) and Highway
County: Orange County in California.
BUILDING CONSTRUCTION PROJECTS; DREDGING PROJECTS (does not include hopper dredge work); HEAVY CONSTRUCTION PROJECTS (does not include water well drilling); HIGHWAY CONSTRUCTION PROJECTS
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/03/2020 1 01/10/2020 2 01/31/2020 3 03/06/2020 4 05/08/2020 5 05/15/2020 6 05/29/2020 7 07/03/2020 8 07/17/2020
00 73 46 - 2 Amendment 07
9 07/24/2020 10 07/31/2020 11 08/07/2020 12 09/04/2020 13 09/25/2020 14 10/02/2020 15 10/09/2020 16 10/16/2020 17 10/23/2020 18 11/13/2020 19 11/27/2020
ASBE0005-002 07/06/2020
Rates Fringes
Asbestos Workers/Insulator (Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems).....$ 45.39 23.74 Fire Stop Technician (Application of Firestopping Materials for wall openings and penetrations in walls, floors, ceilings and curtain walls)...........................$ 28.92 18.73
ASBE0005-004 07/01/2019
Rates Fringes
Asbestos Removal worker/hazardous material handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not)....$ 20.63 12.17
* BRCA0004-010 05/01/2020
Rates Fringes
BRICKLAYER; MARBLE SETTER........$ 41.39 18.95
*The wage scale for prevailing wage projects performed in Blythe, China lake, Death Valley, Fort Irwin, Twenty-Nine Palms, Needles and 1-15 corridor (Barstow to the Nevada State Line) will be Three Dollars ($3.00) above the standard San Bernardino/Riverside County hourly wage rate
BRCA0018-004 06/01/2019
00 73 46 - 3
Rates Fringes
MARBLE FINISHER..................$ 33.43 14.11
TILE FINISHER....................$ 28.23 12.65
TILE LAYER.......................$ 40.07 18.36
BRCA0018-010 09/01/2020
Rates Fringes
TERRAZZO FINISHER................$ 33.66 14.20
TERRAZZO WORKER/SETTER...........$ 41.60 14.73
CARP0409-001 07/01/2018
Rates Fringes
CARPENTER
(1) Carpenter, Cabinet Installer, Insulation Installer, Hardwood Floor Worker and acoustical installer...................$ 41.84 19.17
(2) Millwright..............$ 42.91 19.17
(3) Piledrivermen/Derrick Bargeman, Bridge or Dock Carpenter, Heavy Framer, Rock Bargeman or Scowman, Rockslinger, Shingler (Commercial)................$ 42.54 19.17
(4) Pneumatic Nailer, Power Stapler...............$ 40.09 19.17
(5) Sawfiler...............$ 39.83 19.17
(6) Scaffold Builder.......$ 31.60 19.17
(7) Table Power Saw Operator....................$ 40.93 19.17
FOOTNOTE: Work of forming in the construction of open cut sewers or storm drains, on operations in which horizontal lagging is used in conjunction with steel H-Beams driven or placed in pre- drilled holes, for that portion of a lagged trench against which concrete is poured, namely, as a substitute for back forms (which work is performed by piledrivers): $0.13 per hour additional.
CARP0409-005 07/01/2015
Rates Fringes
Drywall
DRYWALL INSTALLER/LATHER....$ 37.35 11.08
STOCKER/SCRAPPER............$ 10.00 7.17
CARP0409-008 08/01/2010
00 73 46 - 4
Modular Furniture Installer......$ 17.00 7.41
ELEC0011-002 12/31/2018
COMMUNICATIONS AND SYSTEMS WORK
Rates Fringes
Communications System Installer...................$ 36.07 3%+14.43 Technician..................$ 33.30 3%+27.82
SCOPE OF WORK:
Installation, testing, service and maintenance of systems utilizing the transmission and/or transference of voice, sound, vision and digital for commercial, educational, security and entertainment purposes for the following: TV monitoring and surveillance, background-foreground music, intercom and telephone interconnect, inventory control systems, microwave transmission, multi-media, multiplex, nurse call systems, radio page, school intercom and sound, burglar alarms, fire alarm (see last paragraph below) and low voltage master clock systems in commercial buildings.
Communication Systems that transmit or receive information and/or control systems that are intrinsic to the above listed systems; inclusion or exclusion of terminations and testings of conductors determined by their function;
excluding all other data systems or multiple systems which include control function or power supply; excluding installation of raceway systems, conduit systems, line voltage work, and energy management systems. Does not cover work performed at China Lake Naval Ordnance Test Station. Fire alarm work shall be performed at the current inside wireman total cost package.
ELEC0441-001 08/31/2020
Rates Fringes
CABLE SPLICER....................$ 50.11 21.95
ELECTRICIAN......................$ 47.91 21.89
* ELEC0441-003 12/01/2019
COMMUNICATIONS & SYSTEMS WORK (excludes any work on Intelligent Transportation Systems or CCTV highway systems)
Rates Fringes
Communications System Installer...................$ 36.72 14.81 Technician..................$ 31.23 15.39
SCOPE OF WORK The work covered shall include the installation, testing, service and maintenance, of the following systems that utilize the transmission and/or
00 73 46 - 5 Amendment 07 transference of voice, sound, vision and digital for commercial, education, security and entertainment purposes for TV monitoring and surveillance, background foreground music, intercom and telephone interconnect, inventory control systems, microwave transmission, multi-media, multiplex, nurse call system, radio page, school intercom and sound, burglar alarms and low voltage master clock systems.
A. Communication systems that transmit or receive information and/or control systems that are intrinsic to the above listed systems SCADA (Supervisory control/data acquisition PCM (Pulse code modulation) Inventory control systems Digital data systems Broadband & baseband and carriers Point of sale systems VSAT data systems Data communication systems RF and remote control systems Fiber optic data systems
B. Sound and Voice Transmission/Transference Systems Background-Foreground Music Intercom and Telephone Interconnect Systems Sound and Musical Entertainment Systems Nurse Call Systems Radio Page Systems School Intercom and Sound Systems Burglar Alarm Systems Low-Voltage Master Clock Systems Multi-Media/Multiplex Systems Telephone Systems RF Systems and Antennas and Wave Guide
C. *Fire Alarm Systems-installation, wire pulling and testing.
D. Television and Video Systems Television Monitoring and Surveillance Systems Video Security Systems Video Entertainment Systems Video Educational Systems CATV and
CCTV
E. Security Systems, Perimeter Security Systems, Vibration Sensor Systems Sonar/Infrared Monitoring Equipment, Access Control Systems, Card Access Systems
*Fire Alarm Systems
1. Fire Alarms-In Raceways: Wire and cable pulling in raceways performed at the current electrician wage rate and fringe benefits.
2. Fire Alarms-Open Wire Systems: installed by the Technician.
ELEC0441-004 08/31/2020
Rates Fringes
ELECTRICIAN (TRANSPORTATION
SYSTEMS, TRAFFIC SIGNALS &
STREET LIGHTING)
Cable Splicer/Fiber Optic Splicer.....................$ 48.51 21.91 Electrician.................$ 47.91 21.89 Technician..................$ 35.93 21.53
00 73 46 - 6
SCOPE OF WORK: Electrical work on public streets, freeways, toll-ways, etc, above or below ground. All work necessary for the installation, renovation, repair or removal of Intelligent Transportation Systems, Video Surveilance Systems (CCTV), Street Lighting and and Traffic Signal work or systems whether underground or on bridges. Includes dusk to dawn lighting installations and ramps for access to or egress from freeways, toll-ways, etc.
Intelligent Transportation Systems shall include all systems and components to control, monitor, and communicate with pedestrian or vehicular traffic, included but not limited to: installation, modification, removal of all Fiber optic Video System, Fiber Optic Data Systems, Direct interconnect and Communications Systems, Microwave Data and Video Systems, Infrared and Sonic Detection Systems, Solar Power Systems, Highway Advisory Radio Systems, highway Weight and Motion Systems, etc.
Any and all work required to install and maintain any specialized or newly developed systems. All cutting, fitting and bandaging of ducts, raceways, and conduits.
The cleaning, rodding and installation of ""fish and pull wires"". The excavation, setting, leveling and grouting of precast manholes, vaults, and pull boxes including ground rods or grounding systems, rock necessary for leveling and drainagae as well as pouring of a concrete envelope if needed.
JOURNEYMAN TRANSPORTATION ELECTRICIAN shall perform all tasks necessary toinstall the complete transportation system.
JOURNEYMAN TECHNICIAN duties shall consist of: Distribution of material at job site, manual excavation and backfill, installation of system conduits and raceways for electrical, telephone, cable television and comnmunication systems. Pulling, terminating and splicing of traffic signal and street lighting conductors and electrical systems including interconnect, dector loop, fiber optic cable and video/data.
ELEC1245-001 06/01/2020
Rates Fringes
LINE CONSTRUCTION
(1) Lineman; Cable splicer..$ 59.14 20.78
(2) Equipment specialist (operates crawler tractors, commercial motor vehicles, backhoes, trenchers, cranes (50 tons and below), overhead & underground distribution line equipment)...........$ 47.24 19.59
(3) Groundman...............$ 36.12 19.19
(4) Powderman...............$ 51.87 18.79
HOLIDAYS: New Year's Day, M.L. King Day, Memorial Day, 00 73 46 - 7 Amendment 07
Independence Day, Labor Day, Veterans Day, Thanksgiving Day and day after Thanksgiving, Christmas Day
ELEV0018-001 01/01/2020
Rates Fringes
ELEVATOR MECHANIC................$ 57.40 34.765+a+b
FOOTNOTE:
a. PAID VACATION: Employer contributes 8% of regular hourly rate as vacation pay credit for employees with more than 5 years of service, and 6% for 6 months to 5 years of service.
b. PAID HOLIDAYS: New Years Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, Friday after Thanksgiving, and Christmas Day.
ENGI0012-003 07/01/2020
Rates Fringes
OPERATOR: Power Equipment (All Other Work)
GROUP 1....................$ 48.25 27.20
GROUP 2....................$ 49.03 27.20
GROUP 3....................$ 49.32 27.20
GROUP 4....................$ 50.81 27.20
GROUP 5....................$ 48.96 25.25
GROUP 6....................$ 51.03 27.20
GROUP 8....................$ 51.14 27.20
GROUP 9....................$ 49.29 25.25
GROUP 10....................$ 51.26 27.20
GROUP 11....................$ 49.41 25.25
GROUP 12....................$ 51.43 27.20
GROUP 13....................$ 51.53 27.20
GROUP 14....................$ 51.56 27.20
GROUP 15....................$ 51.64 27.20
GROUP 16....................$ 51.76 27.20
GROUP 17....................$ 51.93 27.20
GROUP 18....................$ 52.03 27.20
GROUP 19....................$ 52.14 27.20
GROUP 20....................$ 52.26 27.20
GROUP 21....................$ 52.43 27.20
GROUP 22....................$ 52.53 27.20
GROUP 23....................$ 52.64 27.20
GROUP 24....................$ 52.76 27.20
GROUP 25....................$ 52.93 27.20
OPERATOR: Power Equipment (Cranes, Piledriving & Hoisting)
GROUP 1....................$ 49.60 27.20
GROUP 2....................$ 50.38 27.20
GROUP 3....................$ 50.67 27.20
GROUP 4....................$ 50.81 27.20
GROUP 5....................$ 51.03 27.20
GROUP 6....................$ 51.14 27.20
00 73 46 - 8 Amendment 07
GROUP 7....................$ 51.26 27.20
GROUP 8....................$ 51.43 27.20
GROUP 9....................$ 51.60 27.20
GROUP 10....................$ 52.60 27.20
GROUP 11....................$ 53.60 27.20
GROUP 12....................$ 54.60 27.20
GROUP 13....................$ 55.60 27.20
OPERATOR: Power Equipment (Tunnel Work)
GROUP 1....................$ 50.10 27.20
GROUP 2....................$ 50.88 27.20
GROUP 3....................$ 51.17 27.20
GROUP 4....................$ 51.31 27.20
GROUP 5....................$ 51.53 27.20
GROUP 6....................$ 51.64 27.20
GROUP 7....................$ 51.76 27.20
PREMIUM PAY:
$3.75 per hour shall be paid on all Power Equipment Operator work on the followng Military Bases: China Lake Naval Reserve, Vandenberg AFB, Point Arguello, Seely Naval Base, Fort Irwin, Nebo Annex Marine Base, Marine Corp Logistics Base Yermo, Edwards AFB, 29 Palms Marine Base and Camp Pendleton
Workers required to suit up and work in a hazardous material environment: $2.00 per hour additional. Combination mixer and compressor operator on gunite work shall be classified as a concrete mobile mixer operator.
SEE ZONE DEFINITIONS AFTER CLASSIFICATIONS
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Bargeman; Brakeman; Compressor operator; Ditch Witch, with seat or similar type equipment; Elevator operator-inside; Engineer Oiler; Forklift operator (includes loed, lull or similar types under 5 tons;
Generator operator; Generator, pump or compressor plant operator; Pump operator; Signalman; Switchman
GROUP 2: Asphalt-rubber plant operator (nurse tank operator);
Concrete mixer operator-skip type; Conveyor operator;
Fireman; Forklift operator (includes loed, lull or similar types over 5 tons; Hydrostatic pump operator; oiler crusher (asphalt or concrete plant); Petromat laydown machine; PJU side dum jack; Screening and conveyor machine operator (or similar types); Skiploader (wheel type up to 3/4 yd.
without attachment); Tar pot fireman; Temporary heating plant operator; Trenching machine oiler
GROUP 3: Asphalt-rubber blend operator; Bobcat or similar type (Skid steer); Equipment greaser (rack); Ford Ferguson (with dragtype attachments); Helicopter radioman (ground);
Stationary pipe wrapping and cleaning machine operator
GROUP 4: Asphalt plant fireman; Backhoe operator (mini-max or similar type); Boring machine operator; Boxman or mixerman
00 73 46 - 9 Amendment 07
(asphalt or concrete); Chip spreading machine operator;
Concrete cleaning decontamination machine operator;
Concrete Pump Operator (small portable); Drilling machine operator, small auger types (Texoma super economatic or similar types - Hughes 100 or 200 or similar types -drilling depth of 30' maximum); Equipment greaser (grease truck); Guard rail post driver operator; Highline cableway signalman; Hydra-hammer-aero stomper; Micro Tunneling (above ground tunnel); Power concrete curing machine operator; Power concrete saw operator; Power-driven jumbo form setter operator; Power sweeper operator; Rock Wheel Saw/Trencher; Roller operator (compacting); Screed operator (asphalt or concrete); Trenching machine operator (up to 6 ft.); Vacuum or much truck
GROUP 5: Equipment Greaser (Grease Truck/Multi Shift).
GROUP 6: Articulating material hauler; Asphalt plant engineer; Batch plant operator; Bit sharpener; Concrete joint machine operator (canal and similar type); Concrete planer operator; Dandy digger; Deck engine operator;
Derrickman (oilfield type); Drilling machine operator, bucket or auger types (Calweld 100 bucket or similar types
- Watson 1000 auger or similar types - Texoma 330, 500 or 600 auger or similar types - drilling depth of 45' maximum); Drilling machine operator; Hydrographic seeder machine operator (straw, pulp or seed), Jackson track maintainer, or similar type; Kalamazoo Switch tamper, or similar type; Machine tool operator; Maginnis internal full slab vibrator, Mechanical berm, curb or gutter(concrete or asphalt); Mechanical finisher operator (concrete, Clary-Johnson-Bidwell or similar); Micro tunnel system (below ground); Pavement breaker operator (truck mounted);
Road oil mixing machine operator; Roller operator (asphalt or finish), rubber-tired earth moving equipment (single engine, up to and including 25 yds. struck); Self-propelled tar pipelining machine operator; Skiploader operator (crawler and wheel type, over 3/4 yd. and up to and including 1-1/2 yds.); Slip form pump operator (power driven hydraulic lifting device for concrete forms);
Tractor operator-bulldozer, tamper-scraper (single engine, up to 100 h.p. flywheel and similar types, up to and including D-5 and similar types); Tugger hoist operator (1 drum); Ultra high pressure waterjet cutting tool system operator; Vacuum blasting machine operator
GROUP 8: Asphalt or concrete spreading operator (tamping or finishing); Asphalt paving machine operator (Barber Greene or similar type); Asphalt-rubber distribution operator;
Backhoe operator (up to and including 3/4 yd.), small ford, Case or similar; Cast-in-place pipe laying machine operator; Combination mixer and compressor operator (gunite work); Compactor operator (self-propelled); Concrete mixer operator (paving); Crushing plant operator; Drill Doctor;
Drilling machine operator, Bucket or auger types (Calweld 150 bucket or similar types - Watson 1500, 2000 2500 auger or similar types - Texoma 700, 800 auger or similar types -drilling depth of 60' maximum); Elevating grader operator;
00 73 46 - 10 Amendment 07
Grade checker; Gradall operator; Grouting machine operator;
Heavy-duty repairman; Heavy equipment robotics operator;
Kalamazoo balliste regulator or similar type; Kolman belt loader and similar type; Le Tourneau blob compactor or similar type; Loader operator (Athey, Euclid, Sierra and similar types); Mobark Chipper or similar; Ozzie padder or similar types; P.C.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .