F-35 Munitions Conveyor Facility, Nellis AFB, NV Federal contract opportunity
Solicitation number
W912PL20B0006
Issued by
Department of the Army Corps of Engineers Engineering District Los Angeles

About this file

This notice describes a federal construction contract opportunity for the F-35 Munitions Conveyor Facility at Nellis Air Force Base in Nevada. The project involves building a 60,546 square foot concrete pad and sunshade canopy to support munitions assembly operations for the F-35 aircraft. The project is set aside for 8(a) small businesses and has an estimated value between $5-10 million. The U.S. Army Corps of Engineers will issue the solicitation on or around June 15th, 2020 via the SAM.gov website, with bids due on or around July 17th. The solicitation will use the Invitation for Bid procurement method. Interested 8(a) contractors must register in SAM.gov to receive the solicitation and submit a bid and any other requested documents, which will be evaluated for responsiveness and responsibility. The lowest priced, responsive, and responsible bidder will be considered for award.

View the file

Other files for this federal contract opportunity

Other files attached to F-35 Munitions Conveyor Facility, Nellis AFB, NV, newest first.
File Type Posted
W912PL20B0006 Certified Bid Abstract.pdf PDF
W912PL20B0006_Amendment0005.pdf PDF
W912PL20B0006_Amendment0003.pdf PDF
_site_visit sign in sheets. pdf.pdf PDF
W912PL20B0006_Amendment0002.pdf PDF
W912PL20B0006_Amendment0001.pdf PDF
W912PL20B0006_Solicitation_Specifications.pdf PDF
W912PL20B0006_Solicitation_Drawings.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICIATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPIRATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION ( Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

1 104

0004 15Jul2020

USACE, Los Angeles District ATTN: Contracting Division East Region Branch 915 Wilshire Boulevard, Suite 930 Los Angeles, CA 90017

W912PL20B0006

15JUN2020

F-35 Munitions Conveyor Facility, Nellis AFB, NV

The purpose of this amendment is to make the following changes identified within the continuation sheet.

All other terms and conditions remain unchanged.

W912PL20B0006

AMEND 0004

Changes are:

1. Spec Table Of Contents (replace)

a. Delete specification section 09 65 00

2. 01 33 00 Submittal Register (replace)

3. 01 50 00 (delete paragraph 3.3.1)

4. 07 41 13 (add new spec section)

5. 09 29 00 (add new spec section)

6. Drawing sheet A-010 (replace)

7. Drawing sheet A-500 (replace)

8. Drawing sheet A-601 (replace)

F-35A Munitions Assembly Conveyor Facility 2266

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 GENERAL REQUIREMENTS

01 32 01 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 33 29 SUSTAINABILITY REPORTING

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00 QUALITY CONTROL

01 45 00.15 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)

01 45 35 SPECIAL INSPECTIONS

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

01 57 23 TEMPORARY STORM WATER POLLUTION CONTROL

01 58 00 PROJECT IDENTIFICATION

01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

01 78 24 FACILITY DATA REQUIREMENTS

01 91 00.15 TOTAL BUILDING COMMISSIONING

DIVISION 03 - CONCRETE

03 30 53 MISCELLANEOUS CAST-IN-PLACE CONCRETE

03 33 00 CAST-IN-PLACE ARCHITECTURAL CONCRETE

03 42 13 PLANT-PRECAST CONCRETE PRODUCTS FOR BELOW GRADE

CONSTRUCTION

DIVISION 04 - MASONRY

04 20 00 UNIT MASONRY

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

06 20 00 FINISH CARPENTRY

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS

07 27 10 BUILDING AIR BARRIER SYSTEM

07 41 13 METAL ROOF PANELS

07 41 63 FABRICATED ROOF PANEL ASSEMBLIES

07 60 00 FLASHING AND SHEET METAL

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 71 00 DOOR HARDWARE

DIVISION 09 - FINISHES

09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 29 00 GYPSUM BOARD

09 51 00 ACOUSTICAL CEILINGS

PROJECT TABLE OF CONTENTS Page 1 Amendment 004

09 90 00 PAINTS AND COATINGS

09 96 00 HIGH-PERFORMANCE COATINGS

DIVISION 13 - SPECIAL CONSTRUCTION

13 34 19 METAL BUILDING SYSTEMS

13 48 00 SEISMIC BRACING FOR MISCELLANEOUS EQUIPMENT

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 05 48.19 SEISMIC BRACING FOR HVAC

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 23 00 REFRIGERANT PIPING

23 81 00 DECENTRALIZED UNITARY HVAC EQUIPMENT

DIVISION 26 - ELECTRICAL

26 05 19.10 INSULATED WIRE AND CABLE

26 05 48 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT

26 12 19.10 THREE-PHASE PAD-MOUNTED TRANSFORMERS

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 35 43 400-HERTZ (HZ) SOLID STATE FREQUENCY CONVERTER

26 41 00 LIGHTNING PROTECTION SYSTEM

26 51 00 INTERIOR LIGHTING

26 56 00 EXTERIOR LIGHTING

DIVISION 27 - COMMUNICATIONS

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 31 64 FIRE DETECTION AND ALARM SYSTEM, ADDRESSABLE

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

31 05 19 GEOTEXTILE

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 11 23 AGGREGATE BASE COURSES

32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS

32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE

FACILITIES

32 13 73 COMPRESSION JOINT SEALS FOR CONCRETE PAVEMENTS

32 17 23 PAVEMENT MARKINGS

DIVISION 33 - UTILITIES

33 40 00 STORM DRAINAGE UTILITIES

33 71 01 OVERHEAD TRANSMISSION AND DISTRIBUTION

33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION

33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 2

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 48 PAGES

F-35A Munitions Assembly Conveyor Facility

01 32 01 SD-01 Preconstruction Submittals

1.3 GProject Scheduler Qualifications

3.5Bar Chart Schedule

3.1 GProject Schedule

3.5.1 GPreliminary Project Schedule

3.5.2 GInitial Project Schedule

3.6.1Data Optical Discs

3.5.3 GPeriodic Schedule Update

3.7.2 GPeriodic Schedule Update

3.9.1 GJustification of Delay

3.9.3 GTime Impact Analysis

3.9.4 GForensic Schedule Analysis

3.1.1 GSchedule Status Report

01 33 00 SD-01 Preconstruction Submittals

1.9 GSubmittal Register

01 33 29 SD-01 Preconstruction Submittals

1.5.3.1 GPreliminary High Performance

and Sustainable Building Checklist

1.4.1 GSustainability Action Plan

1.5.3.1 GPreliminary Sustainability

eNotebook SD-11 Closeout Submittals

1.5.3.1 GFinal High Performance and

Sustainable Building Checklist

1.5.3.1 GFinal Sustainability eNotebook

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 48 PAGES

01 33 29 1.5.3.1 GAmended Final Sustainability eNotebook

1.5.3.1 GAmended Final High

Performance and Sustainable Building Checklist

01 35 26 SD-01 Preconstruction Submittals

1.6 G DOAccident Prevention Plan (APP)

1.6.2.11 GHealth Hazard Control Plan

1.6.2.12 GEmergency Action Plan

1.6.2.2 GStandard Lift Plan

1.6.2.3 G DOCritical Lift Plan

1.7Activity Hazard Analysis (AHA)

1.6.2.13 GCovid-19 Monitoring Plan

SD-06 Test Reports 1.11.3Monthly Exposure Reports 1.11Notifications and Reports

1.11.2 G DOAccident Investigation Reports

1.11.4LHE Inspection Reports 1.11.6Regulatory Citations and

Violations SD-07 Certificates

1.5.1.4Crane Operators/Riggers 1.8.1Confined Space Entry Permit 1.8.1Hot Work Permit 1.11.5Certificate of Compliance 3.7Excavation Permit

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 48 PAGES

01 35 26 1.5.1.4Proof of Current Qualification 01 45 00 SD-01 Preconstruction Submittals

3.2 GContractor Quality Control Plan

3.7.2.1 GMTC validation

SD-06 Test Reports 3.9.2Verification Statement

01 45 35 SD-01 Preconstruction Submittals 3.1.2Written Practices 3.1.2NDT Procedures and Equipment

Calibration Records SD-06 Test Reports

3.1.2Daily Reports 3.1.1Biweekly Reports

SD-07 Certificates 2.1Fabrication Plant 2.1AC472 Accreditation 2.1Steel Joist Institute Membership

2.1 GCertificate of Compliance

1.5 GSpecial Inspector

3.1.2Qualification Records

SD-11 Closeout Submittals

3.1.2 GComprehensive Final Report

01 50 00 SD-01 Preconstruction Submittals

1.3 GConstruction Site Plan

3.1.7.1 GTraffic Control Plan

3.6 GSafety Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 48 PAGES

01 50 00 1.4 GTemporary Earthwork Plan

3.1.7.3 GDust Control Methods And

Procedures

2.2 GHaul Road Plan

SD-06 Test Reports 2.4Backflow Preventer Tests

SD-07 Certificates 1.7.1Backflow Tester 1.7Backflow Preventers 1.7.2Backflow Prevention Training

Certificate 01 57 19 SD-01 Preconstruction Submittals

1.6 GEnvironmental Protection Plan

1.6 GEnvironmental Protection Plan

1.6 GEnvironmental Protection Plan

1.6.3 GEnvironmental Protection Plan

1.11 GEnvironmental Protection Plan

3.8.3 GEnvironmental Protection Plan

3.4.1 GATC application

1.6.2 GDust Control Permit

1.6.3Environmental Permits

3.8.4.1 GApproval Letter

3.8.4.1Authorized Desert Tortoise

Biologist Qualifications Statement And Request

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 48 PAGES

01 57 19 3.8.4.2Preconstruction Desert Tortoise Survey Data

SD-03 Product Data 1.6.2Safety Data Sheets

SD-07 Certificates 1.6.3Certifications

01 57 23 SD-01 Preconstruction Submittals

1.5.1 G DOSWPPP

1.5.1 G DOSWPPP

SD-03 Product Data 1.5.1.2BMP Product Data 3.1.1BMP Product Data 3.1.1BMP Product Data 3.1.1BMP Product Data

SD-06 Test Reports 3.1.1SWPPP Amendments 3.2.1SWPPP Amendments 3.2.1SWPPP Amendments 3.2.1SWPPP Amendments 3.2.1SWPPP Amendments 3.2.1SWPPP Amendments

SD-10 Operation and Maintenance Data

3.1.2 G DOPost-Construction Storm Water

Management Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 48 PAGES

01 57 23 3.1.2 G DOPost-Construction Storm Water Management Plan

SD-11 Closeout Submittals

3.1.2 G DOFinal SWPPP

3.2.1 G DOFinal SWPPP

3.1.2 G DONOT Application

3.1.2 G DONOT Application

3.1.2 G DONOT Application

01 58 00 SD-02 Shop Drawings

1.4.1 GSign Legend Orders

01 74 19 SD-01 Preconstruction Submittals

1.5 GWaste Management Plan

SD-11 Closeout Submittals

1.6 SRecords

01 78 00 SD-03 Product Data 1.7.1Warranty Management Plan 1.7.5Warranty Tags 1.5Spare Parts Data

SD-06 Test Reports

3.1.4 Gworking as-built drawings

3.2 G DOfinal as-built record drawings

SD-08 Manufacturer’s Instructions 1.7.1Instructions

SD-10 Operation and Maintenance Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 48 PAGES

01 78 00 3.9Operation and Maintenance Manuals

SD-11 Closeout Submittals

1.3.4 G DORecord Drawings

2.3 GCertification of EPA Designated

Items

3.11 GInterim DD FORM 1354

3.11 GChecklist for DD FORM 1354

3.6 GFinal Approved Shop Drawings

3.7 GConstruction Contract

Specifications 3.8As-Built Record of Equipment and Materials

3.11 GHigh Performance And

Sustainable Building (Hpsb) Checklist

01 78 23 SD-10 Operation and Maintenance Data

1.4 GO&M Database

3.1.1 GTraining Plan

3.1.3 GTraining Outline

3.1.2 GTraining Content

SD-11 Closeout Submittals

3.1.4 GTraining Video Recording

3.1.6 GValidation of Training Completion

01 78 24 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 48 PAGES

01 78 24 1.4.1Facility Data Project Execution Plan

SD-10 Operation and Maintenance Data

3.1 GFacility Data Workbook, Construction Progress

3.1 GFacility Document Set, Construction Progress

SD-11 Closeout Submittals

3.2 GFacility Data Workbook, Construction Final

1.4.3 GFacility Document Set, Construction Final

3.2 GFacility Document Set, Construction Final 01 91 00.15 SD-01 Preconstruction Submittals

1.7 GCommissioning Firm

1.7.1 GLead Commissioning Specialist

1.7.2 GTechnical Commissioning

Specialists

1.7 GCommissioning Firm's Contract

SD-06 Test Reports

3.1.2.1 GInterim Construction Phase

Commissioning Plan

3.1.2.1 GInterim Construction Phase

Commissioning Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 48 PAGES

01 91 00.15 3.1.2.2 GFinal Construction Phase Commissioning Plan

3.1.2.1.2 GTemplate Building Envelope

Inspection Checklists

3.1.4.2 GBuilding Envelope Inspection

Checklists

3.1.4.3 GPre-Functional Checklists

1.8Issues Log

3.2 GCommissioning Report

SD-07 Certificates

1.9 GCertificate of Readiness

SD-10 Operation and Maintenance Data

3.1.5 GTraining Plan

3.1.5 GTraining Attendance Rosters

3.1.6 GSystems Manual and

Computerized Maintenance Management System Manual

SD-11 Closeout Submittals

3.2 SFinal Commissioning Report

03 30 53 SD-02 Shop Drawings

1.4 GInstallation Drawings

SD-03 Product Data 2.2.3.1Air-Entraining Admixture 2.2.3.2Accelerating Admixture

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 48 PAGES

03 30 53 2.2.3.3Water-Reducing or Retarding Admixture

2.2.11Curing Materials 2.2.6Expansion Joint Filler Strips, Premolded 2.2.7Joint Sealants - Field Molded

Sealants 3.2Conveying and Placing Concrete 2.2.8Formwork

2.3 GMix Design Data

2.3Ready-Mix Concrete 2.4.1Curing Compound 2.2.5Mechanical Reinforcing Bar

Connectors SD-06 Test Reports

2.2.2Aggregates

2.1.3 GConcrete Mixture Proportions

3.8.3 GCompressive Strength Testing

3.8.3 GSlump

3.8.3Air Content 2.2.4Water

SD-07 Certificates 2.2.1Cementitious Materials 2.2.2Aggregates 2.3Delivery Tickets

SD-08 Manufacturer’s Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 48 PAGES

03 30 53 2.4.1Curing Compound 03 33 00 SD-02 Shop Drawings

1.4.1Detail Drawings SD-04 Samples

2.1Materials 1.4.2Panels

03 42 13 SD-01 Preconstruction Submittals 1.3.2.2Quality Control Procedures

SD-02 Shop Drawings

2.1.1 GStandard Precast Units

2.1.2 GCustom-Made Precast Units

3.2.4.3Special Finishes

SD-03 Product Data 2.1.1Standard Precast Units 2.1.3Proprietary Precast Units 3.1.3Embedded Items 2.2.5Accessories

SD-05 Design Data

2.1.2 GDesign Calculations

2.1.5.1 GConcrete Mix Proportions

SD-06 Test Reports 1.3.2.4Test Reports

SD-07 Certificates 1.3.2.2Quality Control Procedures

04 20 00 SD-02 Shop Drawings

3.3.2.1 G DO Cut CMU

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 48 PAGES

04 20 00 3.4.1.1 G DO Detail Drawings SD-03 Product Data

1.5.1 G ROHot Weather Procedures

1.5.2 G ROCold Weather Procedures

2.4.1.1 G ROCementitious Materials

SD-04 Samples

2.2.2.2 G ROConcrete Masonry Units (CMU)

2.4.1.4 G ROAdmixtures for Masonry Mortar

2.6.2 G ROAnchors, Ties, and Bar

Positioners

2.6.3 G ROJoint Reinforcement

SD-05 Design Data

2.1.2 G ROMasonry Compressive Strength

2.2.2.4Fire-Rated Concrete Masonry

Units

3.2.5 G ROBracing Calculations

SD-06 Test Reports 2.2.2.4Fire-Rated Concrete Masonry

Units SD-07 Certificates

1.3.1Special Masonry Inspector Qualifications

2.2.2.2Concrete Masonry Units (CMU) 2.4.1.1Cementitious Materials 2.4.1.4Admixtures for Masonry Mortar 2.4.2.2Admixtures for Grout

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 48 PAGES

04 20 00 2.6.2Anchors, Ties, and Bar Positioners

2.6.3Joint Reinforcement SD-08 Manufacturer’s Instructions

2.4.1.4Admixtures for Masonry Mortar 2.4.2.2Admixtures for Grout

SD-10 Operation and Maintenance Data

3.8Take-Back Program 06 10 00 SD-03 Product Data

1.8Fire-retardant Treatment 2.2.2Adhesives

SD-06 Test Reports 1.4.3Preservative-treated

SD-07 Certificates 1.9.1Certificates of Grade 1.7Preservative Treatment

06 20 00 SD-02 Shop Drawings

1.3 GDetail Drawings Indicating All

Wood Assemblies SD-03 Product Data

2.1 GWood Products

2.4 GCountertops

1.4 GTreated Wood Products

2.2 GSoffits

2.3 GFascias and Trim

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 48 PAGES

06 20 00 2.7 GHardware and Accessories

2.1.7 SRecycled Content For

Mdf/Particleboard

2.1.13 SVoc Content For Siding

2.8.1.2 SIndoor Air Quality For

Non-Aerosol Adhesives

2.8.1.2 SIndoor Air Quality For Aerosol

Adhesives SD-04 Samples

1.5 GSamples

SD-07 Certificates

1.7.1.1 GCertificates of Grade

2.1.7 SIndoor Air Quality For Mdf And

Particleboard

2.1.13 SCertified Sustainably Harvested

Siding 07 05 23 SD-01 Preconstruction Submittals

1.4 GWork Plan

SD-03 Product Data

2.2 GThermal Imaging Camera

SD-05 Design Data

3.2 GEnvelope Surface Area

Calculations

SD-07 Certificates 1.6.2.1Pressure Test Agency 1.6.2.2Thermographer Qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 48 PAGES

07 05 23 1.6.3Test Instruments 1.6.3Date Of Last Calibration

SD-06 Test Reports

3.5 GPressure Test Procedures

3.5.8 GAir Leakage Test Report

3.6.5 GDiagnostic Test Report

07 27 10 SD-04 Samples

3.1.2 GMock-Up

SD-06 Test Reports

1.8 GDesign Review Report

3.1.3 GTesting and Inspection

SD-07 Certificates

1.7 GAir Barrier Inspector

07 41 13 SD-02 Shop Drawings

1.4.5 GRoofing Panels

1.4.5 GFlashing and Accessories

1.4.5 GGutter/Downspout Assembly

SD-03 Product Data

2.1 GRoof Panels

SRecycled Content for Aluminum Roof Panels

2.1.1 SRecycled Content for Steel Roof

Panels

1.4.5 GFactory-Applied Color Finish

2.4 GAccessories

1.4.5 GFasteners

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 48 PAGES

07 41 13 1.4.5 GPressure Sensitive Tape

2.7 GUnderlayments

2.8 GGaskets and Sealing/Insulating

Compounds

1.4.5 GCoil Stock

1.4.5 GAluminized Steel Repair Paint

GEnamel Repair Paint GGalvanizing Repair Paint

SD-04 Samples

2.1 GRoof Panels

1.4.5 GFactory-applied Color Finish

2.4 GAccessories

1.4.5 GFasteners

1.4.5 GGaskets and Sealant/Insulating

Compounds SD-05 Design Data

1.2.1.2 GWind Uplift Resistance

SD-06 Test Reports

1.2.1.1 GLeakage Test Report

1.2.1.2 GWind Uplift Test Report

2.6.1 GFire Rating Test Report

2.2 GFactory Finish and Color

Performance Requirements SD-07 Certificates

2.1 GRoof Panels

1.4.5 GCoil Stock Compatibility

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 48 PAGES

07 41 13 2.7.1 GSelf-Adhering Modified Bitumen Underlayment

1.4.1 GQualification of Manufacturer

1.4.2 GQualification of Applicator

SD-08 Manufacturer’s Instructions

2.6 GInsulation

1.4.5 GInstallation Manual

SD-09 Manufacturer’s Field Reports

3.10.1 GManufacturer's Field Inspection

Reports

SD-11 Closeout Submittals

1.8 GWarranties

3.11 GInformation Card

07 41 63 SD-01 Preconstruction Submittals

1.4.1 GQualification of Manufacturer

1.4.1 GQualification of Installer

1.4.1 GQualifications for Welding

1.4.1 GWork Plan

1.4.1 GOn-Site Inspection and

Acceptance Procedure SD-02 Shop Drawings

1.4.1 GRoofing Panels

1.4.1 GFlashing and Accessories

1.4.1 GGutter/Downspout Assembly

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 48 PAGES

07 41 63 1.4.1 GSustainable Acquisition

1.4.1 GCoil Stock

1.4.1 GFactory Color Finish

1.4.1 GSub-girts and Formed Shapes

1.4.1 GClosure Materials

1.4.1 GInsulation

1.4.1 GPressure-Sensitive Tape

1.4.1 GSealants and Caulking

1.4.1 GRated Wall Assembly

1.4.1 GGalvanizing Repair Paint

1.4.1 GEnamel Repair Paint

1.4.1 GAluminized Steel Repair Paint

1.4.1 GAccessories

SD-04 Samples

1.4.1 GCoil Stock

1.4.1 GRoofing Panels

2.3.1.2 GFasteners

2.5.1 GMetal Closure Strips

1.4.1 GInsulation

1.4.1 GManufacturer's Color Charts and

Chips SD-05 Design Data

1.4.1Wind Design Analysis 1.4.1Seismic Design Analysis

SD-06 Test Reports

3.4.1.2 GLeakage Tests

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 48 PAGES

07 41 63 1.4.1 GFire Rating Test Report

3.1 GCoatings and Base Metals of

Metal Roofing

1.4.1 GFactory Finish and Color

Performance Requirements

1.4.1 GWind Uplift Test Report

1.4.1 GSeismic Test Report

SD-07 Certificates 1.4.1Coil Stock 2.3.1.2Fasteners 1.4.1Galvanizing Repair Paint 1.4.1Enamel Repair Paint 1.4.1Safety Data Sheets 2.4.5Coating Physical Properties:

SD-08 Manufacturer’s Instructions 1.4.1Installation of Roof Panel

Assemblies SD-11 Closeout Submittals

1.7Warranty

3.3.5 GInformation Form and Placard

3.4.2Manufacturer's Field Inspection

Reports 1.4.1Application Instructions 1.7.120-Year 'No-Dollar-Limit'

Warranty For Labor And Materials 07 60 00 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 48 PAGES

07 60 00 2.2.1 GExposed Sheet Metal

2.2.1 GGravel Stops and fascia

3.1.11 GBase Flashing

3.1.12 GCounterflashing

3.1.19 GFlashing at Roof Penetrations

and Equipment Supports

2.2.15 GReglets

3.1.22 GCopings

3.1.16 GDrip Edges

3.1.17 GEave Flashing

2.1 SRecycled Content

SD-03 Product Data

2.2.12 GCool Roof

SD-04 Samples

1.4.2 GFinish Samples

SD-08 Manufacturer’s Instructions

1.4.3 GInstructions for Installation

3.5 GQuality Control Plan

SD-10 Operation and Maintenance Data

1.4.3 GCleaning and Maintenance

07 84 00 SD-02 Shop Drawings

2.1 GFirestopping System

SD-03 Product Data

2.2 GFirestopping Materials

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 48 PAGES

07 84 00 3.3 GInspection SD-07 Certificates

1.5.2Inspector Qualifications 2.2Firestopping Materials

1.5.1 GInstaller Qualifications

07 92 00 SD-03 Product Data

2.2 GSealants

2.3 GPrimers

2.4 GBond Breakers

2.5 GBackstops

3.1 GField Adhesion

SD-07 Certificates

1.4.1 GIndoor Air Quality

SD-11 Closeout Submittals

2.2.1 SIndoor Air Quality For Interior

Sealants

2.2.3 SIndoor Air Quality For Interior

Floor Joint Sealants

2.2.4 SIndoor Air Quality For Interior

Acoustical Sealants

2.6 SIndoor Air Quality For Interior

Caulking 08 11 13 SD-02 Shop Drawings

2.1 GDoors

2.1 GDoors

2.4 GFrames

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 48 PAGES

08 11 13 2.4 GFrames 2.2Accessories 2.5Weatherstripping

SD-03 Product Data

2.1 GDoors

2.4 GFrames

2.2Accessories 2.5Weatherstripping

SD-04 Samples

2.7.3 GFactory-applied enamel finish

08 71 00 SD-02 Shop Drawings

1.3 GManufacturer's Detail Drawings

1.3 GVerification of Existing Conditions

1.5 GHardware Schedule

2.3.8 GKeying System

SD-03 Product Data

2.3 GHardware Items

SD-08 Manufacturer’s Instructions 3.1Installation

SD-10 Operation and Maintenance Data

1.5 GHardware Schedule

SD-11 Closeout Submittals

1.6.1Key Bitting 09 22 00 SD-02 Shop Drawings

2.1 GMetal support systems

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 48 PAGES

09 29 00 SD-03 Product Data Abuse Resistant Gypsum Board

2.1.5Accessories 2.1.1Gypsum Board

SD-06 Test Reports GASTM E90 Factory Test Report

SD-07 Certificates

2.1 GAsbestos Free Materials

09 51 00 SD-02 Shop Drawings

2.1 GApproved Detail Drawings

SD-03 Product Data

2.2.1.1 SRecycled Content For Type Iii

Ceiling Tiles

2.3 SRecycled Content For

Suspension Systems SD-04 Samples

2.2 GAcoustical Units

2.2.1.1 GAcoustical Ceiling Tiles

SD-06 Test Reports

2.1.1 GCeiling Attenuation Class and

Test SD-07 Certificates

2.2.1.1 SIndoor Air Quality For Type Iii

Ceiling Tiles

09 90 00 SD-02 Shop Drawings 3.9Piping Identification

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 48 PAGES

09 90 00 SD-03 Product Data

2.1 GCoating

SD-04 Samples

1.10 GColor

1.5.2 GTextured Wall Coating System

SD-07 Certificates 1.4Applicator's Qualifications

1.5.1.2 GQualification Testing

2.1Indoor Air Quality for Paints and

Primers SD-08 Manufacturer’s Instructions

3.5.2Mixing 1.8.2Manufacturer's Safety Data

Sheets SD-10 Operation and Maintenance Data

2.1 GCoatings

09 96 00 SD-01 Preconstruction Submittals

1.3Equipment List SD-03 Product Data

2.2.1Epoxy Coatings SD-04 Samples

1.3Color Chips SD-07 Certificates

2.2.1Epoxy Coatings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 48 PAGES

09 96 00 3.1.4Manufacturer's Printed Instructions

13 34 19 SD-01 Preconstruction Submittals

1.6.3 GManufacturer's Qualifications

SD-02 Shop Drawings

1.2.1.7 GDetail Drawings

1.6.1 GDetail Drawings

1.2.6 GErection Plan

SD-03 Product Data

1.6.1 G ROManufacturer's Catalog Data

SD-04 Samples

1.6.1 G ROCoil Stock

2.1.8 G ROCoil Stock

1.2.1.9 G RORoof Panels

1.2.1.9 G ROWall Panels

2.5.2 G ROFasteners

2.7.1 G ROMetal Closure Strips

2.4.2 G ROManufacturer's Color Charts and

Chips SD-05 Design Data

1.6.1 G ROManufacturer's Descriptive and

Technical Literature

1.6.1 G ROManufacturer's Building Design

Analysis

SD-06 Test Reports

1.6.1 G ROTest Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 48 PAGES

13 34 19 1.6.1 G ROCoatings and Base Metals

1.6.1 G ROFactory Color Finish Performance

Requirements SD-07 Certificates

1.6.1 G ROSystem Components

1.6.1 G ROCoil Stock

2.1.8 G ROCoil Stock

1.6.1 G ROAluminized Steel Repair Paint

1.6.1 G ROGalvanizing Repair Paint

1.6.1 G ROEnamel Repair Paint

1.6.1 G ROQualification of Manufacturer

1.6.1 G ROQualification of Erector

SD-08 Manufacturer’s Instructions

1.6.2 G ROInstallation of Roof and Wall

panels

1.7 G ROShipping, Handling, and Storage

SD-11 Closeout Submittals

3.11.1 G ROManufacturer's Warranty

3.11.2 G ROContractor's Warranty for

Installation 13 48 00 SD-02 Shop Drawings

3.1 GBracing

3.4 GResilient Vibration Isolation

Devices

2.1 GEquipment Requirements

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 48 PAGES

13 48 00 3.1 GBracing

2.1 GEquipment Requirements

3.3 GAnchor Bolts

2.1.2 GVibration Isolators

3.4.2 GSnubbers

SD-05 Design Data

1.2.3 GDesign Calculations

SD-06 Test Reports

3.3 GAnchor Bolts

SD-07 Certificates

3.6 GICC ES AC156 Shake Table Test

23 00 00 SD-02 Shop Drawings

1.4.4 GDetail Drawings

SD-03 Product Data 2.8.1.2Duct Connectors

2.8.2 GDuct Access Doors

2.8.7Louvers 1.4.5Test Procedures

1.2.1.2 GDiagrams

2.8.1 SIndoor Air Quality for Duct

Sealants 2.8.1.1Metallic Flexible Duct 2.8.1.2Insulated Nonmetallic Flexible

Duct Runouts 2.8.5Sound Attenuation Equipment 2.8.5.3Acoustical Duct Liner

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 48 PAGES

23 00 00 2.8.6.1Registers And Grilles 2.8.8Air Vents, Penthouses, And

Goosenecks

2.10 GAir Handling Units

SD-06 Test Reports

3.11 GPerformance Tests

SD-07 Certificates 1.4.3Ozone Depleting Substances

Technician Certification SD-08 Manufacturer’s Instructions

3.2Manufacturer's Installation Instructions

3.13.2Operation and Maintenance Training

SD-10 Operation and Maintenance Data

3.13.1 GOperation and Maintenance

Manuals

SD-11 Closeout Submittals

3.12 SIndoor Air Quality During

Construction 23 05 48.19 SD-02 Shop Drawings

3.1Coupling and Bracing 3.3Flexible Couplings or Joints 2.2Equipment Restraint

1.2.4 GContractor Designed Bracing

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 48 PAGES

23 05 48.19 SD-03 Product Data

3.1 GCoupling and Bracing

3.3 GFlexible Couplings Or Joints

2.2 GEquipment Restraint

1.2.4 GContractor Designed Bracing

2.6Snubbers 3.9Anchor Bolts 2.2.2Vibration Isolators

SD-05 Design Data 1.2.4Design Calculations

SD-06 Test Reports

3.9 GAnchor Bolts

23 05 93 SD-01 Preconstruction Submittals

1.3.3 GRecords of Existing Conditions

1.5.3.1 GTAB Firm

1.2 GTAB Team Assistants

1.2 GTAB Team Engineer

1.5.3.2 GTAB Specialist

1.2 GTAB Team Field Leader

SD-02 Shop Drawings

1.3.3 GTAB Schematic Drawings and

Report Forms SD-03 Product Data

1.3 GEquipment and Performance

Data

1.5.3.4 GTAB Related HVAC Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 48 PAGES

23 05 93 1.5.2 GTAB Procedures

1.5.2 GCalibration

1.3.3 GSystems Readiness Check

1.5.4 GTAB Execution

1.5.4.3 GTAB Verification

SD-06 Test Reports

3.3.5 GCompleted Pre-Final DALT

Report

3.3.8 GCertified Final DALT Report

1.7.2.1 GTAB Design Review Report

1.5.5.2 GTAB Report for Season 1

1.5.5.2 GTAB Report for Season 2

SD-07 Certificates

1.5.1 GIndependent TAB Agency and

Personnel Qualifications

1.7.2 GDALT and TAB Submittal and

Work Schedule

1.7.2.3 GTAB Pre-Field Engineering

Report

1.5.3.1 GTAB Firm

1.3.3 GDesign Review Report

1.7.2.2 GPre-field DALT Preliminary

Notification

1.7.2 GAdvanced Notice for Season 1

TAB Field Work

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 48 PAGES

23 05 93 1.7.2 GPrerequisite HVAC Work Check Out List For Season 1

1.7.2 GAdvanced Notice for Season 2

TAB Field Work

1.7.2 GPrerequisite Hvac Work Check

Out List For Season 2

23 07 00 SD-02 Shop Drawings

3.2.2.4 GMICA Plates

2.3Pipe Insulation Systems 3.2Pipe Insulation Systems 3.3Duct Insulation Systems 3.4Equipment Insulation Systems

2.3.1 SRecycled content for insulation

materials SD-03 Product Data

2.3 GPipe Insulation Systems

3.2 GPipe Insulation Systems

3.3 GDuct Insulation Systems

3.4 GEquipment Insulation Systems

SD-04 Samples

2.2.1.3 GThermal Insulation

3.1.1 GDisplay Samples

SD-07 Certificates

2.2.1 SIndoor air quality for adhesives

SD-08 Manufacturer’s Instructions

2.3 GPipe Insulation Systems

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 48 PAGES

23 07 00 3.2 GPipe Insulation Systems

3.3 GDuct Insulation Systems

3.4 GEquipment Insulation Systems

23 23 00 SD-02 Shop Drawings

2.3 GRefrigerant Piping System

SD-03 Product Data 2.3Refrigerant Piping System 1.5.2Spare Parts 1.3.1Qualifications 3.5Refrigerant Piping Tests 3.1Verification of Dimensions

SD-06 Test Reports 3.5Refrigerant Piping Tests

SD-07 Certificates 2.1Service Organization

SD-10 Operation and Maintenance Data

1.5 GMaintenance

3.4 GOperation and Maintenance

Manuals

3.4 GDemonstrations

23 81 00 SD-03 Product Data 3.7.1Spare Parts 3.4Posted Instructions 2.5.1Coil Corrosion Protection 3.6System Performance Tests

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 48 PAGES

23 81 00 3.4 GTraining 1.5Inventory 2.2.2.5Environmental Data 2.1Supplied Products 2.2Manufacturer's Standard Catalog

Data 2.4.1Humidifier

SD-06 Test Reports

3.5 GRefrigerant Tests, Charging, and

Start-Up

3.6 GSystem Performance Tests

SD-07 Certificates 3.7.2Service Organizations

SD-10 Operation and Maintenance Data

3.4 GOperation and Maintenance

Manuals

SD-11 Closeout Submittals

2.2.2.3 SOzone Depleting Substances

26 05 19.10 SD-03 Product Data

2.1.1 GWire and Cable

2.1.3.1 GConductors

3.1Cable Manufacturing Data

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 48 PAGES

26 05 19.10 3.2 GTest Report(s), Inspection Report(s), and Verification Report(s)

26 05 48 SD-02 Shop Drawings 3.2Lighting Fixtures in Buildings and under Exterior Canopy 1.3Equipment Requirements

SD-03 Product Data

3.2 GLighting Fixtures in Buildings and

under Exterior Canopy

1.3 GEquipment Requirements

1.2.4 GContractor Designed Bracing

26 12 19.10 SD-02 Shop Drawings

1.4.1 GPad-mounted Transformer

Drawings SD-03 Product Data

2.2 GPad-mounted Transformers

SD-06 Test Reports

3.6.1 GAcceptance Checks and Tests

SD-07 Certificates

2.2.2.1 GTransformer Efficiencies

SD-09 Manufacturer’s Field Reports

2.7.1 GTransformer Test Schedule

2.7.2 GDesign Tests

2.7.3 GRoutine and Other Tests

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 48 PAGES

26 12 19.10 SD-10 Operation and Maintenance Data

1.5.1 GTransformer(s)

26 20 00 SD-02 Shop Drawings

2.12 GPanelboards

2.25 GWireways

3.1.8.1 GMarking strips

SD-03 Product Data

2.11 GReceptacles

2.12.3 GCircuit breakers

2.9 GSwitches

2.13 GEnclosed circuit breakers

2.17 GManual motor starters

2.26 GMetering

2.20.3 GGrounding Busbar

2.27 GSurge protective devices

2.16 GMotor Controllers

SD-06 Test Reports

3.5.2 G600-volt wiring test

3.5.4 GGrounding system test

3.5.3 GGround-fault receptacle test

SD-07 Certificates

2.10 GFuses

SD-10 Operation and Maintenance Data

1.5.1 GElectrical Systems

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 48 PAGES

26 20 00 2.26 GMetering 26 35 43 SD-02 Shop Drawings

1.3.1 GFrequency Converter Drawings

SD-03 Product Data

2.1 GFrequency Converter

SD-06 Test Reports

1.3.3 GWork Plan

1.3.4 GRoutine Factory Test Plan

1.3.5 GSpecial Factory Test Plan

1.3.6 GPerformance Test Plan

2.2.1 GTest Schedule

1.3.8 GRoutine Factory Tests

2.2.2 GRoutine Factory Tests

1.3.9 GSpecial Factory Tests

2.2.3 GSpecial Factory Tests

SD-07 Certificates

1.3.2 GQualifications of Manufacturer

1.3.7 GUL Listing

SD-09 Manufacturer’s Field Reports

3.2.3 GInitial Inspection and Tests

1.3.10 GPerformance Tests

3.2.4 GPerformance Tests

3.3.1 GTraining Syllabus

SD-10 Operation and Maintenance Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 48 PAGES

26 35 43 2.1 GFrequency Converter

1.4.1.2 GPreliminary Operation and

Maintenance Manuals 26 41 00 SD-02 Shop Drawings

1.4.1.1 GOverall lightning protection

system

1.4.1.2 GEach…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .