AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION ( Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable Amendment 0003
0003 29 June 2017
W912PL
U.S Army Corps of Engineers,Los Angeles Dist CESPL-CT-E, East Region Branch 915 Wilshire Blvd.
Los Angeles, CA 90017
U.S Army Corps of Engineers,Los Angeles Dist CESPL-CT-E, East Region Branch 915 Wilshire Blvd.
Los Angeles, CA 90017
W912PL-17-R-0045
15 June 2017
Design-Build FY 17 F-35 Squadron Operations Facility/Aircraft Maintenance Unit (AMU) 5 Luke Air Force Base, Arizona
1. See attached SF30 Continuation Page for all revisions.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED PAGE OF PAGES
IMPORTANT - The "offer" section on the reverse must be fully completed by the offeror.
4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER
7. ISSUED BY CODE 8. ADDRESS OFFER TO
9. FOR INFORMATION CALL
A. NAME B. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date):
11. The Contractor shall begin performance within calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable. (See .)
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
12B. CALENDAR DAYS
YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and copies to perform the work required are due at the place specified in Item 8 by (hour) local time (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, is not required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-3212
Designed using Perform Pro, WHS/DIOR, Oct 96
1442-103 STANDARD FORM 1442 (REV. 4-85) (EG)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d)Amendment 0003
W912PL-17-R-0045
X
15 JUNE 2017 1 OF 2
USACE, Los Angeles District Contracting Division, East Region Branch 915 Wilshire Boulevard Los Angeles, CA 90017
See Item 7
Tracey Daggy (213) 452-3239
FY 17 DESIGN BUILD F-35 SQUADRON OPERATIONS / AIRCRAFT MAINTENANCE UNIT (AMU) 5, LUKE AIR FORCE BASE, ARIZONA. Work will include the construction of a sprinkler-equipped facility containing a steel-framed structure, concrete slab and foundation system, masonry block exterior walls, and standing seam metal roof. Renovate B913 for AMU Support functions. Construct covered outdoor storage area. Demolish one facility for 975 SM. The Operations portion of the facility is required to support the operations squadron and contains the space for flight planning, secure air crew briefing and debriefing areas, and training and administration of the squadron. Space must be provided for the storage, care and issue of flight crew life support system equipment and personal space is required for changing into and out of flight clothing. The renovation of B913 will provide spaces for maintenance, a tool crib, ready room, equipment issue area, and classified vault storage area. The estimated cost range of this procurement is $10,000,000-$25,000,000. When applicable, the Notice of Price Evaluation Preference for HUBZone Concerns will apply to this procurement.
10 See 007300
X X *Section 00 73 00
X 10
3 2 PM
July 18, 2017
X
OFFER (Must be fully completed by offeror)
STANDARD FORM 1442 BACK (REV. 4-85)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14)
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within calendar days after the date offers are due. (Insert any number equal or greater than the minimum requirement stated in 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20B. SIGNATURE 20C. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24.SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) ( ) 41 U.S.C. 253(c) ( )
26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BYCODE
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to the issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and
(c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
29. AWARD. (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN
(Type or print)
30B. SIGNATURE 30C. DATE
31A. NAME OF CONTRACTING OFFICER (Type or print)
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
Amendment 0003
DUNS NO.: TAX ID NO.:
CAGE CODE NO.:
( ) - ; FAX ( ) -
SEE PRICING SCHEDULE
Design Build FY 17 F-35 Squadron Operations/ W912PL-17-R-0045 Aircraft Maintenance Unit (AMU) 5, Luke AFB, AZ
SF 30 CONTINUATION PAGE 1 OF 1
SF 30 BLOCK 14 CONTINUATION
SUMMARY OF CHANGES
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
Section Number Section Title
SF1442
00 22 00 SUPPLEMENTARY INSTRUCTIONS
00 22 16 SUPPLEMENTARY INSTRUCTIONS TO PROPOSERS
DIVISION 01 – 48 - TECHNICAL SPECIFICATIONS
Section Number Section Title
01 33 29 SUSTAINABILITY REPORTING
01 82 00 FUNDAMENTAL COMMISSIONING REQUIREMENTS
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED PAGE OF PAGES
IMPORTANT - The "offer" section on the reverse must be fully completed by the offeror.
4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER
7. ISSUED BY CODE 8. ADDRESS OFFER TO
9. FOR INFORMATION CALL
A. NAME B. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date):
11. The Contractor shall begin performance within calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable. (See .)
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
12B. CALENDAR DAYS
YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and copies to perform the work required are due at the place specified in Item 8 by (hour) local time (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, is not required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-3212
Designed using Perform Pro, WHS/DIOR, Oct 96
1442-103 STANDARD FORM 1442 (REV. 4-85) (EG)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d)Amendment 0003
W912PL-17-R-0045
X
15 JUNE 2017 1 OF 2
USACE, Los Angeles District Contracting Division, East Region Branch 915 Wilshire Boulevard Los Angeles, CA 90017
See Item 7
Tracey Daggy (213) 452-3239
FY 17 DESIGN BUILD F-35 SQUADRON OPERATIONS / AIRCRAFT MAINTENANCE UNIT (AMU) 5, LUKE AIR FORCE BASE, ARIZONA. Work will include the construction of a sprinkler-equipped facility containing a steel-framed structure, concrete slab and foundation system, masonry block exterior walls, and standing seam metal roof. Renovate B913 for AMU Support functions. Construct covered outdoor storage area. Demolish one facility for 975 SM. The Operations portion of the facility is required to support the operations squadron and contains the space for flight planning, secure air crew briefing and debriefing areas, and training and administration of the squadron. Space must be provided for the storage, care and issue of flight crew life support system equipment and personal space is required for changing into and out of flight clothing. The renovation of B913 will provide spaces for maintenance, a tool crib, ready room, equipment issue area, and classified vault storage area. The estimated cost range of this procurement is $10,000,000-$25,000,000. When applicable, the Notice of Price Evaluation Preference for HUBZone Concerns will apply to this procurement.
10 See 007300
X X *Section 00 73 00
X 10
3 2 PM
July 18, 2017
X
OFFER (Must be fully completed by offeror)
STANDARD FORM 1442 BACK (REV. 4-85)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14)
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within calendar days after the date offers are due. (Insert any number equal or greater than the minimum requirement stated in 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20B. SIGNATURE 20C. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24.SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) ( ) 41 U.S.C. 253(c) ( )
26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BYCODE
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to the issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and
(c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
29. AWARD. (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN
(Type or print)
30B. SIGNATURE 30C. DATE
31A. NAME OF CONTRACTING OFFICER (Type or print)
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
Amendment 0003
DUNS NO.: TAX ID NO.:
CAGE CODE NO.:
( ) - ; FAX ( ) -
SEE PRICING SCHEDULE
FY17 MILON F-35 Squadron Operations/Aircraft Maintenance Unit 5, Luke AFB, AZ
TABLE OF CONTENTS
VOLUME 1
DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS
00 10 00 PROPOSAL SCHEDULE
00 20 00 INSTRUCTIONS FOR PROCUREMENT (NOT INCLUDED)
00 21 16 INSTRUCTIONS TO PROPOSERS (NOT INCLUDED)
00 22 00 SUPPLEMENTARY INSTRUCTIONS (NOT INCLUDED)
00 22 16 SUPPLEMENTARY INSTRUCTIONS TO PROPOSERS (NOT INCLUDED)
00 70 00 CONDITIONS OF THE CONTRACT (NOT INCLUDED)
00 73 46 WAGE RATE (NOT INCLUDED)
00 80 00 SPECIAL CONTRACT REQUIREMENTS (NOT INCLUDED)
DIVISION 01 – GENERAL REQUIREMENTS
01 00 00 GENERAL REQUIREMENTS
01 01 50 SEQUENCE OF WORK
01 02 00 SOLE SOURCE JUSTIFICATION
01 04 00 MECHANICAL ROOM LAYOUT AND COORDINATION
01 08 00 PERMITS
01 10 10 DESIGN REQUIREMENTS
01 10 12 DESIGN AFTER AWARD
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRUCTIONS
01 20 00 INTERFACE WITH OTHER WORK
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 31 00 PROJECT MEETINGS
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 33 29 LEED™ DOCUMENTATION
01 34 10 COLOR/FINISH SAMPLE BOARDS
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 10 QUALITY CONTROL
01 45 02 USACE QUALITY CONTROL SYSTEM (QCS)
01 45 35 SPECIAL INSPECTIONS, TESTS, AND OBSERVATIONS FOR
STRUCTURAL SYSTEMS
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 51 00 UTILITIES
01 53 00 TEMPORARY FENCING
01 54 00 SECURITY
01 57 00 TRAFFIC CONTROL
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 58 00 PROJECT IDENTIFICATION
01 58 50 STAGING AREAS
01 62 35 RECYCLED / RECOVERED MATERIALS
01 72 00 AS-BUILT DRAWINGS
01 72 80 TRANFER AND ACCEPTANCE OF MILITARY REAL PROPERTY
01 73 00 OPERATION AND MAINTENANCE INSTRUCTIONS
01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
01 78 24.00 10 OPERATIONS AND MAINTENANCE FACILITY DATA REQUIREMENTS
01 82 00 FUNDAMENTAL COMMISSIONING REQUIREMENTS
01 91 00.15 TOTAL BUILDING COMMISSIONING
DIVISION 02 EXISTING CONDITIONS
02 41 00 DEMOLITION
02 82 13.00 10 ASBESTOS ABATEMENT
DIVISION 31 EARTHWORK
31 00 00 EARTHWORK
DIVISION 32 EXTERIOR IMPROVEMENTS
32 11 23 AGGREGATE BASE COURSE
32 13 73 COMPRESSION JOINT SEALS FOR CONCRETE PAVEMENT
VOLUME 2
APPENDIX A LUKE ARCHITECTURAL COMPATIBILITY GUIDE
APPENDIX B SELECTED CHAPTERS FROM THE SOUTHWESTERN DIVISION
ARCHITECTURAL AND ENGINEERING INSTRUCTIONS MANUAL (AEIM):
CHAPTER II CIVIL
CHAPTER III ARCHITECTURAL
CHAPTER IV STRUCTURAL
CHAPTER V MECHANICAL
CHAPTER VI ELECTRICAL
CHAPTER VIII DRAWINGS
CHAPTER XII ENVIRONMENTAL
CHAPTER XIII GEOTECHNICAL
APPENDIX C SPECIFICATIONS
APPENDIX D ATTACHMENT F, BUILDING INFORMATION MODELING (BIM)
APPENDIX E DESIGN ANALYSIS GUIDANCE
VOLUME 3
APPENDIX F STORMWATER PERMITTING GUIDANCE & LUKE BMPS
APPENDIX G GIS DATA (electronic only)
APPENDIX H TOPOGRAPHIC AND GEOPHYSICAL SURVEY
APPENDIX I GEOTECHNICAL INFORMATION
APPENDIX J STRUCTURAL DRAFTING STANDARDS
APPENDIX K FIRE PROTECTION SYSTEMS PRELIMINARY ACCEPTANCE TEST (PAT)
AND FINAL ACCEPTANCE TEST (FAT) CHECKLIST
APPENDIX L UTILITY COST INFORMATION
APPENDIX M LUKE AFB EMCS DOCUMENT
APPENDIX N LUKE COMMUNICATIONS 400’ STANDARD GUIDANCE WITH LUKE
SUPPLEMENT
APPENDIX O LUKE AFB COMMUNICATIONS DESIGN
APPENDIX P CONCEPTUAL AESTHETIC CONSIDERATIONS
APPENDIX Q CONCEPTUAL PROJECT DRAWINGS
APPENDIX R ROOM CRITERIA DATA SHEET
FY17 F-35 Squadron Operations/Aircraft Maintenance Unit 5, Luke AFB, AZ
VOLUME 4
APPENDIX S LEED PROJECT CREDIT CHECKLISTS
APPENDIX T LEED OWNER’S PROJECT REQUIREMENTS
APPENDIX U ROOM SUMMARY MATRIX
APPENDIX V REFERENCE DIGITAL SID
APPENDIX W BLDG 926 ASBESTOS & LEAD REPORTS
APPENDIX X 56 CONS PROCUREMENT REQUIREMENTS (electronic only)
APPENDIX Y FIRE HYDRANT FLOW TEST
APPENDIX Z LUKE AFB FLOOD CONTROL INVESTIGATION STUDY (JUNE 2013)
APPENDIX AA BUILDINGS 913 & 926 AS-BUILT DRAWINGS
APPENDIX BB ELECTRICAL-TELECOMM DIAGRAMS
- End of Project Table of Contents –
Design Build FY 17 F-35 Squadron Operations/ W912PL-17-R-0045
Amendment 0003 Section 00 22 00
SECTION 00 22 00
SUPPLEMENTARY INSTRUCTIONS
1.0. SUBMISSION REQUIREMENTS AND INSTRUCTIONS: …………..…………………………
1.1. GENERAL SUBMISSION REQUIREMENTS: ..……………………………………………………...2
1.2. GENERAL INSTRUCTIONS: ………………………………………………………………………….2
1.3. WHERE TO SUBMIT: ………………………………………………………………………………….3
1.4. SUBMISSION DEADLINE: ……………………………………………………………………………3
1.5 SPECIFIC INSTRUCTIONS FOR THE PRICE PROPOSAL (VOLUME I ): ………………………..3
1.6. CONTENT FOR THE TECHNICAL PROPOSAL (VOLUME II):…………………………………...3
1.7. SPECIFIC INSTRUCTIONS FOR THE TECHNICAL PROPOSAL (VOLUME II)………………..4
Design Build FY 17 F-35 Squadron Operations/ W912PL-17-R-0045
SECTION 00 22 00
SUPPLEMENTARY INSTRUCTIONS
1.0. SUBMISSION REQUIREMENTS AND INSTRUCTIONS
1.1. GENERAL SUBMISSION REQUIREMENTS
1.1.1. In order to effectively and equitably evaluate all offers, the Contracting Officer must receive information sufficiently detailed that clearly responds to the technical evaluation factors in Section 00 22 16.
1.1.2. Each Offeror must submit a Price Proposal, Volume I, and a Technical Proposal Volume II as separate distinct volumes. The Price Proposal, and Technical Proposal, must be received by the closing date and time set for receipt of proposals.
1.1.3. All information intended by the Offeror to be evaluated must be submitted as part of the Technical Proposal. No proposed price information should be included in the response to the technical evaluation factors.
1.2. GENERAL INSTRUCTIONS:
1.2.1. All written portions: Use only 8 ½ by 11 inch paper, unless another size is specifically authorized elsewhere in this section for a particular submission. Do not use 11” x 14” or 11” x 17” size sheets (e.g., fold-outs) unless specifically authorized in this section for a particular submission. Do not use a font size smaller than 10, an unusual font style such as script, or condensed print.
1.2.2 The Past Performance Questionnaires (PPQ) and up to 10 pages of Resumes (single sided) for Factor 4 will not be included in the above page count.
1.2.3. Performance Assessment Reports (PAR) will be included in the page count, however, attachments such as any letters of appreciation or similar correspondence will not count against the page limitation.
1.2.4. Where 11”x17” max format is specifically authorized, it shall be folded to fit the 8 ½ by 11 inch format and binder sizes. These attachments will count against the page limitation. Each 11’x17” drawing(s) (if included) or schedule will count as one (1) page towards the page limitation.
1.2.5. All drawing sheets: 22” x 34” (1/2 size 11”x17”), 24" x 36" or 30" x 42" format. Full or half- size sets are acceptable, but must include a minimum of one (1) full-size set; half-size sets must be readable.
1.2.6. Three-ring binders are preferred. Do not use spring clamps or exceed the recommended capacity of the fastener or binder. Do not use plastic multi-hole/spiral binding systems, heat binding systems, or other systems which do not facilitate the ready insertion of additional pages.
1.2.7. “Confidential” projects cannot be submitted to demonstrate capability unless all of the information required for evaluation as specified herein can nonetheless be provided to the Government as part of the Offeror’s technical proposal. Offerors that include in their proposals information that they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, must
Design Build FY 17 F-35 Squadron Operations/ W912PL-17-R-0045
TAB #1 SF 1442
TAB #2
The Completed Pricing Schedule with the Offeror’s proposed contract line item prices inserted in the appropriate spaces. Prices must be proposed for the Base Bid Items.
Do not round off to the nearest dollar. Check your pricing submission very carefully for mathematical and clerical errors prior to submission.
TAB #3 A Bid Guarantee (e.g., Standard Form 24, “Bid Bond”) TAB #4 Representations & Certifications TAB #5 Teaming Agreement or Irrevocable Subcontractor Offer (if applicable) TAB #6 Subcontracting Plan (if required) be clearly marked in accordance with the instructions at FAR 52.215-1, “Instructions to Offeror— Competitive Acquisition”, paragraph (3), “Restriction on disclosure and use of data”.
1.2.8. Offerors must provide one (1) CD Rom disk of all the following Design Technical Criteria (AutoCAD 2000 & MS WORD 2000) and Offerors Performance Capability with technical proposal. Offerors will not be required to submit electronic copies of catalog cuts.
1.3. WHERE TO SUBMIT:
1.3.1. Offeror(s) shall submit their proposal packages to the Los Angeles District Corps of Engineers (COE) as directed by the Request for Proposal and in accordance with Section 00 21 16.
1.4. SUBMISSION DEADLINE:
1.4.1. Offers shall be received by the Los Angeles District COE no later than the time and date specified as directed by the Request for Proposal and in accordance with Section 00 21 16.
1.5. SPECIFIC INSTRUCTIONS FOR THE PRICE PROPOSAL (VOLUME I):
1.5.1. Number of Sets of the Price Proposal: Submit One (1) original only
1.5.2. Format and Contents of the Price Proposal/List of Tabs: The Price Proposal shall be appropriately labeled as such and shall be organized as indicated in the following chart.
TAB CONTENTS OF THE PRICE PROPOSAL (VOLUME I)
1.6. CONTENT FOR THE TECHNICAL PROPOSAL (VOLUME II):
1.6.1. TAB 1 – EXPERIENCE ON SIMILAR DESIGN BUILD AND DESIGN BID BUILD
CONTRACTS (VOLUME II):
Factor 1: Offeror shall submit all information as required for evaluation as contained in Section 00 22 16.
1.6.2. TAB 2 – PAST PERFORMANCE ON SIMILAR DESIGN BUILD AND DESIGN BID
BUILD PROJECT (VOLUME II):
Design Build FY 17 F-35 Squadron Operations/ W912PL-17-R-0045
Offeror shall submit all information as required for evaluation as contained in Section 00 22 16.
1.6.3 TAB 3 – PROJECT MANAGEMENT PLAN TECHNICAL APPROACH (VOLUME II)
1.6.4. TAB 4 – CORPORATE MANAGEMENT STRUCTURE (VOLUME II)
1.6.5. TAB 5 –PROPOSED SCHEDULE (VOLUME II)
1.6.6 TAB 6 – SMALL BUSINESS PARTICIPATION PLAN
Submission Requirements:
All offerors (both large and small businesses) will be evaluated on the extent of participation of small business concerns in performance of this contact opportunity.
The offeror’s Small Business Participation Plan, submitted in the Technical Proposal, must meet the minimum mandatory Total Small Business participation goal of 20% based on the total contract value (through collective small business participation from any type of small business or sub-category small business). The work to be performed directly by a small business prime offeror will also be evaluated as Small Business participation.
All offerors must complete and submit the Small Business Participation Plan form.
All Offerors (both large and small businesses) are required to complete a Small Business Participation Plan to be evaluated under Small Business Participation Plan Factor. The Offeror shall articulate how the Offeror intends to meet the small business objectives described in the Small Business Participation Plan Factor.
1.6.7 DRAWINGS –
Must be submitted in accordance with Section 00 22 16 and are included in the requirements under Factor 3, Technical Approach. All drawings shall be either full size (22" x 34") or half size (11" x 17") as described in Section 01012.
1.7. SPECIFIC INSTRUCTIONS FOR THE TECHNICAL PROPOSAL (VOLUME II):
1.7.1. Number of Sets of the Technical Proposal: Submit the original and 4 additional sets of the written Technical Proposal, with each set separately packaged. In addition, submit one complete copy of the technical proposal on Compact Disk (CD) using a searchable “.pdf” file format.
1.7.1.1. Format and Contents of the Technical Proposal/List of Tabs: The original and all copies of the technical proposal will be appropriately labeled as such. Each set shall be organized using the tabs specified in the following chart. The main tabs directly correlate to the evaluation factors identified in Section 00 22 16. The Maximum number of pages for the Technical Proposal is thirty-five (35) pages. An additional 10 pages will be added for Factor 6, Small Business Participation Plan and an additional 15 pages for the Subcontracting Plan, which is required to be submitted by Large Business with the proposal.
Design Build FY 17 F-35 Squadron Operations/ W912PL-17-R-0045
1.7.1.2. Detailed Submission Requirements for the Technical Proposal: Offeror(s) must submit detailed responses to the evaluation factors under each of the following volumes and tabs:
VOLUME TAB CONTENTS OF THE TECHNICAL PROPOSAL
VOLUME II
TAB #1
EXPERIENCE ON SIMILAR DESIGN BUILD AND DESIGN BID
BUILD CONTRACTS
(Factor 1 in Section 00 22 16)
TAB #2
PAST PERFORMANCE ON SIMILAR DESIGN BUILD AND
DESIGN BID BUILD PROJECTS
(Factor 2 in Section 00 22 16)
VOLUME II
TAB #3 PROJECT MANAGEMENT PLAN TECHNICAL APPROACH
(Factor 3 in Section 00 22 16)
VOLUME II TAB #4 CORPORATE MANAGEMENT STRUCTURE
(Factor 4 in Section 00 22 16)
TAB #5
PROPOSED SCHEDULE
(Factor 5 in Section 00 22 16)
VOLUME II
TAB #6
SMALL BUSINESS PARTICIPATION PLAN
(Factor 6 in Section 00 22 16)
Instructions regarding responses to the evaluation factors are detailed in Section 00 22 16 section entitled, “Proposed Evaluation and Contract Award”
Design Build FY 17 F-35 Squadron Operations/ W912PL-17-R-0045
PERFORMANCE ASSESSMENT REPORT
(To be completed by Offeror)
1. Contractor (Firm being evaluated):
Name: Address:
2. Contract Number: Task Order (TO) Number if Applicable:
3. Solicitation Type: Negotiated Sealed Bid
4. Contract/TO Type: Fixed-Price Cost Reimbursement Hybrid (explain)
Routine Difficult (low to high) Complexity of Work 1 2 3 4 5
6. Contract/TO Dollar Value:
7. Contract/TO Status: Active Complete Completion Date (w/ extensions):
8. Description, location & relevancy of work:
9. LEED Certification Building Construction:
10. Warranty or other problems encountered and how resolved:
11. Name, Address, Telephone Number and E-mail of the Procuring Contracting Officer and/or the Contracting Officer’s Representative (COR) (and other references, e.g., Administrative Contracting Officer, if applicable): Check one of the following blocks:
11. Check one of the following blocks:
A written performance evaluation was received for this project and is attached.
A written performance evaluation was not received for this project. A performance questionnaire has been sent to the reference(s) listed in Block 10, with a letter requesting that the completed questionnaire be returned directly to the Corps of Engineers by the closing date for this solicitation.
Design Build FY 17 F-35 Squadron Operations/ W912PL-17-R-0045
1.8. PROPOSAL COVER SHEET:
1.8.1. Format for the Proposal Cover Sheet: The proposal cover sheet is required by FAR 52.215-1(c)(i)-(v). This provision, titled “Instructions to Offerors—Competitive Acquisition,” has been provided in full text in Section 00 21 16.
The format is as follows:
PROPOSAL COVER SHEET
1. Solicitation Number: W912PL-17-R-0045
2. The name, address, and telephone and facsimile numbers of the Offeror and electronic address (if available):
3. A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item.
4. Names, titles, and telephone and facsimile numbers (and electronic addresses if available) of persons authorized to negotiate on the Offeror’s behalf with the Government in connection with this solicitation:
5. Name, title, and signature of person authorized to sign the proposal. Proposals signed by an agent shall be accompanied by evidence of that agent’s authority, unless that evidence has been previously furnished to the issuing office.
Design Build FY 17 F-35 Squadron Operations/ W912PL-17-R-0045
SUMMARY OF PROPOSAL SUBMISSION REQUIREMENTS
SUBMITTAL
CONTENTS NUMBER REQUIRED
VOLUME I
PRICE PROPOSAL/
PRO-FORMA
REQUIREMENTS
--PROPOSAL COVER SHEET
-- SF 1442 AND AMENDMENTS
--PRICING SCHEDULE
--OFFER GUARANTEE (“BID BOND”)
--REPRESENTATIONS & CERTIFICATIONS
1 ORIGINAL ONLY
EXPERIENCE ON
SIMILAR DB AND
DBB PROJECTS
PROJECTS OF SIMILAR TYPES, SCOPES
AND COMPLEXITY
-RECENT RELEVANT TEAMING
EXPERIENCES
ORIGINAL + 4 SETS
VOLUME II PAST
PERFORMANCE ON
SIMILAR DB AND
DBB PROJECTS
-PAST PERFORMANCE REFERENCE
CHECK
-RELEVANT PROJECT SUMMARY
-RECENT RELEVANT PROJECT
INFORMATION
PROJECT
MANAGEMENT
PLAN
TECHNICAL
APPROACH
- PROJECT MANAGEMENT PLAN
- NARRATIVES
CORPORATE
MANAGEMENT
STRUCTURE
- NARRATIVES
- VISUAL REPRESENTATIONS
- PRESENT WORKLOAD
- OFFEROR’S SUCCESSION PLAN
- KEY PERSONNEL RESUMES
PROPOSED
SCHEDULE
-PROJECT SCHEDULE NARRATIVE
-PROPOSED SCHEDULE
SMALL BUSINESS
PARTICIPATION
PLAN
- SMALL BUSINESS PARTICIPATION PLAN
DRAWINGS
-CIVIL SITE PLAN,
-OVERALL FLOOR PLAN,
-EXTERIOR ELEVATIONS
Design Build FY 17 F-35 Squadron Operations/ W912PL-17-R-0045
Small Business Participation Plan (Form)
(1) Check the applicable size and categories for the PRIME Offeror -- Check all applicable boxes:
{ } Large Prime or
{ } Small Business Prime; also categorized as a { } Small Disadvantaged Businesses { } Woman-Owned Small Business { } HUB Zone Small Business { } Veteran Owned Small Business { } Service Disabled Veteran Owned Small Business { } HBCU/MIs
(2) Submit the total combined percentage (must equal 100%) of work to be performed by both large and small businesses (include the percentage of work to be performed both by Prime and Sub-contractors):
Example: If Prime proposes a price of $1,000,000 (including all options), and small business(es) will provide $250,000 in services/supplies as a prime or subcontractor, the % planned for small businesses is 25%; and 75% for large business equaling 100%.
Percentage of Total Contract Dollars/Price
Total Percentage planned for Large Business (es) % Total Percentage planned for Small Business (es) %
(3) Please indicate the total percentage of participation to be performed by each type of small business.
The percentage of work performed by Small Businesses that qualify in multiple small business categories may be counted in each category:
Example: Victory Prop Mgt (WOSB and SDVOSB) performing 2%; and Gentleman Concierge (HubZone) and WOSB) performing 3%. Results equate to: HubZone 3%; WOSB 5%; SDVOSB
2%; VOSB 2%);.
SDVOSBs are also VOSBs automatically; however VOSBs are not automatically SDVOSBs.
Small Disadvantaged Businesses % HUB Zone Small Business % Woman Owned Small Business % Service Disabled Veteran Owned SB _% Veteran Owned Small Business % HBCU/MIs _%
(4) List principle supplies/services to be performed by Small Businesses:
Example: If a Small Business qualifies also as a WOSB and a SDVOSB, and you can add them to each category below in which they qualify.
Name of Company Identify Type of Service/Supply
Small:
Small Disadvantaged Businesses:
Design Build FY 17 F-35 Squadron Operations/ W912PL-17-R-0045
Women-Owned Small:
HUB Zone Small:
Veteran Owned Small:
Service Disabled Veteran Owned Small:
HBCU/MI:
(5) Describe the extent of commitment to use small businesses (for example, what types of commitments if any are in place for this specific acquisition either -- written, verbal, enforceable, non-enforceable, joint venturing, mentor-protégé, etc.)
(6) Large Business Subcontracting Past Performance: Describe the extent to which you attained applicable goals for contracts that required you to submit a Subcontracting Plan. You may include copies of up to three ISRs (Individual Subcontracting Reports) to validate your past performance. You may also submit an explanation of your efforts, where you failed to meet goals.
Additional Important Note for Large Businesses only.
Small Business Sub-Contracting Plans (FAR 52.219-9)
Separate from the Small Business Participation Plan, large business offerors must also submit a Subcontracting Plan (Individual Contract Plan) as required by FAR 52.219-9. Large businesses will not be eligible for award if they fail to submit an acceptable Subcontracting Plan.
Subcontracting Plans shall reflect and be consistent with the commitments offered in the Small Business Participation Plan. In accordance with DFARS 215.304(c), when an evaluation assesses the extent that small businesses are specifically identified in proposals, the small businesses considered in the evaluation shall be listed in any subcontracting plan submitted.
Design Build FY 17 F-35 Squadron Operations/ W912PL-17-R-0045
SAMPLE COVER LETTER
Date
SUBJECT: NAVFAC/USACE Past Performance Questionnaire
Name and Address of Reference
Ladies and Gentlemen:
The U.S. Army Corps of Engineers, Los Angeles District, is conducting a review of our past performance history as part of an upcoming source selection acquisition.
Please complete the attached NAVFAC/USACE Past Performance Questionnaire to aid the Government in its evaluation of our past performance. you may provide the requested information by email to Tracey Daggy Tracey.I.Daggy@usace.army.mil. or call at (213) 452-3239.
The Government is requesting receipt of this information by 2:00 p.m. on 14 July 2017.
You are advised that it is Government policy that the identity of sources providing past performance information will not be released outside the Government.
We appreciate your efforts to help the Government fairly evaluate our record of past performance.
Should you have any questions related to this matter, please contact Ms. Tracey Daggy by telephone
(213) 452-3239.
Sincerely, Contractor
Attachment
Design Build FY 17 F-35 Squadron Operations/ W912PL-17-R-0045
NAVFAC/USACE PAST PERFORMANCE QUESTIONNAIRE (Form PPQ-0) CONTRACT INFORMATION (Contractor to complete Blocks 1-4)
1. Contractor Information Firm Name:
CAGE Code:
Address:
DUNs Number: Phone Number:
Email Address:
Point of Contact: Contact Phone Number:
2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain) Percent of project work performed:
If subcontractor, who was the prime (Name/Phone #):
3. Contract Information Contract Number:
Delivery/Task Order Number (if applicable):
Contract Type: Firm Fixed Price Cost Reimbursement Other (Please specify): Contract Title:
Contract Location:
Award Date (mm/dd/yy):
Contract Completion Date (mm/dd/yy): Actual Completion Date (mm/dd/yy): Explain Differences:
Original Contract Price (Award Amount):
Final Contract Price (to include all modifications, if applicable): Explain Differences:
4. Project Description:
Complexity of Work High Med Routine How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)
CLIENT INFORMATION (Client to complete Blocks 5-8)
5. Client Information Name:
Title:
Phone Number:
Email Address:
6. Describe the client’s role in the project:
7. Date Questionnaire was completed (mm/dd/yy):
8. Client’s Signature:
NOTE: NAVFAC/USACE REQUESTS THAT THE CLIENT COMPLETES THIS
QUESTIONNAIRE AND SUBMITS DIRECTLY BACK TO THE OFFEROR. THE OFFEROR
WILL SUBMIT THE COMPLETED QUESTIONNAIRE TO USACE WITH THEIR ROPOSAL,
AND MAY DUPLICATE THIS QUESTIONNAIRE FOR FUTURE SUBMISSION ON USACE
SOLICITATIONS. CLIENTS ARE HIGHLY ENCOURAGED TO SUBMIT
QUESTIONNAIRES DIRECTLY TO THE OFFEROR. HOWEVER, QUESTIONNAIRES
Design Build FY 17 F-35 Squadron Operations/ W912PL-17-R-0045
MAY BE SUBMITTED DIRECTLY TO USACE. PLEASE CONTACT THE OFFEROR FOR
USACE POC INFORMATION. THE GOVERNMENT RESERVES THE RIGHT TO VERIFY
ANY AND ALL INFORMATION ON THIS FORM.
ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST
REFLECT YOUR EVALUATION OF THE CONTRACTOR’S
PERFORMANCE
RATING DEFINITION NOTE
(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.
An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.
(VG) Very Good Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner.
There should have been no significant weaknesses identified.
(S) Satisfactory Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.
(M) Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.
A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.
Design Build FY 17 F-35 Squadron Operations/ W912PL-17-R-0045
(U) Unsatisfactory
Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.
An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.
(N) Not Applicable
No information or did not apply to your contract
Rating will be neither positive nor negative.
TO BE COMPLETED BY CLIENT
PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS
YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.
1. QUALITY:
a) Quality of technical data/report preparation efforts E VG S M U N
b) Ability to meet quality standards specified for technical performance E VG S M U N
c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance
E VG S M U N
d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)
E VG S M U N
2. SCHEDULE/TIMELINESS OF PERFORMANCE:
a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)
b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract
E VG S M U N
3. CUSTOMER SATISFACTION:
a) To what extent were the end users satisfied with the project? E VG S M U N
b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes;
responsiveness to administrative reports, businesslike and communication)
c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer? E VG S M U N
d) Overall customer satisfaction E VG S M U N
4. MANAGEMENT/ PERSONNEL/LABOR
a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force? E VG S M U N
b) Ability to hire, apply, and retain a qualified workforce to this effort
Design Build FY 17 F-35 Squadron Operations/ W912PL-17-R-0045
c) Government Property Control E VG S M U N
d) Knowledge/expertise demonstrated by contractor personnel E VG S M U N
e) Utilization of Small Business concerns E VG S M U N
f) Ability to simultaneously manage multiple projects with multiple disciplines E VG S M U N
g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to E VG S M U N
Government changes
h) Effectiveness of overall management (including ability to effectively lead, manage and control the program) E VG S M U N
5. COST/FINANCIAL MANAGEMENT
a) Ability to meet the terms and conditions within the contractually agreed price(s)?
E VG S M U N
b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client
c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)
d) Is the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section.
Yes No
e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.
Yes No
f) Have there been any indications that the contractor has had any financial problems? If yes, please explain below. Yes No
6. SAFETY/SECURITY
a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues?
(Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)
b) Contractor complied with all security requirements for the project and personnel security requirements.
E VG S M U N
7. GENERAL
a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).
b) Compliance with contractual terms/provisions (explain if specific issues) E VG S M U N
Design Build FY 17 F-35 Squadron Operations/ W912PL-17-R-0045
c) Would you hire or work with this firm again? (If no, please explain below) Yes No
d) In summary, provide an overall rating for the work performed by this contractor. E VG S M U N
Please provide responses to the questions above (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk
(please attach additional pages if necessary):
Design Build FY 17 F-35 Squadron Operations/ W912PL-17-R-0045
Section 00 22 16
SECTION 00 22 16
SUPPLEMENTARY INSTRUCTIONS TO
PROPOSERS
1.0 Eligibility for Contract Award………………………………………………………………….2
2.0 Source Selection Using the Trade-Off Process…………………………………………… …..2
3.0 List of Technical Evaluation Factors………………………………………………………….. 2
4.0 The Relative Weights of Technical Evaluation Factors…………………………………….….2
5.0 Technical Evaluation Factors and Elevation Criteria……………………………..………
6.0 Evaluation of the Price Proposal………………………………………………………..……..15
7.0 Intent to Award without Discussions……………………………………………….……….….15
8.0 Proposal Submittal………………………………………………………………………… …15
Design Build FY 17 F-35 Squadron Operations/ W912PL-17-R-0045
I. ELIGIBILITY FOR CONTRACT AWARD
In accordance with the Federal Acquisition Regulations (FAR), no contract will be entered into unless the Contracting Officer ensures that all requirements of law, executive orders, regulations, and all other applicable procedures, including clearances and approvals, have been met. This includes the FAR requirement that no award shall be made unless the Contracting Officer makes an affirmative determination of responsibility. To be determined responsible, a prospective contractor must meet the general standards in FAR Part 9 and any special standards set forth in the solicitation.
II. SOURCE SELECTION USING THE TRADE-OFF PROCESS
The Government will select the offer that represents the best value to the Government by using the trade- off process described in FAR Part 15. This process permits tradeoffs between price and technical merit/quality and allows the Government to accept other than the lowest priced offer. The award decision will be based on a comparative assessment of proposals against all source selection criteria in the solicitation. The Construction Cost Limitation is $18,750,000. Proposals that exceed the Construction Cost Limitation may be looked upon unfavorably in the evaluation process.
All non-cost (i.e., technical) evaluation factors, when combined, are approximately equal to price. The Government is concerned with striking the most advantageous balance between Technical merit (quality) and cost to the Government (the price). The degree of importance of price could become greater depending upon the equality of the proposals for the non-price technical evaluation factors.
Where competing technical proposals are determined to be substantially equal, price could become the controlling factor.
III. LIST OF THE TECHNICAL EVALUATION FACTORS
The Technical Proposal will be evaluated based on the following technical evaluation factors
FACTOR 1 – EXPERIENCE ON SIMILAR DESIGN BUILD AND DESIGN BID BUILD CONTRACTS
FACTOR 2 – PAST PERFORMANCE ON SIMILAR DESIGN BUILD AND DESIGN BID BUILD
CONTRACTS
FACTOR 3 – PROJECT MANAGEMENT PLAN TECHNICAL APPROACH
FACTOR 4 – CORPORATE MANAGEMENT STRUCTURE
FACTOR 5 - PROPOSED SCHEDULE
FACTOR 6 – SMALL BUSINESS PARTICIPATION PLAN
IV. THE RELATIVE WEIGHTS OF THE TECHNICAL EVALUATION FACTORS AND RATING
SCHEME. The non-price evaluation factors are listed in descending order of importance.
A. Relative Weights of the Technical Evaluation Factors.
Factor 1 is the most important factor and is worth slightly more than Factors 2 and 3.
Factors 2 & 3 are approximately equal in importance and are significantly more important than…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .