AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICIATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPIRATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION ( Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable Amendment 0001

1 162

0003 28 Feb 17

W912PL

U.S Army Corps of Engineers,Los Angeles Dist CESPL-CTE, East Region Branch 915 Wilshire Blvd.

Los Angeles, CA 90017

W912PL-17-R-0025

8 February 2017

DESIGN/BUILD F-35A BOMB BUILD-UP FACILITY, LUKE AFB, AZ

The purpose of this amendment is to revise Site Visit information and remove/replace several sections of the specifications.

1. REMOVE/REPLACE SECTION 00 73 00 SUPPLEMENTARY CONDITIONS - 52.236-27 SITE VISIT

2. REMOVE/REPLACE FOLLOWING SECTIONS: 00 10 00 (ENTIRE SECTION), 01 10 10 (ENTIRE SECTION), 01 10 12 (ENTIRE SECTION), 01 32 01 (ENTIRE SECTION).

3. DRAWING CHANGES, REF. AS-102

FY16 F-35 Bomb Build-Up Facility, Luke AFB, AZ Corrected Final RFP - Solicitation No. W912PL-17-R-0025 Amendment No. 3

SF 30 CONTINUATION PAGE 1 OF 1

SF 30 BLOCK 14 CONTINUATION

SUMMARY OF CHANGES

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

Section Number Section Title

00 10 00 BID SCHEDULE

00 73 00 SUPPLEMENTARY CONDITIONS

DIVISION 01 – 48 - TECHNICAL SPECIFICATIONS

Section Number Section Title

01 10 10 DESIGN REQUIREMENTS

01 10 12 DESIGN AFTER AWARD

01 32 01.00 10 PROJECT SCHEDULE

DRAWINGS

Sheet Number

Sheet Title File Number

AS-102 VOL. III, APPENDIX R, CONCEPTUAL PROJECT DRAWINGS

Solicitation No. W912PL-17-R-0025 Amendment 0003

PROPOSAL SCHEDULE

(To be attached to SF 1442)

Item Unit No. Description Quantity Unit Price Amount

BASE BID

0001 Total Cost of Design of FY16 Bomb Build- Up Facility, Complete

1 JOB *** $

0002 Primary Facilities Including Bomb Preload Station, Mentions Holding Pad, Shelter on Pad, Administration Building, Complete

1 JOB *** $

0003 Supporting Facilities Including Utilities, Pavements, Site Improvements, Communications Requirements, Shelter and Pad lightning Protection, Complete

1 JOB *** $

0004 Total Cost for Arizona Transaction Privilege Tax, Complete

1 JOB *** $

TOTAL AMOUNT (BASE BID) $

NOTES:

1. Award of all proposal items will be made to one bidder. Award of Base Bid and Bid Options (if awarded) will be made to one bidder. Bidders must propose on all items.

2. ARITHMETIC DISCREPANCIES:

(a) For the purpose of initial evaluation of bids, the following will be utilized in the resolving arithmetic discrepancies found on the face of bidding schedule as submitted by the bidder:

NOTES: (Cont’d)

(1) Obviously misplaced decimal points will be corrected;

(2) Discrepancy between unit price and extended price, the unit price will govern;

(3) Apparent errors in extension of unit prices will be corrected;

(4) Apparent errors in addition of lump-sum and extended prices will be corrected.

(b) For the purposes of bid evaluation, the government will proceed on the assumption that the bidder intends the bid to be evaluated on basis of the unit prices, the totals arrived at by resolution of arithmetic discrepancies as provided above and the bid will be so reflected on the abstract of bids.

(c) These correction procedures shall not be used to resolve any ambiguity concerning which bid is low.

3. If a modification to a bid based on unit prices is submitted, which provides for a lump sum adjustment to the total estimated cost, the application of the lump sum adjustment to each unit price in the bid schedule must be stated. If it is not stated, the bidder agrees that the lump sum adjustment shall be applied on a pro rata basis to every unit price in the bid schedule.

4. PROGRESS PAYMENT REQUESTS made by the Contractor pursuant to the provisions of Contract Clause, PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS, shall be submitted on ENG FORM 93 to the administration office as designated in Block 26, Standard Form 1442 Back, Solicitation, Offer and Award. ENG FORM 93 shall be submitted to that office on the 1st of each month in appropriate form and certified. Photocopies of the form shall be furnished on that same date to the Corps of Engineers offices designated at the Pre-Construction Conference.

5. ACCRUALS. In accordance with USACE Engineer Financial Regulation (ER) 37-1- 30, and other applicable Federal and DOD financial accounting standards, the Contractor must assist government personnel with providing reasonably accurate estimates of the value of goods and/or services rendered to the Government pursuant to this contract for each calendar month during which goods and services are delivered. Standard forms and instructions will be provided by the Government to assist with meeting this requirement. These monthly estimates, which facilitate timely entry of accruals, must be received by the Government on or before four (4) business days prior to each calendar month-end.

6. ADDITIVE OR DEDUCTIVE ITEMS (DEC 1991) (DFARS 252.236-7007).

(a) The low offeror and the items to be awarded shall be determined as follows:

(1) Prior to the opening of bids, the Government will determine the amount of funds available for the project.

NOTES: (Cont’d)

PROPOSAL SCHEDULE

(2) The low offeror shall be the Offeror that:

(i) Is otherwise eligible for award; and

(ii) Offers the lowest aggregate amount for the first or base bid item, plus or minus (in the order stated in the list of priorities in the bid schedule) those additive or deductive items that provide the most features within the funds determined available.

(3) The Contracting Officer shall evaluate the bids on the basis of the same additive or deductive items.

(i) If adding another item from the bid schedule list of priorities would make the award exceed the available funds for all offerors, the Contracting Officer will skip that item and go to the next item from the bid schedule of priorities; and

(ii) Add that next item if an award may be made that includes that item and is within the available funds.

(b) The Contracting Officer will use the list of priorities in the bid schedule only to determine the low offeror. After determining the low offeror, an award may be made on any combination of items if:

(1) It is in the best interest of the Government;

(2) Funds are available at the time of award; and

(3) The low offeror's price for the combination to be awarded is less than the price offered by any other responsive, responsible offeror.

(c) Example: The amount available is $100,000. Offeror A's base bid and four additives (in the order stated in the list of priorities in the Bid Schedule) are $85,000, $10,000, $8,000, $6,000 and $4,000. Offeror B's bid and four additives are $80,000, $16,000, $9,000, $7,000, and $4,000. Offeror A is the low offeror. The aggregate amount of Offeror A's bid for purposes of award would be $99,000, which includes a base bid plus the first and fourth additives. The second and third additives were skipped because each of them would cause the aggregate bid to exceed $100,000.

- END OF PROPOSAL SCHEDULE -

W912PL-17-R-0025 Am3

BOMB BUILD-UP PAD

Luke Air Force Base, AZ

00 73 00 - 1 Amendment 0003

SECTION 00 73 00 SUPPLEMENTARY CONDITIONS

ACCRUALS

CONTRACT ADMINISTRATION DATA

REQUIRED INSURANCE

ER 415-1-15 (OCT 1998) TIME EXTENSION FOR UNSUALLY SEVERE WEATHER

WORK DAYS AND HOURS

ALTERNATE STRUCTURED APPROACH TO WEIGHTED GUIDELINE METHOD FOR CONSTRUCTION

CONTRACTS

GOVERNMENT-FURNISHED RFP DRAWINGS, SURVEYS AND SPECIFICATIONS

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

52.236-1 PERFORMANCE OF WORK BY THE CONTRACTOR (APR 1984)

52.236-25 REQUIREMENTS FOR REGISTRATION OF DESIGNERS (JUN 2003)

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)

52.236-5000 DESIGN-BUILD CONTRACT ORDER OF PRECEDENCE (AUG 1997)

52.236-5001 PERSONNEL, SUBCONTRACTORS AND OUTSIDE ASSOCIATES OR CONSULTANTS

PERSONNEL, SUBCONTRACTORS AND OUTSIDE ASSOCIATES OR CONSULTANTS (MAY 2006)

52.236-5002 GOVERNMENT-FURNISHED SPECIFICATIONS, DRAWINGS, SURVEYS, AND SPECIFICATIONS

IN THE REQUEST FOR PROPOSAL (JUL 2002)

52.236-5003 GOVERNMENT-FURNISHED SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (JUL 2003)

52.236-5004 RESPONSIBILITY OF THE CONTRACTOR FOR DESIGN (MAY 2002)

52.236-5005 WARRANTY OF DESIGN (MAY 2002)

52.236-5006 DEVIATING FROM THE ACCEPTED DESIGN (JUN 2002)

52.236-5007 CONTRACTOR'S ROLE DURING DESIGN PROCESS (JUN 1998)

52.236-5008 VALUE ENGINEERING AFTER AWARD (JUN 1999)

52.236-5009 PARTNERING (FEB 2000)

52.236-5010 GOVERNMENT RE-USE OF DESIGN (MAY 2006)

WARRANTY OF CONSTRUCTION WORK

SEQUENCE OF DESIGN-CONSTRUCTION

RECOMMENDED INSURANCE COVERAGE (HND MAR 2002)

TRAINING (HND FEB 2000)

DESIGN CONFERENCES (HND AUG 1997)

00 73 00 - 2 Amendment 0003

SUBMITTAL OF WORK TO BE PERFORMED BY THE CONTRACTOR (HND UNDATED)

INVOICES

252.227-7022 GOVERNMENT RIGHTS (UNLIMITED) (MAR 1979)

252.227-7023 DRAWINGS AND OTHER DATA TO BECOME PROPERTY OF GOVERNMENT. (MAR 1979)

252.236-7000 MODIFICATION PROPOSALS - PRICE BREAKDOWN. (DEC 1991)

252.236-7005 AIRFIELD SAFETY PRECAUTIONS. (DEC 1991)

252.236-7008 CONTRACT PRICES - BIDDING SCHEDULES. (DEC 1991)

00 73 00 - 3 Amendment 0003

ACCRUALS

In accordance with USACE Engineer Financial Regulation (ER) 37-1-30, and other applicable Federal and DOD financial accounting standards, the Contractor is required to assist government personnel with providing reasonably accurate accrual estimates. The accrual is from the thru date of the period of performance (Eng Form 93, block 9) to the end for the month of the value of goods and/or services rendered/expected to be rendered to the Government pursuant to this contract. This is for each calendar month during which goods and services are delivered. Standard forms with instructions will be provided by the Government to assist with meeting this requirement. These monthly estimates, which facilitate timely entry of accruals, must be received by the Government on or before six (6) business days prior to each calendar month-end.

CONTRACT ADMINISTRATION DATA

The Contract Administration Office for this contract subsequent to award is:

Department of the Army Los Angeles District, Corps of Engineers Luke Air Force Base Project Office 14002 W. Marauder Street, Building 302 Luke AFB, Arizona 85309-1125 ATTN: Stephanie Morgan Telephone No: (623) 282-9857

Payment will be made by:

USACE Finance Center

ATTN: CEFC-AO-P

5270 Integrity Drive Millington, TN 38054-5005

Submit Invoices to:

REFER TO SF 1442, BLOCK 26 WHICH WILL BE COMPLETED AT TIME OF AWARD

REQUIRED INSURANCE

Insurance is required as follows:

a. Either Workman's Compensation or Employer's Liability Insurance with a minimum limit of $100,000.00.

b. General Liability. The Contracting Officer shall require bodily injury liability insurance coverage written on the comprehensive form or policy of at least $500,000.00 per occurrence.

c. Automobile Liability Insurance for Bodily Injury and Property Damage with minimum limits of $200,000.00 for injury or death of any one person; $500,000.00 for each accident or occurrence of bodily injury liability; and $20,000.00 for each accident or occurrence for property liability.

d. In every case the insurance coverage shall amount to at least the limits stated above. However, where the Financial Responsibility Compulsory Insurance Law of the State in which the installation is located requires higher limits, the Automobile Liability Insurance Policy should provide coverage of at least those limits.

Prior to the commencement of work hereunder, the Contractor shall furnish to the Contracting Office a certificate or written statement of the above required insurance. The policies evidencing required nsurance shall contain an endorsement to the effect that cancellation or any material change in the policies adversely affecting the interests of the Government in such insurance shall not be effective until 10 days after written notice thereof to the Contracting Officer.

00 73 00 - 4 Amendment 0003

The Contractor agrees to insert the substance of this clause, including this paragraph, in all subcontracts hereunder.

DIRECTIONS FOR SUBMITTING OFFERS

(a) Envelopes containing offers, cost and technical, etc., must be sealed, marked and addressed follows:

Envelopes containing bids must be sealed, marked and addressed as follows:

MARK ENVELOPES:

RFP No. W912PL-17-R-0025 Proposal Due Date: see SF 1442, Block 13

ADDRESS ENVELOPES TO:

Department of the Army U. S. Army Engineer District, Los Angeles ATTN: Contracting Division, CESPL-CT-E C/O: Otse A. Adikhai 915 Wilshire Blvd, Suite 930 Los Angeles, CA 90017

EXPRESS MAIL ENVELOPES:

Department of the Army U.S. Army Engineer District, Los Angeles ATTN: Contracting Division, CESPL-CT-E C/O: Otse A. Adikhai 915 Wilshire Blvd, Suite 930 Los Angeles, CA 90017

(b) Hand carried proposals may be deposited prior to the time and date set for receipt of proposals as follows:

US Army Engineer District, Los Angeles Security Office 915 Wilshire Blvd, Suite 1101

Los Angeles, California 90017

ER 415-1-15 (OCT 1998) TIME EXTENSION FOR UNSUALLY SEVERE WEATHER

This provision specifies the procedure for the determination of time extensions for unusually severe weather in accordance with the Contract Clause entitled “DEFAULT (FIXED PRICE CONSTRUCTION)”. In order for the Contracting Officer to award a time extension under this clause, the following conditions must be satisfied:

The weather experienced at the project site during the contract period must be found to be unusually severe, that is, more severe that the adverse weather anticipated for the project location during any given month. The unusually severe weather must actually cause a delay to the completion of the project. The delay must be beyond the control and without the fault of negligence of the Contractor.

a. The following schedule of monthly anticipated adverse weather delays is based on National Oceanic and Atmospheric Administration (NOAA) or similar data for the project location and will constitute the base line for monthly weather time extensions. The contractor’s progress schedule must reflect these anticipated adverse weather delays in all weather dependent activities.

00 73 00 - 5 Amendment 0003

Monthly Anticipated Adverse Weather Delay

Work Days Based on (5) Day Work Week

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

5 3 3 1 1 0 1 2 1 1 2 5

b. Upon acknowledgement of the Notice to Proceed (NTP) and continuing throughout the contract, the Contractor will record the daily CQC report, the occurrence of adverse weather and resultant impact to normally scheduled work. Actual adverse weather delay days must prevent work on critical activities for 50 percent or more of the Contractor’s scheduled work day.

c. The number of actual adverse weather delay days shall include days impacted by actual adverse weather (even if adverse weather occurred in previous month), be calculated chronologically from the first to the last day of each month, and be recorded as full days. If the number of actual adverse weather delay days exceeds the number of days anticipated in paragraph (b), above, the Contracting Officer will convert any qualifying delays to calendar days, giving full consideration for equivalent fair weather work days, and issue a modification in accordance with the contract clause entitled “Default (Fixed Price Construction)”.

WORK DAYS AND HOURS

The normal workdays and hours for this project will be Monday through Friday, excluding federal holidays, from 7:00 a.m. to 5:00 p.m. Access to the work site may be restricted to these hours and days. Work during other than normal hours and days must be coordinated in advance with the Administrative Contracting Officer.

ALTERNATE STRUCTURED APPROACH TO WEIGHTED GUIDELINE METHOD FOR

CONSTRUCTION CONTRACTS

The following alternate structured approach shall be used for all fixed-price construction contract actions.

Factor Rate Weight Value

Degree of risk 20 Relative difficulty of work 15 Size of job 15 Period of performance 15 Contractor's investment 5 Assistance by Government 5 Subcontracting 25

Total 100%

Based on the circumstances of the procurement action, each of the above factors shall be weighted from .03 to .12 as indicated below. "Value shall be obtained by multiplying the rate by the weight. The Value column when totaled indicates the fair and reasonable profit percentage under the circumstances of the particular procurement. The profit percentage should be multiplied by the total contract costs, including general and administrative costs.

(1) Degree of risk. Where the work involves no risk or the degree of risk is very small, the weighting should be .03; as the degree of risk increases, the weighting should be increased up to a maximum of .12. Lump sum items shall generally have a higher weight than unit price items; other things to consider include the nature of the work and where it is to be performed. Consider the portion of the work to be done by subcontractors, amount and type of labor included in costs, whether the negotiation is before or after performance of the work, etc. Modifications settled before the fact have much greater risk than those settled after the fact. A weight of .03 is appropriate for after the fact equitable adjustments and/or settlements.

00 73 00 - 6 Amendment 0003

(2) Relative Difficulty of Work: If the work is difficult and complex, the weight should be .12 and should be proportionately reduced to .03 on the simplest of jobs. This factor is tied in to some extent with the degree of risk.

Some other things to consider are the nature of the work, by whom it is to be done (i.e., subcontractors, consultants), what is the time schedule.

(3) Size of Job. Work of $100,000 or less shall be weighted at .12. Work estimated between $100,000 and $5,000,000 shall be proportionately weighted from .12 to .05. Work from $5,000,000 to $10,000,000 shall be weighted at .04. Work in excess of $10,000,000 shall be weighted at .03. It should be noted that control of fixed expenses generally improves with increased job magnitude.

(4) Period of Performance. Work not to exceed one month is to be proportionately weighted at .03. Work in excess of 24 months is to be weighted at .12. Durations between one month and 24 months are to be proportionately weighted between .03 and .12.

(5) Contractor's Investment. To be weighted from .03 to .12 on the basis of below average, average and above average. Things to consider include amount of subcontracting, Government-furnished property or data such as surveys, soil tests, method of making progress payments, and any mobilization payment items.

(6) Assistance by Government. To be weighted from .12 to .03 on the basis of average to above average.

Consider use of Government-owned property, equipment and facilities, and expediting assistance.

(7) Subcontracting. To be weighted inversely proportional to the amount of subcontracting. Where 80% or more of the work is to be subcontracted use .03. The weighting should be increased proportionately to .12 where all the work is performed by the contractor's own forces.

GOVERNMENT-FURNISHED RFP DRAWINGS, SURVEYS AND SPECIFICATIONS

a. The Contractor shall

(1) Check all Government-furnished drawings and surveys immediately upon receipt;

(2) Compare all drawings and surveys and verify the figures before laying out the work;

(3) Promptly notify the Contracting Officer of any discrepancies; and

(4) Be responsible for any errors which might have been avoided by complying with this paragraph.

(5) Verify and use latest edition of required design references.

b. Large scale drawings shall, in general, govern small scale drawings. Figures marked on drawings shall, in general, be followed in preference to scale measurements.

c. Omissions from the drawings or specifications or the misdescription of details of work which are manifestly necessary to carry out the intent of the drawings and specifications, or which are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work, but shall be performed as if fully and correctly set forth and described in the drawings and specifications.

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 365 calendar days after the contractor receives the Notice to Proceed. The project duration will be adjusted to the Contractor’s proposed number of calendar days for the project duration in its response to Evaluation Factor 5 of Section 00 22 16, so long as the proposed duration does not exceed 365 calendar days. The time stated for completion shall include final cleanup of the premises.

(End of clause)

00 73 00 - 7 Amendment 0003

52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $2028 for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

52.236-1 PERFORMANCE OF WORK BY THE CONTRACTOR (APR 1984)

The Contractor shall perform on the site, and with its own organization, work equivalent to at least fifteen (15%) percent of the total amount of work to be performed under the contract. This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the Contractor requests a reduction and the Contracting Officer determines that the reduction would be to the advantage of the Government.

52.236-25 REQUIREMENTS FOR REGISTRATION OF DESIGNERS (JUN 2003)

Architects or engineers registered to practice in the particular professional field involved in a State, the District of Columbia, or an outlying area of the United States shall prepare or review and approve the design of architectural, structural, mechanical, electrical, civil, or other engineering features of the work.

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for—

Date: February 23, 2017 at 9:00 a.m.

March 16, 2017 at 9:00 a.m. (Second Site Visit)

POC: Stephanie Morgan at Phone (W) 623-282-9857 (c) 480-800-7168, Email Address Stephanie.L.Morgan@usace.army.mil

00 73 00 - 8 Amendment 0003

All individuals must ride the bus to the site. No individual vehicles will be allowed on site.

This site is in a restricted area.

(c) Participants will meet at Address: Luke Golf Course Parking Lot. On Northern Ave (approx 1 mile west of Litchfield. North side of Northern) Participants will be shuttled via bus from the parking lot to the site.

(d) Attendee Specific Information required by MARCH 3RD, 2017 (FRIDAY) in advance of the site visit shall be provided to Stephanie Morgan by e-mail

Offerors desiring to attend the site visit shall provide the following information:

1. Individual's full name (last name, first name, middle initial) 2 . State of birth

3. Social security number

4. Drivers license number and the state issued in

5. If you are US Citizen or not

You are to e-mail this information back to Stephanie Morgan. Base Security will be performing background checks on all individuals planning on coming onto the Base for this site visit.

(e) The information listed in paragraph (d) above must be received by MARCH 3RD, 2017 (FRIDAY) prior to the site visit for the individual to be included on the entry list. Information received after this date will not be incorporated into the list. Individuals not on the list will not be granted access to Luke Air Force Base.

(f) All individuals must have in their possession a valid Driver's License prior to boarding the bus. Anyone without a Driver's License on their person will not be allowed to access the bus.

(End of provision)

52.236-5000 DESIGN-BUILD CONTRACT ORDER OF PRECEDENCE (AUG 1997)

(a) The contract includes the standard contract clauses and schedules current at the time of contract award. It entails

(1) the solicitation in its entirety, including all drawings, cuts, and illustrations, and any amendments, and (2) the successful offeror’s accepted proposal. The contract constitutes and defines the entire agreement between the Contractor and the Government. No documentation shall be omitted which in any way bears upon the terms of that agreement.

(b) In the event of conflict or inconsistency between any of the provisions of this contract, precedence shall be given in the following order:

(1) Betterments: Any portions of the accepted proposal which both conform to and exceed the provisions of the solicitation.

(2) The provisions of the solicitation. (See also FAR 52.236-2 Alt 1, Specifications and Drawings for Construction)

(3) All other provisions of the accepted proposal.

(4) Any design products including, but not limited to, plans, specifications, engineering studies and analyses, shop drawings, equipment installation drawings, etc. These are "deliverables" under the contract and are not part of the contract itself. Design products must conform with all provisions of the contract, in the order of precedence herein.

00 73 00 - 9 Amendment 0003

52.236-5001 PERSONNEL, SUBCONTRACTORS AND OUTSIDE ASSOCIATES OR CONSULTANTS.

PERSONNEL, SUBCONTRACTORS AND OUTSIDE ASSOCIATES OR CONSULTANTS (MAY 2006)

In connection with this contract, any in-house personnel, subcontractors, and outside associates or consultants will be limited to individuals or firms that were specifically identified in the Contractor's accepted proposal. The Contractor shall obtain the Contracting Officer's written consent before making any substitution for these designated in-house personnel, subcontractors, associates, or consultants. If the Contractor proposes a substitution, it shall submit the same type of information that was submitted in the accepted proposal to the Contracting Officer for evaluation and approval. The level of qualifications and experience submitted in the accepted proposal or that required by the Solicitation, whichever is greater, is the minimum standard for any substitution.

As prescribed at 11.703(c), insert the following clause in solicitations and contracts for fixed-price construction contracts when subdivided items are to be separately priced for payment purposes

52.236-5002 GOVERNMENT-FURNISHED SPECIFICATIONS, DRAWINGS, SURVEYS, AND

SPECIFICATIONS IN THE REQUEST FOR PROPOSAL (JUL 2002)

This is to clarify DFARS 252.236-7001, Contract Drawings and Specifications, refers to any Government- furnished design or design criteria included in the Request for Proposal (RFP).

52.236-5003 GOVERNMENT-FURNISHED SPECIFICATIONS AND DRAWINGS FOR

CONSTRUCTION (JUL 2003)

This is to clarify FAR 52.236-21Alt 1, Specifications and Drawings for Construction, refers to any specifications and drawings furnished in the Request for Proposal (RFP). The term "specifications" refers to the design criteria or scope of work, in addition to any attached specifications.

52.236-5004 RESPONSIBILITY OF THE CONTRACTOR FOR DESIGN (MAY 2002)

(a) The Contractor shall be responsible for the professional quality, technical accuracy, and the coordination of all designs, drawings, specifications, and other non-construction services furnished by the Contractor under this contract. The Contractor shall, without additional compensation, correct or revise any errors or deficiency in its designs, drawings, specifications, and other non-construction services and perform any necessary rework or modifications, including any damage to real or personal property, resulting from the design error or omission.

(b) The standard of care for all design services performed under this agreement shall be the care and skill ordinarily used by members of the architectural or engineering professions practicing under similar conditions at the same time and locality. Notwithstanding the above, in the event that the contract specifies that portions of the Work be performed in accordance with a performance standard, the design services shall be performed so as to achieve such standards.

(c) Neither the Government’s review, approval or acceptance of, nor payment for, the services required under this contact, shall be construed to operate as a waiver of any rights under this contract or of any cause of action arising out of the performance of this contract. The Contractor shall be and remain liable to the Government in accordance with applicable law for all damages to the Government caused by the Contractor’s negligent performance of any of these services furnished under this contract.

(d) The rights and remedies of the Government provided for under this contract are in addition to any other rights and remedies provided by law.

(e) If the Contractor is comprised of more than one legal entity, each entity shall be jointly and severally liable hereunder.

http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/dfars/dfars252_232.htm#P784_58963

00 73 00 - 10 Amendment 0003

52.236-5005 WARRANTY OF DESIGN (MAY 2002)

(a) The Contractor warrants that the design shall be performed in accordance with the contract requirements. Design and design related construction not conforming to the Contract requirements shall be corrected at no additional cost to the Government. The standard of care for design is defined in paragraph (b) of special contract requirement 52.236-5004, Responsibility of the Contractor for Design.

(b) The period of this warranty shall commence upon final completion and the Government’s acceptance of the work, or in the case of the Government’s beneficial occupancy of all or part of the work for its convenience, prior to final completion and acceptance, at the time of such occupancy.

(c) This design warranty shall be effective from the above event through the Statue of Limitations and Statute of Repose, as applicable to the state that the project is located in.

(d) The rights and remedies of the Government provided for under this clause are in addition to any other rights and remedies provided in this contract or by law.

52.236-5006 DEVIATING FROM THE ACCEPTED DESIGN (JUN 2002)

(a) The Contractor must obtain the approval of the Designer of Record and the Government’s concurrence for any Contractor proposed revision to the professionally stamped and sealed and Government reviewed design, before proceeding with the revision.

(b) The Government reserves the right to non-concur with any revision to the design, which may impact furniture, furnishings, equipment selections or operations decisions that were made, based on the reviewed design.

(c) Any revision to the design, which deviates from the contract requirements (i.e., the RFP and the accepted proposal), will require a modification, pursuant to the Changes clause, in addition to Government concurrence.

The Government reserves the right to disapprove such a revision.

(d) Unless the Government initiates a change to the contract requirements, or the Government determines that the Government furnished design criteria are incorrect and must be revised, any Contractor initiated proposed change to the contract requirements, which results in additional cost, shall strictly be at the Contractor's expense.

(e) The Contractor shall track all approved revisions to the reviewed and accepted design and shall incorporate them into the as-built design documentation, in accordance with agreed procedures. The Designer of Record shall document its professional concurrence on the as-builts for any revisions in the stamped and sealed drawings and specifications.

52.236-5007 CONTRACTOR'S ROLE DURING DESIGN PROCESS (JUN 1998)

The contractor's construction management key personnel shall be actively involved during the design process to effectively integrate the design and construction requirements of this contract. In addition to the typical required construction activities, the Contractor's involvement includes, but is not limited to actions such as: integrating the design schedule into the Master Schedule to maximize the effectiveness of fast-tracking design and construction (within the limits allowed in the contract), ensuring constructability and economy of the design, integrating the shop drawing and installation drawing process into the design, executing the material and equipment acquisition programs to meet critical schedules, effectively interfacing the construction QC program with the design QC program, and maintaining and providing the design team with accurate, up-to-date redline and as-built documentation. The Contractor shall require and manage the active involvement of key trade subcontractors in the above activities.

52.236-5008 VALUE ENGINEERING AFTER AWARD (JUN 1999)

(a) In reference to FAR 52.248-3, Value Engineering-Construction, the Government may refuse to entertain a "Value Engineering Change Proposal" (VECP) for those "performance oriented" aspects of the Solicitation

00 73 00 - 11 Amendment 0003 documents which were addressed in the Contractor's accepted contract proposal and which were evaluated in competition with other offerors for award of this contract.

(b) The Government may consider a VECP for those "prescriptive" aspects of the Solicitation documents, not addressed in the Contractor's accepted contract proposal or addressed but evaluated only for minimum conformance with the Solicitation requirements.

(c) For purposes of this clause, the term "performance oriented" refers to those aspects of the design criteria or other contract requirements which allow the offeror or Contractor certain latitude, choice of and flexibility to propose in its accepted contract offer a choice of design, technical approach, design solution, construction approach or other approach to fulfill the contract requirements. Such requirements generally tend to be expressed in terms of functions to be performed, performance required or essential physical characteristics, without dictating a specific process or specific design solution for achieving the desired result.

(d) In contrast, for purposes of this clause, the term "prescriptive" refers to those aspects of the design criteria or other Solicitation requirements wherein the Government expressed the design solution or other requirements in terms of specific material, approaches, systems, and/or processes to be used. Prescriptive aspects typically allow the offerors little or no freedom in the choice of design approach, materials, fabrication techniques, methods of installation, or any other approach to fulfill the contract requirements.

52.236-5009 PARTNERING (FEB 2000)

In order to most effectively accomplish this contract, the Government proposes to form a partnership with the Contractor to develop a cohesive building team. It is anticipated that this partnership would involve the U.S. Air Force Hill Air Force Base installation, the Contractor, primary subcontractors and designers and the Corps of Engineers. This partnership would strive to develop a cooperative management team drawing on the strengths of each team member in an effort to achieve a quality project within budget and on schedule. This partnership would be bilateral in membership and participation will be totally voluntary.

52.236-5010 GOVERNMENT RE-USE OF DESIGN (MAY 2006)

In conjunction with the DFARS 252.227-7022, Government Rights (Unlimited), the Government will not ask for additional originals or copies of the design works after the Contractor provides all required design documentation and as-built documentation under the instant contract. Further, if the Government uses the design for other projects without additional compensation to the Contractor for re-use, the Government releases the Contractor from liability in the design on the other projects, due to defects in the design that are not the result of fraud, gross mistake as amounts to fraud, gross negligence or intentional misrepresentation.

WARRANTY OF CONSTRUCTION WORK

(a) In addition to any other warranties in this contract, the Contractor warrants, except as provided in paragraph (1) of this clause, that work performed under this contract conforms to the contract requirements and is free of any defect in equipment, material, or workmanship performed by the Contractor or any subcontractor or supplier at any tier.

(b) This warranty shall continue for a period of 1 year from the date of final acceptance of the work. If the Government takes possession of any part of the work before final acceptance, this warranty shall continue for a period of 1 year from the date the Government takes possession.

(c) The Contractor shall remedy at the Contractor's expense any failure to conform, or any defect. In addition, the Contractor shall remedy at the Contractor's expense any damage to Government-owned or controlled real or personal property, when that damage is the result of--

(1) The Contractor's failure to conform to contract requirements; or

(2) Any defect of equipment, material, or workmanship.

00 73 00 - 12 Amendment 0003

(d) The Contractor shall restore any work damaged in fulfilling the terms and conditions of this clause. The Contractor's warranty with respect to work repaired or replaced will run for 1 year from the date of repair or replacement.

(e) The Contracting Officer shall notify the Contractor, in writing, within a reasonable time after the discovery of any failure, defect, or damage.

(f) If the Contractor fails to remedy any failure, defect, or damage within a reasonable time after receipt of notice, the Government shall have the right to replace, repair, or otherwise remedy the failure, defect, or damage at the Contractor's expense.

(g) With respect to all warranties, express or implied, from subcontractors, manufacturers, or suppliers for work performed and materials furnished under this contract, the Contractor shall--

(1) Obtain all warranties that would be given in normal commercial practice:

(2) Require all warranties to be executed, in writing, for the benefit of the Government, if directed by the Contracting Officer; and

(3) Enforce all warranties for the benefit of the Government, if directed by the Contracting Officer.

(h) In the event the Contractor's warranty under paragraph (b) of this clause has expired, the Government may bring suit at its expense to enforce a subcontractor's, manufacturer's, or supplier's warranty.

(i) Unless a defect is caused by the negligence of the Contractor or subcontractor or supplier at any tier, the Contractor shall not be liable for the repair of any defects of material furnished by the Government nor for the repair of any damage that results from any defect in Government-furnished material or design.

(j) This warranty shall not limit the Government's rights under the Inspection and Acceptance clause of this contract with respect to latent defects, gross mistakes, or fraud.

SEQUENCE OF DESIGN-CONSTRUCTION

After receipt of the Contract Notice to Proceed (NTP) the Contractor shall initiate design, comply with all design submission requirements as covered under Division 01 General Requirements, and obtain Government review of each submission. The contractor may begin construction on portions of the work for which the Government has reviewed the final design submission and has determined satisfactory for purposes of beginning construction. The ACO or Contracting Officer Representative (COR) will notify the Contractor when the design is cleared for construction. The Government will not grant any time extension for any design resubmittal required when, in the opinion of the ACO or COR, the initial submission failed to meet the minimum quality requirements as set forth in the Contract.

If the Government allows the Contractor to proceed with limited construction based on pending minor revisions to the reviewed Final Design submission, no payment will be made for any in-place construction related to the pending revisions until they are completed, resubmitted and are satisfactory to the Government. No payment will be made for any in-place construction until all required submittals have been made, reviewed and are satisfactory to the Government.

RECOMMENDED INSURANCE COVERAGE (HND MAR 2002)

The Design-Build Contractor’s attention is invited to the contract requirements concerning “RESPONSIBILITY OF THE CONTRACTOR FOR DESIGN”, “WARRANTY OF DESIGN” and “WARRANTY OF CONSTRUCTION WORK”. These requirements vest in the Contractor complete responsibility for the professional quality, technical accuracy, and coordination of all design, drawings, specifications and other work or materials furnish by his in-house

00 73 00 - 13 Amendment 0003 or consultant forces. The Design-Build Contractor must correct and revise any errors or deficiencies in his work, notwithstanding any review, approval, acceptance or payment by the Government. The Contractor must correct and change any work resulting from his defective design at no additional cost to the Government. The requirements further stipulate that the Design-Build Contractor shall be liable to the Government for the damages to the Government caused by negligent performance. Though not a mandatory requirement, this is to recommend that the Design-Build Contractor investigate and obtain appropriate insurance coverage for such liability protection.

TRAINING (HND FEB 2000)

The Contractor shall provide operational and maintenance training for all systems furnished under this contract for the operating and maintenance personnel. The system manufacturer shall conduct the training, where feasible. All operation and maintenance manuals shall be submitted and approved prior to conducting the training and shall be used during training. The Contractor shall videotape the training session on DVD and provide the DVD(s) to the government.

DESIGN CONFERENCES (HND AUG 1997)

(a) Pre-Work: As part of the Pre-Work Conference conducted after contract award, key representatives of the Government and the Contractor will review the design submission and review procedures specified herein, discuss the preliminary design schedule and provisions for phase completion of the D-B documents with construction activities, as appropriate, meet with Corps of Engineers Design Review personnel and key Using Agency points of contact and any other appropriate pre-design discussion items.

(b) Design Charette: After award of the contract, the Contractor shall visit the site and conduct extensive interviews, and problem solving discussions with the individual users, base personnel, Corps of Engineers personnel to acquire all necessary site information, review user options, and discuss user needs.

The Contractor shall document all discussions. The design shall be finalized as direct result of these meetings.

(c) Design Review Conferences: Review conferences will be held on base for each design submittal. The Contractor will bring the personnel that developed the design submittal to the review conference. The conferences will take place the week after the review is complete.

SUBMITTAL OF WORK TO BE PERFORMED BY THE CONTRACTOR (HND UNDATED)

The Contractor shall furnish the Contracting Officer within 10 days after the award the items of work he will perform with his own forces and the estimated cost of those items. The percentage of work that must be performed by the Contractor is stated in Contract Clause 52.236-1, “PERFORMANCE OF WORK BY THE CONTRACTOR”.

INVOICES

The Government shall pay the Contractor upon submission of proper invoices for supplies delivered and accepted or services rendered and accepted for the portion of work actually performed under this contract. Invoices will be submitted in quadruplicate to the address in Block 26, SF1442, which will be completed at time of award. Invoices shall be submitted on ENG Form 93, which will be provided to the Contractor by the Government

252.227-7022 GOVERNMENT RIGHTS (UNLIMITED) (MAR 1979)

The Government shall have unlimited rights, in all drawings, designs, specifications, notes and other works developed in the performance of this contract, including the right to use same on any other Government design or construction without additional compensation to the Contractor. The Contractor hereby grants to the Government a paid-up license throughout the world to all such works to which he may assert or establish any claim under design

00 73 00 - 14 Amendment 0003 patent or copyright laws. The Contractor for a period of three (3) years after completion of the project agrees to furnish the original or copies of all such works on the request of the Contracting Officer.

(End of clause)

252.227-7023 DRAWINGS AND OTHER DATA TO BECOME PROPERTY OF GOVERNMENT. (MAR

1979)

All designs, drawings, specifications, notes and other works developed in the performance of this contract shall become the sole property of the Government and may be used on any other design or construction without additional compensation to the Contractor. The Government shall be considered the "person for whom the work was prepared" for the purpose of authorship in any copyrightable work under 17 U.S.C. 201(b). With respect thereto, the Contractor agrees not to assert or authorize others to assert any rights nor establish any claim under the design patent or copyright laws. The Contractor for a period of three (3) years after completion of the project agrees to furnish all retained works on the request of the Contracting Officer. Unless otherwise provided in this contract, the Contractor shall have the right to retain copies of all works beyond such period.

252.236-7000 MODIFICATION PROPOSALS - PRICE BREAKDOWN. (DEC 1991)

(a) The Contractor shall furnish a price breakdown, itemized as required and within the time specified by the Contracting Officer, with any proposal for a contract modification.

(b) The price breakdown --

(1) Must include sufficient detail to permit an analysis of profit, and of all costs for --

(i) Material;

(ii) Labor;

(iii) Equipment;

(iv) Subcontracts; and

(v) Overhead; and

(2) Must cover all work involved in the modification, whether the work was deleted, added, or changed.

(c) The Contractor shall provide similar price breakdowns to support any amounts claimed for subcontracts.

(d) The Contractor's proposal shall include a justification for any time extension proposed.

252.236-7005 AIRFIELD SAFETY PRECAUTIONS. (DEC 1991)

(a) Definitions. As used in this clause --

(1) "Landing areas means" --

(i) The primary surfaces, comprising the surface of the runway, runway shoulders, and lateral safety zones. The length of each primary surface is the same as the runway length. The width of each primary surface is 2,000 feet (1,000 feet on each side of the runway centerline);

(ii) The "clear zone" beyond the ends of each runway, i.e., the extension of the primary surface for a distance of

00 73 00 - 15 Amendment 0003

1,000 feet beyond each end of each…