W912PL-17-R-0011_Drawings.pdf

PDF 28 MB Posted

Attached to
FY16 F-35 PAVEMENTS ; NELLIS AFB, NV
Solicitation number
W912PL-17-R-0011
Issued by

About this file

Drawings

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ISSUE DATE:

US Army Corps of Engineers

SOLICITATION NO.:

CONTRACT NO.:

SACRAMENTO DISTRICT

XXXXXX-XX-X-XXXX

30 SEPTEMBER 2016

XXXXXX-XX-XXXX

NELLIS AFB, NV

F35A AIRFIELD PAVEMENTS

RKMF143003

NELLIS AFB

PROJECT LOCATION

VICINITY LOCATION

S O

L I C

I T

A T

I O

N

N

O

D E

S I G

N E

D

B

Y

D E

S C

R I P

T I O

N

A

M A

R K

S I Z

E

S U

B M

I T

T E

D

B

Y

D A

T E

C O

N T

R A

C T

N

O

C H

E C

K E

D

B

Y

D R

A W

N

B

Y

I S

S U

E

D

A T

E

SHEET ID

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

US Army Corps of Engineers

U S

A

R M

Y

C

O R

P S

F

E

N G

I N

E E

R S

S P

E

F I L

E

N

O

F I L

E

N

A M

E j:\Nellis\f35 airfield paving ramp\CADD\Civil\Sheets\G-001XXX.dwg

G-001

T I T

L

H E

E T

E R

G

E R

G

R B

C s

P

E T

R

V

A L

E N

T I N

E

G

X X

X d w g

100% DESIGN

N E

L L

I

B

N

V

F

R

F I E

D

V

E M

E N

T S

R K

M F

I N

H

O U

S

I G

N

J

T R

E E

T

S A

C R

A M

E N

T O

C

A

S A

C R

A M

E N

S

T R

I C

T

P

T E

M B

X X

X X

X X

X

X X

X X

X

X X

X X

X X

X

X X

X

X X

X

A N

S I

D

THE PROJECT WAS DESIGNED BY THE SACRAMENTO DISTRICT OF THE US ARMY CORPS OF ENGINEERS. THE INITIALS

OR SIGNATURE AND REGISTRATION DESIGNATIONS OF INDIVIDUALS APPEAR ON THESE PROJECT DOCUMENTS WITHIN

THE SCOPE OF THEIR EMPLOYMENT AS REQUIRED BY ER 1110-1-8152.

DISTRIBUTION STATEMENT A

APPROVED FOR PUBLIC RELEASE. DISTRIBUTION UNLIMITED

PREPARED UNDER THE DIRECTION OF:

USACE SACRAMENTO SIGNATURE BLOCK

Col. Corps of Engineers, Sacramento District

Chief, Engineering Division

Chief, Design Branch

Chief, Mech/Elec Design Section

Chief, Civil Design Section A

Chief, Geotechnical Branch

APPROVED BY:

APPROVED FUNCTIONAL ADEQUACY:

DATE

David G. Ray

/s/ Rick Poeppelman P.E.

/s/ Scott Tincher P.E.

/s/ John Parrish P.E.

/s/ Peter Valentine P.E

/s/ April Fontaine P.G.

30 SEPTEMBER 2016

100% CORRECTED DESIGN

X

X

X

X X

X

X

X

C

E

E j:\Nellis\f35 airfield paving ramp\CADD\Civil\Sheets\G-101XXX.dwg

N

N

CONTRACTOR'S HAUL ROUTE

NTS

CONTRACTOR'S STAGING AREA

NTS

NOTES:

1. CONTRACTOR MUST COORDINATE WITH THE BASE OPERATIONS FOR COMPLYING WITH

OPERATIONAL SAFETY REQUIREMENTS, SWEEPING HAUL ROUTES TO REMOVE DEBRIS

CAUSED BY CONTRACTOR'S OPERATIONS, AND PROVIDE TRAFFIC CONTROLS

CONFORMING TO THE CONTRACT SPECIFICATIONS.

2. NO STOPPING PERMITTED WITHIN DESIGNATED BLAST AREA ALONGSIDE ACTIVE

TAXIWAY AND APRON. ACTIVITIES MUST BE COORDINATED WITH AIRFIELD

OPERATIONS.

3. O'BANNON RD ALSO KNOWN AS N. HOLLYWOOD RD.

4. CONSTRUCTION CONTRACTORS MUST ACCESS NELLIS AFB THROUGH THE AREA II

GATE. ALL PRIVATELY OWNED VEHICLES (POV), COMMERCIAL VEHICLES AND VEHICLES

LARGER THAN PICKUP TRUCKS WILL BE SUBJECT TO SECURITY FORCES INSPECTION.

THE TURNOFF TO THE AREA II GATE IS ACROSS FROM THE RACETRACK ON LAS VEGAS

BLVD APPROXIMATELY 3 MILES NORTH OF THE MAIN GATE.

5. HAUL PATH SHOWN IS APPROXIMATELY 4 MILES FROM N LAS VEGAS BLVD.

6. UPON ARRIVAL AT A SECURITY GATE, ALL VEHICLE OCCUPANTS WILL BE REQUIRED TO

SHOW IDENTIFICATION BEFORE ENTERING THE BASE. A PICTURED IDENTIFICATION

SUCH AS A DRIVER'S LICENSE WILL BE REQUIRED

7. SPEED LIMIT: UNLESS OTHERWISE POSTED, THE SPEED LIMIT ON BASE IS 25 MPH AND

IN BASE HOUSING AREAS AND FLIGHTLINE IT IS 15 MPH.

8. ALL TRUCKS MUST HAVE COMPANY NAME LOGOS ON THE DOOR SIDES.

9. NO POV'S ALLOWED WITHIN THE CONSTRUCTION SITE.

10. THE CONTRACTOR SHALL VERIFY THE WORKING HOURS WITH THE BASE SECURITY

FOR APPROVAL PERSONNEL CANNOT SHOW UP AT THE GATE WITHOUT PRIOR

NOTIFICATION FOR ACCESS AND EXPECT TO GAIN ACCESS. VERBAL ACCESS CANNOT

BE PROVIDED.

11. POINT OF CONTACTS:

11.1. BASE OPERATOR - (775) 652-1110

11.2. GATE AREA II - (775) 652-1801

12. PROPOSED CONTRACTOR'S STAGING AREA SHOWN IS APPROXIMATELY 4.5+ ACRES.

STAGING AREA MUST HAVE ENTRANCE OFF OF O'BANNON ROAD. THE FINAL STAGING

AREA PLAN IS REQUIRED PER SPECIFICATION SECTION 01 00 00 "GENERAL

REQUIREMENTS".

13. CONCRETE PAVEMENT FOR THE APRON MUST BE BATCHED ON-SITE. CONTRACTOR IS

REQUIRED TO DEVELOP A BATCH PLANT FOR CONCRETE PRODUCTION.

14. PRIOR TO COMMENCING EXCAVATION ACTIVITIES, THE CONTRACTOR SHALL

PHYSICALLY EXPOSE KEY UTILITY LINES SUCH AS PRIMARY POWER AND

COMMUNICATIONS LINES THAT WERE IDENTIFIED (MARKED IN THE FIELD OR SHOWN ON

PROVIDED DRAWINGS) BY THE AIR FORCE BY USING HAND DIGGING, HYDRO

EXCAVATION, OR OTHER SIMILAR NON-DESTRUCTIVE METHODS. THE LINES NEED TO BE

EXPOSED IN AS MANY LOCATIONS AS NECESSARY IN ORDER TO BE ABLE TO

DETERMINE THE PRECISE LOCATION OF THE UTILITY LINES THAT ARE IN THE PROJECT

AREA TO BE EXCAVATED. MARKINGS CAN BE UNRELIABLE AND CAN BE OFF LINE BY

SEVERAL FEET. CONTRACTOR SHALL ALSO USE HYDRO-EXCAVATION FOR ALL UTILITY

EXCAVATION ACTIVITIES. WHEN HYDRO-EXCAVATION IS NOT FEASIBLE THE

CONTRACTOR MAY DIG BY HAND. NO MECHANICAL EXCAVATION SHALL BE USED

UNLESS APPROVED BY THE CONTRACTING OFFICER.

G

B

V

D

E CRAIG RD

CONTRACTOR'S ENTRANCE

AREA II GATE

SEE NOTE 1

B

E

R

G

S

T

R

M

E

M

I

N

E

P

E

R

I

M

E

T

P

E

R

I M

E

T

O B

A N

N O

N

R

D

S

T

E

MAIN GATE ENTRANCE

PROJECT BOUNDARY

PROPOSED CONTRACTOR'S

STAGING AREA AND BATCH

PLANT LOCATION.

N

L A

M

V

D

N

N

E L

L

V

D

P

E

R

I

M

E

T

O B

A N

N O

N

R

D

ABANDONED GATE

HAUL PATH

S O

L I C

I T

A T

I O

N

N

O

D E

S I G

N E

D

B

Y

D E

S C

R I P

T I O

N

A

M A

R K

S I Z

E

S U

B M

I T

T E

D

B

Y

D A

T E

C O

N T

R A

C H

E C

K E

D

B

Y

D R

A W

N

B

Y

I S

S U

E

D

A T

E

SHEET ID

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

US Army Corps of Engineers

U S

A

R M

Y

C

O R

E

N G

I N

E E

R S

S P

F I L

E

N

O

F I L

E

N

A M

E

G-101

C O

N T

R A

C T

U

L

R

O U

A

G I N

G

E R

G

E R

G

R B

C s

P

E T

L

E N

T I N

E

G

X X

X d w g

100% DESIGN

N E

L L

B

N

V

F

R

F I E

V

E M

E N

T S

R K

M F

I N

H

O U

S

I G

N

T R

E E

T

S A

C R

A M

E N

T O

C

A

S A

C R

A M

E N

S

T R

I C

T

P

T E

M B

X X

X X

X X

X

X X

X X

X

X X

X X

X X

X

X X

X

X X

X

A N

S I

D

SEE E-141 FOR NEW

EDGE LIGHT THIS SIDE

OF TAXIWAY

X

X

X

X

X

X

X

X

X

X X X X

X X

X

X

X

C

D

C E

D

C

E

E

PERIMETER ROAD RELOCATION

CONSTRUCTION PRIOR TO

CLOSURE OF EXISTING AS SHOWN

EXISTING AIRFIELD FENCE TO BE REMOVED

AFTER NEW FENCE CONSTRUCTION

CONSTRUCTION CONES

AT EOP, SEE DETAIL 2

ON SHEET C-503

PROJECT BOUNDARY

PARKING LOT TO BE RESTRIPED

PRIOR TO PARKING LOT DEMOLITION

CONSTRUCT DRIVEWAY

ENTRANCE AND RESTRIPE

PRIOR TO CLOSURE OF THE

EXISTING PERIMETER RD AND

CONSTRUCTION OF AIRFIELD

FENCING

ADJUSTED APRON EDGE

DURING CONSTRUCTION.

PROVIDE LOW PROFILE

AIRFIELD BARRIERS.

SEE DETAIL 3 C-503

81'

FROM EDGE OF

EXISTING APRON.

SEE NOTE 4.

FUTURE FY2020

APRON EXPANSION

PLACE TEMPORARY ROAD BARRICADES DURING

DEMOLITION PHASE AFTER ROAD RELOCATION

AND INTERSECTION HAS BEEN COMPLETED

SEE DETAIL 1 ON C-503

USE TEMPORARY ROAD BARRICADES

DURING CONSTRUCTION OF THE

RELOCATED PERIMETER ROAD AND

INTERSECTION IMPROVEMENTS

SEE DETAIL 1 ON C-503

USE TEMPORARY ROAD BARRICADES

ONCE PERIMETER ROAD RELOCATION IS

COMPLETE, PRIOR TO AIRFIELD FENCING

COMPLETION. SEE DETAIL 2 ON C-503

37.5'

R

Y

P

ADJUSTED APRON EDGE

DURING CONSTRUCTION.

PROVIDE LOW PROFILE

AIRFIELD BARRIERS.

SEE DETAIL 3 C-503

OBLITERATE EXISTING

NOSE WHEEL STRIPING

AS INDICATED.

PROVIDE TEMPORARY NOSE WHEEL

STRIPING AS INDICATED. UPON

COMPLETION OF NEW APRON

ADDITION RESTORE ALL PAVEMENT

MARKING PER SHEETS C-711 & C-712

PROVIDE FOD FENCING ALONG EDGE OF

APRON TO PREVENT MIGRATION OF DEBRIS

ONTO PAVEMENT. ANY WORK BETWEEN

THE FOD FENCING AND LOW PROFILE

BARRIERS SHALL BE COORDINATED WITH

THE CONTRACTING OFFICER/AIRFIELD

MANAGER.

TAXIWAY LATERAL CLEARANCE

LINE SEE NOTE 3.

FOD FENCE ALONG T/W

G LATERAL CLEARANCE

SEE NOTE 3 FOR

PHASING.

N: 26788753.68

E: 821054.35

N: 26789166.33

E: 821412.94

N: 26788875.97

E: 821161.32

N: 26788998.73

E: 821267.85

NEW EDGE LIGHT SEE NOTE 5

LIGHT POLE

FOR CURRENT

PROJECT AND

FUTURE 2020

EXPANSION

LIGHT POLE

FOR CURRENT

PROJECT AND

FUTURE 2020

EXPANSION

j:\Nellis\f35 airfield paving ramp\CADD\Civil\Sheets\G-102XXX.dwg

N

S O

L I C

I T

A T

I O

N

N

O

D E

S I G

N E

D

B

Y

D E

S C

R I P

T I O

N

A

M A

R K

S I Z

E

S U

B M

I T

T E

D

B

Y

D A

T E

C O

N T

R A

C H

E C

K E

D

B

Y

D R

A W

N

B

Y

I S

S U

E

D

A T

E

SHEET ID

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

US Army Corps of Engineers

U S

A

R M

Y

C

O R

E

N G

I N

E E

R S

S P

F I L

E

N

O

F I L

E

N

A M

E

G-102

P H

A S

I N

G

P

L A

N

E R

G

E R

G

R B

C s

P

E T

L

E N

T I N

E

G

X X

X d w g

100% DESIGN

N E

L L

B

N

V

F

R

F I E

V

E M

E N

T S

R K

M F

I N

H

O U

S

I G

N

T R

E E

T

S A

C R

A M

E N

T O

C

A

S A

C R

A M

E N

S

T R

I C

T

P

T E

M B

X X

X X

X X

X

X X

X X

X

X X

X X

X X

X

X X

X

X X

X

A N

S I

D

NOTES:

1. TEMPORARY NOSE WHEEL STRIPING, OBLITERATION OF STRIPING AS INDICATED,

AND LOW PROFILE BARRIER PLACEMENT SHALL BE DONE WHEN APRON IS

VACANT. COORDINATE TEMPORARY PAVEMENT MARKINGS AND OBLITERATIONS

WITH CONTRACTING OFFICER AND AIRFIELD MANAGER. UPON COMPLETION OF

NEW APRON ADDITION MARKING SHALL BE RESTORED AS INDICATED IN SHEETS

C-711 AND C-712

2. THE PROJECT IS LOCATED WITHIN A RESTRICTED/CONTROLLED AREA AND

THEREFORE CONSTRUCTION ACTIVITIES (INCLUDING DEMOLITION) CANNOT

START UNTIL A TEMPORARY AIRFIELD CONSTRUCTION WAIVER (TACW) ALONG

WITH A FREE ZONE (FZ) APPLICATION IS APPROVED BY THE 99TH ABW

COMMANDER. PART OF THE TACW REQUIRES THE CONTRACTOR TO FILE AN FAA

NOTICE (FORM 7460-1) OF PROPOSED CONSTRUCTION OR ALTERATION WHICH

IDENTIFIES HAZARDS TO AIR NAVIGATION DURING CONSTRUCTION. THIS FORM

MUST BE FILLED OUT 45 DAYS MINIMUM PRIOR TO START OF CONSTRUCTION.

ADDITIONALLY, THE BASE WILL TAKE ADDITIONAL TIME ON TOP OF THAT IN

ORDER TO PROCESS THE TACW AND FZ WHICH INCLUDES THE FAA LETTER OF

DETERMINATION, PRELIMINARY FENCING PLAN AND LAYDOWN AREAS. PLEASE

SEE AIRFIELD SAFETY SPEC SECTION FOR THIS SUBMITTAL REQUIREMENT.

3. ALL WORK TO BE DONE BETWEEN TAXIWAY G AND THE TAXIWAY CLEARANCE

LINE (200' FROM CL.) SHALL BE PHASED TO MINIMIZE IMPACT TO THE TAXIWAY.

WORK SHALL BE SCHEDULED AND COORDINATED WITH THE CONTRACTING

OFFICER/AIRFIELED MANAGER PRIOR TO APPROVAL OF CONTRACTOR'S

SCHEDULE. WORK TO BE DONE IN THIS AREA SHALL BE CLEARLY IDENTIFIED IN

THE CONTRACTOR'S SCHEDULE.

4. CLEARANCE LINE TO FIXED OR MOBILE OBJECTS WILL BE THE EDGE OF EXISTING

APRON BASED ON A B-1B AS THE DESIGN AIRCRAFT. LOW PROFILE BARRIERS

ARE TO BE SET 81' FROM THE EDGE OF EXISTING APRON AND WILL REPRESENT

THE EDGE OF EXISTING APRON DURING CONSTRUCTION. ALL WORK AT THE

LATERAL CLEARANCE LINE UP TO THE TEMPORARY LOW PROFILE BARRIERS

SHALL BE SCHEDULED AND COORDINATED WITH THE CONTRACTING

OFFICER/AIRFIELD MANAGER. CONTRACTOR SHALL PLACE FOD FENCING

AROUND THE EXISTING APRON AS INDICATED AND THE FOD FENCING WILL ALSO

IDENTIFY THE CLEARANCE LINE TO FIXED OR MOBILE OBJECTS.

5. NEW EDGE LIGHT ON WEST SIDE OF TAXIWAY G SHALL BE INSTALLED PER E-141

THIS WORK IS WITHIN THE TAXIWAY CLEARANCE LINE AND SHALL BE SCHEDULED

AND COORDINATED WITH CONTRACTING OFFICER AND AIRFIELD MANAGER.

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text U

AutoCAD SHX Text U

AutoCAD SHX Text U

AutoCAD SHX Text U

AutoCAD SHX Text

TR

AutoCAD SHX Text

TR

AutoCAD SHX Text

TR

AutoCAD SHX Text

TR

AutoCAD SHX Text W

AutoCAD SHX Text W

AutoCAD SHX Text W

AutoCAD SHX Text W

AutoCAD SHX Text W

AutoCAD SHX Text W

AutoCAD SHX Text W

AutoCAD SHX Text W

AutoCAD SHX Text W

AutoCAD SHX Text

TR

AutoCAD SHX Text W

AutoCAD SHX Text W

AutoCAD SHX Text 5039439

AutoCAD SHX Text 1849.70

AutoCAD SHX Text conc L

AutoCAD SHX Text

TR

AutoCAD SHX Text U

AutoCAD SHX Text

B-1B PRELIM

AutoCAD SHX Text

B-1B PRELIM

AutoCAD SHX Text

B-1B PRELIM

AutoCAD SHX Text

B-1B PRELIM

AutoCAD SHX Text

B-1B PRELIM

AutoCAD SHX Text

B-1B PRELIM

AutoCAD SHX Text

( IN FEET )

AutoCAD SHX Text

GRAPHIC SCALE

AutoCAD SHX Text

AutoCAD SHX Text

( IN FEET )

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 1 inch = 150 ft.

V-101V-102 V-106V-107V-105V-104V-103

V-108V-109V-110V-111V-112

V-116V-115V-114V-113 V-118V-117

S O

L I C

I T

A T

I O

N

N

O

D E

S I G

N E

D

B

Y

D E

S C

R I P

T I O

N

A

M A

R K

S I Z

E

S U

B M

I T

T E

D

B

Y

D A

T E

C O

N T

R A

C H

E C

K E

D

B

Y

D R

A W

N

B

Y

I S

S U

E

D

A T

E

SHEET ID

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

US Army Corps of Engineers

U S

A

R M

Y

C

O R

E

N G

I N

E E

R S

S P

F I L

E

N

O

F I L

E

N

A M

E j:\Nellis\f35 airfield paving ramp\Topo\1525_NellisAFB_F35_Beddown_Topo\1525_NellisAFB_F35_Beddown_Topo.dwg

V-100

T O

P O

G R

A P

Y

D E

X

D

M

E L

L O

L

H

U L

C Y

J

M

A R

I N

O s

J A

M E

S

M

O

L I V

E R

N e l l i s A

F B

F

B e d d o w n

T o p o d w g

100% DESIGN

N E

L L

B

N

V

F

R

F I E

V

E M

E N

T S

R K

M F

I N

H

O U

S

I G

N

T R

E E

T

S A

C R

A M

E N

T O

C

A

S A

C R

A M

E N

S

T R

I C

T

P

T E

M B

X X

X X

X X

X

X X

X X

X

X X

X X

X X

X

X X

X

X X

X

A N

S I

D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

ABBREVIATIONS

AutoCAD SHX Text A/C ------------AIR CONDITIONER BT -------------BLACKTOP CONC ------------CONCRETE CMP ------------CORRUGATED METAL PIPE DI ------------DROP INLET E ------------EAST EBB ------------GROVE OF ELDERBERRY BUSH EBBX ------------SPOT ELEVATION OF ELDERBERRY BUSH EL -------------ELEVATION E.S.B. ------------ELECTRIC SPLICE BOX INV ------------INVERT MH ------------MANHOLE M/W ------------MONITORING WELL

AutoCAD SHX Text N ------------NORTH ROCK ------------ROCK, BOULDER, OR OUTCROPPING ROCKX ------------SPOT ELEVATION ON ROCK, BOULDER S ------------SOUTH SD ------------STORM DRAIN S/S ------------SANITARY SEWER SDMH ------------STORM DRAIN MANHOLE SSMH ------------SANITARY SEWER MANHOLE TOP ------------TOP OF PIPE UG ------------UNDERGROUND VCP ------------VITRIFIED CONCRETE PIPE W ------------WEST XFMR ------------TRANSFORMER

AutoCAD SHX Text

SCALE: 1''=240'

AutoCAD SHX Text 240'

AutoCAD SHX Text 240'

AutoCAD SHX Text

AutoCAD SHX Text 120'

AutoCAD SHX Text N

AutoCAD SHX Text

1. GRID COORDINATES ARE IN US SURVEY FEET AND REFER TO THE NEVADA STATE COORDINATE SYSTEM ZONE EAST, GRID COORDINATES ARE IN US SURVEY FEET AND REFER TO THE NEVADA STATE COORDINATE SYSTEM ZONE EAST, NAD 83, AND ARE BASED ON CONTROL POINT GPS4 & LVS1. 2. ELEVATIONS ARE IN US SURVEY FEET AND REFER TO NAVD 1988, GEOID 12A AND ARE BASED ON CP GPS4 & LVS1. ELEVATIONS ARE IN US SURVEY FEET AND REFER TO NAVD 1988, GEOID 12A AND ARE BASED ON CP GPS4 & LVS1. 3. TOPOGRAPHY BY TOTAL STATION & RTK SURVEY METHODS. FIELD SURVEY DATES: JUNE 22-JUL 29, AUGUST 24-25, TOPOGRAPHY BY TOTAL STATION & RTK SURVEY METHODS. FIELD SURVEY DATES: JUNE 22-JUL 29, AUGUST 24-25, 2015 & JANUARY 25-29, 2016. 4. CONTOUR INTERVAL IS 1 FOOT. CONTOUR INTERVAL IS 1 FOOT. 5. COMBINED FACTOR IS 0.999928090.COMBINED FACTOR IS 0.999928090.

AutoCAD SHX Text

CONTROL TABULATION

AutoCAD SHX Text

STATION

AutoCAD SHX Text

NORTH

AutoCAD SHX Text

EAST

AutoCAD SHX Text

MON EL

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

GPS4

AutoCAD SHX Text 26788291.10

AutoCAD SHX Text 1867.79

AutoCAD SHX Text 1841.97

AutoCAD SHX Text

BRASS DISC

AutoCAD SHX Text

LVS1

AutoCAD SHX Text 26787828.47

AutoCAD SHX Text 813835.77

AutoCAD SHX Text 820040.58

AutoCAD SHX Text

BRASS DISC

AutoCAD SHX Text

WHEEL STOP

AutoCAD SHX Text W

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text J

AutoCAD SHX Text T

AutoCAD SHX Text C

AutoCAD SHX Text W

AutoCAD SHX Text 268.10

AutoCAD SHX Text (10")

AutoCAD SHX Text D

AutoCAD SHX Text S

AutoCAD SHX Text C

AutoCAD SHX Text W

AutoCAD SHX Text

CO

AutoCAD SHX Text E

AutoCAD SHX Text

PNT NO.

AutoCAD SHX Text

ELEV

AutoCAD SHX Text

DESC

AutoCAD SHX Text

TYPE

AutoCAD SHX Text

CONTROL POINT

AutoCAD SHX Text

POINTS

AutoCAD SHX Text

SPOT ELEV

AutoCAD SHX Text

POWER/TELEPHONE POLE

AutoCAD SHX Text

TELEPHONE RISER

AutoCAD SHX Text

STORMDRAIN MANHOLE

AutoCAD SHX Text

SANITARY SEWER MANHOLE

AutoCAD SHX Text

JBOX COMMUNICATIONS

AutoCAD SHX Text

JUNCTION BOX - E.S.B.

AutoCAD SHX Text

ELECTRICAL PANEL

AutoCAD SHX Text

UNDERGROUND MARKER

AutoCAD SHX Text

GUY WIRE

AutoCAD SHX Text

SIGN

AutoCAD SHX Text

BORE HOLE

AutoCAD SHX Text

VALVE

AutoCAD SHX Text

WATER VALVE

AutoCAD SHX Text

WATER WELL

AutoCAD SHX Text

MISCELLANEOUS OBJECT

AutoCAD SHX Text

HYDRANT

AutoCAD SHX Text

BOLLARD

AutoCAD SHX Text

CLEAN OUT

AutoCAD SHX Text

ELECTRICAL BOX

AutoCAD SHX Text

TRANSFORMER

AutoCAD SHX Text

WATER METER

AutoCAD SHX Text

STREET LIGHT

AutoCAD SHX Text

MONITORING SITE

AutoCAD SHX Text

US SURVEY FOOT EQUIVALENT

AutoCAD SHX Text

TEST WELL

AutoCAD SHX Text

SHRUB

AutoCAD SHX Text

DECORATIVE ROCK

AutoCAD SHX Text

ROCK

AutoCAD SHX Text

ELECTRIC VAULT

AutoCAD SHX Text

GAS VAULT

AutoCAD SHX Text

COMMUNICATION VAULT

AutoCAD SHX Text

WATER VAULT

AutoCAD SHX Text

TELEPHONE VAULT

AutoCAD SHX Text

A/C OR HEAT PUMP

AutoCAD SHX Text

BUILDING OUTLINE

AutoCAD SHX Text

TREE P=PINE, O=OAK

AutoCAD SHX Text

SYMBOL LEGEND

AutoCAD SHX Text

TW

AutoCAD SHX Text S

AutoCAD SHX Text

SEPTIC VAULT

AutoCAD SHX Text

TR

RUNWAY LIGHT

L I C

I T

A T

I O

N

N

O

D E

S I G

N E

D

B

Y

D E

S C

R I P

T I O

N

A

M A

R K

S I Z

E

S U

B M

I T

T E

D

B

Y

D A

T E

C O

N T

R A

C H

E C

K E

D

B

Y

D R

A W

N

B

Y

I S

S U

E

D

A T

E

SHEET ID

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

US Army Corps of Engineers

U S

A

R M

Y

C

O R

E

N G

I N

E E

R S

S P

F I L

E

N

O

F I L

E

N

A M

E j:\Nellis\f35 airfield paving ramp\Topo\1525_NellisAFB_F35_Beddown_Topo\1525_NellisAFB_F35_Beddown_Topo.dwg

V-101

T O

P O

G R

A P

H Y

D

M

E L

L O

L

H

U L

C Y

J

M

A R

I N

O s

J A

M E

S

M

O

L I V

E R

N e l l i s A

F B

F

B e d d o w n

T o p o d w g

100% DESIGN

N E

L L

B

N

V

F

R

F I E

V

E M

E N

T S

R K

M F

I N

H

O U

S

I G

N

T R

E E

T

S A

C R

A M

E N

T O

C

A

S A

C R

A M

E N

S

T R

I C

T

P

T E

M B

X X

X X

X X

X

X X

X X

X

X X

X X

X X

X

X X

X

X X

X

A N

S I

D

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E 820,700

AutoCAD SHX Text E 820,700

AutoCAD SHX Text E 820,800

AutoCAD SHX Text E 820,800

AutoCAD SHX Text E 820,900

AutoCAD SHX Text E 820,900

AutoCAD SHX Text E 821,000

AutoCAD SHX Text E 821,200

AutoCAD SHX Text E 821,200

AutoCAD SHX Text N 26,789,200

AutoCAD SHX Text N 26,789,200

AutoCAD SHX Text N 26,789,300

AutoCAD SHX Text N 26,789,300

AutoCAD SHX Text N 26,789,400

AutoCAD SHX Text N 26,789,400

AutoCAD SHX Text N 26,789,500

AutoCAD SHX Text N 26,789,500

AutoCAD SHX Text N 26,789,600

AutoCAD SHX Text N 26,789,600

AutoCAD SHX Text N 26,789,700

AutoCAD SHX Text N 26,789,800

AutoCAD SHX Text N 26,789,800

AutoCAD SHX Text E 821,000

AutoCAD SHX Text E 821,100

AutoCAD SHX Text E 821,100

AutoCAD SHX Text N 26,789,700

AutoCAD SHX Text

AIRFIELD APRON

AutoCAD SHX Text

TAXIWAY

AutoCAD SHX Text

TAXIWAY

AutoCAD SHX Text

CONCRETE

AutoCAD SHX Text

CONCRETE

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text

CONCRETE

AutoCAD SHX Text

AIRCRAFT STRIPING

AutoCAD SHX Text

CONCRETE

AutoCAD SHX Text

MATCH TO SHEET V-104

AutoCAD SHX Text

MATCH TO SHEET V-102

AutoCAD SHX Text

ABBREVIATIONS

AutoCAD SHX Text A/C ------------AIR CONDITIONER BT -------------BLACKTOP CONC ------------CONCRETE CMP ------------CORRUGATED METAL PIPE DI ------------DROP INLET E ------------EAST EBB ------------GROVE OF ELDERBERRY BUSH EBBX ------------SPOT ELEVATION OF ELDERBERRY BUSH EL -------------ELEVATION E.S.B. ------------ELECTRIC SPLICE BOX INV ------------INVERT MH ------------MANHOLE M/W ------------MONITORING WELL

AutoCAD SHX Text N ------------NORTH ROCK ------------ROCK, BOULDER, OR OUTCROPPING ROCKX ------------SPOT ELEVATION ON ROCK, BOULDER S ------------SOUTH SD ------------STORM DRAIN S/S ------------SANITARY SEWER SDMH ------------STORM DRAIN MANHOLE SSMH ------------SANITARY SEWER MANHOLE TOP ------------TOP OF PIPE UG ------------UNDERGROUND VCP ------------VITRIFIED CONCRETE PIPE W ------------WEST XFMR ------------TRANSFORMER

AutoCAD SHX Text

SCALE: 1''=40'

AutoCAD SHX Text 40'

AutoCAD SHX Text 40'

AutoCAD SHX Text

AutoCAD SHX Text 20'

AutoCAD SHX Text N

AutoCAD SHX Text

1. GRID COORDINATES ARE IN US SURVEY FEET AND REFER TO THE NEVADA STATE COORDINATE SYSTEM ZONE EAST, GRID COORDINATES ARE IN US SURVEY FEET AND REFER TO THE NEVADA STATE COORDINATE SYSTEM ZONE EAST, NAD 83, AND ARE BASED ON CONTROL POINT GPS4 & LVS1. 2. ELEVATIONS ARE IN US SURVEY FEET AND REFER TO NAVD 1988, GEOID 12A AND ARE BASED ON CP GPS4 & LVS1. ELEVATIONS ARE IN US SURVEY FEET AND REFER TO NAVD 1988, GEOID 12A AND ARE BASED ON CP GPS4 & LVS1. 3. TOPOGRAPHY BY TOTAL STATION & RTK SURVEY METHODS. FIELD SURVEY DATES: JUNE 22-JUL 29, AUGUST 24-25, TOPOGRAPHY BY TOTAL STATION & RTK SURVEY METHODS. FIELD SURVEY DATES: JUNE 22-JUL 29, AUGUST 24-25, 2015 & JANUARY 25-29, 2016. 4. CONTOUR INTERVAL IS 1 FOOT. CONTOUR INTERVAL IS 1 FOOT. 5. COMBINED FACTOR IS 0.999928090.COMBINED FACTOR IS 0.999928090.

AutoCAD SHX Text

CONTROL TABULATION

AutoCAD SHX Text

STATION

AutoCAD SHX Text

NORTH

AutoCAD SHX Text

EAST

AutoCAD SHX Text

MON EL

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

GPS4

AutoCAD SHX Text 26788291.10

AutoCAD SHX Text 1867.79

AutoCAD SHX Text 1841.97

AutoCAD SHX Text

BRASS DISC

AutoCAD SHX Text

LVS1

AutoCAD SHX Text 26787828.47

AutoCAD SHX Text 813835.77

AutoCAD SHX Text 820040.58

AutoCAD SHX Text

BRASS DISC

AutoCAD SHX Text

WHEEL STOP

AutoCAD SHX Text W

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text J

AutoCAD SHX Text T

AutoCAD SHX Text C

AutoCAD SHX Text W

AutoCAD SHX Text 268.10

AutoCAD SHX Text (10")

AutoCAD SHX Text D

AutoCAD SHX Text S

AutoCAD SHX Text C

AutoCAD SHX Text W

AutoCAD SHX Text

CO

AutoCAD SHX Text E

AutoCAD SHX Text

PNT NO.

AutoCAD SHX Text

ELEV

AutoCAD SHX Text

DESC

AutoCAD SHX Text

TYPE

AutoCAD SHX Text

CONTROL POINT

AutoCAD SHX Text

POINTS

AutoCAD SHX Text

SPOT ELEV

AutoCAD SHX Text

POWER/TELEPHONE POLE

AutoCAD SHX Text

TELEPHONE RISER

AutoCAD SHX Text

STORMDRAIN MANHOLE

AutoCAD SHX Text

SANITARY SEWER MANHOLE

AutoCAD SHX Text

JBOX COMMUNICATIONS

AutoCAD SHX Text

JUNCTION BOX - E.S.B.

AutoCAD SHX Text

ELECTRICAL PANEL

AutoCAD SHX Text

UNDERGROUND MARKER

AutoCAD SHX Text

GUY WIRE

AutoCAD SHX Text

SIGN

AutoCAD SHX Text

BORE HOLE

AutoCAD SHX Text

VALVE

AutoCAD SHX Text

WATER VALVE

AutoCAD SHX Text

WATER WELL

AutoCAD SHX Text

MISCELLANEOUS OBJECT

AutoCAD SHX Text

HYDRANT

AutoCAD SHX Text

BOLLARD

AutoCAD SHX Text

CLEAN OUT

AutoCAD SHX Text

ELECTRICAL BOX

AutoCAD SHX Text

TRANSFORMER

AutoCAD SHX Text

WATER METER

AutoCAD SHX Text

STREET LIGHT

AutoCAD SHX Text

MONITORING SITE

AutoCAD SHX Text

US SURVEY FOOT EQUIVALENT

AutoCAD SHX Text

TEST WELL

AutoCAD SHX Text

SHRUB

AutoCAD SHX Text

DECORATIVE ROCK

AutoCAD SHX Text

ROCK

AutoCAD SHX Text

ELECTRIC VAULT

AutoCAD SHX Text

GAS VAULT

AutoCAD SHX Text

COMMUNICATION VAULT

AutoCAD SHX Text

WATER VAULT

AutoCAD SHX Text

TELEPHONE VAULT

AutoCAD SHX Text

A/C OR HEAT PUMP

AutoCAD SHX Text

BUILDING OUTLINE

AutoCAD SHX Text

TREE P=PINE, O=OAK

AutoCAD SHX Text

SYMBOL LEGEND

AutoCAD SHX Text

TW

AutoCAD SHX Text S

AutoCAD SHX Text

SEPTIC VAULT

AutoCAD SHX Text

TR

L I C

I T

A T

I O

N

N

O

D E

S I G

N E

D

B

Y

D E

S C

R I P

T I O

N

A

M A

R K

S I Z

E

S U

B M

I T

T E

D

B

Y

D A

T E

C O

N T

R A

C H

E C

K E

D

B

Y

D R

A W

N

B

Y

I S

S U

E

D

A T

E

SHEET ID

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

US Army Corps of Engineers

U S

A

R M

Y

C

O R

E

N G

I N

E E

R S

S P

F I L

E

N

O

F I L

E

N

A M

E j:\Nellis\f35 airfield paving ramp\Topo\1525_NellisAFB_F35_Beddown_Topo\1525_NellisAFB_F35_Beddown_Topo.dwg

V-102

T O

P O

G R

A P

H Y

D

M

E L

L O

L

H

U L

C Y

J

M

A R

I N

O s

J A

M E

S

M

O

L I V

E R

N e l l i s A

F B

F

B e d d o w n

T o p o d w g

100% DESIGN

N E

L L

B

N

V

F

R

F I E

V

E M

E N

T S

R K

M F

I N

H

O U

S

I G

N

T R

E E

T

S A

C R

A M

E N

T O

C

A

S A

C R

A M

E N

S

T R

I C

T

P

T E

M B

X X

X X

X X

X

X X

X X

X

X X

X X

X X

X

X X

X

X X

X

A N

S I

D

AutoCAD SHX Text E 821,300

AutoCAD SHX Text E 821,500

AutoCAD SHX Text E 821,500

AutoCAD SHX Text E 821,600

AutoCAD SHX Text E 821,800

AutoCAD SHX Text N 26,789,400

AutoCAD SHX Text N 26,789,600

AutoCAD SHX Text E 821,300

AutoCAD SHX Text E 821,400

AutoCAD SHX Text E 821,400

AutoCAD SHX Text E 821,600

AutoCAD SHX Text E 821,700

AutoCAD SHX Text E 821,700

AutoCAD SHX Text E 821,800

AutoCAD SHX Text E 821,900

AutoCAD SHX Text E 821,900

AutoCAD SHX Text N 26,789,200

AutoCAD SHX Text N 26,789,200

AutoCAD SHX Text N 26,789,300

AutoCAD SHX Text N 26,789,300

AutoCAD SHX Text N 26,789,400

AutoCAD SHX Text N 26,789,500

AutoCAD SHX Text N 26,789,500

AutoCAD SHX Text N 26,789,600

AutoCAD SHX Text N 26,789,700

AutoCAD SHX Text N 26,789,700

AutoCAD SHX Text

PARKING LOT

AutoCAD SHX Text

BLOCK WALL

AutoCAD SHX Text

BUILDING

AutoCAD SHX Text

TR

AutoCAD SHX Text W

AutoCAD SHX Text W

AutoCAD SHX Text

TIE DOWNS (TYP)

AutoCAD SHX Text

LARGE LIGHT

AutoCAD SHX Text

DECORATIVE GRAVEL

AutoCAD SHX Text

GRAVEL

AutoCAD SHX Text

SIDEWALK

AutoCAD SHX Text

SIDEWALK

AutoCAD SHX Text

SIDEWALK

AutoCAD SHX Text

CONCRETE

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text

BLOCK WALL

AutoCAD SHX Text

JOINT PATTERN (TYP)

AutoCAD SHX Text

SSMH NW 4"VCP=1851.21 NE 4"VCP=1851.15 SW 4"VCP=1851.31

AutoCAD SHX Text

DI SW 24" CONC=1846.43

AutoCAD SHX Text

DI SW 24"CONC=1846.28

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text S

AutoCAD SHX Text

MATCH TO SHEET V-105

AutoCAD SHX Text

MATCH TO SHEET V-101

AutoCAD SHX Text

MATCH TO SHEET V-106

AutoCAD SHX Text

ABBREVIATIONS

AutoCAD SHX Text A/C ------------AIR CONDITIONER BT -------------BLACKTOP CONC ------------CONCRETE CMP ------------CORRUGATED METAL PIPE DI ------------DROP INLET E ------------EAST EBB ------------GROVE OF ELDERBERRY BUSH EBBX ------------SPOT ELEVATION OF ELDERBERRY BUSH EL -------------ELEVATION E.S.B. ------------ELECTRIC SPLICE BOX INV ------------INVERT MH ------------MANHOLE M/W ------------MONITORING WELL

AutoCAD SHX Text N ------------NORTH ROCK ------------ROCK, BOULDER, OR OUTCROPPING ROCKX ------------SPOT ELEVATION ON ROCK, BOULDER S ------------SOUTH SD ------------STORM DRAIN S/S ------------SANITARY SEWER SDMH ------------STORM DRAIN MANHOLE SSMH ------------SANITARY SEWER MANHOLE TOP ------------TOP OF PIPE UG ------------UNDERGROUND VCP ------------VITRIFIED CONCRETE PIPE W ------------WEST XFMR ------------TRANSFORMER

AutoCAD SHX Text

SCALE: 1''=40'

AutoCAD SHX Text 40'

AutoCAD SHX Text 40'

AutoCAD SHX Text

AutoCAD SHX Text 20'

AutoCAD SHX Text N

AutoCAD SHX Text

1. GRID COORDINATES ARE IN US SURVEY FEET AND REFER TO THE NEVADA STATE COORDINATE SYSTEM ZONE EAST, GRID COORDINATES ARE IN US SURVEY FEET AND REFER TO THE NEVADA STATE COORDINATE SYSTEM ZONE EAST, NAD 83, AND ARE BASED ON CONTROL POINT GPS4 & LVS1. 2. ELEVATIONS ARE IN US SURVEY FEET AND REFER TO NAVD 1988, GEOID 12A AND ARE BASED ON CP GPS4 & LVS1. ELEVATIONS ARE IN US SURVEY FEET AND REFER TO NAVD 1988, GEOID 12A AND ARE BASED ON CP GPS4 & LVS1. 3. TOPOGRAPHY BY TOTAL STATION & RTK SURVEY METHODS. FIELD SURVEY DATES: JUNE 22-JUL 29, AUGUST 24-25, TOPOGRAPHY BY TOTAL STATION & RTK SURVEY METHODS. FIELD SURVEY DATES: JUNE 22-JUL 29, AUGUST 24-25, 2015 & JANUARY 25-29, 2016. 4. CONTOUR INTERVAL IS 1 FOOT. CONTOUR INTERVAL IS 1 FOOT. 5. COMBINED FACTOR IS 0.999928090.COMBINED FACTOR IS 0.999928090.

AutoCAD SHX Text

CONTROL TABULATION

AutoCAD SHX Text

STATION

AutoCAD SHX Text

NORTH

AutoCAD SHX Text

EAST

AutoCAD SHX Text

MON EL

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

GPS4

AutoCAD SHX Text 26788291.10

AutoCAD SHX Text 1867.79

AutoCAD SHX Text 1841.97

AutoCAD SHX Text

BRASS DISC

AutoCAD SHX Text

LVS1

AutoCAD SHX Text 26787828.47

AutoCAD SHX Text 813835.77

AutoCAD SHX Text 820040.58

AutoCAD SHX Text

BRASS DISC

AutoCAD SHX Text

WHEEL STOP

AutoCAD SHX Text W

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text J

AutoCAD SHX Text T

AutoCAD SHX Text C

AutoCAD SHX Text W

AutoCAD SHX Text 268.10

AutoCAD SHX Text (10")

AutoCAD SHX Text D

AutoCAD SHX Text S

AutoCAD SHX Text C

AutoCAD SHX Text W

AutoCAD SHX Text

CO

AutoCAD SHX Text E

AutoCAD SHX Text

PNT NO.

AutoCAD SHX Text

ELEV

AutoCAD SHX Text

DESC

AutoCAD SHX Text

TYPE

AutoCAD SHX Text

CONTROL POINT

AutoCAD SHX Text

POINTS

AutoCAD SHX Text

SPOT ELEV

AutoCAD SHX Text

POWER/TELEPHONE POLE

AutoCAD SHX Text

TELEPHONE RISER

AutoCAD SHX Text

STORMDRAIN MANHOLE

AutoCAD SHX Text

SANITARY SEWER MANHOLE

AutoCAD SHX Text

JBOX COMMUNICATIONS

AutoCAD SHX Text

JUNCTION BOX - E.S.B.

AutoCAD SHX Text

ELECTRICAL PANEL

AutoCAD SHX Text

UNDERGROUND MARKER

AutoCAD SHX Text

GUY WIRE

AutoCAD SHX Text

SIGN

AutoCAD SHX Text

BORE HOLE

AutoCAD SHX Text

VALVE

AutoCAD SHX Text

WATER VALVE

AutoCAD SHX Text

WATER WELL

AutoCAD SHX Text

MISCELLANEOUS OBJECT

AutoCAD SHX Text

HYDRANT

AutoCAD SHX Text

BOLLARD

AutoCAD SHX Text

CLEAN OUT

AutoCAD SHX Text

ELECTRICAL BOX

AutoCAD SHX Text

TRANSFORMER

AutoCAD SHX Text

WATER METER

AutoCAD SHX Text

STREET LIGHT

AutoCAD SHX Text

MONITORING SITE

AutoCAD SHX Text

US SURVEY FOOT EQUIVALENT

AutoCAD SHX Text

TEST WELL

AutoCAD SHX Text

SHRUB

AutoCAD SHX Text

DECORATIVE ROCK

AutoCAD SHX Text

ROCK

AutoCAD SHX Text

ELECTRIC VAULT

AutoCAD SHX Text

GAS VAULT

AutoCAD SHX Text

COMMUNICATION VAULT

AutoCAD SHX Text

WATER VAULT

AutoCAD SHX Text

TELEPHONE VAULT

AutoCAD SHX Text

A/C OR HEAT PUMP

AutoCAD SHX Text

BUILDING OUTLINE

AutoCAD SHX Text

TREE P=PINE, O=OAK

AutoCAD SHX Text

SYMBOL LEGEND

AutoCAD SHX Text

TW

AutoCAD SHX Text S

AutoCAD SHX Text

SEPTIC VAULT

AutoCAD SHX Text

TR

L I C

I T

A T

I O

N

N

O

D E

S I G

N E

D

B

Y

D E

S C

R I P

T I O

N

A

M A

R K

S I Z

E

S U

B M

I T

T E

D

B

Y

D A

T E

C O

N T

R A

C H

E C

K E

D

B

Y

D R

A W

N

B

Y

I S

S U

E

D

A T

E

SHEET ID

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

US Army Corps of Engineers

U S

A

R M

Y

C

O R

E

N G

I N

E E

R S

S P

F I L

E

N

O

F I L

E

N

A M

E j:\Nellis\f35 airfield paving ramp\Topo\1525_NellisAFB_F35_Beddown_Topo\1525_NellisAFB_F35_Beddown_Topo.dwg

V-103

T O

P O

G R

A P

H Y

D

M

E L

L O

L

H

U L

C Y

J

M

A R

I N

O s

J A

M E

S

M

O

L I V

E R

N e l l i s A

F B

F

B e d d o w n

T o p o d w g

100% DESIGN

N E

L L

B

N

V

F

R

F I E

V

E M

E N

T S

R K

M F

I N

H

O U

S

I G

N

T R

E E

T

S A

C R

A M

E N

T O

C

A

S A

C R

A M

E N

S

T R

I C

T

P

T E

M B

X X

X X

X X

X

X X

X X

X

X X

X X

X X

X

X X

X

X X

X

A N

S I

D

AutoCAD SHX Text U

AutoCAD SHX Text U

AutoCAD SHX Text E 820,100

AutoCAD SHX Text E 820,200

AutoCAD SHX Text N 26,788,500

AutoCAD SHX Text N 26,788,600

AutoCAD SHX Text N 26,788,600

AutoCAD SHX Text N 26,788,800

AutoCAD SHX Text N 26,788,800

AutoCAD SHX Text N 26,788,900

AutoCAD SHX Text N 26,789,000

AutoCAD SHX Text N 26,789,100

AutoCAD SHX Text E 820,000

AutoCAD SHX Text E 820,000

AutoCAD SHX Text E 820,100

AutoCAD SHX Text E 820,200

AutoCAD SHX Text E 820,300

AutoCAD SHX Text E 820,300

AutoCAD SHX Text E 820,400

AutoCAD SHX Text E 820,400

AutoCAD SHX Text E 820,500

AutoCAD SHX Text E 820,500

AutoCAD SHX Text N 26,788,500

AutoCAD SHX Text N 26,788,700

AutoCAD SHX Text N 26,788,700

AutoCAD SHX Text N 26,788,900

AutoCAD SHX Text N 26,789,000

AutoCAD SHX Text N 26,789,100

AutoCAD SHX Text

2-24" CONC PIPES W/ FES INV(E)=1844.04 INV(W)=1844.11

AutoCAD SHX Text

TAXIWAY

AutoCAD SHX Text

TAXIWAY

AutoCAD SHX Text

RIPRAP

AutoCAD SHX Text

TOP OF SLOPE

AutoCAD SHX Text

TOE OF SLOPE

AutoCAD SHX Text

RIPRAP

AutoCAD SHX Text

DIRT

AutoCAD SHX Text

DIRT

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text

DIRT

AutoCAD SHX Text

DIRT

AutoCAD SHX Text

JOINT PATTERN (TYP)

AutoCAD SHX Text

2' WIDE STRIPING

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

MATCH TO SHEET V-109

AutoCAD SHX Text

MATCH TO SHEET V-104

AutoCAD SHX Text

ABBREVIATIONS

AutoCAD SHX Text A/C ------------AIR CONDITIONER BT -------------BLACKTOP CONC ------------CONCRETE CMP ------------CORRUGATED METAL PIPE DI ------------DROP INLET E ------------EAST EBB ------------GROVE OF ELDERBERRY BUSH EBBX ------------SPOT ELEVATION OF ELDERBERRY BUSH EL -------------ELEVATION E.S.B. ------------ELECTRIC SPLICE BOX INV ------------INVERT MH ------------MANHOLE M/W ------------MONITORING WELL

AutoCAD SHX Text N ------------NORTH ROCK ------------ROCK, BOULDER, OR OUTCROPPING ROCKX ------------SPOT ELEVATION ON ROCK, BOULDER S ------------SOUTH SD ------------STORM DRAIN S/S ------------SANITARY SEWER SDMH ------------STORM DRAIN MANHOLE SSMH ------------SANITARY SEWER MANHOLE TOP ------------TOP OF PIPE UG ------------UNDERGROUND VCP ------------VITRIFIED CONCRETE PIPE W ------------WEST XFMR ------------TRANSFORMER

AutoCAD SHX Text

SCALE: 1''=40'

AutoCAD SHX Text 40'

AutoCAD SHX Text 40'

AutoCAD SHX Text

AutoCAD SHX Text 20'

AutoCAD SHX Text N

AutoCAD SHX Text

1. GRID COORDINATES ARE IN US SURVEY FEET AND REFER TO THE NEVADA STATE COORDINATE SYSTEM ZONE EAST, GRID COORDINATES ARE IN US SURVEY FEET AND REFER TO THE NEVADA STATE COORDINATE SYSTEM ZONE EAST, NAD 83, AND ARE BASED ON CONTROL POINT GPS4 & LVS1. 2. ELEVATIONS ARE IN US SURVEY FEET AND REFER TO NAVD 1988, GEOID 12A AND ARE BASED ON CP GPS4 & LVS1. ELEVATIONS ARE IN US SURVEY FEET AND REFER TO NAVD 1988, GEOID 12A AND ARE BASED ON CP GPS4 & LVS1. 3. TOPOGRAPHY BY TOTAL STATION & RTK SURVEY METHODS. FIELD SURVEY DATES: JUNE 22-JUL 29, AUGUST 24-25, TOPOGRAPHY BY TOTAL STATION & RTK SURVEY METHODS. FIELD SURVEY DATES: JUNE 22-JUL 29, AUGUST 24-25, 2015 & JANUARY 25-29, 2016. 4. CONTOUR INTERVAL IS 1 FOOT. CONTOUR INTERVAL IS 1 FOOT. 5. COMBINED FACTOR IS 0.999928090.COMBINED FACTOR IS 0.999928090.

AutoCAD SHX Text

CONTROL TABULATION

AutoCAD SHX Text

STATION

AutoCAD SHX Text

NORTH

AutoCAD SHX Text

EAST

AutoCAD SHX Text

MON EL

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

GPS4

AutoCAD SHX Text 26788291.10

AutoCAD SHX Text 1867.79

AutoCAD SHX Text 1841.97

AutoCAD SHX Text

BRASS DISC

AutoCAD SHX Text

LVS1

AutoCAD SHX Text 26787828.47

AutoCAD SHX Text 813835.77

AutoCAD SHX Text 820040.58

AutoCAD SHX Text

BRASS DISC

AutoCAD SHX Text

WHEEL STOP

AutoCAD SHX Text W

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text J

AutoCAD SHX Text T

AutoCAD SHX Text C

AutoCAD SHX Text W

AutoCAD SHX Text 268.10

AutoCAD SHX Text (10")

AutoCAD SHX Text D

AutoCAD SHX Text S

AutoCAD SHX Text C

AutoCAD SHX Text W

AutoCAD SHX Text

CO

AutoCAD SHX Text E

AutoCAD SHX Text

PNT NO.

AutoCAD SHX Text

ELEV

AutoCAD SHX Text

DESC

AutoCAD SHX Text

TYPE

AutoCAD SHX Text

CONTROL POINT

AutoCAD SHX Text

POINTS

AutoCAD SHX Text

SPOT ELEV

AutoCAD SHX Text

POWER/TELEPHONE POLE

AutoCAD SHX Text

TELEPHONE RISER

AutoCAD SHX Text

STORMDRAIN MANHOLE

AutoCAD SHX Text

SANITARY SEWER MANHOLE

AutoCAD SHX Text

JBOX COMMUNICATIONS

AutoCAD SHX Text

JUNCTION BOX - E.S.B.

AutoCAD SHX Text

ELECTRICAL PANEL

AutoCAD SHX Text

UNDERGROUND MARKER

AutoCAD SHX Text

GUY WIRE

AutoCAD SHX Text

SIGN

AutoCAD SHX Text

BORE HOLE

AutoCAD SHX Text

VALVE

AutoCAD SHX Text

WATER VALVE

AutoCAD SHX Text

WATER WELL

AutoCAD SHX Text

MISCELLANEOUS OBJECT

AutoCAD SHX Text

HYDRANT

AutoCAD SHX Text

BOLLARD

AutoCAD SHX Text

CLEAN OUT

AutoCAD SHX Text

ELECTRICAL BOX

AutoCAD SHX Text

TRANSFORMER

AutoCAD SHX Text

WATER METER

AutoCAD SHX Text

STREET LIGHT

AutoCAD SHX Text

MONITORING SITE

AutoCAD SHX Text

US SURVEY FOOT EQUIVALENT

AutoCAD SHX Text

TEST WELL

AutoCAD SHX Text

SHRUB

AutoCAD SHX Text

DECORATIVE ROCK

AutoCAD SHX Text

ROCK

AutoCAD SHX Text

ELECTRIC VAULT

AutoCAD SHX Text

GAS VAULT

AutoCAD SHX Text

COMMUNICATION VAULT

AutoCAD SHX Text

WATER VAULT

AutoCAD SHX Text

TELEPHONE VAULT

AutoCAD SHX Text

A/C OR HEAT PUMP

AutoCAD SHX Text

BUILDING OUTLINE

AutoCAD SHX Text

TREE P=PINE, O=OAK

AutoCAD SHX Text

SYMBOL LEGEND

AutoCAD SHX Text

TW

AutoCAD SHX Text S

AutoCAD SHX Text

SEPTIC VAULT

AutoCAD SHX Text

TR

L I C

I T

A T

I O

N

N

O

D E

S I G

N E

D

B

Y

D E

S C

R I P

T I O

N

A

M A

R K

S I Z

E

S U

B M

I T

T E

D

B

Y

D A

T E

C O

N T

R A

C H

E C

K E

D

B

Y

D R

A W

N

B

Y

I S

S U

E

D

A T

E

SHEET ID

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

US Army Corps of Engineers

U S

A

R M

Y

C

O R

E

N G

I N

E E

R S

S P

F I L

E

N

O

F I L

E

N

A M

E j:\Nellis\f35 airfield paving ramp\Topo\1525_NellisAFB_F35_Beddown_Topo\1525_NellisAFB_F35_Beddown_Topo.dwg

V-104

T O

P O

G R

A P

H Y

D

M

E L

L O

L

H

U L

C Y

J

M

A R

I N

O s

J A

M E

S

M

O

L I V

E R

N e l l i s A

F B

F

B e d d o w n

T o p o d w g

100% DESIGN

N E

L L

B

N

V

F

R

F I E

V

E M

E N

T S

R K

M F

I N

H

O U

S

I G

N

T R

E E

T

S A

C R

A M

E N

T O

C

A

S A

C R

A M

E N

S

T R

I C

T

P

T E

M B

X X

X X

X X

X

X X

X X

X

X X

X X

X X

X

X X

X

X X

X

A N

S I

D

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text E 820,800

AutoCAD SHX Text E 820,900

AutoCAD SHX Text E 821,000

AutoCAD SHX Text E 821,100

AutoCAD SHX Text E 821,100

AutoCAD SHX Text E 821,200

AutoCAD SHX Text E 821,200

AutoCAD SHX Text N 26,788,500

AutoCAD SHX Text N 26,788,600

AutoCAD SHX Text N 26,788,600

AutoCAD SHX Text N 26,788,700

AutoCAD SHX Text N 26,788,800

AutoCAD SHX Text N 26,788,800

AutoCAD SHX Text N 26,789,000

AutoCAD SHX Text N 26,789,000

AutoCAD SHX Text N 26,789,100

AutoCAD SHX Text N 26,789,100

AutoCAD SHX Text E 820,600

AutoCAD SHX Text E 820,600

AutoCAD SHX Text E 820,700

AutoCAD SHX Text E 820,700

AutoCAD SHX Text E 820,800

AutoCAD SHX Text E 820,900

AutoCAD SHX Text E 821,000

AutoCAD SHX Text N 26,788,700

AutoCAD SHX Text N 26,788,900

AutoCAD SHX Text N 26,788,900

AutoCAD SHX Text

2-18" CONC PIPES W/ FES INV(E)=1843.90 INV(W)=1843.46

AutoCAD SHX Text

AIRFIELD APRON

AutoCAD SHX Text

TIE DOWN (TYP)

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text

RIPRAP

AutoCAD SHX Text

TOP OF SLOPE

AutoCAD SHX Text

TOE OF SLOPE

AutoCAD SHX Text

DECORATIVE GRAVEL

AutoCAD SHX Text

DIRT

AutoCAD SHX Text

DIRT

AutoCAD SHX Text

CONCRETE

AutoCAD SHX Text

CONCRETE

AutoCAD SHX Text

CONCRETE

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text

AIRCRAFT STRIPING

AutoCAD SHX Text

AIRCRAFT STRIPING

AutoCAD SHX Text

AIRCRAFT STRIPING

AutoCAD SHX Text

JOINT PATTERN (TYP)

AutoCAD SHX Text

MARKER UNDERGROUND WATER

AutoCAD SHX Text

SDMH SEALED SHUT UNABLE TO OPEN

AutoCAD SHX Text

SDMH BOX INV=1845.21 24" CONC PIPES THRU NOT MEASURED

AutoCAD SHX Text

DI NE 24"CONC=1845.43 SW 24"CONC=1845.38

AutoCAD SHX Text

DI NE 24"CONC=1844.88 SW1 18"CONC=1844.83 SW2 18"CONC=1844.83

AutoCAD SHX Text

SDMH BOX INV=1844.70 2-24" CONC PIPES THRU, NOT MEASURED OUTLET AT POND.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

MATCH TO SHEET V-110

AutoCAD SHX Text

MATCH TO SHEET V-103

AutoCAD SHX Text

MATCH TO SHEET V-105

AutoCAD SHX Text

MATCH TO SHEET V-101

AutoCAD SHX Text

ABBREVIATIONS

AutoCAD SHX Text A/C ------------AIR CONDITIONER BT -------------BLACKTOP CONC ------------CONCRETE CMP ------------CORRUGATED METAL PIPE DI ------------DROP INLET E ------------EAST EBB ------------GROVE OF ELDERBERRY BUSH EBBX ------------SPOT ELEVATION OF ELDERBERRY BUSH EL -------------ELEVATION E.S.B. ------------ELECTRIC SPLICE BOX INV ------------INVERT MH ------------MANHOLE M/W ------------MONITORING WELL

AutoCAD SHX Text N ------------NORTH ROCK ------------ROCK, BOULDER, OR OUTCROPPING ROCKX ------------SPOT ELEVATION ON ROCK, BOULDER S ------------SOUTH SD ------------STORM DRAIN S/S ------------SANITARY SEWER SDMH ------------STORM DRAIN MANHOLE SSMH ------------SANITARY SEWER MANHOLE TOP ------------TOP OF PIPE UG ------------UNDERGROUND VCP ------------VITRIFIED CONCRETE PIPE W ------------WEST XFMR ------------TRANSFORMER

AutoCAD SHX Text

SCALE: 1''=40'

AutoCAD SHX Text 40'

AutoCAD SHX Text 40'

AutoCAD SHX Text

AutoCAD SHX Text 20'

AutoCAD SHX Text N

AutoCAD SHX Text

1. GRID COORDINATES ARE IN US SURVEY FEET AND REFER TO THE NEVADA STATE COORDINATE SYSTEM ZONE EAST, GRID COORDINATES ARE IN US SURVEY FEET AND REFER TO THE NEVADA STATE COORDINATE SYSTEM ZONE EAST, NAD 83, AND ARE BASED ON CONTROL POINT GPS4 & LVS1. 2. ELEVATIONS ARE IN US SURVEY FEET AND REFER TO NAVD 1988, GEOID 12A AND ARE BASED ON CP GPS4 & LVS1. ELEVATIONS ARE IN US SURVEY FEET AND REFER TO NAVD 1988, GEOID 12A AND ARE BASED ON CP GPS4 & LVS1. 3. TOPOGRAPHY BY TOTAL STATION & RTK SURVEY METHODS. FIELD SURVEY DATES: JUNE 22-JUL 29, AUGUST 24-25, TOPOGRAPHY BY TOTAL STATION & RTK SURVEY METHODS. FIELD SURVEY DATES: JUNE 22-JUL 29, AUGUST 24-25, 2015 & JANUARY 25-29, 2016. 4. CONTOUR INTERVAL IS 1 FOOT. CONTOUR INTERVAL IS 1 FOOT. 5. COMBINED FACTOR IS 0.999928090.COMBINED FACTOR IS 0.999928090.

AutoCAD SHX Text

CONTROL TABULATION

AutoCAD SHX Text

STATION

AutoCAD SHX Text

NORTH

AutoCAD SHX Text

EAST

AutoCAD SHX Text

MON EL

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

GPS4

AutoCAD SHX Text 26788291.10

AutoCAD SHX Text 1867.79

AutoCAD SHX Text 1841.97

AutoCAD SHX Text

BRASS DISC

AutoCAD SHX Text

LVS1

AutoCAD SHX Text 26787828.47

AutoCAD SHX Text 813835.77

AutoCAD SHX Text 820040.58

AutoCAD SHX Text

BRASS DISC

AutoCAD SHX Text

WHEEL STOP

AutoCAD SHX Text W

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text J

AutoCAD SHX Text T

AutoCAD SHX Text C

AutoCAD SHX Text W

AutoCAD SHX Text 268.10

AutoCAD SHX Text (10")

AutoCAD SHX Text D

AutoCAD SHX Text S

AutoCAD SHX Text C

AutoCAD SHX Text W

AutoCAD SHX Text

CO

AutoCAD SHX Text E

AutoCAD SHX Text

PNT NO.

AutoCAD SHX Text

ELEV

AutoCAD SHX Text

DESC

AutoCAD SHX Text

TYPE

AutoCAD SHX Text

CONTROL POINT

AutoCAD SHX Text

POINTS

AutoCAD SHX Text

SPOT ELEV

AutoCAD SHX Text

POWER/TELEPHONE POLE

AutoCAD SHX Text

TELEPHONE RISER

AutoCAD SHX Text

STORMDRAIN MANHOLE

AutoCAD SHX Text

SANITARY SEWER MANHOLE

AutoCAD SHX Text

JBOX COMMUNICATIONS

AutoCAD SHX Text

JUNCTION BOX - E.S.B.

AutoCAD SHX Text

ELECTRICAL PANEL

AutoCAD SHX Text

UNDERGROUND MARKER

AutoCAD SHX Text

GUY WIRE

AutoCAD SHX Text

SIGN

AutoCAD SHX Text

BORE HOLE

AutoCAD SHX Text

VALVE

AutoCAD SHX Text

WATER VALVE

AutoCAD SHX Text

WATER WELL

AutoCAD SHX Text

MISCELLANEOUS OBJECT

AutoCAD SHX Text

HYDRANT

AutoCAD SHX Text

BOLLARD

AutoCAD SHX Text

CLEAN OUT

AutoCAD SHX Text

ELECTRICAL BOX

AutoCAD SHX Text

TRANSFORMER

AutoCAD SHX Text

WATER METER

AutoCAD SHX Text

STREET LIGHT

AutoCAD SHX Text

MONITORING SITE

AutoCAD SHX Text

US SURVEY FOOT EQUIVALENT

AutoCAD SHX Text

TEST WELL

AutoCAD SHX Text

SHRUB

AutoCAD SHX Text

DECORATIVE ROCK

AutoCAD SHX Text

ROCK

AutoCAD SHX Text

ELECTRIC VAULT

AutoCAD SHX Text

GAS VAULT

AutoCAD SHX Text

COMMUNICATION VAULT

AutoCAD SHX Text

WATER VAULT

AutoCAD SHX Text

TELEPHONE VAULT

AutoCAD SHX Text

A/C OR HEAT PUMP

AutoCAD SHX Text

BUILDING OUTLINE

AutoCAD SHX Text

TREE P=PINE, O=OAK

AutoCAD SHX Text

SYMBOL LEGEND

AutoCAD SHX Text

TW

AutoCAD SHX Text S

AutoCAD SHX Text

SEPTIC VAULT

AutoCAD SHX Text

TR

L I C

I T

A T

I O

N

N

O

D E

S I G

N E

D

B

Y

D E

S C

R I P

T I O

N

A

M A

R K

S I Z

E

S U

B M

I T

T E

D

B

Y

D A

T E

C O

N T

R A

C H

E C

K E

D

B

Y

D R

A W

N

B

Y

I S

S U

E

D

A T

E

SHEET ID

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

US Army Corps of Engineers

U S

A

R M

Y

C

O R

E

N G

I N

E E

R S

S P

F I L

E

N

O

F I L

E

N

A M

E j:\Nellis\f35 airfield paving ramp\Topo\1525_NellisAFB_F35_Beddown_Topo\1525_NellisAFB_F35_Beddown_Topo.dwg

V-105

T O

P O

G R

A P

H Y

D

M

E L

L O

L

H

U L

C Y

J

M

A R

I N

O s

J A

M E

S

M

O

L I V

E R

N e l l i s A

F B

F

B e d d o w n

T o p o d w g

100% DESIGN

N E

L L

B

N

V

F

R

F I E

V

E M

E N

T S

R K

M F

I N

H

O U

S

I G

N

T R

E E

T

S A

C R

A M

E N

T O

C

A

S A

C R

A M

E N

S

T R

I C

T

P

T E

M B

X X

X X

X X

X

X X

X X

X

X X

X X

X X

X

X X

X

X X

X

A N

S I

D

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E 821,300

AutoCAD SHX Text E 821,500

AutoCAD SHX Text E 821,600

AutoCAD SHX Text E 821,600

AutoCAD SHX Text E 821,700

AutoCAD SHX Text E 821,800

AutoCAD SHX Text E 821,900

AutoCAD SHX Text E 821,900

AutoCAD SHX Text N 26,788,600

AutoCAD SHX Text N 26,788,700

AutoCAD SHX Text N 26,788,800

AutoCAD SHX Text N 26,788,900

AutoCAD SHX Text N 26,788,900

AutoCAD SHX Text N 26,789,000

AutoCAD SHX Text N 26,789,000

AutoCAD SHX Text N 26,789,100

AutoCAD SHX Text E 821,300

AutoCAD SHX Text E 821,400

AutoCAD SHX Text E 821,400

AutoCAD SHX Text E 821,500

AutoCAD SHX Text E 821,700

AutoCAD SHX Text E 821,800

AutoCAD SHX Text N 26,788,600

AutoCAD SHX Text N 26,788,700

AutoCAD SHX Text N 26,788,800

AutoCAD SHX Text N 26,789,100

AutoCAD SHX Text

PERIMETER ROAD

AutoCAD SHX Text

DIRT DRIVEWAY

AutoCAD SHX Text

DIRT DRIVEWAY

AutoCAD SHX Text

PARKING LOT

AutoCAD SHX Text

AIRFIELD APRON

AutoCAD SHX Text

PARKING LOT

AutoCAD SHX Text C

AutoCAD SHX Text

DECORATIVE GRAVEL

AutoCAD SHX Text

DECORATIVE GRAVEL

AutoCAD SHX Text

SIDEWALK

AutoCAD SHX Text

DIRT

AutoCAD SHX Text

CONCRETE

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text

AIRCRAFT STRIPING

AutoCAD SHX Text

BLOCK WALL

AutoCAD SHX Text

JOINT PATTERN (TYP)

AutoCAD SHX Text

SDMH BOX INV=1845.80 24" CONC PIPES THRU. NOT MEASURED

AutoCAD SHX Text

SSMH NE 8"VCP=1837.73 SW 8"VCP=1837.63

AutoCAD SHX Text

CURB & GUTTER (TYP)

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text S

AutoCAD SHX Text

MATCH TO SHEET V-111

AutoCAD SHX Text

MATCH TO SHEET V-104

AutoCAD SHX Text

MATCH TO SHEET V-106

AutoCAD SHX Text

MATCH TO SHEET V-102

AutoCAD SHX Text

ABBREVIATIONS

AutoCAD SHX Text A/C ------------AIR CONDITIONER BT -------------BLACKTOP CONC ------------CONCRETE CMP ------------CORRUGATED METAL PIPE DI ------------DROP INLET E ------------EAST EBB ------------GROVE OF ELDERBERRY BUSH EBBX ------------SPOT ELEVATION OF ELDERBERRY BUSH EL -------------ELEVATION E.S.B. ------------ELECTRIC SPLICE BOX INV ------------INVERT MH ------------MANHOLE M/W ------------MONITORING WELL

AutoCAD SHX Text N ------------NORTH ROCK ------------ROCK, BOULDER, OR OUTCROPPING ROCKX ------------SPOT ELEVATION ON ROCK, BOULDER S ------------SOUTH SD ------------STORM DRAIN S/S ------------SANITARY SEWER SDMH ------------STORM DRAIN MANHOLE SSMH ------------SANITARY SEWER MANHOLE TOP ------------TOP OF PIPE UG ------------UNDERGROUND VCP ------------VITRIFIED CONCRETE PIPE W ------------WEST XFMR ------------TRANSFORMER

AutoCAD SHX Text

SCALE: 1''=40'

AutoCAD SHX Text 40'

AutoCAD SHX Text 40'

AutoCAD SHX Text

AutoCAD SHX Text 20'

AutoCAD SHX Text N

AutoCAD SHX Text

1. GRID COORDINATES ARE IN US SURVEY FEET AND REFER TO THE NEVADA STATE COORDINATE SYSTEM ZONE EAST, GRID COORDINATES ARE IN US SURVEY FEET AND REFER TO THE NEVADA STATE COORDINATE SYSTEM ZONE EAST, NAD 83, AND ARE BASED ON CONTROL POINT GPS4 & LVS1. 2. ELEVATIONS ARE IN US SURVEY FEET AND REFER TO NAVD 1988, GEOID 12A AND ARE BASED ON CP GPS4 & LVS1. ELEVATIONS ARE IN US SURVEY FEET AND REFER TO NAVD 1988, GEOID 12A AND ARE BASED ON CP GPS4 & LVS1. 3. TOPOGRAPHY BY TOTAL STATION & RTK SURVEY METHODS. FIELD SURVEY DATES: JUNE 22-JUL 29, AUGUST 24-25, TOPOGRAPHY BY TOTAL STATION & RTK SURVEY METHODS. FIELD SURVEY DATES: JUNE 22-JUL 29, AUGUST 24-25, 2015 & JANUARY 25-29, 2016. 4. CONTOUR INTERVAL IS 1 FOOT. CONTOUR INTERVAL IS 1 FOOT. 5. COMBINED FACTOR IS 0.999928090.COMBINED FACTOR IS 0.999928090.

AutoCAD SHX Text

CONTROL TABULATION

AutoCAD SHX Text

STATION

AutoCAD SHX Text

NORTH

AutoCAD SHX Text

EAST

AutoCAD SHX Text

MON EL

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

GPS4

AutoCAD SHX Text 26788291.10

AutoCAD SHX Text 1867.79

AutoCAD SHX Text 1841.97

AutoCAD SHX Text

BRASS DISC

AutoCAD SHX Text

LVS1

AutoCAD SHX Text 26787828.47

AutoCAD SHX Text 813835.77

AutoCAD SHX Text 820040.58

AutoCAD SHX Text

BRASS DISC

AutoCAD SHX Text

WHEEL STOP

AutoCAD SHX Text W

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text J

AutoCAD SHX Text T

AutoCAD SHX Text C

AutoCAD SHX Text W

AutoCAD SHX Text 268.10

AutoCAD SHX Text (10")

AutoCAD SHX Text D

AutoCAD SHX Text S

AutoCAD SHX Text C

AutoCAD SHX Text W

AutoCAD SHX Text

CO

AutoCAD SHX Text E

AutoCAD SHX Text

PNT NO.

AutoCAD SHX Text

ELEV

AutoCAD SHX Text

DESC

AutoCAD SHX Text

TYPE

AutoCAD SHX Text

CONTROL POINT

AutoCAD SHX Text

POINTS

AutoCAD SHX Text

SPOT ELEV

AutoCAD SHX Text

POWER/TELEPHONE POLE

AutoCAD SHX Text

TELEPHONE RISER

AutoCAD SHX Text

STORMDRAIN MANHOLE

AutoCAD SHX Text

SANITARY SEWER MANHOLE

AutoCAD SHX Text

JBOX COMMUNICATIONS

AutoCAD SHX Text

JUNCTION BOX - E.S.B.

AutoCAD SHX Text

ELECTRICAL PANEL

AutoCAD SHX Text

UNDERGROUND MARKER

AutoCAD SHX Text

GUY WIRE

AutoCAD SHX Text

SIGN

AutoCAD SHX Text

BORE HOLE

AutoCAD SHX Text

VALVE

AutoCAD SHX Text

WATER VALVE

AutoCAD SHX Text

WATER WELL

AutoCAD SHX Text

MISCELLANEOUS OBJECT

AutoCAD SHX Text

HYDRANT

AutoCAD SHX Text

BOLLARD

AutoCAD SHX Text

CLEAN OUT

AutoCAD SHX Text

ELECTRICAL BOX

AutoCAD SHX Text

TRANSFORMER

AutoCAD SHX Text

WATER METER

AutoCAD SHX Text

STREET LIGHT

AutoCAD SHX Text

MONITORING SITE

AutoCAD SHX Text

US SURVEY FOOT EQUIVALENT

AutoCAD SHX Text

TEST WELL

AutoCAD SHX Text

SHRUB

AutoCAD SHX Text

DECORATIVE ROCK

AutoCAD SHX Text

ROCK

AutoCAD SHX Text

ELECTRIC VAULT

AutoCAD SHX Text

GAS VAULT

AutoCAD SHX Text

COMMUNICATION VAULT

AutoCAD SHX Text

WATER VAULT

AutoCAD SHX Text

TELEPHONE VAULT

AutoCAD SHX Text

A/C OR HEAT PUMP

AutoCAD SHX Text

BUILDING OUTLINE

AutoCAD SHX Text

TREE P=PINE, O=OAK

AutoCAD SHX Text

SYMBOL LEGEND

AutoCAD SHX Text

TW

AutoCAD SHX Text S

AutoCAD SHX Text

SEPTIC VAULT

AutoCAD SHX Text

TR

AutoCAD SHX Text

RUNWAY LIGHT

MATCH TO SHEET V-112

L I C

I T

A T

I O

N

N

O

D E

S I G

N E

D

B

Y

D E

S C

R I P

T I O

N

A

M A

R K

S I Z

E

S U

B M

I T

T E

D

B

Y

D A

T E

C O

N T

R A

C H

E C

K E

D

B

Y

D R

A W

N

B

Y

I S

S U

E

D

A T

E

SHEET ID

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

US Army Corps of Engineers

U S

A

R M

Y

C

O R

E

N G

I N

E E

R S

S P

F I L

E

N

O

F I L

E

N

A M

E j:\Nellis\f35 airfield paving ramp\Topo\1525_NellisAFB_F35_Beddown_Topo\1525_NellisAFB_F35_Beddown_Topo.dwg

V-106

T O

P O

G R

A P

H Y

D

M

E L

L O

L

H

U L

C Y

J

M

A R

I N

O s

J A

M E

S

M

O

L I V

E R

N e l l i s A

F B

F

B e d d o w n

T o p o d w g

100% DESIGN

N E

L L

B

N

V

F

R

F I E

V

E M

E N

T S

R K

M F

I N

H

O U

S

I G

N

T R

E E

T

S A

C R

A M

E N

T O

C

A

S A

C R

A M

E N

S

T R

I C

T

P

T E

M B

X X

X X

X X

X

X X

X X

X

X X

X X

X X

X

X X

X

X X

X

A N

S I

D

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E 822,000

AutoCAD SHX Text E 822,000

AutoCAD SHX Text E 822,100

AutoCAD SHX Text E 822,100

AutoCAD SHX Text E 822,400

AutoCAD SHX Text E 822,400

AutoCAD SHX Text N 26,788,700

AutoCAD SHX Text N 26,788,900

AutoCAD SHX Text N 26,789,100

AutoCAD SHX Text N 26,789,200

AutoCAD SHX Text N 26,789,200

AutoCAD SHX Text N 26,789,300

AutoCAD SHX Text N 26,789,300

AutoCAD SHX Text E 822,200

AutoCAD SHX Text E 822,200

AutoCAD SHX Text E 822,300

AutoCAD SHX Text E 822,300

AutoCAD SHX Text E 822,500

AutoCAD SHX Text E 822,500

AutoCAD SHX Text N 26,788,700

AutoCAD SHX Text N 26,788,800

AutoCAD SHX Text N 26,788,800

AutoCAD SHX Text N 26,788,900

AutoCAD SHX Text N 26,789,000

AutoCAD SHX Text N 26,789,000

AutoCAD SHX Text N 26,789,100

AutoCAD SHX Text

12" CMP INV=1846.24

AutoCAD SHX Text

12" CMP INV=1846.11

AutoCAD SHX Text

O'BANNON ROAD

AutoCAD SHX Text

PERIMETER ROAD

AutoCAD SHX Text

PARKING LOT

AutoCAD SHX Text

TR

AutoCAD SHX Text

TOP OF SLOPE

AutoCAD SHX Text

TOE OF SLOPE

AutoCAD SHX Text

DIRT

AutoCAD SHX Text

DIRT

AutoCAD SHX Text

SSMH SEALED SHUT UNABLE TO OPEN

AutoCAD SHX Text

SSMH SEALED SHUT UNABLE TO OPEN

AutoCAD SHX Text

SSMH N 6"VCP=1839.91 E 8"VCP=1839.66 W 8"VCP=1839.54

AutoCAD SHX Text

SSMH N 6"VCP=1845.55 S 6"VCP=1845.56

AutoCAD SHX Text

SSMH E 8"VCP=1839.15 SW 8"VCP=1839.14

AutoCAD SHX Text

CURB & GUTTER (TYP)

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text W

AutoCAD SHX Text W

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text E

AutoCAD SHX Text

DIRT

AutoCAD SHX Text

DIRT

AutoCAD SHX Text

DIRT

AutoCAD SHX Text U

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text

MATCH TO SHEET V-112

AutoCAD SHX Text

MATCH TO SHEET V-105

AutoCAD SHX Text

MATCH TO SHEET V-107

AutoCAD SHX Text

ABBREVIATIONS

AutoCAD SHX Text A/C ------------AIR CONDITIONER BT -------------BLACKTOP CONC ------------CONCRETE CMP ------------CORRUGATED METAL PIPE DI ------------DROP INLET E ------------EAST EBB ------------GROVE OF ELDERBERRY BUSH EBBX ------------SPOT ELEVATION OF ELDERBERRY BUSH EL -------------ELEVATION E.S.B. ------------ELECTRIC SPLICE BOX INV ------------INVERT MH ------------MANHOLE M/W ------------MONITORING WELL

AutoCAD SHX Text N ------------NORTH ROCK ------------ROCK, BOULDER, OR OUTCROPPING ROCKX ------------SPOT ELEVATION ON ROCK, BOULDER S ------------SOUTH SD ------------STORM DRAIN S/S ------------SANITARY SEWER SDMH ------------STORM DRAIN MANHOLE SSMH ------------SANITARY SEWER MANHOLE TOP ------------TOP OF PIPE UG ------------UNDERGROUND VCP ------------VITRIFIED CONCRETE PIPE W ------------WEST XFMR ------------TRANSFORMER

AutoCAD SHX Text

SCALE: 1''=40'

AutoCAD SHX Text 40'

AutoCAD SHX Text 40'

AutoCAD SHX Text

AutoCAD…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .