AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICIATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPIRATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION ( Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

1 1

0002 Aug 28, 2015

W912PL

USACE-LOS ANGELES DISTRICT

CONTRACTING DIVISION, WEST REGION BRANCH

915 Wilshire Blvd, Suite 1440

LOS ANGELES, CA 90017

W912PL-15-B-0009

Aug 5, 2015

Santa Ana River Mainstem Lower Santa Ana River Channel Reach 9, Phase 4 (Gypsum Canyon Road to Coal Canyon Road) Orange County, CA.

Amendment issued to revise:

- Table of Contents

- Section 00 10 00 CLIN Pricing Schedule. CLIN 0035 changed.

INSTRUCTIONS

Instructions for items other than those that are self-explanatory, are as follows:

Item 1 (Contract ID Code) . Insert the contract type identification code that appears in the title block of the contract being modified.

Item 3 (Effective date) .

(1)

(2)

(3)

(4)

(5)

For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.

For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.

For a modification issued as an initial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.

For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.

For a modification confirming the contacting officer's determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision.

(a)

(b)

(c)

(d)

(e)

(f)

Item 6 (Issued By) . Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.

Item 8 (Name and Address of Contractor) . For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.

Item 9, (Amendment of Solicitation No. - Dated), and 10, (Modification of Contract/Order No. - Dated ). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order.

Item 12 (Accounting and Appropriation Data) .

When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries.

(2) Accounting classification Net decrease $

Include subject matter or short title of solicitation/contract where feasible.

Item 16B . The contracting officer's signature is not required on solicitation amendments. The contracting offier's signature is normally affixed last on supplemental agreements.

(i)

NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation sheet".

Item 13 . Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)

Item 14 (Description of Amendment/Modification) .

Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:

Total contract price increased by $

Total contract price decreased by $

Total contract price unchanged.

State reason for modification.

When removing, reinstating, or adding funds, identify the contract items and accounting classifications.

When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to --

A reference to the letter determination; and

A statement of the net amount determined to be due in settlement of the contract.

(g)

(h)

(i)

(ii)

(1)

(2)

(3)

(4)

(5)

(6)

(i)

(ii)

(iii)

STANDARD FORM 30 (REV. 10-83) BACK

(1) Accounting classification Net increase $

Lower Santa Ana River Reach 9 Phase 4 W912PL-15-B-0009 Orange County, California

Table of Contents - 1 Amendment 2

PROJECT TABLE OF CONTENTS

DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS

SF-1442 Solicitation, Offer and Award

00 01 05 Certification Page 00 10 00 CLIN Pricing Schedule Am1 Am2 00 21 00 Instructions Am1 00 21 13 Instructions to Bidders

00 45 00 Representations and Certifications 00 70 00 Conditions of the Contract 00 73 00 Special Contract Requirements Am1 00 73 46 Wage Rates Am1

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 Summary of Work Am1 01 22 00 Measurement and Payment Am1 01 30 00 Administrative Requirements 01 32 01.00 10 Project Schedule 01 33 00 Submittal Procedures 01 33 00a Submittal Register Am1 01 35 26 Governmental Safety Requirements

01 42 00 Sources for Reference Publications 01 45 00.00 10 Contractor Quality Control 01 45 00.10 10 Quality Control System (QCS) 01 50 02 Temporary Construction Facilities 01 57 20 Environmental Protection 01 57 23.00 10 Storm Water Pollution Prevention Measures 01 57 30 Diversion and Control of Water 01 78 00 Closeout Submittals

DIVISION 02 – EXISTING CONDITIONS

02 41 00 Demolition

DIVISION 03 - CONCRETE

03 25 00 Soil Cement 03 30 53 Miscellaneous Cast-In-Place Concrete 03 40 00.00 10 Plant-Precast Concrete Products for Below Grade Construction

DIVISION 05 - METALS

05 50 13 Metalwork Fabrication

Lower Santa Ana River Reach 9 Phase 4 W912PL-15-B-0009

Table of Contents - 2 Amendment 2

DIVISION 31 - EATHWORK

31 00 00 Earthwork Am1 31 03 00 Geotechnical Instrumentation Am1 31 05 22 Geotextiles Used as Filters 31 11 00 Clearing and Grubbing 31 32 11 Soil Surface Erosion Control

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 11 23 Aggregate Base Course 32 11 30 Decomposed Granite 32 12 10 Bituminous Tack Coats 32 12 16 Hot-Mix Asphalt (HMA) for Roads 32 17 24.00 10 Pavement Markings 32 31 13 Fences and Gates 32 92 19 Hydroseeding Am1 32 93 00 Exterior Planting (Santa Ana River)

DIVISION 33 - UTILITIES

33 40 00 Storm Drainage Utilities

DIVISION 35 – WATERWAY and MARINE CONSTUCTION

35 31 19 Stone Protection

ORANGE COUNTY FLOOD CONTROL DISTRICT SPECIFICATIONS

02726 Manhole and Precast Vault Construction 06620 Plastic Liner (Polyvinyl Chloride)

-- End of Project Table of Contents --

Lower Santa Ana River Reach 9 Phase 4 W912PL-15-B-0009

00 10 00 - 1 Amendment 2

SECTION 00 10 00

Solicitation Contract Line Item Number (CLIN) Schedule

BASE BID (Build Station SC 1382+10 through Station SC 1414+30)

Item Estimated No. Description Quantity Unit Unit Price Amount

0001 Mobilization and Demobilization 1 Job JA $

0002 Diversion and Control Of Water 1 Job JA $

0003 Erosion Control 1 Job JA $

0004 Traffic Control 1 Job JA $

0005 Geotechnical Instrumentation 1 Job JA $

0006 Drainage System Behind 1 Job JA $ Soil Cement

0007 Caltrans Post-Construction 1 Job JA $12,000.00

Deflection Study

0008 As-Built Drawings 1 Job JA $

0009 Clearing 20.1 AC $ $

0010 Sound Wall 10,330 LF $ $

0011 Permanent Bike Way 3,910 LF $ $_________

(Sta BW 20+00 through Sta BW 42+40 and Sta BW 69+40 through Sta BW 87+06.84)

0012 Temporary Bike Way 2,860 LF $ $_________

(Sta SC 1386+00 through Sta SC 1413+30)

0013 Sari Line Manhole Extension 1 EA $ $_________

(Sta BW 41+37.66)

0014 Remove Existing Bike Way 7,050 LF $ $_________

0015 Excavation 105,100 CY $ $

0016 Demolish Existing Roller 400 CY $ $ Compacted Concrete

0017 Structural Fill 31,300 CY $ $

0018 Soil Cement 34,200 CY $ $

Lower Santa Ana River Reach 9 Phase 4 W912PL-15-B-0009

00 10 00 - 2 Amendment 2

0019 Engineered Fill 57,800 CY $ $

0020 24-In RCP with Outlet 1 EA $ $ Structure

0021 5-Ft By 5-Ft RCB with 2 EA $ $ Outlet Structure

0022 48-In RCP with Inlet and 1 EA $ $ Outlet Structure (complete)

0023 Decomposed Granite (DG) 7,800 SY $ $

0024 Cable Fence 3,200 LF $ $

0025 Hydroseed and Landscape 16.75 AC $ $_________ Plantings

0026 Landscape Plantings Maintenance 16.75 AC $ $_________

0027 Temporary Irrigation System 16.75 AC $ $_________

0028 Vehicle Gate 1 EA $ _ $_________

TOTAL BASE BID: $

(Line Items 0001 through 0028)

Lower Santa Ana River Reach 9 Phase 4 W912PL-15-B-0009

00 10 00 - 3 Amendment 2

OPTION ITEMS

BID OPTION 1 (Fill and Permanent Bike Way)

0029 Install and Removal of 5,300 LF $ $_________

Temporary Fence (Along TCE)

0030 Temporary Bike Way Over SC 2,700 LF $ $ (Sta SC 1386+00 Through Sta SC 1413+30)

0031 Remove Temporary(Base) Bike Way 2,860 LF $ $ (Sta SC 1386+00 Through Sta SC 1413+30)

0032 Engineered Fill 28,400 CY $ $

0033 24-In RCP Extension with Manhole 1 EA $ $

0034 5-Ft By 5-Ft RCB 2 EA $ $ Extension with Manhole

0035 Sari Line Manhole Extension 4 EA $ $

0036 Permanent Bike Way 2,700 LF $ $

0037 Hydroseed and Landscape 3.75 AC $ $ Plantings

0038 Landscape Plantings Maintenance 3.75 AC $ $_________

0039 Temporary Irrigation System 3.75 AC $ $_________

0040 Permanent Fence 8,120 LF $ $ (Along Caltrans Right-Of-Way)

0041 Hydroseeding, Maintenance and 14.5 AC $ $ Temporary Irrigation System – Borrow Area

SUB TOTAL OPTION 1 ITEMS: $

(Line Items 0029 through 0041)

Lower Santa Ana River Reach 9 Phase 4 W912PL-15-B-0009

00 10 00 - 4 Amendment 2

BID OPTION 2 (Gully Repair)

No. Description Quantity Unit Unit Price Amount

0042 Excavation 1,450 CY $ $

0043 Dispose Excess Material 1,000 CY $ $

0044 Engineered Fill 300 CY $ $

0045 Hydroseed and Landscape 2.5 AC $ $ Plantings

0046 Landscape Plantings Maintenance 2.5 AC $ $_________

0047 Temporary Irrigation System 2.5 AC $ $_________

SUB TOTAL OPTION 2 ITEMS: $

(Line Items 0042 through 0047)

BID OPTION 3 (Extend Soil Cement Sta SC 1414+30 Through Sta SC 1420+17.79)

No. Description Quantity Unit Unit Price Amount

0048 Diversion and Control 1 Job JA $_________ of Water

0049 Erosion Control 1 Job JA $_________

0050 Drainage System Behind 1 Job JA $_________

Soil Cement

0051 Excavation 25,200 CY $ $

0052 Structural Fill 5,200 CY $ $

0053 Soil Cement 6,900 CY $ $

0054 Engineered Fill 12,400 CY $ $

0055 Decomposed Granite (DG) 950 SY $ $

0056 Cable Fence 600 LF $ $

0057 Hydroseed and Landscape 2.5 AC $ $_________ Plantings

0058 Landscape Plantings Maintenance 2.5 AC $ $_________

0059 Temporary Irrigation System 2.5 AC $ $_________

SUB TOTAL OPTION 3 ITEMS: $

(Line Items 0048 through 0059)

Lower Santa Ana River Reach 9 Phase 4 W912PL-15-B-0009

00 10 00 - 5 Amendment 2

BID OPTION 4

0060 Caltrans Pre-Construction 1 Job JA $12,000.00 Deflection Study

SUB TOTAL OPTION 4 ITEMS: $

(Line Items 0060 through 0060)

TOTAL OF ALL OPTION ITEMS: $

(Line Items 0029 through 0060)

TOTAL ESTIMATED AMOUNT: $

(Base Bid plus All Option Items)

Abbreviations:

AC = Acre CY = Cubic Yard EA = Each LF = Linear Foot JA = Job Amount SF = Square Foot Ton = 2000 pounds

SC – Soil Cement BW - Bikeway

ADDITIONAL BIDDER'S NOTES:

1. All extensions of the unit prices shown will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered to be the bid.

2. If a modification to a bid based on unit prices is submitted which provides for a job amount adjustment to the total estimated amount, the application of the job amount adjustment to each unit price in the Price Schedule must be stated. If it is not stated, the bidder agrees that the lump sum adjustment shall be applied on a pro rata basis to every unit price in the Price Schedule.

3. Prices must be submitted on all individual items of the Solicitation, Contract Line Item Number (CLIN) Schedule. Failure to do so may cause the bid to be determined “non-responsive.”

Lower Santa Ana River Reach 9 Phase 4 W912PL-15-B-0009

00 10 00 - 6 Amendment 2

4. For the purpose of initial evaluation of bids, the following will be utilized in resolving arithmetic discrepancies found on the face of the Price Schedule as submitted by the bidder:

a. Obviously misplaced decimal points will be corrected;

b. In case of discrepancy between the unit price and the extended price, the unit price will govern;

c. Apparent errors in extensions of unit prices will be corrected;

d. Apparent errors in addition of lump sum and extended prices will be corrected.

5. For the purpose of bid evaluation, the Government will proceed on the assumption that the bidder intends the bid to be evaluated on the basis of unit prices the totals arrived at by the resolution of arithmetic discrepancies as provided above and the bid will be so reflected on the abstract of bids.

6. The job amount "JA" line items in the Price Schedule are not "Estimated Quantity" line items and are not subject to the "Variation in Estimated Quantity" contract clause.

7. The Contract Clause 52.232-27, "Prompt Payment for Construction Contracts" requires that the name and address of the contractor official, to whom payment is to be sent, be the same as that in the contract or in a proper Notice of Assignment.

8. Principal Contracting Officer. The Contracting Officer who signs this contract will be the Principal Contracting Officer for this contract. However, any Contracting Officer assigned to the Los Angeles District, Contracting within his authority, may take formal action on this contract when the Principal Contracting Officer is unavailable and the action needs to be taken.

9. Amounts and prices shall be indicated in either words or figures, NOT BOTH.

10. The bidder/offeror shall distribute indirect costs (overhead, profit, bond, etc) over all items in the Contract Line Item Number (CLIN) Schedule.

The Government will review all submitted Solicitation, Contract Line Item Number (CLIN) Schedules for any unbalancing of the items. Any submitted Solicitation, Contract Line Item Number (CLIN) Schedule determined to be unbalanced may cause the bidder to be ineligible for award.

11. The bidder shall furnish all plant, labor, material, equipment, etc., necessary to perform all work in strict accordance with the terms and conditions set forth in the contract in include all attachments thereto.

12. Some quantities are ESTIMATED, the bidders prices MUST BE FIRM.

13. Bidder is cautioned to check his Price Schedule carefully prior to submission. If the Price Schedule contains unit prices, they should be round off to the second decimal point only NOT EXTENDED

FURTHER.

14. Payment of Electronic Funds Transfer (EFT) is the mandatory method of payment. The Contractors attention is directed to Contract Clause NO.

52.232-33 “Mandatory Information for Electronic Funds Transfer” located in Section 00 70 00 Conditions of the Contract.

Lower Santa Ana River Reach 9 Phase 4 W912PL-15-B-0009

00 10 00 - 7 Amendment 2

15. Contractor is required to fill in Cage code, TIN and DUNS Number in Block No. 14 on Standard Form 1442, the Name and Address Block.

252.236-7008 Contract Prices - Bidding Schedules (Dec 1991)

a. The Government's payment for the items listed in the CLIN Schedule shall constitute full compensation to the Contractor for --

(1) Furnishing all plant, labor, equipment, appliances, and materials;

and

(2) Performing all operations required to complete the work in conformity with the drawings and specifications.

b. The Contractor shall include in the prices for the items listed in the Pricing Schedule all costs for work in the specifications, whether or not specifically listed in the Pricing Schedule.

52.217-5 Evaluation of Options (Jul 1990)

Except when it is determined in accordance with FAR 17.206(b) not to be in the Government’s best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).

-- End of Section –

STANDARD FORM 30
TABLE OF CONTENTS
00 10 00

File details come from the government source that posted it. Updated .