Am01_W912PL-15-B-0008.pdf
PDF 898 KB Posted
- Solicitation number
- W912PL-15-B-0008
About this file
Amendment 1. Changes to 00 10 00 - Bid Schedule 00 73 46 Wage Rates and 2 sheets of drawings.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION ( Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
0001 Jul 10, 2015
USACE, Los Angeles District 915 Wilshire Boulevard, Suite 930 Los Angeles, California 90017-3401 Attn:Contracting Division CESPL-CT-E
W912PL-15-B-0008
Jun 23, 2015
F-4 Channel Rehabilitation Project,Clark County, Nevada
Replace the following specification sections in their entirety:
* 00 10 00 - Bid Schedule
* 00 73 46 - Wage Rates
Replace the following 2 drawings:
* Sheet T1
* Sheet C1
F-4 Channel Rehabilitation Project W912PL-15-B-0008 Clark County, Nevada JULY 2015
TABLE OF CONTENTS - 1 Amendment 1
PROJECT TABLE OF CONTENTS
DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 15 CERTIFICATE OF OFFEROR’S PRINCIPAL
00 10 00 BID SCHEDULE Am 01
00 21 00 INSTRUCTIONS
00 21 13 INSTRUCTIONS TO BIDDERS
00 45 00 REPRESENTATION AND CERTIFICATIONS
00 70 00 CONTRACT CLAUSES
00 73 00 SUPPLEMENTARY CONDITIONS
00 73 46 WAGE DETERMINATION SCHEDULE Am 01
DIVISION 01 - GENERAL REQUIREMENTS
01 20 00 GENERAL REQUIREMENTS
01 20 00B GENERAL REQUIREMENTS - PROJECT SIGNS
01 27 00 MEASUREMENT AND PAYMENT
01 31 20 RESIDENT MANAGEMENT SYSTEM (RMS)
01 32 10 NETWORK ANALYSIS SCHEDULES (NAS)
01 33 00 SUBMITTAL PROCEDURES
01 33 00B SUBMITTAL REGISTER
01 33 00C ENG FORM 4025 (Front and Back)
01 35 26 GOVERNMENTL SAFETY REQUIREMENTS
01 35 50 ENVIRONMENTAL PROTECTION
01 35 50B ENVIRONMENTAL COMMITMENTS - TABLE
01 35 60 STORM WATER POLLUTION PREVENTION MEASURES
01 41 50 METRIC MEASUREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 10 CONTRACTOR QUALITY CONTROL
01 70 20 AS-BUILT DRAWINGS
DIVISION 02 - SITE CONSTRUCTION
02 10 00 DIVERSION AND CONTROL OF WATER
02 23 00 CLEAR SITE AND REMOVE OBSTRUCTIONS
02 30 00 EARTHWORK
02 50 00 STATION MARKINGS
02 70 00 SIDE DRAINS AND STORM DRAINAGE SYSTEMS
02 70 90 WEEP HOLE SYSTEM
02 72 20 AGGREGATE BASE COURSE
02 74 10 HOT-MIX ASPHALT (HMA) FOR ROADS
02 74 80 BITUMINOUS TACK AND PRIME COATS
02 82 10 FENCING AND RAILING
DIVISION 03 - CONCRETE
03 10 10 FORMWORK FOR CONCRETE
03 15 10 EXPANSION, CONTRACTION AND CONSTRUCTION JOINTS IN
CONCRETE FOR CIVIL WORKS
03 20 00 CONCRETE REINFORCEMENT
03 30 10 CAST-IN-PLACE STRUCTURAL CONCRETE
DIVISION 05 – METALS
05 50 20 MISCELLANEOUS METAL
DIVISION 09 – FINISHES
09 90 00 PAINTING
-- End of Project Table of Contents --
Amendment 01 00 10 00 - 1
SECTION 00 10 00
BIDDING SCHEDULE
1.1 BASE BID – Station 25+24.766 to Station 25+61.000
Item Estimated No. Description Quantity Unit Unit Price Amount
0001 DIVERSION AND CONTROL OF WATER, 1 JA LS $
EXCEPT FOR OPTION
0002 CLEAR SITE AND REMOVE 1 JA LS $
OBSTRUCTIONS, EXCEPT FOR OPTION
0003 EXCAVATION, CHANNEL, 1 JA LS $
EXCEPT FOR OPTION
0004 COMPACTED FILL, CHANNEL, 1 JA LS $
EXCEPT FOR OPTION
0005 CONCRETE, CHANNEL, 305 m3 $ $
EXCEPT FOR OPTION
0006 WEEPHOLE SYSTEM, 8 ea $ $
EXCEPT FOR OPTION
0007 4.000 METER AND TYPE II, 1 JA LS $
MAINTENANCE ROAD,
EXCEPT FOR OPTION
0008 CHAIN LINK FENCE FROM SALVAGE, 72 m $ $
1.830 M HIGH, 9 GAGE,
EXCEPT FOR OPTION
0009 POST AND CABLE RAILING 54 m $ $
FROM SALVAGE,
EXCEPT FOR OPTION
0010 LADDER SYSTEMS, 2 ea $ $
EXCEPT FOR OPTION
0011 STATION MARKINGS, 2 ea $ $
EXCEPT FOR OPTION
0012 AS-BUILT DRAWINGS, 1 JA LS $
EXCEPT FOR OPTION
ESTIMATED AMOUNT OF BASE BID: $
(Line Items 0001 through 0012)
Amendment 01 00 10 00 - 2
1.2 OPTION - Station 25+61.000 to Station 26+64.000
Item Estimated No. Description Quantity Unit Unit Price Amount
0013 DIVERSION AND CONTROL OF WATER 1 JA LS $
0014 CLEAR SITE AND REMOVE 1 JA LS $
OBSTRUCTIONS
0015 EXCAVATION, CHANNEL 1 JA LS $
0016 COMPACTED FILL, CHANNEL 1 JA LS $
0017 CONCRETE, CHANNEL 695 m3 $ $
0018 WEEPHOLE SYSTEM 24 ea $ $
0019 4.000 METER AND TYPE II, 1 JA LS $
MAINTENANCE ROAD
0020 SIDE DRAIN, STA. 26+60.000 LT, 1 JA LS $
1.524 X 0.610 RCB
0021 CHAIN LINK FENCE FROM SALVAGE, 206 m $ $
1.830 M HIGH, 9 GAGE
0022 POST AND CABLE RAILING 206 m $ $
FROM SALVAGE
0023 STATION MARKINGS 3 ea $ $
0024 AS-BUILT DRAWINGS 1 JA LS $
ESTIMATED AMOUNT OF OPTION: $
(Line Items 0013 through 0024)
TOTAL ESTIMATED AMOUNT: $
(Base Bid and Option Bid Items)
Abbreviations:
m = Meter m3 = Cubic Meter m2 = Square Meter t = Metric Ton (1000 Kilograms) ea = Each JA = Job LS = Lump Sum
Amendment 01 00 10 00 - 3
ADDTIONAL BIDDER'S NOTES
1. All extensions of the unit prices shown will be subject to verification by the Government. If there is a difference between the unit price and the extended total, the unit price will be considered to be the intended bid and the total recomputed, accordingly. If a bidder provides a total but fails to enter a unit price, the total divided by the specified quantity will be considered to be the intended unit price.
2. If a modification to a price is submitted which provides for an adjustment to the total amount, the application of adjustment to each item in the Bid Schedule must be stated. If it is not stated, the offeror agrees that the adjustment shall be applied on a pro rata basis to every item in the Bid Schedule.
3. Prices must be submitted on all individual items of the Bid Schedule, otherwise the bid will be considered nonresponsive and will be rejected.
4. For the purpose of initial evaluation of bids, the following will be utilized in resolving arithmetic discrepancies found on the face of the Bid Schedule as submitted by the bidder:
a. Obviously misplaced decimal points will be corrected;
b. In case of discrepancy between the unit price and the extended price, the unit price will govern;
c. Apparent errors in extensions of unit prices will be corrected;
d. Apparent errors in addition of lump sum and extended prices will be corrected.
5. For the purpose of bid evaluation, the Government will proceed on the assumption that the bidder intends the bid to be evaluated on the basis of unit prices the totals arrived at by the resolution of arithmetic discrepancies as provided above and the bid will be so reflected on the abstract of bids.
6. The Job (lump sum) line items in the Bid Schedule are not "Estimated Quantity" line items and are not subject to the "Variation in Estimated Quantity" contract clause.
7. The Contract Clause 52.232-27, "Prompt Payment for Construction Contracts" requires that the name and address of the contractor official, to whom payment is to be sent, be the same as that in the contract or in a proper Notice of Assignment.
8. Principal Contracting Officer. The Contracting Officer who signs this contract will be the Principal Contracting Officer for this contract.
However, any Contracting Officer assigned to the Los Angeles District, contracting within his authority, may take formal action on this contract when the Principal Contracting Officer is unavailable and the action needs to be taken.
9. Amounts and prices shall be indicated in either words or figures, NOT
BOTH.
10. Payment of Electronic Funds Transfer (EFT) is the mandatory method of payment. The Contractors attention is directed to Contract Clause No.
52.232-33 "Mandatory Information for Electronic Funds Transfer" located in Section 00 73 00 - SUPPLEMENTARY CONDITIONS.
Amendment 01 00 10 00 - 4
11. PROGRESS PAYMENT REQUESTS made by the Contractor pursuant to the provisions of Contract Clause, PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS, shall be submitted on ENG FORM 93 to the administration office as designated in Block 26, Standard Form 1442 Back, Solicitation, Offer and Award. ENG FORM 93 shall be submitted to that office on the 20th day of each month in appropriate form and certified. Photocopies of the form shall be furnished on that same date to the Corps of Engineers offices designated at the Pre-Construction Conference.
12. The bidder shall distribute his indirect costs (overhead, profit, bond, etc.,) over all items in the Bid Schedule. The Government will review all submitted Bid Schedules for any unbalancing of the items. Any submitted Bid Schedule determined to be unbalanced may be considered nonresponsive and cause the bidder to be ineligible for contract award.
13. The bidder shall furnish all plant, labor, material, equipment, etc., necessary to perform all work in strict accordance with the terms and conditions set forth in the contract in include all attachments thereto.
14. Some quantities are ESTIMATED, the bidders prices MUST BE FIRM.
15. Bidder is cautioned to check his Bid Schedule carefully prior to submission. If the Bid Schedule contains unit prices, they should be round off to the second decimal point only NOT EXTENDED FUTHER.
16. Contractor is required to fill in Cage code (Reference Section 00 45 00
- REPRESENTATION AND CERTIFICATIONS, entitled "Required Central Contractor Registration" Mar 1998) and DUNS Number, entitled, "Data Universal Numbering System (DUNS) Number" June1999) in Block No. 15 on Standard Form 1442, Name and Address Block (Cage Code under Code and DUNS No. under Facility Code respectively).
17. Bidders are to submit prices on all line items in the Bid Schedule.
The Government contemplates award of one contract to the responsive, responsible bidder who submits the lowest bid for the Base Bid and Optional Bid Items. See Section 00 21 13 - INSTRUCTIONS TO BIDDERS, Clause 52.217-5, entitled, "Evaluation of Options". Any bidder who submits a bid without all line items for both Base Bid and Optional Bid Items filled out comprehensively and correctly will be deemed nonresponsive and their bid will be rejected. Basis of Bid shall be the entire work complete in accordance with the drawings and specifications for Base Bid Items, and including the work indicated or specified to be provided under any Option Bid Item.
18. PERIOD OF PERFORMANCE. The Offeror shall complete and propose on all Base Bid items in the Bid Schedule to correspond with the completion time in calendar days after receipt of Notice To Proceed (NTP) as specified in Section 00 73 00 - SUPPLEMENTARY CONDITIONS, COMMENCEMENT, PROSECUTION AND
COMPLETION OF WORK.
19. EXERCISE OF OPTION. The Government reserves the right to exercise the option by written notice to the Contractor either singularly or in any combination for up to 120 calendar days after NTP of the Base Bid without an increase in the Offeror's bid price. Completion of the option shall be as noted in Section 00 73 00 - SUPPLEMENTARY CONDITIONS, COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK.
20. Please refer to Section 00 21 13, Submission of Bids for special instructions for Hand-Carried Bids.
-- End of Section --
F-4 Channel Rehabilitation Project W912PL-15-B-0008 Clark County, Nevada July 2015
00 73 46 - 1 Amendment 1
SECTION 00 73 46
General Decision Number: NV150022 07/03/2015 NV22
Superseded General Decision Number: NV20140022
State: Nevada
Construction Type: Heavy
County: Clark County in Nevada.
EXCLUDES NEVADA TEST SITE (NTS), NATIONAL TEST AND TRAINING
RANGE (NTTR) AND TONOPAH TEST RANGE (TTR)
Note: Executive Order (EO) 13658 establishes an hourly minimum wage of $10.10 for 2015 that applies to all contracts subject to the Davis-Bacon Act for which the solicitation is issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.10 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/02/2015 1 01/23/2015 2 07/03/2015
* CARP1780-011 07/01/2015
Rates Fringes
CARPENTER (Form Work Only).......$ 39.13 14.86
ZONE PAY:
0 to 40 miles radius from intersection of Maryland Parkway and Charleston Blvd in Las Vegas: Free Zone
40 to 60 miles radius: $2.50 additional per hour
Over 60 miles radius: $4.25 additional per hour
Laughlin Area: $2.00 additional per hour
* CARP1827-001 07/01/2015
Rates Fringes
MILLWRIGHT.......................$ 35.69 20.62
ZONE PAY:
Zone 1: Las Vegas within 20 miles from Maryland Parkway and Charleston/Reno within 15 miles from County Courthouse:
F-4 Channel Rehabilitation Project W912PL-15-B-0008 Clark County, Nevada July 2015
00 73 46 - 2 Amendment 1
Free Zone Zone 2: Las Vegas 20 to 40 miles/Reno 15 to 35 miles: 1.50 additional per hour.
Zone 3: Las Vegas 40 miles/Reno over 35 miles: $3.25 additional per hour.
* ELEC0357-007 06/01/2015
Rates Fringes
ELECTRICIAN......................$ 43.08 18.62
ZONE PAY:
(A) The area bound by a 25 mile radius from the intersection of Main Street and Fremont Street in Las Vegas is hereby established a Free Zone.
(B) The area bound by a 25-55 mile radius from the intersection of Main and Fremont Street shall receive $2.50 per hour at a straight time rate for Zone Pay.
(C) The area outside of 55 miles radius from Main Street and Fremont Street shall receive $3.50 per hour at the straight time rate of Zone Pay.
ENGI0012-012 04/01/2014
Rates Fringes
Operators:
(03) Skid Loader/Bobcat.....$ 40.02 21.15
(04) Backhoe, Roller, Trackhoe....................$ 40.13 21.15
(06) Bulldozer, Scraper.....$ 40.42 21.15
(08) Mechanic, Excavator....$ 40.92 21.15
(10) Grader/ Blade..........$ 39.92 21.15
Add $2.00 per hour to wage rates:
20 miles to 40 miles from the City Hall of Las Vegas Add $3.00 per hour to wage rates:
40 Miles to 60 Miles from the City Hall of Las Vegas Add $3.50 per hour:
Over 60 Miles from the City Hall of Las Vegas
* IRON0118-004 07/01/2015
Rates Fringes
IRONWORKER (Ornamental, Reinforcing, and Structural).....$ 33.97 28.92
LABO0872-007 07/01/2014
F-4 Channel Rehabilitation Project W912PL-15-B-0008 Clark County, Nevada July 2015
00 73 46 - 3 Amendment 1
Rates Fringes
LABORER
(1) Form Stripping..........$ 24.81 22.48
(3) Mason Tender-Cement Concrete....................$ 25.12 22.48
(8) Flagger.................$ 23.31 22.48
PAIN0159-002 07/01/2011
Rates Fringes
PAINTER..........................$ 37.97 12.19
PLAS0797-007 07/01/2014
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 35.18 13.70
SHEE0088-003 08/01/2014
Rates Fringes
SHEET METAL WORKER (Including HVAC Duct Installation and Metal Roof)......................$ 41.41 23.57
Zone 1: 0 to 30 miles $0.00 Zone 2: 30 to 50 miles $2.50 Zone 3: 50 to 100 miles (including Laughlin) $3.50 Zone 4: over 100 miles $5.00
TEAM0631-005 07/01/2014
Rates Fringes
TRUCK DRIVER
GROUP 1.....................$ 27.19 22.31
GROUP 2.....................$ 27.29 22.31
GROUP 3.....................$ 27.50 22.31
GROUP 4.....................$ 27.68 22.31
ZONE PAY:
ZONE 1: All work within 30 road miles of City Hall in Las Vegas shall be considerered a Free Zone.
ZONE 2: All work 30 to 50 road miles from City Hall in Las Vegas shall receive $1.50 additional per hour.
ZONE 3: All work 50 to 70 road miles from City Hall in Las Vegas shall receive $2.50 additional per hour.
ZONE 4: ALL work over 70 road miles from City Hall in Las Vegas shall receive $3.50 additional per hour.
F-4 Channel Rehabilitation Project W912PL-15-B-0008 Clark County, Nevada July 2015
00 73 46 - 4 Amendment 1
CLASSIFICATIONS
GROUP 1: Flatbed; Dump Truck less than 12 yds.
GROUP 2: Dump trucks 12 yds but less than 16 yds.
GROUP 3: Dump trucks 16 yds up to and including 22 yds.
GROUP 4: Dump trucks over 22 yds.
SUNV2007-029 09/19/2007
Rates Fringes
CARPENTER, Excludes Form Work....$ 25.43 8.79
LABORER: Common or General......$ 20.93 0.00
LABORER: Concrete Saw (Hand Held/Walk Behind)................$ 23.92 0.00
LABORER: Landscape..............$ 18.51 0.00
LABORER: Pipelayer..............$ 21.73 8.31
OPERATOR: Backhoe Loader Combo............................$ 30.15 10.31
OPERATOR: Crane.................$ 28.54 9.75
OPERATOR: Loader................$ 38.10 0.00
PIPEFITTER.......................$ 28.79 9.23
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
F-4 Channel Rehabilitation Project W912PL-15-B-0008 Clark County, Nevada July 2015
00 73 46 - 5 Amendment 1
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
F-4 Channel Rehabilitation Project W912PL-15-B-0008 Clark County, Nevada July 2015
00 73 46 - 6 Amendment 1
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
G E
N E
R A
L
C
IV
IL
P O
S T
A N
D C
A B
L E
S A
F E
T Y
R A
IL
IN
G D
E T
A
IL
S
C H
A
IN
L
IN
K F
E N
C
IN
G A
N D
M A
IN
T
E N
A N
C E
R O
A D
D E
T A
IL
S
G E
N E
R A
L N
O T
E S
, A B
B R
E V
IA
T
IO
N
S , S
Y M
B O
L S
A N
D E
S T
A B
L
IS
H E
D C
O N
T R
O L
P O
IN
T
S
IN
D
E X
T O
C O
N T
R A
C T
D R
A W
IN
G
S V
IC
IN
IT
Y
M A
P , P
R O
J E
C T
L O
C A
T
IO
N M
A P
A N
D
W O
R K
L
IM
IT
S
A N
D S
T A
G
IN
G A
R E
A
/4
/4
C R
O S
S S
E C
T I O
N S
, S T
A . 2
.0
T
O S
T A
. 2
.0
S T
R U
C T
U R
A L
P L
A N
A N
D P
R O
F I L
E , S
T A
. 2
.0
T O
S T
A . 2
.7
T Y
P
IC
A L
S E
C T
IO
N
/4
/4
/4
/4
/4
/4
G E
N E
R A
L S
T R
U C
T U
R A
L N
O T
E S
A N
D D
E T
A
IL
S
C H
A N
N E
L W
A L
L S
C H
E D
U L
E , D
E T
A
IL
S A
N D
IN
V
E R
T A
C C
E S
S L
A D
D E
R D
E T
A
IL
S
B O
X C
O N
D U
IT
S
C H
E D
U L
E , S
ID
E
D R
A
IN
T A
B U
L A
T
IO
N A
N D
D E
T A
IL
S
S A
H A
R A
A V
E N
U E
LAS VEGAS
BLVD
MAIN
D E
S E
R T
R D
F L
A M
IN
G
O R
O A
D
T R
O P
I C
A N
A
V
E
PARADISE
MARYLAND
R U
S S
E L
L R
O A
D
RANCHO RD
PACIFIC
T W
A
IN
A V
E
U N
L V
S A
N D
S
A V E
PARADISE ROAD
UNION
IN
N
ST
PARKW AY
RD
W A
R M
S P
R I N
LAS VEGAS BLVD SOUTH
W A
R M
S P
R I N
G S
S U
N S
T
O A
D
BUFFALO
FORT APACHE
HUALPAI WAY
ROCK
S A
H A R
A
R U
S S
E L
L R
O A
D
W I
N D
M I L L
L A
N E
W
IG
W A
M A
V E
UNION
P A
C I F I
C
B L
U E
D I
A M
O N
D
B L
U E
D I
A M
O N
D
R O
A D
C H
A R
L E
S T
O N
JONES
DECATUR
RAINBOW
F l a m i n g o
W a s h
B L
U E
D I A
M O
N D
D E
T E
N T
I O
N B
A S
I N
F D
E B
R I S
B A
S I N
F C
H A
N N
E L
T r o p i c a n a
W a s h
R
R O
A D
A V
E
R O
A D
B L
V D
RED
C H
A N
N E L
W A S
H
C H
A N
N E L
F
C
H A
N N E L
F L
A M I
N
D I
V E R S I
O N
C H
A N
N E
L
F D
E B
R I S
B A
S I N
BLVD.
BLVD.
BLVD.
DRIVE
I N
N D E S E
A D
S P R I
N G
M O
U N
T A
IN
F L
A M
IN
G
O R
O A
D W
E S
T
W E
S T
W E
S T
W E
S T
W E
S T
UNION
PACIFIC
M C
C A
R R
A N
IN
T
E R
N A
T
IO
N A
L
A
IR
P O
R T
DRIVE
ROAD
R E
D R
O C
K D
E T
E N
T I O
N B
A S
I N
H A
C I E
N D
A A
V E
O Q
U E
N D
O R
O A
D
P A
T R
I C
K L
A N
E
F L
A M
I N
U
T F
A L
L
E
X I S
T I N
G
R A I L R
O A
D
A B
A N
D O
N E
D
R
C
K
VALLEY VIEW BLVD.
U P P E R
B L
U E
D I
A M
O N
D
DIVERSION CHANNEL
RAILROAD
D I
A M
O N
D
B L
U
S
H
RAILROAD
ARVILLE
ST.
C H
A N
N E
L O
U T
L E
T
T R
O P
I C
A N
A
LOWER
BLUE DIAMOND
DIVERSIONCHANNEL
E
X I S
T I N
G
E
X I S
T I N
G
E
X I S
T I N
G
(EXISTING)
E
X I S
T I N
G
C
CC
CCC
A
A
C
C
AA
CC
A
F-4 CHANNEL
WYNN RD
APPROVALDATE
P R
O J E
C T
L O
C A
T
IO
N M
A P
P R
O J E
C
L
C A
T I O
N
D E
T E
N T
I O
N B
A S
I N
R
B R
I S
B A
S I N
F
T
IT
L E
M
IS
C E
L L
A N
E O
U S
M
/4
M
C O
N T
R A
C T
D R
A W
IN
G
S I N
D E
X
REVISED SHEETS. (AM-01) JMM7/10/15A
A
A
S A
F E
T Y
P A
Y S
V A
L U
E E
N G
IN
E
E R
IN
G
P A
Y S
DESIGNED BY:
DRAW N BY:
CHECKED BY:
SYMBOL DESCRIPTIONS
S H
E E
T
U.S. ARMY ENGINEER DISTRICT
LOS ANGELES
CORPS OF ENGINEERS
REVISIONSDISTRICT FILE NO.
PREPARED UNDER THE DIRECTION OF:
CHIEF, DESIGN BRANCH
SUBMITTED BY: APPROVED:
CHIEF, ENGINEERING DIVISION
DATE: DATE:
FILE NAME:
DISTRICT ENGINEER
A B C D
THIS PROJECT W AS DESIGNED BY THE LOS ANGELES DISTRICT OF THE U.S. ARMY CORPS OF
ENGINEERS. THE INITIALS OR SIGNATURES AND REGISTRATION DESIGNATIONS OF INDIVIDUALS APPEAR
ON THESE PROJECT DOCUMENTS W ITHIN THE SCOPE OF THEIR EMPLOYMENT AS REQUIRED BY
E.R. 1110-1-8152. SIGNATURES AFFIXED HEREON INDICATE OFFICIAL RECOMMENDATION AND APPROVAL
OF ALL THE DRAW INGS IN THIS SET.
M E
T R
IC
T h is d r a w in g w a s p r o d u c e d in
A B C D
(TROPICANA AND FLAMINGO W ASHES), NEVADA
LAS VEGAS W ASH AND TRIBUTARIES
214/
COL. KIMBERLY W. COLLOTON
F-4 CHANNEL REHABILITATION
G/E
G/E
SPEC. NO. W 912PL-15-B-0008
N O
R E
G O
N
ID
A H
O
U T
A H
M E
X
IC
O
CALIF
O
R N I
A
ARIZONA
R en o
L a s
V eg as
S acram ento
S an F rancisco
S an B ernardino L os A ngeles
S an D iego
PA
C I
F I C
O C
E A
N
C arso n C ity
N eed les
N E
V A
D A
V
IC
IN
IT
Y M
A P
AND INDEX TO CONTRACT DRAW INGS
VICINITY MAP, PROJECT LOCATION MAP
L A
S V
E G
A S
W A
S H
A N
D T
R
IB
U T
A R
IE
S
(T R
O P
IC
A
N A
A N
D F
L A
M
IN
G O
W A
S H
E S
), N E
V A
D A
T R
O P
D E
T E
N T
I O
N B
A S
I N
F -4
C H
A N
N E
L R
E H
A B
IL
IT
A T
IO
N
N
T1_AM01.DGN
USACE
USACE
R. KW AN
T
T
T
P R
O J E
C T
L O
C A
T
IO
N
7/10/2015 $tim e$ $am pm $
$filenam e$ J U
N E
C
C
C
S
S
S
S H
E E
T N
O
F I L
E N
O
D
IS
T R
IC
T
S t e v e S i s o l a k , C h a i r
L a r r y
B r o w n
, V i c e C h a i r
T m l l i n s
S u s a n
B r a g e r
C h r i s
G i u n c h i g l i a n i
M a r y
B e t h
S c o w
L a w r e n c e W e e k l y
C o u n ty
C o m m is s io n e r s
C o u n ty
M a n a g e r
D o n
B u r n e t t e
STA. 27+00.00
E
25+00
26+00
27+00
A A
CSSta 11+43.152
T C E
T C E
T C E
R
W
R
W R
W
R
W
R
W
R/W
P R
O F
IL
E
N O
T E
: G R
A D
E L
IN
E
IS
D
E F
IN
E
D
R E
C O
N S
T R
U C
T R
C B
R E
M O
V E
A N
D
STA. 25+24.766
O P
T
IO
N B
A S
E B
ID
B A
S E
B
ID
O P
T
IO
N
STA. 25+24.766
F O
R
IN
V E
C E S S
L A D
D E R , S
E E
S
H E E T
S
1.524 X 0.610 RCB
STA. 26+60.000
R E
C O
N S
T R
U C
T R
C B
R E
M O
V E
A N
D
STA. 26+64.000
STA. 25+61.000
STA. 26+64.000
STA. 25+61.000
S E
C T
IO
N
D -D
S E
C T
IO
N
D -D
O N
S H
E E
T C
SEE SHEET S3, SEC I
INV. EL. 771.727
1.524X0.610 RCB
STA. 26+60.000 LT.
F O
R
P
O
D
C
A B L E
R
A
IL
IN
G , S
E E
S
H E
HT.=2.440
STA. 25+00.00
W
V A
R I E
S
.9
W
T O
.2
W
P R
O T
E C
T
IN
P L
A C
E
A N
D B
O X
C O
N D
U
IT
E X
IS
T
IN
G
C H
A N
N E
L
P R
O T
E C
T
IN
P L
A C
E
E X
IS
T
IN
G
C H
A N
N E
L
A N
D B
O X
C O
N D
U
IT
E X
IS
T
IN
G
C H
A N
N E
L
P R
O T
E C
T
IN
P L
A C
E
P R
O T
E C
T
IN
P L
A C
E
E X
IS
T
IN
G
C H
A N
N E
L
P R
O T
E C
T
IN
P L
A C
E
E X
IS
T
IN
G
C H
A N
N E
L
A 7/10/15 JMM
A
A
A
8.295
9.460+-
12.773+-
13.931
.3
C
N T
R
.7
C
N T
R
L O
C A
T
IO
N S
T A
T
IO
N
.1
C N
T R
.0
.0
.7
E X
IS
T
IN
G
C H
A N
N E
L
F
IE
L D
V E
R
IF
Y W
IT
H
F
O W
L
IN
E L
O C
A T
IO
N
F L
O W
L I N
E N
O T
E
A
A
REVISED FLOW LINE LOCATIONS. (AM-01)
ADDED CHANNEL W IDTH DIMENSIONS.
1.3
.5
.5
.1
.2
.67
.6
.7
.9
.2
.2
A 7 .6
.9
APPROVALDATE
S A
F E
T Y
P A
Y S
V A
L U
E E
N G
IN
E
E R
IN
G
P A
Y S
DESIGNED BY:
DRAW N BY:
CHECKED BY:
SYMBOL DESCRIPTIONS
S H
E E
T
U.S. ARMY ENGINEER DISTRICT
LOS ANGELES
CORPS OF ENGINEERS
REVISIONSDISTRICT FILE NO.
SUBMITTED BY:
CHIEF, DESIGN BRANCH
FILE NAME:
A B C D
A B C D
M E
T R
IC
T h is d r a w in g w a s p r o d u c e d in
(TROPICANA AND FLAMINGO W ASHES), NEVADA
LAS VEGAS W ASH AND TRIBUTARIES
C a l l b e f o r e y o u
D g
-8
-2
-2
214/
F-4 CHANNEL REHABILITATION
S C
A L
E : 1
:5
P L
A N
P R
O F
IL
E
V E
R T
IC
A
L S
C A
L E
: 1 :1
H O
R
IZ
O N
T A
L S
C A
L E
: 1 :5
G R
O U
N D
A T
C
A P
P R
O X
. E X
IS
T
IN
G
L
STA. 25+30.000 RT.
INVERT ACCESS LADDER
T O
P O
F C
H A
N N
E L
W A
L L
S
STA. 25+24.766
PLAN AND PROFILE
E L
.1
E L
.4
C O
N S
T R
U C
T
IO
N N
O T
E S
HT= 4.200
R E
F E
R E
N C
E N
O T
E S
A
T
A
IL
, S
E E
S
H E E T
S
F O
R
C
H A N
N
L L
S C
H E D
U L E
M A
IN
T
. R D
T Y
P E
I I
I N
S T
A L
L
.5
X
.6
R C
B S
I D
E D
R A
I N
S T
U B
O
U T m m
P L
Y W
O O
D
P L
U G
E N
D O
F R
C B
W I T
H
.0
.5
.5
.5
F R
O M
S T
A T
IO
N
T O
S T
A T
IO
N m F
R O
M L
E F
T W
A L
L
F L
O W
L
IN
E L
O C
A T
IO
N
.3
.3
.4
.1
S id e T
O
.9
.9
C n t r T
O
.3
C n t r
.3 x
F
C O
N T
R O
L L
I N
E
L O
C A
T
IO
N
N O
R T
H
IN
G E
A S
T
IN
G E
L E
V A
T
IO
N
.4
.5
.4
.5
.4
.4
M
IS
C . F
IL
L
G R
A D
E L
IN
E
S .0
E L
.3
6 2
.4
.0
.4
A .B
.C . M
A
IN
T E
N A
N C
E R
O A
D
.0
A .C
. O V
E R
.1
A N
D
C
U R
V E
D
A T
A , S
E E
S
H E E T S
T
F
H
R
IZ
O N T
A L
G E O
M E T R
Y
IN
F O
R M
A T
IO
R
T C E
A N
D
R
IM
IT
, S
E E
S
H E E T S
T
S E
E S
H E
E T
M
F
IN
T E N
A N C E
R
O A D , C
H A
IN
L
IN
K
F E N
USACE
USACE
R. KW AN
STA. 26+64.000 TO STA. 25+24.766
0 4
S E
C T
I O
N , S
E E
S H
E E
T C
F O
R
T
Y P
IC
A L
C
H A N
N E L B
O X
C
O N
D U
IT
F O
R
S
ID
E
D R
A
IN
S T
U B O
U T , S
E E
S
H E E T
S
F O
R
C R
O S S
S E C T
IO
N S , S
E E
S
H E E T
C
C
STA. 27+00.000
STA. 25+00.000
0 5
O F
E X
C A
V A
T
IO
N
A P
P R
O X
. L
IM
IT
S
O F
E X
C A
V A
T
IO
N
A P
P R
O X
. L
IM
IT
S
J O
I N
T
T H
E N
E A
R E
S T
C O
N S
T R
U C
T
IO
N O
R C
O N
T R
A C
T
IO
P R
O X
IM
A
T E
. S A
W C
U T
S H
A L
L B
E M
A D
E
IM
IT
S
O F
C H
A N
N E
L R
E M
O V
A L
A
O T
E C
T I
N P
L A
C E
P A
T R
IC
K
L A
T E
R A
L
.0
F
O R
O P
T I O
N
B A
S E
B I D
A N
D S
T A
. 2
.0
T
O S
T A
S T
A . 2
.7
A
N D
S T
A . 2
.0
F
IL
L A
N D
P O
S T
A N
D C
A B
L E
R A
IL
IN
G F
R O
M
A N
D
IN
V E
R T
, M A
IN
T
E N
A N
C E
R O
A D
, C H
A N
N
M O
V E
A N
D R
E C
O N
S T
R U
C T
C H
A N
N E
L W
A L
IL
IN
G O
N T
O P
O F
C H
A N
N E
L W
A L
L
R E
M O
V E
A N
D S
A L
V A
G E
P O
S T
A N
D C
A B
C1_AM01.DGNSPEC. NO. W 912PL-15-B-0008
ARTHUR Y. JUNG, PE
G E
N E
R A
L N
O T
E : A
L L
D
IM
E N
S
IO
N S
A R
E S
H O
W N
IN
M
E T
E R
S
7/10/2015 $tim e$ $am pm $
$filenam e$ J U
N E
| SF-30 Am1 |
| Table of Contents |
| 00 10 00 - Bid Schedule |
| 00 73 46 - Wage Rates |
| Sheet T1 |
| Sheet C1 |
File details come from the government source that posted it. Updated .