thang.nguyen Typewriter 231/811
A
8 7
B
6 5
C
D
8 7 6 5 4
I W
R S
F
S
P r o j e c t s
C
A D
S h e e t F i l e s G
G e n
N o t e s S h t
I n d e x
L e g e n d
T t d w g
S
A
V A
L O
N
B
L V
D
S
U I T
E
W E
S T
B
S
I
M
U N
I C
I P
L
W
T
E R
D
S
T R
I C
T
D I S
T R
I C
T
F
I L
E
N
O
C A
R S
O N
C
A
A
B
C
D
P L
A N
S
P
R E
P A
R E
D
B
Y
I r v i n e
C a l i f o r n i a
V o n
K a r m a n
A v e
S u i t e
F
A X
C A
R S
O
L L
L A
T E
R A
L
P
H A
L O
S
A
N G
E L E
S
C
O U
N T
Y
C
A L I F
O R
N I A
W E
S
N
I C
I P
A L
W
A T
S
T R
I C
T
R
E C
Y C
L E
D
W
A T
Y S
T E
M
SAFETY PAYS
VALUE ENGINEERING PAYS
S C
A L
E
O F
S H
E E
T
S H
E E
T S
F I L
E
N
A M
E
S P
E C
N
A W
N
B
Y
D E
S I G
N E
D
B
Y
C H
E C
K E
D
B
Y
S Y
M B
O L
R E
V I S
I O
N S
D E
S C
R I P
T I O
N S
D A
T E
A P
P R
O V
A L
W
P L
B
S U
B M
I T
T E
D
B
Y
C H
I E
F
D
E S
I G
N
B
R A
N C
H
A R
T H
J U
N G
P
E
U S
A
R M
Y
C
O R
P
F
E
N G
I N
E E
R S
L O
S
A
N G
E L
S
T R
I C
T
11/24/14
M W
B
R J W
L E
N O
N E
G
S H
E E
T
I N
D E
X
B
A S
B
E A
R I N
G
N
C H
M A
R K
R E
C Y
C L
T
T
E S
U
T I L
I T
Y
C
O M
P A
N I E
S
UTILITY COMPANIES
RECYCLED WATER NOTES
1. STATIONS SHOWN ARE ALONG THE CENTERLINE OF THE PIPELINE.
2. ELEVATION SHOWN ON PIPELINE PROFILE APPLY TO INVERT OF PIPE OR
INVERTS AT POINTS OF INTERSECTION OF SLOPE CHANGES
3. THE CONTRACTOR SHALL ADD FITTINGS OR DEFLECT JOINTS (PER WBMWD
STANDARD DRAWING RW42) AS REQUIRED TO AVOID EXISTING UTILITIES
ENCOUNTERED. ANY CHANGES IN PROFILE SHALL BE APPROVED BY THE
CONTRACTING OFFICER'S REPRESENTATIVE (COE).
4. THE CONTRACTOR SHALL CONTACT UNDERGROUND SERVICE ALERT (U.S.A.)
AT 1-800-227-2600 AT LEAST 48 HOURS PRIOR TO STARTING WORK.
5. THE CONTRACTING OFFICER'S REPRESENTATIVE (COE) SHALL BE NOTIFIED
AT LEAST 2 WORKING DAYS PRIOR TO BEGINNING CONSTRUCTION OR ANY
INSPECTION.
6. CONSTRUCT THRUST BLOCKS AT ALL LOCATIONS INDICATED ON THE PLANS
PER WBMWD STD RW-19.
7. ALL WORK IS TO BE DONE PER "STANDARD SPECIFICATIONS FOR PUBLIC
WORKS CONSTRUCTION" (GREEN BOOK) LATEST EDITION, AND THE
DISTRICT'S STANDARD SPECIFICATIONS AND DRAWINGS UNLESS
OTHERWISE INDICATED AND IN ACCORDANCE WITH THESE PLANS AND
SPECIFICATIONS. THE CONTRACTOR SHALL HAVE A COPY OF THESE PLANS
AND THE SPECIFICATIONS AND THE STANDARD SPECIFICATIONS ON THE JOB
AT ALL TIMES.
8. THE TOP OF RECYCLED WATER MAINS SHALL BE A MINIMUM OF 42-INCHES
BELOW STREET PAVEMENT OR FINISH GRADE UNLESS OTHERWISE SHOWN
ON THE PLANS. IF THE MINIMUM COVER CANNOT BE MET, THE CONTRACTOR
SHALL NOTIFY THE ENGINEER OR DISTRICT FOR GUIDANCE.
9. ALL CONCRETE SHALL BE CLASS 560-C-3250 UNLESS OTHERWISE INDICATED.
10. THE CONTRACTOR SHALL SUBMIT A SHORING PLAN PREPARED BY A
REGISTERED CIVIL ENGINEER AS REQUIRED PER SECTION 7-10.4.2 OF THE
"STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION" LATEST
EDITION.
11. PIPELINES SHALL BE PRESSURE TESTED IN ACCORDANCE WITH
SPECIFICATIONS TO THE MINIMUM TEST PRESSURE INDICATED BELOW OR
AS INDICATED ON THE PLANS:
PIPE CLASS - AWWA C-900 DR-14
MINIMUM TEST PRESSURE - 200 P.S.I.
12. CONTRACTOR SHALL MAINTAIN THE WORK AREA IN A NEAT, SAFE, CLEAN
AND SANITARY CONDITION AT ALL TIMES. STREETS SHALL BE KEPT CLEAN
OF DEBRIS, WITH DUST AND NUISANCE BEING CONTROLLED AT ALL TIMES.
THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR ANY CLEANUP OF
ADJACENT STREETS AFFECTED BY HIS CONSTRUCTION. CONTRACTOR TO
CLEAN STREET WITH SWEEPER PRIOR TO END OF EACH WORK DAY AS A
MINIMUM IN ACCORDANCE WITH CITY PERMIT.
13. ALL SURPLUS MATERIAL REMOVED, INCLUDING EXCAVATED MATERIALS
WHICH ARE NOT SUITABLE FOR USE IN THIS PROJECT SHALL BECOME THE
PROPERTY OF THE CONTRACTOR AND SHALL BE DISPOSED OF AWAY FROM
THE JOB SITE IN A MANNER AND AT LOCATION ACCEPTABLE TO ALL
COGNIZANT AGENCIES.
14. THE CONTRACTOR SHALL POTHOLE AND LOCATE EXISTING CROSSING
UNDERGROUND UTILITIES AND POINTS OF CONNECTION AT LEAST THREE
WEEKS OR 1,5OO FEET, WHICHEVER IS GREATER, IN ADVANCE OF THE
PIPELINE CONSTRUCTION. IN ADDITION TO THE ABOVE REQUIRED
POTHOLING, THE CONTRACTOR SHALL EXPOSE ALL UTILITIES AND SERVICES
AT LEAST 200 FEET IN ADVANCE OF THE ACTUAL PIPE EXCAVATION
OPERATIONS. THE CONTRACTOR SHALL BE LIABLE FOR ANY ADDITIONAL
COST REQUIRED IN THE EVENT THAT HE HAS NOT CORRECTLY LOCATED
THE EXISTING UTILITIES.
15. ALL BURIED BOLTS, NUTS AND WASHERS SHALL BE TYPE 316 STAINLESS
STEEL AND COATED IN ACCORDANCE WITH THE SPECIFICATIONS.
16. THE CONTRACTOR SHALL CONFINE ALL OF HIS ACTIVITIES TO THE AREAS
WITHIN THE EXISTING STREET RIGHT-OF-WAY SHOWN IN THESE PLANS.
CONTRACTOR IS RESPONSIBLE FOR OBTAINING A TEMPORARY STORAGE AREA.
18. THE CONTRACTOR SHALL PROTECT IN PLACE EXISTING SEWER, GAS,
WATER LATERALS AND OTHER UTILITIES OR REPLACE IN KIND. LOCATIONS
OF EXISTING UTILITIES AND SUBSTRUCTURES SHOWN ON THE DRAWINGS
ARE APPROXIMATE ONLY. CONTRACTOR SHALL VERIFY EXACT LOCATIONS,
ELEVATIONS AND DIMENSIONS IN THE FIELD PRIOR TO CONSTRUCTION IN
THE AREA OF THE SPECIFIC SUB-STRUCTURE.
19. ALL BURIED VALVES SHALL BE PROVIDED WITH RISERS, VALVE BOXES AND
COVER PER DISTRICT STANDARD SPECIFICATION AND STANDARD DRAWINGS
RW-7 AND RW-8.
20. SHUT DOWN OF EXISTING RECYCLED WATER MAINS TO FACILITATE
CONNECTION TO EXISTING FACILITIES SHALL BE COORDINATED WITH THE
COR AND THE DISTRICT.
21.
22. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DAMAGE TO ALL EXISTING
UTILITIES, PAVEMENT, CURB, TRAFFIC STRIPPING AND MARKINGS, TRAFFIC
DETECTOR LOOPS, STRUCTURE, TREES, LANDSCAPING, AND IRRIGATION
SYSTEMS AS A RESULT OF HIS OPERATIONS, AND WILL BE REQUIRED TO
REPAIR OR REPLACE SAME TO THE SATISFACTORY OF, AND AS DIRECTED
BY, THE COE, DISTRICT AND/OR CITY OF CARSON.
23. ALL CONSTRUCTION SURVEYS FOR THIS PROJECT SHALL BE PROVIDED BY
THE CONTRACTOR AT HIS EXPENSE. SURVEY POINTS DESTROYED AS A
RESULT OF THE CONTRACTOR'S NEGLIGENCE OR FAILURE TO PROVIDE
PROPER PROTECTION, SHALL BE REPLACED AT THE CONTRACTOR'S
EXPENSE.
24. THE CONTRACTOR IS TO MAINTAIN AND PROVIDE THE CONTRACTING
OFFICER WITH A "RECORD" SET OF AS BUILT DRAWINGS AT THE
COMPLETION OF ALL WORK PER THE PLANS AND SPECIFICATIONS.
25. ALL TRAFFIC SIGNAL CONDUITS AND LOOPS HAVE NOT BEEN SHOWN ON
THESE PLANS. CONTRACTOR SHALL DETERMINE LOCATION OF ALL
IMPACTED FACILITIES AND REPLACE ALL TRAFFIC SIGNAL CONDUITS AND
LOOPS DAMAGED OR REMOVED DURING CONSTRUCTION TO THE CITY OF
CARSON SATISFACTION.
26. CONTRACTOR SHALL BE RESPONSIBLE FOR IDENTIFYING AND ACQUIRING
STAGING OR MATERIAL STOCK PILE AREAS, SUBJECT TO APPROVAL OF THE
CONTRACTING OFFICER.
27. CONTRACTOR SHALL CONTACT THE CONTRACTING OFFICER AND WEST
BASIN MUNICIPAL WATER DISTRICT THREE BUSINESS DAYS PRIOR TO ANY
CONSTRUCTION.
29. CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS FROM THE CITY OF
CARSON BEFORE COMMENCING WORK. THE CONTRACTOR SHALL PROVIDE A
24 HOUR TELEPHONE NUMBER FOR EMERGENCY REPAIRS TO TRAFFIC
CONTROL AND PAVEMENT MARKINGS.
30. CONTRACTOR SHALL PROVIDE TRAFFIC CONTROL IN CONFORMANCE WITH
THE APPROVED TRAFFIC CONTROL PLANS.
JOB SITE SAFETY
PRIVATE ENGINEER'S NOTICE TO CONTRACTOR
DISCLAIMER
32. PIPE BEDDING SHALL CONFORM TO WBMWD STANDARD DRAWING RW17.
COORDINATES ARE BASED ON THE CALIFORNIA COORDINATE
SYSTEM (CCS83), ZONE V, 1983 NAD (2007.0 EPOCH).
BASIS OF BEARINGS
EXISTING SHRUBBERY
EXISTING PEDESTAL/PULL BOX
EXISTING MANHOLE
EXISTING DRIVEWAY
EXISTING REDUCER
EXISTING POWER POLE W/GUY WIRE
EXISTING CATCH BASIN
EXISTING FIRE HYDRANT
EXISTING WATER METER
NEW WATER VALVE
EXISTING WATER VALVE
EXISTING TREE
NEW THRUST BLOCK
EXISTING POWER POLE
NEW BLOW-OFF ASSEMBLY
NEW AIR/VACUUM RELEASE VALVE
(e.g. SIDEWALK & DRWY)
EXISTING ELECTRIC LINE
EXISTING SEWER LINE
EXISTING TELEPHONE
EXISTING WATER LINE
EXISTING STORM DRAIN
RIGHT-OF-WAY LINE
EXISTING FIBER OPTIC
EXISTING OIL LINE
EXISTING GAS LINE
EXISTING CABLE TV
4"O
4"G
T
51"SD
BACK OF CONCRETE
CURB & GUTTER
NEW PIPE LINE
8"S
12"W
LEGEND
EXISTING STREET/TRAFFIC LIGHT
EXISTING SIGN
LOOP SIGNAL
BENCHMARK
17.
28.
33.
34.
35.
36.
PRIOR TO COMMENCEMENT OF WORK, ALL SURVEY MONUMENTS IN THE PROJECT
AREA SHALL BE LOCATED AND TIED OUT BY THE CONTRACTOR. ALL CENTERLINE
MONUMENTS OR TIES LOST OR DESTROYED BY THIS WORK SHALL BE REPLACED
AND NEW TIE SHEETS PROVIDED. METHOD OF ESTABLISHMENT SHALL BE STATED
ON THE TIE SHEET. TIE SHEETS SHALL BE PREPARED AND STAMPED BY A LICENSED
ENGINEER OR SURVEYOR AND SHALL BE DELIVERED TO THE CITY OF CARSON
PRIOR TO CONSTRUCTION.
ALL CONCRETE SIDEWALKS OR CURBS & GUTTERS TO BE REPLACED SHALL
BE SAWCUT TO THE NEAREST TRANSVERSE SCORE MARK OR ADJUSTABLE
CONTROL JOINT OR WEAKENED PLANE JOINT AND REPLACED IN
CONFORMANCE WITH THE CITY OF CARSON. ALL EXPOSED CONCRETE
SURFACES SHALL CONFORM IN GRADE, COLOR AND FINISH TO ALL
ADJOINING CURBS AND WALKS.
GAS, WATER AND SEWER SERVICES ARE SHOWN APPROXIMATELY. NO PLANS WERE
AVAILABLE. HOWEVER, THE PLANS DO NOT NECESSARILY REFLECT ALL OF THE GAS,
WATER AND SEWER SERVICES. THE CONTRACTOR SHALL FIELD VERIFY LOCATION
OF ALL GAS, WATER AND SEWER SERVICE LOCATIONS AND PROTECT IN PLACE.
ALL APPROACHES TO PRIVATE DRIVEWAYS, DRIVEWAYS AND INTERSECTING
STREETS SHALL BE KEPT OPEN TO TRAFFIC AT ALL TIMES. CONTRACTOR SHALL
INFORM ALL PROPERTY OWNERS OR BUSINESSES A MINIMUM OF ONE WEEK PRIOR
TO PERFORMING ANY CONSTRUCTION WHICH WILL IMPEDE THE NORMAL ACCESS
TO THEIR DRIVEWAYS.
DISRUPTED OR DAMAGED STREET LIGHTING SYSTEMS SHALL BE REPAIRED OR
REPLACED TO CITY STANDARDS. DAMAGED STREET LIGHT CONDUIT OR CABLE
SHALL BE REPLACED FROM POLE TO POLE (NO SPLICING WILL BE ALLOWED).
THE CONTRACTOR SHALL RENEW OR REPLACE ANY EXISTING TRAFFIC
STRIPING AND/OR PAVEMENT MARKINGS WHICH DURING HIS OPERATIONS
HAVE BEEN EITHER REMOVED OR THE EFFECTIVENESS HAS BEEN
REDUCED TO THE CITY OF CARSON SATISFACTION.
ALL BURIED D.I. PIPE, VALVES, FITTINGS, ETC. SHALL BE WRAPPED IN 8 MIL
POLYETHYLENE.
37.
DURING CONSTRUCTION, DISPOSAL OF SUCH MATERIALS SHOULD OCCUR IN A
SPECIFIED AND CONTROLLED TEMPORARY AREA ON SITE PHYSICALLY
SEPARATED FROM POTENTIAL STORM WATER RUN-OFF, WITH ULTIMATE
DISPOSAL IN ACCORDANCE WITH LOCAL, STATE AND FEDERAL
REQUIREMENTS.
MATERIALS WHICH MAY HAVE EFFECTS OF POLLUTION INCLUDE BUT ARE NOT
LIMITED TO: SOLID OR LIQUID CHEMICAL SPILLS; WASTES FROM PAINTS, STAINS,
SEALANTS, GLUES, LIMES, PESTICIDES, HERBICIDES, WOOD PRESERVATIVES
AND SOLVENTS; ASBESTOS FIBERS, PAINT FLAKES OR STUCCO FRAGMENTS;
FUELS, OILS, LUBRICANTS, AND HYDRAULIC, RADIATOR OR BATTERY FLUIDS;
FERTILIZERS, VEHICLE/EQUIPMENT WASH WATER AND CONCRETE WASH WATER;
CONCRETE DETERGENT OR FLOATABLE WASTES; WASTES FROM ANY
ENGINE/EQUIPMENT STEAM CLEANING OR CHEMICAL DEGREASING, AND SUPER
CHLORINATED WATER LINE FLUSHINGS.
SUCH "DISCHARGES" OF MATERIAL OTHER THAN STORM WATER ARE ALLOWED
ONLY WHEN NECESSARY FOR PERFORMANCE AND COMPLETION OF
CONSTRUCTION PRACTICES AND WHERE THEY DO NOT: CAUSE OR CONTRIBUTE
TO A VIOLATION OF ANY WATER QUALITY STANDARD; CAUSE OR THREATEN TO
CAUSE POLLUTION, CONTAMINATION, OR NUISANCE; OR CONTAIN A HAZARDOUS
SUBSTANCE IN A QUANTITY REPORTABLE UNDER FEDERAL REGULATIONS 40 CFR
PARTS 117 AND 302.
CONSTRUCTION SITES SHALL BE MAINTAINED IN SUCH A CONDITION THAT AN
UNANTICIPATED STORM DOES NOT CARRY WASTES OR POLLUTANTS OFF THE SITE.
THE CONTRACTOR SHALL CONDUCT HIS CONSTRUCTION OPERATIONS IN
SUCH A MANNER THAT STORM OR OTHER WATERS MAY PROCEED
UNINTERRUPTED ALONG THE STREET OR DRAINAGE COURSES.
TRENCH COMPACTION AND SUBGRADE COMPACTION TESTS SHALL BE
PERFORMED BY A CORPS VALIDATED COMMERCIAL TESTING LABORATORY
OR CONTRACTOR'S VALIDATED TESTING FACILITY.
38.
40.
41.
LOOSE EXCAVATED MATERIAL SHALL NOT BE PLACED OR STORED IN
WATERWAYS OR STORM DRAIN CHANNELS. ALL EXCESS EXCAVATED SOIL
AND MATERIALS SHALL BE REMOVED AND DISPOSED OF IN A PROPER AND
LEGAL MANNER BY THE CONTRACTOR ALL DISTURBED SURFACE AREAS
SHALL BE SHAPED TO FACILITATE DRAINAGE AND AVOID PONDING AND
SHALL BE RESTORED TO NEAR NATURAL OR PRE-CONSTRUCTION
CONDITIONS.
39.
ACCESS TO DRIVEWAYS ADJACENT TO THE CONSTRUCTION WORK ZONE SHALL
BE MAINTAINED AT ALL TIMES IF AT ALL POSSIBLE. ADDITIONAL CONES OR
DELINEATORS MAY BE REQUIRED TO DELINEATE THE DRIVEWAY ACCESS ROUTE
THROUGH THE CONSTRUCTION WORK ZONE. A MINIMUM OF ONE TRAVEL LANE
SHALL BE MAINTAINED ACROSS THE DRIVEWAYS UNLESS PRIOR WRITTEN
APPROVAL IS OBTAINED FROM THE CITY OF CARSON AND/OR THE CONTRACTING
OFFICER.
42.
AT THE END OF EACH WORKING DAY AND AT TIMES WHEN CONSTRUCTION
OPERATIONS ARE SUSPENDED FOR ANY REASON, THE CONTRACTOR SHALL
REMOVE ALL EQUIPMENT, VEHICLES, MATERIAL, TRAFFIC CONTROL DEVICES,
STOCKPILE OR ANY OTHER FORM OF OBSTRUCTION FROM THE STREET
RIGHT-OF-WAY.
43.
THE CONTRACTOR SHALL EITHER BACKFILL AND PLACE BASE PAVEMENT
OR STEEL PLATE TRENCH EXCAVATION AT THE END OF EACH WORK DAY
SO ALL TRAVEL LANES CAN BE OPEN TO TRAFFIC. SEE SPECIFICATIONS
FOR STEEL PLATE REQUIREMENTS. STEEL PLATES WITHIN TRAVEL LANES
SHALL BE LIMITED TO 200 FEET.
31.
CONTRACTOR SHALL DEMONSTRATE EXTREME CAUTION WHEN TRENCHING
IN CLOSE PROXIMITY TO OTHER UTILITIES. ANY SIGN OF DEGRADATION OF
THE TRENCH WALL INTEGRITY WILL NOT BE TOLERATED AND WILL FORCE
THE STOPPAGE OF WORK UNTIL THE TRENCH INTEGRITY IS ADEQUATELY
RESTORED.
44.
WATER QUALITY SAMPLING STATION
CONTRACTOR SHALL VERIFY THE HORIZONTAL AND VERTICAL LOCATION OF
ALL POINTS OF CONNECTION PRIOR TO COMMENCING CONSTRUCTION. SEE
NOTE NO. 14
ELEVATIONS ARE BASED ON CITY OF LOS ANGELES
COUNTY BENCH MARK "Y 10542", A DEPARTMENT OF
PUBLIC WORKS BENCH MARK TAG IN EAST CURB
LOCATED IN THE SOUTHEAST CORNER OF MAIN
STREET AND TORRANCE BOULEVARD
ELEV. = 22.773 FEET (NAVD 1988, YEAR LEVELED 2005)
BY ACCEPTING THIS CONTRACT, CONTRACTOR HEREBY RELEASES AND AGREES TO INDEMNIFY,
DEFEND, HOLD HARMLESS THE OWNER (WEST BASIN MUNICIPAL WATER DISTRICT), CONTRACTING OFFICER
(COE), ENGINEER (HEREINAFTER TETRA TECH), THE CITY OF CARSON, THEIR PARENT AND SUBSIDIARY
COMPANIES, AGENTS, EMPLOYEES, CONSULTANTS AND REPRESENTATIVES FOR ANY AND ALL DAMAGE TO
PERSONS OR PROPERTY OR WRONGFUL DEATH REGARDLESS OF WHETHER OR NOT SUCH CLAIM, DAMAGE, LOSS OR EXPENSE IS CAUSED IN WHOLE OR IN PART BY THE NEGLIGENCE, ACTIVE OR PASSIVE, OF OWNER, CONTRACTING OFFICER, ENGINEER, THE CITY OF CARSON, THEIR PARENT AND SUBSIDIARY COMPANIES, AS
WELL AS THEIR AGENTS AND EMPLOYEES, EXCEPTING ONLY THE SOLE NEGLIGENCE OF OWNER, CONTRACTING
OFFICER, ENGINEER, THE CITY OF CARSON, THEIR PARENT AND SUBSIDIARY COMPANIES AND THEIR AGENTS
AND EMPLOYEES TO THE FULLEST EXTENT PERMITTED BY LAW. SUCH INDEMNIFICATION SHALL EXTEND TO ALL
CLAIMS, DEMANDS, ACTIONS, OR LIABILITY FOR INJURIES, DEATH OR DAMAGES OCCURRING AFTER COMPLETION
OF PROJECT, AS WELL AS DURING THE WORK'S PROGRESS. CONTRACTOR FURTHER AGREES THAT IT SHALL
ACCOMPLISH THE ABOVE AT ITS OWN COST, EXPENSE AND RISK EXCLUSIVE OF AND REGARDLESS OF ANY
APPLICABLE INSURANCE POLICY OR POSITION TAKEN BY ANY INSURANCE COMPANY REGARDING COVERAGE.
THE CRITERIA FOR THE SEPARATION OF EXISTING WATER MAINS FROM NEW RECYCLED WATER
MAINS SHALL BE PER DISTRICT STANDARD SPECIFICATION AND STANDARD DRAWING RW21.
45.
CONTRACTOR SHALL DEFEND, INDEMNIFY AND HOLD THE OWNER (WEST BASIN MUNICIPAL WATER
DISTRICT), CONTRACTING OFFICER (COE), AND TETRA TECH ITS EMPLOYEES, OFFICERS, OR
AGENTS, HARMLESS AGAINST ANY AND ALL CLAIMS BY ANY PARTIES ARISING FROM, OR RELATED
TO, ANY AND ALL DAMAGES, INCLUDING LEGAL COSTS AND ATTORNEY'S FEES, RESULTING FROM
INTERFERENCE WITH, INTERRUPTION OF, DAMAGE TO, OR ANY AND ALL INJURIES WHICH RESULT
FROM DAMAGE CAUSED TO SUBSURFACE INSTALLATIONS AS DEFINED IN GOVERNMENT CODE
4216.1 (J), WHICH IS UNFORESEEN AND DESPITE ENGINEER'S EFFORT DURING THE DESIGN
PROCESS WAS NOT LOCATED, EXCEPTING ONLY THE GROSS NEGLIGENCE OR WILLFUL
MISCONDUCT OF ENGINEER IN PROVIDING ITS SERVICES.
THESE DOCUMENTS HAVE BEEN PREPARED FOR A SPECIFIC PROJECT AND SHALL NEITHER BE ALTERED
NOR REUSED FOR ANY OTHER PURPOSE. ALSO, THESE DOCUMENTS DO NOT REPRESENT AS-BUILT
CONDITIONS. IF THESE DOCUMENTS ARE ALTERED INTENTIONALLY OR UNINTENTIONALLY, OR REUSED
WITHOUT THE DESIGN ENGINEER'S WRITTEN APPROVAL, IT WILL BE AT THE SOLE RISK AND RESPONSIBILITY
OF THE USER. THE ACT OF ALTERING OR REUSING IS CONSTRUED AS INDEMNIFYING AND HOLDING THE
DESIGN ENGINEERING FIRM AND ITS EMPLOYEES HARMLESS FROM ALL CLAIMS, DAMAGES, AND EXPENSES, INCLUDING ATTORNEY FEES, ARISING OUT OF SUCH ACT.
THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITIES OR STRUCTURES SHOWN ON
THESE PLANS ARE OBTAINED BY A SEARCH OF AVAILABLE RECORDS. TO THE BEST OF OUR
KNOWLEDGE THERE ARE NO EXISTING UTILITIES EXCEPT THOSE SHOWN ON THIS PLAN. THE
CONTRACTOR IS REQUIRED TO TAKE ALL PRECAUTIONARY MEASURES TO PROTECT THE UTILITIES
SHOWN, AND ANY OTHER LINES OR STRUCTURES NOT SHOWN ON THESE PLANS, AND IS
RESPONSIBLE FOR THE PROTECTION OF, AND ANY DAMAGE TO THOSE LINES OR STRUCTURES.
CONTRACTOR SHALL VERIFY THE LOCATIONS OF ALL UTILITIES SHOWN ON THE DRAWINGS.
WEST BASIN MUNICIPAL WATER DISTRICT (310) 217-2411
SOUTHERN CALIFORNIA EDISON (714) 796-9932
EXXON/MOBIL (310) 212-1794
SHELL (310) 816-2063
AT&T (310) 515-4029
CALIFORNIA WATER SERVICE (310) 257-1400
KINDER MORGAN ENERGY PARTNERS (714) 560-4604
LA COUNTY PUBLIC WORKS - FLOOD PERMITS (626) 458-4936
LEVEL 3 COMMUNICATIONS (720) 888-2639
ZAYO FNA ABOVE NET (443) 403-2023
PRAXAIR INC (562) 983-2175
QWEST (714) 666-9219
SOUTHERN CALIFORNIA GAS COMPANY (818) 701-4546
TESORO REFINING (310) 522-7149
VERIZON (714) 375-6760
LOS ANGELES COUNTY SANITATION DISTRICT (310) 830-8050
CITY OF CARSON (310) 830-7600
BEARINGS ARE BASED ON THE BEARING BETWEEN
CALIFORNIA SPATIAL REFERENCE CENTER CGPS
STATIONS "TORP" TO "CRHS" BEING N62°08'21.8"E
EXISTING SURVEY MONUMENT OR NAIL
WM
NEW WATER METER
CONTRACTOR SHALL COORDINATE THE REMOVAL OF ABANDONED OIL LINES WITH EXXON MOBIL
WHERE SHOWN ON THE PLANS.
46.
LACSD SEWER NOTES
EXISTING SEWER FORCE MAIN
EXISTING WATER SERVICE
21"FM
WS
1. LARGE DIAMETER PUBLIC SEWERS (GENERALLY 12 INCHES AND GREATER) ARE OWNED AND
MAINTAINED BY THE LOS ANGELES COUNTY SANITATION DISTRICTS (LACSD).
2. SMALL DIAMETER PUBLIC SEWERS (GENERALLY 8 AND 10 INCHES) ARE OWNED BY THE CITY OF
CARSON AND MAINTAINED UNDER CONTRACT BY THE CONSOLIDATED SEWER MAINTENANCE
DISTRICT (626) 300-3399, A DIVISION OF THE LOS ANGELES COUNTY DEPARTMENT OF PUBLIC
WORKS (LACDPW).
3. THE CONTRACTOR SHALL NOTIFY THE LACSD FIELD ENGINEERING MANAGER AT (310) 830-8050
AND THE LACSD WASTEWATER COLLECTION SYSTEM MANAGER AT (310) 638-1161 AT LEAST
FIVE (5) WORKING DAYS PRIOR TO THE START OF ANY WORK (INCLUDING POTHOLING) IN
FRONT OF LACSD'S MAIN STREET PUMPING PLANT (SEE SHEET C-3).
4. THE CONTRACTOR SHALL POTHOLE AND FIELD VERIFY THE HORIZONTAL AND VERTICAL
LOCATION OF THE 21" FM, 12" FM, 30" FM, AND 21" FM IN FRONT OF THE MAIN STREET PUMPING
PLANT AND SUBMIT POTHOLE DATA PRIOR TO THE START OF CONSTRUCTION TO LACSD.
SHOULD THE PROPOSED RW PIPELINE PROFILE BE REVISED TO CROSS BELOW THE EXISTING
SEWER FORCEMAINS, THE CONTRACTOR SHALL SUBMIT TO THE LACSD SEWER DESIGN
SECTION FOR REVIEW AND APPROVAL DETAILS OF ITS PROPOSED METHOD(S) OF SUPPORTING
THE THREE (3) EXISTING IN-SERVICE FORCE MAINS (21" RCP, 21" ACP, AND 30" HDPE) ACROSS
ITS TRENCH. THE SUBMITTAL SHALL BE BASED ON AND INCLUDE THE RESULTS OF POTHOLING
OF THE FORCEMAINS AND SHALL BE STAMPED BY A CIVIL OR STRUCTURAL ENGINEER
CURRENTLY REGISTERED IN THE STATE OF CALIFORNIA. THE CONTRACTOR SHALL ALLOW A
MINIMUM OF THREE (3) WEEKS FOR LACSD REVIEW OF THE SUBMITTAL AND ANY
RESUBMITTALS.
EXISTING GAS SERVICE
GS
SHEET INDEX
DISTRICT FILE
NO.
SHT # SHEET TITLE
231/811 G-1 TITLE SHEET
231/812 G-2
RECYCLED WATER NOTES, UTILITY COMPANIES,
SHEET INDEX, BASIS OF BEARINGS AND BENCHMARK
231/813 C-1 PLAN AND PROFILE STA 10+11± TO STA 16+00.00
231/814 C-2 PLAN AND PROFILE STA 16+00.00 TO STA 25+00.00
231/815 C-3 PLAN AND PROFILE STA 25+00.00 TO STA 35+00.00
231/816 C-4 PLAN AND PROFILE STA 35+00.00 TO STA 43+00.00
231/817 C-5 PLAN AND PROFILE STA 43+00.00 TO STA 52+00.00
231/818 C-6 PLAN AND PROFILE STA 52+00.00 TO STA 56+55.00
231/819 D-1 MISCELLANEOUS DETAILS
231/820 D-2 WBMWD STANDARD DRAWINGS 1
231/821 D-3 WBMWD STANDARD DRAWINGS 2
231/822 D-4 WBMWD STANDARD DRAWINGS 3
231/823 D-5 WBMWD STANDARD DRAWINGS 4
231/824 TC-1 TRAFFIC CONTROL TITLE SHEET
231/825 TC-2 TRAFFIC CONTROL STAGE 1
231/826 TC-3 TRAFFIC CONTROL STAGE 2
231/827 TC-4 TRAFFIC CONTROL STAGE 3A
231/828 TC-5 TRAFFIC CONTROL STAGE 3B
231/829 TC-6 TRAFFIC CONTROL STAGE 4
231/830 TC-7 TRAFFIC CONTROL STAGE 5A
231/831 TC-8 TRAFFIC CONTROL STAGE 5B
231/832 TC-9 TRAFFIC CONTROL STAGE 6
231/833 TC-10 TRAFFIC CONTROL STAGE 7
231/834 TC-11 TRAFFIC CONTROL STAGE 8A
231/835 TC-12 TRAFFIC CONTROL STAGE 8B
231/836 TC-13 TRAFFIC CONTROL STAGE 9
231/837 TC-14 TRAFFIC CONTROL STAGE 10
231/838 TC-15 TRAFFIC CONTROL STAGE 11
MW
EXISTING MONITORING WELL
CP
EXISTING CATHODIC PROTECTION TEST STATION
LACFCD NOTES
1. LACFCD MAINTENANCE ACCESS GATE TO THE CHANNEL SHALL REMAIN ACCESSIBLE AT ALL
TIMES.
2. THE CONTRACTOR SHALL PROTECT IN PLACE EXISTING LACFCD'S STORM DRAINS. SEE
GENERAL NOTE 18.
3. CONTRACTOR SHALL BE RESPONSIBLE FOR DAMAGE TO LACFCD'S FACILITIES AND UTILITIES
AS A RESULT OF HIS OPERATIONS, AND WILL BE REQUIRED TO REPAIR OR REPLACE SAME TO
THE SATISFACTORY OF, AND AS DIRECTED BY, THE COE AND/OR LACFCD.
B
6 5
C
D
8 7 6 5 4
I W
R S
F
S
P r o j e c t s
C
A D
S h e e t F i l e s C
P l a n P r o f i l e d
S
A
V A
L O
N
B
L V
D
S
U I T
E
W E
S
N
I C
I P
T
S
T R
I C
T
D I S
T R
I C
T
F
I L
E
N
O
C A
R S
O N
C
A
A
B
C
D
P L
A N
S
P
R E
P A
R E
D
B
Y
I r v i n e
C a l i f o r n i a
V o n
K a r m a n
A v e
S u i t e
F
A X
C A
R S
L L
L A
T E
R A
L
P
H A
L O
S
A
N G
E L E
S
C
O U
N T
Y
C
A L I F
O R
N I A
W E
S
N
I C
I P
A L
W
A T
S
T R
I C
T
R
E C
Y C
L E
D
W
A T
S
T E
M
SAFETY PAYS
VALUE ENGINEERING PAYS
S C
A L
E
O F
S H
E E
T
S H
E E
T S
F I L
E
N
A M
E
S P
E C
N
A W
N
B
Y
D E
S I G
N E
D
B
Y
C H
E C
K E
D
B
Y
S Y
M B
O L
R E
V I S
I O
N S
D E
S C
R I P
T I O
N S
D A
T E
A P
P R
O V
A L
W
P L
B
S U
B M
I T
T E
D
B
Y
C H
I E
F
D
E S
I G
N
B
R A
N C
H
A R
T H
J U
N G
P
E
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
L O
S
A
N G
E L
S
T R
I C
T
11/24/14
M W
B
R J W
L E
C
S T A
T O
S T A
P L A
N
A
O
F I L E
10 11 12 13 14
SCALE:
HORIZ: 1"=40'
VERT: 1" = 4'
15 16
SCALE:
20' 40' 80'
1" = 40'
N
M A
T C
H L
I N
E
S
NOTES TO CONTRACTOR
1. CONTRACTOR SHALL POTHOLE ALL UTILITY CROSSINGS AND POINTS OF CONNECTION
2. CONTRACTOR SHALL MAINTAIN ACCESS TO ALL DRIVEWAYS AT ALL TIMES
3. CONTRACTOR SHALL EXERCISE EXTREME CAUTION WHEN WORKING IN THE VICINITY OF
EXISTING OIL LINES. CONTRACTOR SHALL TAKE ALL PRECAUTIONARY MEASURES
NECESSARY TO PROTECT IN PLACE THE EXISTING OIL LINES
4. LOCATION OF ALL APPURTENANCES SHALL BE DETERMINED IN THE FIELD BY THE
CONTRACTING OFFICER'S REPRESENTATIVE (COE). CONTRACTOR SHALL COORDINATE
WITH COE AND WBMWD A MINIMUM OF 10 BUSINESS DAYS IN ADVANCE
5. CONTRACTOR SHALL COORDINATE REMOVAL OF EXISTING ABANDONED 8" EXXON MOBIL
PIPELINE PRIOR TO EXCAVATION OF BORE & JACK PITS. EXXON MOBIL WILL PERFORM
REMOVAL. SEE PROJECT SPECIFICATION SECTION 01 14 00
6. THERE WERE NO PLANS AVAILABLE THAT SHOW GAS SERVICES, SEWER SERVICES, AND
WATER SERVICES. LOCATION AND DEPTH OF CROSSINGS HAS BEEN GUESSED.
CONTRACTOR SHALL DETERMINE LOCATION IN THE FIELD AND IN COORDINATION WITH
THE UTILITY COMPANY AND PROTECT IN PLACE
7. CONTRACTOR SHALL REMOVE AND REPLACE CONCRETE MEDIAN IN-KIND (APPROX 40
LF). RECORD DRAWINGS PROVIDED IN APPENDIX E OF THE TECHNICAL SPECIFICATIONS
CONSTRUCTION NOTES
CONSTRUCT 12" C-900 PVC PIPE, DR-14
CONSTRUCT 12" DUCTILE IRON PIPE, CLASS 350
(RESTRAIN ALL JOINTS)
3 CONSTRUCT 12" 11.25° DUCTILE IRON ELBOW, PO
CONSTRUCT CONCRETE THRUST BLOCK PER WBMWD
STD DWG RW19
CONSTRUCT 1" COMBINATION AIR RELEASE AND
VACUUM VALVE PER WBMWD STD DWG RW9 AND AS
MODIFIED PER DETAIL 2 ON SHT D-1
10 CONSTRUCT 4" BLOWOFF PER WBMWD STD DWG RW13
CONSTRUCT 2" RECYCLED WATER SERVICE PER
WBMWD STD DWG RW3. LOCATION OF SERVICE LINE
TO BE FIELD VERIFIED WITH COE AND WBMWD A
MINIMUM OF 10 BUSINESS DAYS IN ADVANCE.
CONSTRUCT RECYCLED WATER PIPE IDENTIFICATION
PER WBMWD STD DWGS RW15 AND RW16
14 BACKFILL AND TRENCH REPAIR PER DTL 1 ON SHT D-1
CONSTRUCT 229.00 LF OF 12" DIP, CL 350
RESTRAIN ALL JOINTS
CONSTRUCT 360.00 LF OF 12" C-900 PVC PIPE, DR-14
S T A
115.00 LF OF 24" (OD) x
" THK (MIN)
STEEL CASING PER WBMWD STD
DWG RW20 WITH SACRIFICIAL
ANODES PER THE TECHNICAL
SPECIFICATIONS
LEGEND
8" REINFORCED PCC ROAD UNDER 3" AC
16 REMOVE AND REPLACE 8' WIDE CONCRETE SIDEWALK
PER CITY STD DWG NO 119A (20 LF)
17 CONSTRUCT 12" 45° DUCTILE IRON ELBOW, MJ
(RESTRAINED)
B
6 5
C
D
8 7 6 5 4
I W
R S
F
S
P r o j e c t s
C
A D
S h e e t F i l e s C
P l a n P r o f i l e d
S
A
V A
L O
N
B
L V
D
S
U I T
E
W E
S
N
I C
I P
T
S
T R
I C
T
D I S
T R
I C
T
F
I L
E
N
O
C A
R S
O N
C
A
A
B
C
D
P L
A N
S
P
R E
P A
R E
D
B
Y
I r v i n e
C a l i f o r n i a
V o n
K a r m a n
A v e
S u i t e
F
A X
C A
R S
L L
L A
T E
R A
L
P
H A
L O
S
A
N G
E L E
S
C
O U
N T
Y
C
A L I F
O R
N I A
W E
S
N
I C
I P
A L
W
A T
S
T R
I C
T
R
E C
Y C
L E
D
W
A T
S
T E
M
SAFETY PAYS
VALUE ENGINEERING PAYS
S C
A L
E
O F
S H
E E
T
S H
E E
T S
F I L
E
N
A M
E
S P
E C
N
A W
N
B
Y
D E
S I G
N E
D
B
Y
C H
E C
K E
D
B
Y
S Y
M B
O L
R E
V I S
I O
N S
D E
S C
R I P
T I O
N S
D A
T E
A P
P R
O V
A L
W
P L
B
S U
B M
I T
T E
D
B
Y
C H
I E
F
D
E S
I G
N
B
R A
N C
H
A R
T H
J U
N G
P
E
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
L O
S
A
N G
E L
S
T R
I C
T
11/24/14
M W
B
R J W
L E
C
S T
A
T
O
S
P L A
N
A
O
F I L E
SCALE:
20' 40' 80'
1" = 40'
N
17 18 19 20 21
SCALE:
HORIZ: 1"=40'
VERT: 1" = 4'
22 2316 24 25
M A
T C
H L
I N
E
S
M A
T C
H L
I N
E
S
NOTES TO CONTRACTOR
1. CONTRACTOR SHALL POTHOLE ALL UTILITY CROSSINGS AND POINTS OF
CONNECTION
2. CONTRACTOR SHALL MAINTAIN ACCESS TO ALL DRIVEWAYS AT ALL TIMES
3. CONTRACTOR SHALL EXERCISE EXTREME CAUTION WHEN WORKING IN THE
VICINITY OF EXISTING OIL LINES. CONTRACTOR SHALL TAKE ALL PRECAUTIONARY
MEASURES NECESSARY TO PROTECT IN PLACE THE EXISTING OIL LINES
4. LOCATION OF ALL APPURTENANCES SHALL BE DETERMINED IN THE FIELD BY THE
CONTRACTING OFFICER'S REPRESENTATIVE (COE). CONTRACTOR SHALL
COORDINATE WITH COE AND WBMWD A MINIMUM OF 10 BUSINESS DAYS IN
ADVANCE
5. THERE WERE NO PLANS AVAILABLE THAT SHOW GAS SERVICES, SEWER SERVICES,
AND WATER SERVICES. LOCATION AND DEPTH OF CROSSINGS HAS BEEN
GUESSED. CONTRACTOR SHALL DETERMINE LOCATION IN THE FIELD AND IN
COORDINATION WITH THE UTILITY COMPANY AND PROTECT IN PLACE
CONSTRUCTION NOTES
CONSTRUCT 12" C-900 PVC PIPE, DR-14
3 CONSTRUCT 12" 11.25° DUCTILE IRON ELBOW, PO
4 CONSTRUCT 12" 22.5° DUCTILE IRON ELBOW, PO
5 CONSTRUCT 12" 45° DUCTILE IRON ELBOW, PO
CONSTRUCT CONCRETE THRUST BLOCK PER WBMWD
STD DWG RW19
CONSTRUCT 1" COMBINATION AIR RELEASE AND
VACUUM VALVE PER WBMWD STD DWG RW9 AND AS
MODIFIED PER DETAIL 2 ON SHT D-1
10 CONSTRUCT 4" BLOWOFF PER WBMWD STD DWG RW13
CONSTRUCT RECYCLED WATER PIPE IDENTIFICATION
PER WBMWD STD DWGS RW15 AND RW16
BACKFILL AND TRENCH REPAIR PER DTL 1 ON SHT D-1
CONSTRUCT 900.00 LF OF 12" C-900 PVC PIPE, DR-14
LEGEND
8" REINFORCED PCC ROAD UNDER 3" AC
16 REMOVE AND REPLACE 8' WIDE CONCRETE SIDEWALK
PER CITY STD DWG NO 119A (20 LF)
B
6 5
C
D
8 7 6 5 4
I W
R S
F
S
P r o j e c t s
C
A D
S h e e t F i l e s C
P l a n P r o f i l e d
S
A
V A
L O
N
B
L V
D
S
U I T
E
W E
S
N
I C
I P
T
S
T R
I C
T
D I S
T R
I C
T
F
I L
E
N
O
C A
R S
O N
C
A
A
B
C
D
P L
A N
S
P
R E
P A
R E
D
B
Y
I r v i n e
C a l i f o r n i a
V o n
K a r m a n
A v e
S u i t e
F
A X
C A
R S
L L
L A
T E
R A
L
P
H A
L O
S
A
N G
E L E
S
C
O U
N T
Y
C
A L I F
O R
N I A
W E
S
N
I C
I P
A L
W
A T
S
T R
I C
T
R
E C
Y C
L E
D
W
A T
S
T E
M
SAFETY PAYS
VALUE ENGINEERING PAYS
S C
A L
E
O F
S H
E E
T
S H
E E
T S
F I L
E
N
A M
E
S P
E C
N
A W
N
B
Y
D E
S I G
N E
D
B
Y
C H
E C
K E
D
B
Y
S Y
M B
O L
R E
V I S
I O
N S
D E
S C
R I P
T I O
N S
D A
T E
A P
P R
O V
A L
W
P L
B
S U
B M
I T
T E
D
B
Y
C H
I E
F
D
E S
I G
N
B
R A
N C
H
A R
T H
J U
N G
P
E
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
L O
S
A
N G
E L
S
T R
I C
T
11/24/14
M W
B
R J W
L E
C
S T
A
T
O
S
P L A
N
A
O
F I L E
SCALE:
20' 40' 80'
1" = 40'
N
26 27 28 29 30
SCALE:
HORIZ: 1"=40'
VERT: 1" = 4'
31 3225 33 34
M A
T C
H L
I N
E
S
M A
T C
H L
I N
E
S
NOTES TO CONTRACTOR
CONSTRUCTION NOTES
CONSTRUCT 12" C-900 PVC PIPE, DR-14
5 CONSTRUCT 12" 45° DUCTILE IRON ELBOW, PO
CONSTRUCT CONCRETE THRUST BLOCK PER WBMWD
STD DWG RW19
CONSTRUCT 1" COMBINATION AIR RELEASE AND
VACUUM VALVE PER WBMWD STD DWG RW9 AND AS
MODIFIED PER DETAIL 2 ON SHT D-1
CONSTRUCT RECYCLED WATER PIPE IDENTIFICATION
PER WBMWD STD DWGS RW15 AND RW16
14 BACKFILL AND TRENCH REPAIR PER DTL 1 ON SHT D-1
CONSTRUCT 1000.00 LF OF 12" C-900 PVC PIPE, DR-14
1. CONTRACTOR SHALL POTHOLE ALL UTILITY CROSSINGS AND POINTS OF CONNECTION
2. CONTRACTOR SHALL MAINTAIN ACCESS TO ALL DRIVEWAYS AT ALL TIMES
3. CONTRACTOR SHALL EXERCISE EXTREME CAUTION WHEN WORKING IN THE VICINITY OF EXISTING OIL LINES. CONTRACTOR
SHALL TAKE ALL PRECAUTIONARY MEASURES NECESSARY TO PROTECT IN PLACE THE EXISTING OIL LINES
4. LOCATION OF ALL APPURTENANCES SHALL BE DETERMINED IN THE FIELD BY THE CONTRACTING OFFICER'S REPRESENTATIVE
(COE). CONTRACTOR SHALL COORDINATE WITH COE AND WBMWD A MINIMUM OF 10 BUSINESS DAYS IN ADVANCE
5. THE CONTRACTOR SHALL NOTIFY THE LACSD FIELD ENGINEERING MANAGER AT (310) 830-8050 AND THE LACSD WASTEWATER
COLLECTION SYSTEM MANAGER AT (310) 638-1161 AT LEAST FIVE (5) WORKING DAYS PRIOR TO THE START OF ANY WORK
(INCLUDING POTHOLING) IN FRONT OF LACSD'S MAIN STREET PUMPING PLANT
6. THE CONTRACTOR SHALL POTHOLE AND FIELD VERIFY THE HORIZONTAL AND VERTICAL LOCATION OF THE 21" FM, 12" FM, 30"
FM, AND 21" FM IN FRONT OF THE MAIN STREET PUMPING PLANT AND SUBMIT POTHOLE DATA PRIOR TO THE START OF
CONSTRUCTION TO LACSD. SHOULD THE PROPOSED RW PIPELINE PROFILE BE REVISED TO CROSS BELOW THE EXISTING
SEWER FORCEMAINS, THE CONTRACTOR SHALL SUBMIT TO THE LACSD SEWER DESIGN SECTION FOR REVIEW AND APPROVAL
DETAILS OF ITS PROPOSED METHOD(S) OF SUPPORTING THE THREE (3) EXISTING IN-SERVICE FORCE MAINS (21" RCP, 21" ACP, AND 30" HDPE) ACROSS ITS TRENCH. THE SUBMITTAL SHALL BE BASED ON AND INCLUDE THE RESULTS OF POTHOLING OF THE
FORCEMAINS AND SHALL BE STAMPED BY A CIVIL OR STRUCTURAL ENGINEER CURRENTLY REGISTERED IN THE STATE OF
CALIFORNIA. THE CONTRACTOR SHALL ALLOW A MINIMUM OF THREE (3) WEEKS FOR LACSD REVIEW OF THE SUBMITTAL AND
ANY RESUBMITTALS
7. THERE WERE NO PLANS AVAILABLE THAT SHOW GAS SERVICES, SEWER SERVICES, AND WATER SERVICES. LOCATION AND
DEPTH OF CROSSINGS HAS BEEN GUESSED. CONTRACTOR SHALL DETERMINE LOCATION IN THE FIELD AND IN COORDINATION
WITH THE UTILITY COMPANY AND PROTECT IN PLACE
LEGEND
8" REINFORCED PCC ROAD UNDER 3" AC
LACSD SEWER RECORD DRAWING REFERENCES
DWG NO
8-D-3
8-P-27
8-P-32
8-D-2
8-D-4
8-G-21
8-P-21
8-P-83
DIA & MATERIAL
33" RCP
42" RCP
15" VCP
15" VCP
12" CIP (ABAN)
21" RCP
21" ACP
30" HDPE
SEWER TYPE
GRAVITY
GRAVITY
GRAVITY
GRAVITY
FORCE MAIN
FORCE MAIN
FORCE MAIN
FORCE MAIN
R L
CURVE DATA
T
A 03°45'29" 2836.93' 186.08' 93.07'
4 CONSTRUCT 12" 22.5° DUCTILE IRON ELBOW, PO
16 REMOVE AND REPLACE 8' WIDE CONCRETE SIDEWALK
PER CITY STD DWG NO 119A (20 LF)
B
6 5
C
D
8 7 6 5 4
I W
R S
F
S
P r o j e c t s
C
A D
S h e e t F i l e s C
P l a n P r o f i l e d
S
A
V A
L O
N
B
L V
D
S
U I T
E
W E
S
N
I C
I P
T
S
T R
I C
T
D I S
T R
I C
T
F
I L
E
N
O
C A
R S
O N
C
A
A
B
C
D
P L
A N
S
P
R E
P A
R E
D
B
Y
I r v i n e
C a l i f o r n i a
V o n
K a r m a n
A v e
S u i t e
F
A X
C A
R S
L L
L A
T E
R A
L
P
H A
L O
S
A
N G
E L E
S
C
O U
N T
Y
C
A L I F
O R
N I A
W E
S
N
I C
I P
A L
W
A T
S
T R
I C
T
R
E C
Y C
L E
D
W
A T
S
T E
M
SAFETY PAYS
VALUE ENGINEERING PAYS
S C
A L
E
O F
S H
E E
T
S H
E E
T S
F I L
E
N
A M
E
S P
E C
N
A W
N
B
Y
D E
S I G
N E
D
B
Y
C H
E C
K E
D
B
Y
S Y
M B
O L
R E
V I S
I O
N S
D E
S C
R I P
T I O
N S
D A
T E
A P
P R
O V
A L
W
P L
B
S U
B M
I T
T E
D
B
Y
C H
I E
F
D
E S
I G
N
B
R A
N C
H
A R
T H
J U
N G
P
E
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
L O
S
A
N G
E L
S
T R
I C
T
11/24/14
M W
B
R J W
L E
C
S T
A
T
O
S
P L A
N
A
O
F I L E
SCALE:
20' 40' 80'
1" = 40'
N
35 36 37 38 39
SCALE:
HORIZ: 1"=40'
VERT: 1" = 4'
40 41 42 43
M A
T C
H L
I N
E
S
M A
T C
H L
I N
E
S
CONSTRUCTION NOTES
CONSTRUCT 12" C-900 PVC PIPE, DR-14
3 CONSTRUCT 12" 11.25° DUCTILE IRON ELBOW, PO
CONSTRUCT 12" 45° DUCTILE IRON ELBOW, PO
CONSTRUCT CONCRETE THRUST BLOCK PER WBMWD
STD DWG RW19
CONSTRUCT 1" COMBINATION AIR RELEASE AND
VACUUM VALVE PER WBMWD STD DWG RW9 AND AS
MODIFIED PER DETAIL 2 ON SHT D-1
10 CONSTRUCT 4" BLOWOFF PER WBMWD STD DWG RW13
CONSTRUCT RECYCLED WATER PIPE IDENTIFICATION
PER WBMWD STD DWGS RW15 AND RW16
BACKFILL AND TRENCH REPAIR PER DTL 1 ON SHT D-1
R L
CURVE DATA
T
A 03°45'29" 2836.93' 186.08' 93.07'
B 04°17'47" 2853.93' 214.00' 107.05'
CONSTRUCT 800.00 LF OF 12" C-900 PVC PIPE, DR-14
NOTES TO CONTRACTOR
1. CONTRACTOR SHALL POTHOLE ALL UTILITY CROSSINGS AND POINTS OF
CONNECTION
2. CONTRACTOR SHALL MAINTAIN ACCESS TO ALL DRIVEWAYS AT ALL TIMES
3. CONTRACTOR SHALL EXERCISE EXTREME CAUTION WHEN WORKING IN THE
VICINITY OF EXISTING OIL LINES. CONTRACTOR SHALL TAKE ALL PRECAUTIONARY
MEASURES NECESSARY TO PROTECT IN PLACE THE EXISTING OIL LINES
4. LOCATION OF ALL APPURTENANCES SHALL BE DETERMINED IN THE FIELD BY THE
CONTRACTING OFFICER'S REPRESENTATIVE (COE). CONTRACTOR SHALL
COORDINATE WITH COE AND WBMWD A MINIMUM OF 10 BUSINESS DAYS IN
ADVANCE
5. THERE WERE NO PLANS AVAILABLE THAT SHOW GAS SERVICES, SEWER SERVICES,
AND WATER SERVICES. LOCATION AND DEPTH OF CROSSINGS HAS BEEN
GUESSED. CONTRACTOR SHALL DETERMINE LOCATION IN THE FIELD AND IN
COORDINATION WITH THE UTILITY COMPANY AND PROTECT IN PLACE
LEGEND
8" REINFORCED PCC ROAD UNDER 3" AC
16 REMOVE AND REPLACE 8' WIDE CONCRETE SIDEWALK
PER CITY STD DWG NO 119A (20 LF)
B
6 5
C
D
8 7 6 5 4
I W
R S
F
S
P r o j e c t s
C
A D
S h e e t F i l e s C
P l a n P r o f i l e d
S
A
V A
L O
N
B
L V
D
S
U I T
E
W E
S
N
I C
I P
T
S
T R
I C
T
D I S
T R
I C
T
F
I L
E
N
O
C A
R S
O N
C
A
A
B
C
D
P L
A N
S
P
R E
P A
R E
D
B
Y
I r v i n e
C a l i f o r n i a
V o n
K a r m a n
A v e
S u i t e
F
A X
C A
R S
L L
L A
T E
R A
L
P
H A
L O
S
A
N G
E L E
S
C
O U
N T
Y
C
A L I F
O R
N I A
W E
S
N
I C
I P
A L
W
A T
S
T R
I C
T
R
E C
Y C
L E
D
W
A T
S
T E
M
SAFETY PAYS
VALUE ENGINEERING PAYS
S C
A L
E
O F
S H
E E
T
S H
E E
T S
F I L
E
N
A M
E
S P
E C
N
A W
N
B
Y
D E
S I G
N E
D
B
Y
C H
E C
K E
D
B
Y
S Y
M B
O L
R E
V I S
I O
N S
D E
S C
R I P
T I O
N S
D A
T E
A P
P R
O V
A L
W
P L
B
S U
B M
I T
T E
D
B
Y
C H
I E
F
D
E S
I G
N
B
R A
N C
H
A R
T H
J U
N G
P
E
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
L O
S
A
N G
E L
S
T R
I C
T
11/24/14
M W
B
R J W
L E
C
S T
A
T
O
P L A
N
A
O
F I L E
SCALE:
20' 40' 80'
1" = 40'
N
44 45 46 47 48
SCALE:
HORIZ: 1"=40'
VERT: 1" = 4'
49 5043 51 52
M A
T C
H L
I N
E
S
M A
T C
H L
I N
E
S
CONSTRUCTION NOTES
CONSTRUCT 12" C-900 PVC PIPE, DR-14
3 CONSTRUCT 12" 11.25° DUCTILE IRON ELBOW, PO
5 CONSTRUCT 12" 45° DUCTILE IRON ELBOW, PO
CONSTRUCT CONCRETE THRUST BLOCK PER WBMWD
STD DWG RW19
10 CONSTRUCT 4" BLOWOFF PER WBMWD STD DWG RW13
CONSTRUCT 3" RECYCLED WATER SERVICE PER
WBMWD STD DWG RW4. LOCATION OF SERVICE LINE
TO BE FIELD VERIFIED WITH COE AND WBMWD A
MINIMUM OF 10 BUSINESS DAYS IN ADVANCE
CONSTRUCT RECYCLED WATER PIPE IDENTIFICATION
PER WBMWD STD DWGS RW15 AND RW16
14 BACKFILL AND TRENCH REPAIR PER DTL 1 ON SHT D-1
CONSTRUCT 900.00 LF OF 12" C-900 PVC PIPE, DR-14
NOTES TO CONTRACTOR
1. CONTRACTOR SHALL POTHOLE ALL UTILITY CROSSINGS AND POINTS OF
CONNECTION
2. CONTRACTOR SHALL MAINTAIN ACCESS TO ALL DRIVEWAYS AT ALL TIMES
3. CONTRACTOR SHALL EXERCISE EXTREME CAUTION WHEN WORKING IN THE
VICINITY OF EXISTING OIL LINES. CONTRACTOR SHALL TAKE ALL PRECAUTIONARY
MEASURES NECESSARY TO PROTECT IN PLACE THE EXISTING OIL LINES
4. LOCATION OF ALL APPURTENANCES SHALL BE DETERMINED IN THE FIELD BY THE
CONTRACTING OFFICER'S REPRESENTATIVE (COE). CONTRACTOR SHALL
COORDINATE WITH COE AND WBMWD A MINIMUM OF 10 BUSINESS DAYS IN
ADVANCE
5. THERE WERE NO PLANS AVAILABLE THAT SHOW GAS SERVICES, SEWER
SERVICES, AND WATER SERVICES. LOCATION AND DEPTH OF CROSSINGS HAS
BEEN GUESSED. CONTRACTOR SHALL DETERMINE LOCATION IN THE FIELD AND IN
COORDINATION WITH THE UTILITY COMPANY AND PROTECT IN PLACE
LEGEND
8" REINFORCED PCC ROAD UNDER 3" AC
15 CONSTRUCT 4"x12" TEE (FLG'D), 12" RW GATE VALVE
(FLGxPO) AND ANCHOR BLOCK PER WBMWD STD DWG
RW7
16 REMOVE AND REPLACE 8' WIDE CONCRETE SIDEWALK
PER CITY STD DWG NO 119A (20 LF)
6 CONSTRUCT 12" ADAPTER (FLGxPO)
B
6 5 4 3
C
D
8 7 6 5 4
I W
R S
F
S
P r o j e c t s
C
A D
S h e e t F i l e s C
P l a n P r o f i l e d
S
A
V A
L O
N
B
L V
D
S
U I T
E
W E
S
N
I C
I P
T
S
T R
I C
T
D I S
T R
I C
T
F
I L
E
N
O
C A
R S
O N
C
A
A
B
C
D
P L
A N
S
P
R E
P A
R E
D
B
Y
I r v i n e
C a l i f o r n i a
V o n
K a r m a n
A v e
S u i t e
F
A X
C A
R S
L L
L A
T E
R A
L
P
H A
L O
S
A
N G
E L E
S
C
O U
N T
Y
C
A L I F
O R
N I A
W E
S
N
I C
I P
T
S
T R
I C
T
R
E C
Y C
L E
D
W
A T
S
T E
M
SAFETY PAYS
VALUE ENGINEERING PAYS
S C
A L
E
O F
S H
E E
T
S H
E E
T S
F I L
E
N
A M
E
S P
E C
N
A W
N
B
Y
D E
S I G
N E
D
B
Y
C H
E C
K E
D
B
Y
S Y
M B
O L
R E
V I S
I O
N S
D E
S C
R I P
T I O
N S
D A
T E
A P
P R
O V
A L
W
P L
B
S U
B M
I T
T E
D
B
Y
C H
I E
F
D
E S
I G
N
B
R A
N C
H
A R
T H
J U
N G
P
E
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
L O
S
A
N G
E L
S
T R
I C
T
11/24/14
M W
B
R J W
L E
C
S T
A
T
O
S
P L A
N
A
O
F I L E
SCALE:
20' 40' 80'
1" = 40'
N
53 54 55 56 57
SCALE:
HORIZ: 1"=40'
VERT: 1" = 4'
M A
T C
H L
I N
E
S
CONSTRUCTION NOTES
CONSTRUCT 12" C-900 PVC PIPE, DR-14
5 CONSTRUCT 12" 45° DUCTILE IRON ELBOW, PO
CONSTRUCT DEAD END TEMPORARY BLOW OFF PER
WBMWD STD DWG RW12
CONSTRUCT CONCRETE THRUST BLOCK PER WBMWD
STD DWG RW19
CONSTRUCT 1" COMBINATION AIR RELEASE AND
VACUUM VALVE PER WBMWD STD DWG RW9 AND AS
MODIFIED PER DETAIL 2 ON SHT D-1
CONSTRUCT RECYCLED WATER PIPE IDENTIFICATION
PER WBMWD STD DWGS RW15 AND RW16
14 BACKFILL AND TRENCH REPAIR PER DTL 1 ON SHT D-1
CONSTRUCT 455.00 LF OF 12" C-900 PVC PIPE, DR-14
NOTES TO CONTRACTOR
1. CONTRACTOR SHALL POTHOLE ALL UTILITY CROSSINGS AND POINTS OF CONNECTION
2. CONTRACTOR SHALL MAINTAIN ACCESS TO ALL DRIVEWAYS AT ALL TIMES
3. CONTRACTOR SHALL EXERCISE EXTREME CAUTION WHEN WORKING IN THE VICINITY OF EXISTING
OIL LINES. CONTRACTOR SHALL TAKE ALL PRECAUTIONARY MEASURES NECESSARY TO PROTECT
IN PLACE THE EXISTING OIL LINES
4. LOCATION OF ALL APPURTENANCES SHALL BE DETERMINED IN THE FIELD BY THE CONTRACTING
OFFICER'S REPRESENTATIVE (COE). CONTRACTOR SHALL COORDINATE WITH COE AND WBMWD A
MINIMUM OF 10 BUSINESS DAYS IN ADVANCE
5. THE CITY OF CARSON WILL BE CONSTRUCTING A 12" RW PIPELINE FROM STATION 56+55 TO CARSON
STREET AND 8" RW PIPELINES ON MAIN STREET AND CARSON STREET AS A PART OF THE MAIN
STREET IMPROVEMENTS. CONTRACTOR SHALL COORDINATE CONSTRUCTION WITH CITY
CONTRACTOR. CONTRACTOR MAY BE REQUIRED TO CONNECT TO CITY'S 12" RW PIPELINE. SEE DTL
5 ON SHT D-1 IF CONNECTION TO 12" RW IS REQUIRED
6. THERE WERE NO PLANS AVAILABLE THAT SHOW GAS SERVICES, SEWER SERVICES, AND WATER
SERVICES. LOCATION AND DEPTH OF CROSSINGS HAS BEEN GUESSED. CONTRACTOR SHALL
DETERMINE LOCATION IN THE FIELD AND IN COORDINATION WITH THE UTILITY COMPANY AND
PROTECT IN PLACE
LEGEND
8" REINFORCED PCC ROAD UNDER 3" AC
16 REMOVE AND REPLACE 8' WIDE CONCRETE SIDEWALK
PER CITY STD DWG NO 119A (20 LF)
PIPE SUPPORT DETAIL
SCALE: NTS
B
6 5
C
D
8 7 6 5 4
P
C
A D
S h e e t F i l e s D
C i v i l
D e t a i l s
T t d
S
A
V A
L O
N
B
L V
D
S
U I T
E
W E
S
N
I C
I P
T
S
T R
I C
T
D I S
T R
I C
T
F
I L
E
N
O
C A
R S
O N
C
A
A
B
C
D
P L
A N
S
P
R E
P A
R E
D
B
Y
I r v i n e
C a l i f o r n i a
V o n
K a r m a n
A v e
S u i t e
F
A X
C A
R S
L L
L A
T E
R A
L
P
H A
L O
S
A
N G
E L E
S
C
O U
N T
Y
C
A L I F
O R
N I A
W E
S
N
I C
I P
A L
W
A T
S
T R
I C
T
R
E C
Y C
L E
D
W
A T
S
T E
M
SAFETY PAYS
VALUE ENGINEERING PAYS
S C
A L
E
O F
S H
E E
T
S H
E E
T S
F I L
E
N
A M
E
S P
E C
N
A W
N
B
Y
D E
S I G
N E
D
B
Y
C H
E C
K E
D
B
Y
S Y
M B
O L
R E
V I S
I O
N S
D E
S C
R I P
T I O
N S
D A
T E
A P
P R
O V
A L
W
P L
B
S U
B M
I T
T E
D
B
Y
C H
I E
F
D
E S
I G
N
B
R A
N C
H
A R
T H
J U
N G
P
E
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
L O
S
A
N G
E L
S
T R
I C
T
11/24/14
M W
B
R J W
L E
T
E D
D
M I S
C E
L L A
N E
O U
S
D
E T
A I L S
1" COMBINATION AIR RELEASE
AND VACUUM VALVE ASSEMBLY2
SCALE: NTS
REPAVING DETAIL
SCALE: NTS
SERVICE CONNECTION4
SCALE: HORIZ: 1" = 20'
CONNECTION TO EXIST 12" RW
(JIM DEAR BLVD)3
SCALE: NTS
VERT: 1" = 4'
CONNECTION TO EXIST 12" RW
(CARSON ST)5
SCALE: NTS
CONTRACTOR SHALL MAINTAIN BASE PAVEMENT AND PROVIDE TEMPORARY STRIPING AS REQUIRED UNTIL FINAL
PAVING, SLURRY SEAL AND STRIPING IS COMPLETED.
CONTRACTOR SHALL REMOVE ALL EQUIPMENT AND MATERIAL OFF STREET AT THE END OF EACH WORK DAY.
ALL STEEL PLATES SHALL BE NON-SKID. ADVANCED WARNING SIGNS SHALL BE REQUIRED FOR STEEL PLATES WITHIN TRAVELED
WAYS (TYPE P PER WATCH MANUAL).
7.
6.
TRENCH PAVEMENT REPLACEMENT SHALL BE PLACED NO LESS THAN FLUSH WITH ADJACENT EXISTING A.C. PAVEMENT.
WHERE THE EDGE LINE OF THE PAVEMENT REMOVED FOR THE PIPELINE TRENCH EXCAVATION COMES WITHIN
THREE (3) FEET OF THE OUTER EDGE OF THE PAVEMENT AGAINST GUTTER LINE OR CURB FACE, THE EXISTING
PAVING SHALL BE REMOVED TO THE GUTTER LINE OR CURB FACE AND THE PERMANENT PAVEMENT LAID TO THE
GUTTER LINE OR CURB FACE.
WHERE THE EDGE LINE OF THE PAVEMENT REMOVED FOR THE PIPELINE TRENCH EXCAVATION IS MORE THAN THREE (3)
FEET FROM THE GUTTER LINE OR CURB FACE, THE CONTRACTOR IS TO SAW CUT THE EXISTING PAVING TWELVE (12)
INCHES BACK FROM THE EDGE OF THE TRENCH AND REMOVE THAT EXISTING PAVEMENT BEFORE PLACEMENT OF
PERMANENT PAVING.
CONTRACTOR SHALL RAISE ALL EXISTING AND NEW WATER/RECYCLED WATER VALVES, SEWER/WATER/RECYCLED WATER
MANHOLES AND ALL UTILITY BOXES TO GRADE AFTER FINAL PAVING IS COMPLETED.
CONTRACTOR TO CLEAN STREET USING SWEEPER PRIOR TO END OF EACH WORK DAY.
5.
3.
4.
2.
TRENCH PAVEMENT REPLACEMENT
NOTES:
1.
TABLE 1
SPECIAL REQUIREMENTS
RUBBERIZED
SLURRY SEAL CURB
TO MEDIAN CURB OR
HALF STREET
(SEE NOTE 13)
BACKFILL WITH JURISDICTIONAL
AGENCY'S REQUIREMENT PER
12"
TABLE 1
12"
ORIGINAL SAWCUT
LOCATION OF
13.
RUBBERIZED SLURRY SEAL SHALL BE RUBBERIZED EMULSION AGGREGATE SLURRY (REAS) PER GREEN BOOK SECTION 203-5.5.
MAIN ST
(AC ROAD)
STA 18+10 TO 20+65
STA 31+65 TO 33+60
STA 33+75 TO 36+10
STA 42+00 TO 45+55
STA 45+70 TO 47+10
STA 47+25 TO 49+75
STA 49+90 TO 56+55
EXISTING + 1"
(5" MINIMUM)
A.C. PVMT. THICKNESS
SEE NOTES 1 AND 2
BASE
THICKNESS
(NONE)
BACKFILL
LOCATION OF SECOND
SAWCUT
CLASS II AGGREGATE
BASE COMPACTED TO
95% RELATIVE
COMPACTION OR 1
SACK SLURRY
TRAVERSE TRENCH
RUBBERIZED SLURRY
SEAL 25' EACH SIDE
OF TRENCH
(SEE NOTE 13)
8.
9.
TRANSVERSE TRENCHES ARE ANY TRENCHES WHICH ARE PERPENDICULAR TO THE STREET CENTERLINE, i.e. CROSSINGS OF STREETS, AIR &
VACUUM RELEASE INSTALLATIONS, BLOW OFF INSTALLATIONS & WATER SERVICE INSTALLATIONS.
DEPTH OF EXISTING PAVEMENT AND BASE ARE:
MAIN ST VARIES: 5" AC OVER 12" AB - 12" AC OVER 6" AB (SEE BORING LOGS)
10.
TRENCH BACKFILL AND PAVEMENT REPAIRS SHALL BE CONSTRUCTED IN ACCORDANCE WITH CITY OF CARSON STD. DWG. NO.127 AND
136 EXCEPT AS MODIFIED BY THIS DETAIL.
11.
PIPE BEDDING SHALL CONFORM TO WBMWD STD. DWG. RW-17
IN AREAS OF CONCRETE REPLACEMENT:
12.
A. ALL CONCRETE SHALL BE REMOVED BY SAW CUTTING.
B. DRILL 24" DOWELS 12" INTO EXISTING CONCRETE EPOXY.
ASPHALT DIP THE EXPOSED 12", SPACE DOWELS AT 24" O.C.
C. CONSTRUCTION JOINTS SHALL BE PLACED AS EXISTING JOINTS.
D. CONTROL JOINTS SHALL BE SPACED MIDWAY BETWEEN CONSTRUCTION JOINTS.
E. ALL TRENCH BACKFILL UNDER CONCRETE REPLACEMENT SHALL BE PER TABLE 1.
F. THE LIMITS OF REMOVAL AND REPLACEMENT WILL BE DETERMINED IN THE FIELD BY THE CITY OF CARSON INSPECTOR.
CONCRETE PAVEMENT SHALL BE REMOVED UP TO EXISTING JOINTS WITHIN THREE (3) FEET FROM THE TRENCH SAW CUT.
G. CONTRACTOR SHALL BE RESPONSIBLE TO PROTECT THE INSTALLED CONCRETE IMPROVEMENTS UNTIL THEY ARE ADEQUATELY
CURED AND READY TO ACCEPT TRAFFIC.
LIMITS OF SLURRY SEAL
M E
D I A
N
C
U R
B
H A
R
E E
T
C U
D
G U
T T
E R
SAWCUT & TACK COAT (TYP)
3" AC OVER 8" PCC OVER 12" AB (SEE PLANS FOR APPROXIMATE LOCATION)
EXIST AC PAVEMENT
DOWELS -
SEE NOTE 12
AC OVER PCC ROADAC ROAD
EXIST BASE
EXIST BASE
PCC THICKNESS
SEE NOTES 2 AND 12
RUBBERIZED
SLURRY SEAL CURB
TO MEDIAN CURB OR
HALF STREET
(SEE NOTE 13)
MAIN ST
(AC OVER PCC ROAD)
STA 10+11 TO 10+50
STA 11+65 TO 18+10
STA 20+65 TO 31+65
STA 33+60 TO 33+75
STA 36+10 TO 42+00
STA 45+55 TO 45+70
STA 47+10 TO 47+25
STA 49+75 TO 49+90
3"
(NONE)
CLASS II AGGREGATE
BASE COMPACTED TO
95% RELATIVE
COMPACTION OR 1
SACK SLURRY
RUBBERIZED SLURRY
SEAL 25' EACH SIDE
OF TRENCH
(SEE NOTE 13)
8"
REPLACE PCC WITH
JURISDICTIONAL AGENCY'S
REQUIREMENT PER TABLE 1
REPLACE AC WITH
JURISDICTIONAL AGENCY'S
REQUIREMENT PER TABLE 1
EXIST AC PAVEMENT
EXIST PCC
14.
TRAFFIC CONTROL FOR PAVING OPERATIONS SHALL BE PREPARED BY THE CONTRACTOR PER THE "WORK AREA TRAFFIC
CONTROL HANDBOOK" (WATCH MANUAL), CALIFORNIA MANUAL ON UNIFORM TRAFFIC CONTROL (CMUTCD) OR TRAFFIC CONTROL
AND APPROVED BY CITY. PLANS SHALL BE SIGNED AND SEALED BY A LICENSED CIVIL ENGINEER IN THE STATE OF CALIFORNIA.
CONNECT SAMPLING PORT
TO TAP ON VALVE BODY
1/2" BRONZE ANGLE VALVE
(FEMALE IPT)
3/4" MALE X 1/2" MALE IPT
BRASS HOSE NIPPLE
1/2" BRONZE STREET ELL
AND 1/2" CLOSE BRASS
NIPPLE
WBMWD STD. DWG. RW9 SHALL BE MODIFIED PER THE
ABOVE. SEE RW9 FOR REMAINING DETAIL.
L
L
L
A
B
A
N
L
B
A
N
O
L
W'LY
ROW
E'LY
ROW
B
E
L
O
W
F
O
L
A
B
A
N
MAIN
STREET
CL
S T
A
I N
V
S T
A
V
S T
A
B E N D
S T
A
B E N D
S
-0 .0
S
CONSTRUCT 83 LF± OF 4" DIP, CL 350
RESTRAIN ALL JOINTS
I N
V
I N
V
S T A
I N
V
R
W
S
E R
V I C
E
P E
R
W
B M
S=0.0058
8' WIDE SIDEWALK
10'± TO
HORIZONTAL BEND
PROPOSED 12" PVC PIPE
EXISTING 12" RW
(PVC) (BY OTHERS)
REMOVE EXISTING 2"
TEMPORARY BLOW OFF, 12" CAP
AND THRUST BLOCK (3 CY)
STA 56+55±
REMOVE INTERFERING
PORTIONS OF EXIST 12" PVC PIPE
AND CONNECT TO EXIST WITH 12"
LONG BODY DI SOLID SLEEVE
B
6 5
C
D
8 7 6 5 4
P
C
A D
S h e e t F i l e s D
W
B M
W D
S t d
D w t d
S
A
V A
L O
N
B
L V
D
S
U I T
E
W E
S
N
I C
I P
T
S
T R
I C
T
D I S
T R
I C
T
F
I L
E
N
O
C A
R S
O N
C
A
A
B
C
D
P L
A N
S
P
R E
P A
R E
D
B
Y
I r v i n e
C a l i f o r n i a
V o n
K a r m a n
A v e
S u i t e
F
A X
C A
R S
L L
L A
T E
R A
L
P
H A
L O
S
A
N G
E L E
S
C
O U
N T
Y
C
A L I F
O R
N I A
W E
S
N
I C
I P
A L
W
A T
S
T R
I C
T
R
E C
Y C
L E
D
W
A T
S
T E
M
SAFETY PAYS
VALUE ENGINEERING PAYS
S C
A L
E
O F
S H
E E
T
S H
E E
T S
F I L
E
N
A M
E
S P
E C
N
A W
N
B
Y
D E
S I G
N E
D
B
Y
C H
E C
K E
D
B
Y
S Y
M B
O L
R E
V I S
I O
N S
D E
S C
R I P
T I O
N S
D A
T E
A P
P R
O V
A L
W
P L
B
S U
B M
I T
T E
D
B
Y
C H
I E
F
D
E S
I G
N
B
R A
N C
H
A R
T H
J U
N G
P
E
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
L O
S
A
N G
E L
S
T R
I C
T
11/24/14
M W
B
R J W
L E
N O
N E
D
W B
M W
D
S
T A
N D
A R
D
D
R A
W I N
B
6 5
C
D
8 7 6 5 4
P
C
A D
S h e e t F i l e s D
W
B M
W D
S t d
D w t d
S
A
V A
L O
N
B
L V
D
S
U I T
E
W E
S
N
I C
I P
T
S
T R
I C
T
D I S
T R
I C
T
F
I L
E
N
O
C A
R S
O N
C
A
A
B
C
D
P L
A N
S
P
R E
P A
R E
D
B
Y
I r v i n e
C a l i f o r n i a
V o n
K a r m a n
A v e
S u i t e
F
A X
C A
R S
L L
L A
T E
R A
L
P
H A
L O
S
A
N G
E L E
S
C
O U
N T
Y
C
A L I F
O R
N I A
W E
S
N
I C
I P
A L
W
A T
S
T R
I C
T
R
E C
Y C
L E
D
W
A T
S
T E
M
SAFETY PAYS
VALUE ENGINEERING PAYS
S C
A L
E
O F
S H
E E
T
S H
E E
T S
F I L
E
N
A M
E
S P
E C
N
A W
N
B
Y
D E
S I G
N E
D
B
Y
C H
E C
K E
D
B
Y
S Y
M B
O L
R E
V I S
I O
N S
D E
S C
R I P
T I O
N S
D A
T E
A P
P R
O V
A L
W
P L
B
S U
B M
I T
T E
D
B
Y
C H
I E
F
D
E S
I G
N
B
R A
N C
H
A R
T H
J U
N G
P
E
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
L O
S
A
N G
E L
S
T R
I C
T
11/24/14
M W
B
R J W
L E
N O
N E
D
W B
M W
D
S
T A
N D
A R
D
D
R A
W I N
B
6 5
C
D
8 7 6 5 4
P
C
A D
S h e e t F i l e s D
W
B M
W D
S t d
D w t d
S
A
V A
L O
N
B
L V
D
S
U I T
E
W E
S
N
I C
I P
T
S
T R
I C
T
D I S
T R
I C
T
F
I L
E
N
O
C A
R S
O N
C
A
A
B
C
D
P L
A N
S
P
R E
P A
R E
D
B
Y
I r v i n e
C a l i f o r n i a
V o n
K a r m a n
A v e
S u i t e
F
A X
C A
R S
L L
L A
T E
R A
L
P
H A
L O
S
A
N G
E L E
S
C
O U
N T
Y
C
A L I F
O R
N I A
W E
S
N
I C
I P
A L
W
A T
S
T R
I C
T
R
E C
Y C
L E
D
W
A T
S
T E
M
SAFETY PAYS
VALUE ENGINEERING PAYS
S C
A L
E
O F
S H
E E
T
S H
E E
T S
F I L
E
N
A M
E
S P
E C
N
A W
N
B
Y
D E
S I G
N E
D
B
Y
C H
E C
K E
D
B
Y
S Y
M B
O L
R E
V I S
I O
N S
D E
S C
R I P
T I O
N S
D A
T E
A P
P R
O V
A L
W
P L
B
S U
B M
I T
T E
D
B
Y
C H
I E
F
D
E S
I G
N
B
R A
N C
H
A R
T H
J U
N G
P
E
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
L O
S
A
N G
E L
S
T R
I C
T
11/24/14
M W
B
R J W
L E
N O
N E
D
W B
M W
D
S
T A
N D
A R
D
D
R A
W I N
DO NOT DRINK
WATER
RECYCLED
WARNING
NO TOMAR
AVISO
AGUA IMPURA
CAUTION - RECYCLED WATER, DO NOT DRINK
CAUTION - RECYCLED WATER LINE BELOW
B
6 5
C
D
8 7 6 5 4
P
C
A D
S h e e t F i l e s D
W
B M
W D
S t d
D w t d
S
A
V A
L O
N
B
L V
D
S
U I T
E
W E
S
N
I C
I P
T
S
T R
I C
T
D I S
T R
I C
T
F
I L
E
N
O
C A
R S
O N
C
A
A
B
C
D
P L
A N
S
P
R E
P A
R E
D
B
Y
I r v i n e
C a l i f o r n i a
V o n
K a r m a n
A v e
S u i t e
F
A X
C A
R S
L L
L A
T E
R A
L
P
H A
L O
S
A
N G
E L E
S
C
O U
N T
Y
C
A L I F
O R
N I A
W E
S
N
I C
I P
A L
W
A T
S
T R
I C
T
R
E C
Y C
L E
D
W
A T
S
T E
M
SAFETY PAYS
VALUE ENGINEERING PAYS
S C
A L
E
O F
S H
E E
T
S H
E E
T S
F I L
E
N
A M
E
S P
E C
N
A W
N
B
Y
D E
S I G
N E
D
B
Y
C H
E C
K E
D
B
Y
S Y
M B
O L
R E
V I S
I O
N S
D E
S C
R I P
T I O
N S
D A
T E
A P
P R
O V
A L
W
P L
B
S U
B M
I T
T E
D
B
Y
C H
I E
F
D
E S
I G
N
B
R A
N C
H
A R
T H
J U
N G
P
E
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
L O
S
A
N G
E L
S
T R
I C
T
11/24/14
M W
B
R J W
L E
N O
N E
D
W B
M W
D
S
T A
N D
A R
D
D
R A
W I N
B
6 5
C
D
8 7 6 5 4
P
C
A D
S h e e t F i l e s T
C
T i t l e
S h e e t d
S
A
V A
L O
N
B
L V
D
S
U I T
E
W E
S
N
I C
I P
T
S
T R
I C
T
D I S
T R
I C
T
F
I L
E
N
O
C A
R S
O N
C
A
A
B
C
D
P L
A N
S
P
R E
P A
R E
D
B
Y
I r v i n e
C a l i f o r n i a
V o n
K a r m a n
A v e
S u i t e
F
A X
C A
R S
L L
L A
T E
R A
L
P
H A
L O
S
A
N G
E L E
S
C
O U
N T
Y
C
A L I F
O R
N I A
W E
S
N
I C
I P
A L
W
A T
S
T R
I C
T
R
E C
Y C
L E
D
W
A T
S
T E
M
SAFETY PAYS
VALUE ENGINEERING PAYS
S C
A L
E
O F
S H
E E
T
S H
E E
T S
F I L
E
N
A M
E
S P
E C
N
A W
N
B
Y
D E
S I G
N E
D
B
Y
C H
E C
K E
D
B
Y
S Y
M B
O L
R E
V I S
I O
N S
D E
S C
R I P
T I O
N S
D A
T E
A P
P R
O V
A L
W
P L
B
S U
B M
I T
T E
D
B
Y
C H
I E
F
D
E S
I G
N
B
R A
N C
H
A R
T H
J U
N G
P
E
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
L O
S
A
N G
E L
S
T R
I C
T
11/24/14
11/24/14
P K
W V
P J
P K
C A
L E
T C
T
I T
L E
S H
E E
T
T C
T R
A F
F
N
T R
T
H E
E T
TRAFFIC CONTROL PLANS FOR
WEST BASIN MUNICIPAL WATER DISTRICT RECYCLED WATER SYSTEM
LOS ANGELES COUNTY, CALIFORNIA
CARSON MALL LATERAL, PHASE II
TRAFFIC CONTROL PLAN GENERAL NOTES:
1. ALL TRAFFIC CONTROL WORK FOR CONSTRUCTION SHALL CONFORM TO THE
LATEST CA MUTCD, AND WATCH MANUAL.
2. ALL SIGNING AND STRIPING SHALL CONFORM TO THE LATEST CA MUTCD AND
STANDARD PLANS AND SPECIFICATIONS.
3. CONTRACTOR SHALL MAINTAIN ACCESS TO ALL ADJACENT PROPERTIES.
4. ALL SIGNS SHALL BE REFLECTORIZED AND STANDARD SIZE.
5. CONTRACTOR SHALL HAVE ALL SIGNS, DELINEATORS, BARRICADES, ETC.,
PROPERLY INSTALLED PRIOR TO COMMENCING CONSTRUCTION.
6. WHEN CONSTRUCTION IS NOT BEING PERFORMED, ALL ROADWAYS SHALL BE
RETURNED TO THEIR FULL TRAFFIC USAGE BY PLATING OR BACKFILLING THE
OPEN TRENCHES, AND REMOVAL OF ALL TRAFFIC CONTROL DEVICES USED
FOR TRAFFIC CONTROL OR DETOUR.
7. ALL TUBULAR DELINEATORS SHALL BE 36 IN. MINIMUM HEIGHT AND CONES
SHALL BE 28 IN. MINIMUM HEIGHT AND SHALL INCLUDE 12 IN. HIGH
INTENSITY REFLECTORIZED SLEEVE.
8. NO WORK IS PERMITTED ON WEEKENDS OR HOLIDAYS UNLESS APPROVED BY
THE CITY ENGINEER.
9. CONTRACTOR SHALL RE-PAVE WITHIN FIVE DAYS OF BACKFILLING.
CONTRACTOR SHALL RESTORE ANY AND ALL STRIPING, PAVEMENT MARKINGS
AND TRAFFIC SIGNAL LOOPS DAMAGED OR REMOVED DURING CONSTRUCTION
TO THE SATISFACTION OF THE CITY ENGINEER.
10. CONTRACTOR SHALL COORDINATE WITH THE LOCAL AGENCY AT LEAST THREE
WORKING DAYS (72 HOURS) PRIOR TO THE STARTING OF TRAFFIC CONTROL
DELINEATION.
11. ARROW BOARDS SHALL BE USED ON ANY LANE CLOSURES ON ARTERIAL AND
COLLECTORS STREETS.
12. EACH CITY'S ENGINEER RESERVES THE RIGHT TO OBSERVE THESE TRAFFIC
CONTROL PLANS IN USE AND TO MAKE ANY NECESSARY CHANGES AS FIELD
CONDITIONS WARRANT. ANY CHANGES SHALL SUPERSEDE THESE PLANS.
EXACT LOCATION OF ALL EQUIPMENT AND TRAFFIC CONTROL DEVICES SHALL
BE DETERMINED BY THE CITY ENGINEER.
13. ALL TRAFFIC CONTROL DEVICES SHALL BE KEPT IN THEIR PROPER POSITION
AT ALL TIMES, AND SHALL BE REPAIRED, REPLACED, OR CLEANED AS
NECESSARY TO PRESERVE THEIR APPEARANCE AND CONTINUITY.
14. A MINIMUM OF FIVE FOOT CLEARANCE SHALL BE MAINTAINED BETWEEN OPEN
EXCAVATION AND ADJACENT MOVING TRAFFIC LANE.
15. CONTRACTOR SHALL PROVIDE FLAGGERS AS DEEMED NECESSARY BY
CITY ENGINEER.
16. PLACE ADDITIONAL "LANE CLOSED" (C30) SIGNS ON TYPE II BARRICADES AT
300 FOOT INTERVALS THROUGHOUT EXTENDED WORK AREAS IN EACH LANE
THAT IS CLOSED. INSTALL "OPEN TRENCH" (C27) SIGNS WHENEVER AN
OPEN EXCAVATION AREA EXISTS ADJACENT TO THE TRAVELED WAY.
17. CONTRACTOR SHALL REPLACE/REPAIR ALL DAMAGED STRIPING WITH
TEMPORARY STRIPING OR RAISED PAVEMENT MARKERS AT END OF EACH
WORKING DAY.
18. CONTRACTOR SHALL BE AWARE OF AMERICAN DISABILITY ACT REQUIREMENTS
AS RELATED TO PEDESTRIAN ACCESS AND MAINTAIN PEDESTRIAN ACCESS AT
ALL TIMES PER ADA REQUIREMENTS.
19. CONTRACTOR SHALL COVER OR REMOVE ALL CONFLICTING SIGNS.
20. CONTRACTOR SHALL POST "SYMBOL" UNEVEN LANES, "STEEL PLATES AHEAD"
OR "BUMP" SIGNS, FOR PAVEMENT SURFACE DISRUPTIONS OF ½ IN. OR
GREATER. PAVEMENT DISRUPTIONS OF 1 IN. OR GREATER SHALL BE
BEVELED EDGE OF FOUR(4) HORIZONTAL TO ONE(1) VERTICAL.
21. CONTRACTOR SHALL INSTALL "CAUTION STEEL PLATES AHEAD" AND/OR
"ROUGH ROAD"SIGNS IN ADVANCE OF STEEL PLATE BRIDGING.
22. CONTRACTOR SHALL NOTIFY BUS OPERATION OR ANY OTHER AFFECTED TRANSIT
SERVICES LOCAL AGENCIES AND UTILITY COMPANIES AT LEAST FIVE WORKING DAYS
PRIOR TO CONSTRUCTION.
23. CONTRACTOR SHALL POST "TEMPORARY NO PARKING" SIGNS AROUND
WORK ZONE AREA AT LEAST 72 HOURS PRIOR TO CONSTRUCTION.
C30(CA) G20-2
R3-7
C20-(RT)(CA)
R9-3
R4-7AR3-1 R3-2
R11-2
W20-1W12-1 W20-3
R3-5R
R6-2R
TATNPR61-19(CA)
W4-2(RT)
R9-3bP(LT)
LEGEND:
SIGNALIZED INTERSECTION
FLASHING ARROW BOARD
WORK AREA
SIGN
TRAFFIC CONE (REFLECTORIZED)
TYPE II BARRICADE
TYPE III BARRICADE
DIRECTION OF TRAVEL
TEMPORARY RAILING (TYPE K)
TEMPORARY CRASH CUSHION
TOW AWAY TEMPORARY
NO PARKING (100' SPACING)
TATNP
C20-(RT)(CA)
LOCATION MAP
N.T.S.
W4-2(LT)
R9-3bP(RT)
JIM DEAR
B
L
V
D
DEL AMO BLVD
CARSON ST
W 214TH ST
S
V
E R
M O
V E
TORRANCE BLVD
PROJECT LOCATION
E 215TH ST
E 216TH ST
W 213TH PL
W CLARION DR
E D
O M
IN
Q
U E
Z
S
T
A V
A L
V
D
223RD ST
E 223RD ST
E DEL AMO BLVD
E UNIVERSITY DR
S
C
E N
T R
E
LACFCD
T
O
R
R
A
N
T
E
R
A
CITY OF CARSON
B
6 5
C
D
8 7 6 5 4
P
C
A D
S h e…