Amend 0002 IGE and bids.xlsx XLSX spreadsheet
W912PL-10-B-0009 Bid Abstract.pdf PDF
Plans_Am3.pdf PDF
Am3.pdf PDF
Am2.pdf PDF
Am2-Dwg.zip ZIP file
Am1.pdf PDF
Site Visit List 2010-03-17.pdf PDF
Architectural.pdf PDF
W912PL-10-B-0009Vol1.pdf PDF
W912PL-10-B-0009Vol3.pdf PDF
Electrical.pdf PDF
Mechanical.pdf PDF
Instrumentation.pdf PDF
Structural.pdf PDF
Civil.pdf PDF
Hvac.pdf PDF
Plumbing.pdf PDF
General.pdf PDF
W912PL-10-B-0009Vol2.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IGE

SECTION 00010 - PRICING SCHEDULE
TRES RIOS ENVIRONMENTAL RESTORATION PROJECT, PHASE II
IN-PLANT SECONDARY EFFLUENT PUMP STATION (IPSEPS)
AMERICAN RECOVERY REINVESTMENT ACT (ARRA) FUNDED

IGE

The undersigned hereby proposes and agrees that on award by the Government under this Bid, and in accordance with the provisions therein stated, to execute the Agreement, with necessary bonds, to furnish and install any and all labor, materials, equipment transportation, and services for the construction of the Tres Rios Environmental Restoration Project - Phase II, In-Plant Secondary Effluent Pump Station, in accordance with the Contract Documents therefore adopted and on file with the Government within the time hereinafter set forth and at the prices named in this Bid as follows:

ESTIMATEDUNIT OFUNITTOTAL
ITEM NO.DESCRIPTION_ QTYMEASUREPRICEPRICE
BASE BID (Line Items 0001 thru 0023)
Period of Performance: 550 Calendar Days

0001 MOBILIZATION/DEMOBILIZATION 1.00 LS $ - 0 $ 2,000,000.00

0002 GENERAL CONDITIONS 1.00 LS $ - 0 $ 69,000.00

0003 DIVERSION & CONTROL OF STORMWATER 1.00 LS $ - 0 $ 250,000.00

0004 AS-BUILT DRAWINGS 1.00 LS $ - 0 $ 66,000.00

0005 SITE DEMOLITION 1.00 LS $ - 0 $ 20,000.00

0006 TRAFFIC CONTROLS 1.00 LS $ - 0 $ 100,000.00

0007 CLEARING & GRUBBING 8.00 * ACRE $ 10,000.00 $ 80,000.00

0008 STOCK PILE PREPARATION 800.00 * SY $ 100.00 $ 80,000.00

0009 EXCAVATE & HAUL TO GENERAL FILL 33,521.00 * CY $ 11.50 $ 385,491.50

0010 EXCAVATE & HAUL TO STOCKPILE 1,890.00 * CY $ 11.50 $ 21,735.00

0011 SPREAD AND COMPACT GENERAL FILL 33,521.00 * CY $ 6.50 $ 217,886.50

0012 MAINTENANCE ROAD/ STORAGE AREA - 6 INCH DG 150.00 * SY $ 20.00 $ 3,000.00

0013 MAINTENANCE ROAD - 2 INCH ASPHALT 14,332.00 * SY $ 16.00 $ 229,312.00

0014 RESTORE EXISTING SURFACES 1.00 * LS $ 173,000.00 $ 173,000.00

0015 96-INCH CEFF PIPE AND FITTINGS 375.00 * LF $ 1,200.00 $ 450,000.00

0016 84-INCH CEFF PIPE AND FITTINGS 310.00 * LF $ 780.00 $ 241,800.00

0017 IPSEPS INCLUDING EJB-1 & FMB-1 1.00 LS $ 9,731,000.00 $ 9,731,000.00

0018 PLANT 3 EFFLUENT JUNCTION STRUCTURE 1.00 LS $ 514,000.00 $ 514,000.00

0019 PLANTS 1, 2 AND 3 EFFLUENT JUNCTION STRUCTURE 1.00 LS $ 1,564,000.00 $ 1,564,000.00

0020 IPSEPS ELECTRICAL BUILDING 1.00 LS $ 671,000.00 $ 671,000.00

0021 CHLORINE PIPING RELOCATION 1.00 LS $ 100,000.00 $ 100,000.00

0022 POTABLE WATER YARD PIPING INCLUDING POTABLE WATER, NON-POTABLE WATER, SCUM & DECANT 1.00 LS $ 335,000.00 $ 335,000.00

ESTIMATEDUNIT OFUNITTOTAL
ITEM NO.DESCRIPTION_ QTYMEASUREPRICEPRICE

0023 ELECTRICAL AND INSTRUMENTATION 1.00 LS $ 3,858,000.00 $ 3,858,000.00

TOTAL BASE BID (Line Items 0001 thru 0023) $ 21,160,225.00

0024 OPTION 1 (BID ALTERNATIVE 1) - PUMP NO. 6, COMPLETE

0024 PUMP NO. 6 ADDITION, COMPLETE 1.00 LS $ 1,200,000.00 $ 1,200,000.00

0025 OPTION 2 (BID ALTERNATIVE 2) - FMB-1 ACTUATED GATES, COMPLETE

0025 FMB-1 ACTUATED GATES, COMPLETE 1.00 LS $ 405,000.00 $ 405,000.00

0026 OPTION 3 (BID ALTERNATIVE 3) - FORCEMAIN "E", COMPLETE

0026 FORCEMAIN "E", COMPLETE 1.00 LS $ 6,200,000.00 $ 6,200,000.00

TOTAL (OPTIONS 1, 2 AND 3) $ 7,805,000.00

TOTAL (BASE BID AND OPTIONS 1, 2 AND 3) $ 28,965,225.00

* QUANTITY IS AN ESTIMATED AMOUNT. SEE SECTION 00700, FAR 52.211-18, FOR VARIATION IN ESTIMATED QUANTITY CONTRACT CLAUSE.

W912PL-10-B-0009

RTA SUBMITTAL &12SECTION 00010-&P

Amendment 0002 (Strikethrough & Bold Italic)

LAKESHORE

SECTION 00010 - PRICING SCHEDULE
TRES RIOS ENVIRONMENTAL RESTORATION PROJECT, PHASE II
IN-PLANT SECONDARY EFFLUENT PUMP STATION (IPSEPS)
AMERICAN RECOVERY REINVESTMENT ACT (ARRA) FUNDED

LAKESHORE

The undersigned hereby proposes and agrees that on award by the Government under this Bid, and in accordance with the provisions therein stated, to execute the Agreement, with necessary bonds, to furnish and install any and all labor, materials, equipment transportation, and services for the construction of the Tres Rios Environmental Restoration Project - Phase II, In-Plant Secondary Effluent Pump Station, in accordance with the Contract Documents therefore adopted and on file with the Government within the time hereinafter set forth and at the prices named in this Bid as follows:

ESTIMATEDUNIT OFUNITTOTAL
ITEM NO.DESCRIPTION_ QTYMEASUREPRICEPRICE
BASE BID (Line Items 0001 thru 0023)
Period of Performance: 550 Calendar Days

0001 MOBILIZATION/DEMOBILIZATION 1.00 LS $ - 0 $ 459,000.00

0002 GENERAL CONDITIONS 1.00 LS $ - 0 $ 3,164,000.00

0003 DIVERSION & CONTROL OF STORMWATER 1.00 LS $ - 0 $ 161,000.00

0004 AS-BUILT DRAWINGS 1.00 LS $ - 0 $ 45,000.00

0005 SITE DEMOLITION 1.00 LS $ - 0 $ 803,000.00

0006 TRAFFIC CONTROLS 1.00 LS $ - 0 $ 516,000.00

0007 CLEARING & GRUBBING 8.00 * ACRE $ 37,000.00 $ 296,000.00

0008 STOCK PILE PREPARATION 800.00 * SY $ 144.00 $ 115,200.00

0009 EXCAVATE & HAUL TO GENERAL FILL 33,521.00 * CY $ 14.00 $ 469,294.00

0010 EXCAVATE & HAUL TO STOCKPILE 1,890.00 * CY $ 21.00 $ 39,690.00

0011 SPREAD AND COMPACT GENERAL FILL 33,521.00 * CY $ 6.00 $ 201,126.00

0012 MAINTENANCE ROAD/ STORAGE AREA - 6 INCH DG 150.00 * SY $ 161.00 $ 24,150.00

0013 MAINTENANCE ROAD - 2 INCH ASPHALT 14,332.00 * SY $ 53.00 $ 759,596.00

0014 RESTORE EXISTING SURFACES 1.00 * LS $ 803,000.00 $ 803,000.00

0015 96-INCH CEFF PIPE AND FITTINGS 375.00 * LF $ 2,300.00 $ 862,500.00

0016 84-INCH CEFF PIPE AND FITTINGS 310.00 * LF $ 2,180.00 $ 675,800.00

0017 IPSEPS INCLUDING EJB-1 & FMB-1 1.00 LS $ 21,235,000.00 $ 21,235,000.00

0018 PLANT 3 EFFLUENT JUNCTION STRUCTURE 1.00 LS $ 803,000.00 $ 803,000.00

0019 PLANTS 1, 2 AND 3 EFFLUENT JUNCTION STRUCTURE 1.00 LS $ 2,294,000.00 $ 2,294,000.00

0020 IPSEPS ELECTRICAL BUILDING 1.00 LS $ 3,222,000.00 $ 3,222,000.00

0021 CHLORINE PIPING RELOCATION 1.00 LS $ 746,000.00 $ 746,000.00

0022 POTABLE WATER YARD PIPING INCLUDING POTABLE WATER, NON-POTABLE WATER, SCUM & DECANT 1.00 LS $ 459,000.00 $ 459,000.00

ESTIMATEDUNIT OFUNITTOTAL
ITEM NO.DESCRIPTION_ QTYMEASUREPRICEPRICE

0023 ELECTRICAL AND INSTRUMENTATION 1.00 LS $ 2,294,000.00 $ 2,294,000.00

TOTAL BASE BID (Line Items 0001 thru 0023) $ 40,447,356.00

0024 OPTION 1 (BID ALTERNATIVE 1) - PUMP NO. 6, COMPLETE

0024 PUMP NO. 6 ADDITION, COMPLETE 1.00 LS $ 2,638,000.00 $ 2,638,000.00

0025 OPTION 2 (BID ALTERNATIVE 2) - FMB-1 ACTUATED GATES, COMPLETE

0025 FMB-1 ACTUATED GATES, COMPLETE 1.00 LS $ 3,211,000.00 $ 3,211,000.00

0026 OPTION 3 (BID ALTERNATIVE 3) - FORCEMAIN "E", COMPLETE

0026 FORCEMAIN "E", COMPLETE 1.00 LS $ 6,306,000.00 $ 6,306,000.00

TOTAL (OPTIONS 1, 2 AND 3) $ 12,155,000.00

TOTAL (BASE BID AND OPTIONS 1, 2 AND 3) $ 52,602,356.00

* QUANTITY IS AN ESTIMATED AMOUNT. SEE SECTION 00700, FAR 52.211-18, FOR VARIATION IN ESTIMATED QUANTITY CONTRACT CLAUSE.

RTA SUBMITTAL &12SECTION 00010-&P

& Bold Italic)

ARCHER WESTERN

SECTION 00010 - PRICING SCHEDULE
TRES RIOS ENVIRONMENTAL RESTORATION PROJECT, PHASE II
IN-PLANT SECONDARY EFFLUENT PUMP STATION (IPSEPS)
AMERICAN RECOVERY REINVESTMENT ACT (ARRA) FUNDED

ARCHER WESTERN

The undersigned hereby proposes and agrees that on award by the Government under this Bid, and in accordance with the provisions therein stated, to execute the Agreement, with necessary bonds, to furnish and install any and all labor, materials, equipment transportation, and services for the construction of the Tres Rios Environmental Restoration Project - Phase II, In-Plant Secondary Effluent Pump Station, in accordance with the Contract Documents therefore adopted and on file with the Government within the time hereinafter set forth and at the prices named in this Bid as follows:

ESTIMATEDUNIT OFUNITTOTAL
ITEM NO.DESCRIPTION_ QTYMEASUREPRICEPRICE
BASE BID (Line Items 0001 thru 0023)
Period of Performance: 550 Calendar Days

0001 MOBILIZATION/DEMOBILIZATION 1.00 LS $ - 0 $ 1,900,000.00

0002 GENERAL CONDITIONS 1.00 LS $ - 0 $ 541,000.00

0003 DIVERSION & CONTROL OF STORMWATER 1.00 LS $ - 0 $ 10,000.00

0004 AS-BUILT DRAWINGS 1.00 LS $ - 0 $ 2,000.00

0005 SITE DEMOLITION 1.00 LS $ - 0 $ 50,000.00

0006 TRAFFIC CONTROLS 1.00 LS $ - 0 $ 3,000.00

0007 CLEARING & GRUBBING 8.00 * ACRE $ 2,000.00 $ 16,000.00

0008 STOCK PILE PREPARATION 800.00 * SY $ 10.00 $ 8,000.00

0009 EXCAVATE & HAUL TO GENERAL FILL 33,521.00 * CY $ 1.00 $ 33,521.00

0010 EXCAVATE & HAUL TO STOCKPILE 1,890.00 * CY $ 1.00 $ 1,890.00

0011 SPREAD AND COMPACT GENERAL FILL 33,521.00 * CY $ 1.00 $ 33,521.00

0012 MAINTENANCE ROAD/ STORAGE AREA - 6 INCH DG 150.00 * SY $ 11.00 $ 1,650.00

0013 MAINTENANCE ROAD - 2 INCH ASPHALT 14,332.00 * SY $ 11.00 $ 157,652.00

0014 RESTORE EXISTING SURFACES 1.00 * LS $ 20,000.00 $ 20,000.00

0015 96-INCH CEFF PIPE AND FITTINGS 375.00 * LF $ 1,200.00 $ 450,000.00

0016 84-INCH CEFF PIPE AND FITTINGS 310.00 * LF $ 900.00 $ 279,000.00

0017 IPSEPS INCLUDING EJB-1 & FMB-1 1.00 LS $ 6,995,000.00 $ 6,995,000.00

0018 PLANT 3 EFFLUENT JUNCTION STRUCTURE 1.00 LS $ 270,000.00 $ 270,000.00

0019 PLANTS 1, 2 AND 3 EFFLUENT JUNCTION STRUCTURE 1.00 LS $ 580,000.00 $ 580,000.00

0020 IPSEPS ELECTRICAL BUILDING 1.00 LS $ 560,000.00 $ 560,000.00

0021 CHLORINE PIPING RELOCATION 1.00 LS $ 40,000.00 $ 40,000.00

0022 POTABLE WATER YARD PIPING INCLUDING POTABLE WATER, NON-POTABLE WATER, SCUM & DECANT 1.00 LS $ 110,000.00 $ 110,000.00

ESTIMATEDUNIT OFUNITTOTAL
ITEM NO.DESCRIPTION_ QTYMEASUREPRICEPRICE

0023 ELECTRICAL AND INSTRUMENTATION 1.00 LS $ 5,700,000.00 $ 5,700,000.00

TOTAL BASE BID (Line Items 0001 thru 0023) $ 17,762,234.00

0024 OPTION 1 (BID ALTERNATIVE 1) - PUMP NO. 6, COMPLETE

0024 PUMP NO. 6 ADDITION, COMPLETE 1.00 LS $ 690,000.00 $ 690,000.00

0025 OPTION 2 (BID ALTERNATIVE 2) - FMB-1 ACTUATED GATES, COMPLETE

0025 FMB-1 ACTUATED GATES, COMPLETE 1.00 LS $ 418,000.00 $ 418,000.00

0026 OPTION 3 (BID ALTERNATIVE 3) - FORCEMAIN "E", COMPLETE

0026 FORCEMAIN "E", COMPLETE 1.00 LS $ 2,966,000.00 $ 2,966,000.00

TOTAL (OPTIONS 1, 2 AND 3) $ 4,074,000.00

TOTAL (BASE BID AND OPTIONS 1, 2 AND 3) $ 21,836,234.00

* QUANTITY IS AN ESTIMATED AMOUNT. SEE SECTION 00700, FAR 52.211-18, FOR VARIATION IN ESTIMATED QUANTITY CONTRACT CLAUSE.

RTA SUBMITTAL &12SECTION 00010-&P

& Bold Italic)

MCCARTHY BUILDING

SECTION 00010 - PRICING SCHEDULE
TRES RIOS ENVIRONMENTAL RESTORATION PROJECT, PHASE II
IN-PLANT SECONDARY EFFLUENT PUMP STATION (IPSEPS)
AMERICAN RECOVERY REINVESTMENT ACT (ARRA) FUNDED

MCCARTHY BUILDING

The undersigned hereby proposes and agrees that on award by the Government under this Bid, and in accordance with the provisions therein stated, to execute the Agreement, with necessary bonds, to furnish and install any and all labor, materials, equipment transportation, and services for the construction of the Tres Rios Environmental Restoration Project - Phase II, In-Plant Secondary Effluent Pump Station, in accordance with the Contract Documents therefore adopted and on file with the Government within the time hereinafter set forth and at the prices named in this Bid as follows:

ESTIMATEDUNIT OFUNITTOTAL
ITEM NO.DESCRIPTION_ QTYMEASUREPRICEPRICE
BASE BID (Line Items 0001 thru 0023)
Period of Performance: 550 Calendar Days

0001 MOBILIZATION/DEMOBILIZATION 1.00 LS $ - 0 $ 100,000.00

0002 GENERAL CONDITIONS 1.00 LS $ - 0 $ 1,465,000.00

0003 DIVERSION & CONTROL OF STORMWATER 1.00 LS $ - 0 $ 5,600.00

0004 AS-BUILT DRAWINGS 1.00 LS $ - 0 $ 12,000.00

0005 SITE DEMOLITION 1.00 LS $ - 0 $ 15,000.00

0006 TRAFFIC CONTROLS 1.00 LS $ - 0 $ 85,000.00

0007 CLEARING & GRUBBING 8.00 * ACRE $ 5,200.00 $ 41,600.00

0008 STOCK PILE PREPARATION 800.00 * SY $ 4.25 $ 3,400.00

0009 EXCAVATE & HAUL TO GENERAL FILL 33,521.00 * CY $ 3.20 $ 107,267.20

0010 EXCAVATE & HAUL TO STOCKPILE 1,890.00 * CY $ 3.30 $ 6,237.00

0011 SPREAD AND COMPACT GENERAL FILL 33,521.00 * CY $ 1.00 $ 33,521.00

0012 MAINTENANCE ROAD/ STORAGE AREA - 6 INCH DG 150.00 * SY $ 5.00 $ 750.00

0013 MAINTENANCE ROAD - 2 INCH ASPHALT 14,332.00 * SY $ 10.00 $ 143,320.00

0014 RESTORE EXISTING SURFACES 1.00 * LS $ 131,000.00 $ 131,000.00

0015 96-INCH CEFF PIPE AND FITTINGS 375.00 * LF $ 1,180.00 $ 442,500.00

0016 84-INCH CEFF PIPE AND FITTINGS 310.00 * LF $ 740.00 $ 229,400.00

0017 IPSEPS INCLUDING EJB-1 & FMB-1 1.00 LS $ 7,740,000.00 $ 7,740,000.00

0018 PLANT 3 EFFLUENT JUNCTION STRUCTURE 1.00 LS $ 300,000.00 $ 300,000.00

0019 PLANTS 1, 2 AND 3 EFFLUENT JUNCTION STRUCTURE 1.00 LS $ 642,000.00 $ 642,000.00

0020 IPSEPS ELECTRICAL BUILDING 1.00 LS $ 541,000.00 $ 541,000.00

0021 CHLORINE PIPING RELOCATION 1.00 LS $ 63,000.00 $ 63,000.00

0022 POTABLE WATER YARD PIPING INCLUDING POTABLE WATER, NON-POTABLE WATER, SCUM & DECANT 1.00 LS $ 154,000.00 $ 154,000.00

ESTIMATEDUNIT OFUNITTOTAL
ITEM NO.DESCRIPTION_ QTYMEASUREPRICEPRICE

0023 ELECTRICAL AND INSTRUMENTATION 1.00 LS $ 5,525,000.00 $ 5,525,000.00

TOTAL BASE BID (Line Items 0001 thru 0023) $ 17,786,595.20

0024 OPTION 1 (BID ALTERNATIVE 1) - PUMP NO. 6, COMPLETE

0024 PUMP NO. 6 ADDITION, COMPLETE 1.00 LS $ 785,000.00 $ 785,000.00

0025 OPTION 2 (BID ALTERNATIVE 2) - FMB-1 ACTUATED GATES, COMPLETE

0025 FMB-1 ACTUATED GATES, COMPLETE 1.00 LS $ 380,000.00 $ 380,000.00

0026 OPTION 3 (BID ALTERNATIVE 3) - FORCEMAIN "E", COMPLETE

0026 FORCEMAIN "E", COMPLETE 1.00 LS $ 3,570,000.00 $ 3,570,000.00

TOTAL (OPTIONS 1, 2 AND 3) $ 4,735,000.00

TOTAL (BASE BID AND OPTIONS 1, 2 AND 3) $ 22,521,595.20

* QUANTITY IS AN ESTIMATED AMOUNT. SEE SECTION 00700, FAR 52.211-18, FOR VARIATION IN ESTIMATED QUANTITY CONTRACT CLAUSE.

RTA SUBMITTAL &12SECTION 00010-&P

& Bold Italic)

SLETTEN

SECTION 00010 - PRICING SCHEDULE
TRES RIOS ENVIRONMENTAL RESTORATION PROJECT, PHASE II
IN-PLANT SECONDARY EFFLUENT PUMP STATION (IPSEPS)
AMERICAN RECOVERY REINVESTMENT ACT (ARRA) FUNDED

SLETTEN CONSTRUCTION

The undersigned hereby proposes and agrees that on award by the Government under this Bid, and in accordance with the provisions therein stated, to execute the Agreement, with necessary bonds, to furnish and install any and all labor, materials, equipment transportation, and services for the construction of the Tres Rios Environmental Restoration Project - Phase II, In-Plant Secondary Effluent Pump Station, in accordance with the Contract Documents therefore adopted and on file with the Government within the time hereinafter set forth and at the prices named in this Bid as follows:

ESTIMATEDUNIT OFUNITTOTAL
ITEM NO.DESCRIPTION_ QTYMEASUREPRICEPRICE
BASE BID (Line Items 0001 thru 0023)
Period of Performance: 550 Calendar Days

0001 MOBILIZATION/DEMOBILIZATION 1.00 LS $ - 0 $ 500,000.00

0002 GENERAL CONDITIONS 1.00 LS $ - 0 $ 1,500,000.00

0003 DIVERSION & CONTROL OF STORMWATER 1.00 LS $ - 0 $ 5,000.00

0004 AS-BUILT DRAWINGS 1.00 LS $ - 0 $ 6,008.00

0005 SITE DEMOLITION 1.00 LS $ - 0 $ 40,000.00

0006 TRAFFIC CONTROLS 1.00 LS $ - 0 $ 20,000.00

0007 CLEARING & GRUBBING 8.00 * ACRE $ 15,000.00 $ 120,000.00

0008 STOCK PILE PREPARATION 800.00 * SY $ 30.00 $ 24,000.00

0009 EXCAVATE & HAUL TO GENERAL FILL 33,521.00 * CY $ 2.00 $ 67,042.00

0010 EXCAVATE & HAUL TO STOCKPILE 1,890.00 * CY $ 6.00 $ 11,340.00

0011 SPREAD AND COMPACT GENERAL FILL 33,521.00 * CY $ 6.00 $ 201,126.00

0012 MAINTENANCE ROAD/ STORAGE AREA - 6 INCH DG 150.00 * SY $ 10.00 $ 1,500.00

0013 MAINTENANCE ROAD - 2 INCH ASPHALT 14,332.00 * SY $ 12.00 $ 171,984.00

0014 RESTORE EXISTING SURFACES 1.00 * LS $ 100,000.00 $ 100,000.00

0015 96-INCH CEFF PIPE AND FITTINGS 375.00 * LF $ 1,408.00 $ 528,000.00

0016 84-INCH CEFF PIPE AND FITTINGS 310.00 * LF $ 1,000.00 $ 310,000.00

0017 IPSEPS INCLUDING EJB-1 & FMB-1 1.00 LS $ 8,144,000.00 $ 8,144,000.00

0018 PLANT 3 EFFLUENT JUNCTION STRUCTURE 1.00 LS $ 200,000.00 $ 200,000.00

0019 PLANTS 1, 2 AND 3 EFFLUENT JUNCTION STRUCTURE 1.00 LS $ 750,000.00 $ 750,000.00

0020 IPSEPS ELECTRICAL BUILDING 1.00 LS $ 750,000.00 $ 750,000.00

0021 CHLORINE PIPING RELOCATION 1.00 LS $ 50,000.00 $ 50,000.00

0022 POTABLE WATER YARD PIPING INCLUDING POTABLE WATER, NON-POTABLE WATER, SCUM & DECANT 1.00 LS $ 250,000.00 $ 250,000.00

ESTIMATEDUNIT OFUNITTOTAL
ITEM NO.DESCRIPTION_ QTYMEASUREPRICEPRICE

0023 ELECTRICAL AND INSTRUMENTATION 1.00 LS $ 6,000,000.00 $ 6,000,000.00

TOTAL BASE BID (Line Items 0001 thru 0023) $ 19,750,000.00

0024 OPTION 1 (BID ALTERNATIVE 1) - PUMP NO. 6, COMPLETE

0024 PUMP NO. 6 ADDITION, COMPLETE 1.00 LS $ 400,000.00 $ 400,000.00

0025 OPTION 2 (BID ALTERNATIVE 2) - FMB-1 ACTUATED GATES, COMPLETE

0025 FMB-1 ACTUATED GATES, COMPLETE 1.00 LS $ 250,000.00 $ 250,000.00

0026 OPTION 3 (BID ALTERNATIVE 3) - FORCEMAIN "E", COMPLETE

0026 FORCEMAIN "E", COMPLETE 1.00 LS $ 3,000,000.00 $ 3,000,000.00

TOTAL (OPTIONS 1, 2 AND 3) $ 3,650,000.00

TOTAL (BASE BID AND OPTIONS 1, 2 AND 3) $ 23,400,000.00

* QUANTITY IS AN ESTIMATED AMOUNT. SEE SECTION 00700, FAR 52.211-18, FOR VARIATION IN ESTIMATED QUANTITY CONTRACT CLAUSE.

RTA SUBMITTAL &12SECTION 00010-&P

& Bold Italic)

HAYDEN

SECTION 00010 - PRICING SCHEDULE
TRES RIOS ENVIRONMENTAL RESTORATION PROJECT, PHASE II
IN-PLANT SECONDARY EFFLUENT PUMP STATION (IPSEPS)
AMERICAN RECOVERY REINVESTMENT ACT (ARRA) FUNDED

HAYDEN BUILDING

The undersigned hereby proposes and agrees that on award by the Government under this Bid, and in accordance with the provisions therein stated, to execute the Agreement, with necessary bonds, to furnish and install any and all labor, materials, equipment transportation, and services for the construction of the Tres Rios Environmental Restoration Project - Phase II, In-Plant Secondary Effluent Pump Station, in accordance with the Contract Documents therefore adopted and on file with the Government within the time hereinafter set forth and at the prices named in this Bid as follows:

ESTIMATEDUNIT OFUNITTOTAL
ITEM NO.DESCRIPTION_ QTYMEASUREPRICEPRICE
BASE BID (Line Items 0001 thru 0023)
Period of Performance: 550 Calendar Days

0001 MOBILIZATION/DEMOBILIZATION 1.00 LS $ - 0 $ 250,000.00

0002 GENERAL CONDITIONS 1.00 LS $ - 0 $ 1,500,000.00

0003 DIVERSION & CONTROL OF STORMWATER 1.00 LS $ - 0 $ 20,000.00

0004 AS-BUILT DRAWINGS 1.00 LS $ - 0 $ 15,000.00

0005 SITE DEMOLITION 1.00 LS $ - 0 $ 85,000.00

0006 TRAFFIC CONTROLS 1.00 LS $ - 0 $ 7,500.00

0007 CLEARING & GRUBBING 8.00 * ACRE $ 400.00 $ 3,200.00

0008 STOCK PILE PREPARATION 800.00 * SY $ 1.00 $ 800.00

0009 EXCAVATE & HAUL TO GENERAL FILL 33,521.00 * CY $ 4.50 $ 150,844.50

0010 EXCAVATE & HAUL TO STOCKPILE 1,890.00 * CY $ 4.50 $ 8,505.00

0011 SPREAD AND COMPACT GENERAL FILL 33,521.00 * CY $ 1.95 $ 65,365.95

0012 MAINTENANCE ROAD/ STORAGE AREA - 6 INCH DG 150.00 * SY $ 18.00 $ 2,700.00

0013 MAINTENANCE ROAD - 2 INCH ASPHALT 14,332.00 * SY $ 13.00 $ 186,316.00

0014 RESTORE EXISTING SURFACES 1.00 * LS $ 150,000.00 $ 150,000.00

0015 96-INCH CEFF PIPE AND FITTINGS 375.00 * LF $ 1,050.00 $ 393,750.00

0016 84-INCH CEFF PIPE AND FITTINGS 310.00 * LF $ 715.00 $ 221,650.00

0017 IPSEPS INCLUDING EJB-1 & FMB-1 1.00 LS $ 12,650,000.00 $ 12,650,000.00

0018 PLANT 3 EFFLUENT JUNCTION STRUCTURE 1.00 LS $ 325,000.00 $ 325,000.00

0019 PLANTS 1, 2 AND 3 EFFLUENT JUNCTION STRUCTURE 1.00 LS $ 915,000.00 $ 915,000.00

0020 IPSEPS ELECTRICAL BUILDING 1.00 LS $ 625,000.00 $ 625,000.00

0021 CHLORINE PIPING RELOCATION 1.00 LS $ 60,000.00 $ 60,000.00

0022 POTABLE WATER YARD PIPING INCLUDING POTABLE WATER, NON-POTABLE WATER, SCUM & DECANT 1.00 LS $ 115,000.00 $ 115,000.00

ESTIMATEDUNIT OFUNITTOTAL
ITEM NO.DESCRIPTION_ QTYMEASUREPRICEPRICE

0023 ELECTRICAL AND INSTRUMENTATION 1.00 LS $ 5,800,000.00 $ 5,800,000.00

TOTAL BASE BID (Line Items 0001 thru 0023) $ 23,550,631.45

0024 OPTION 1 (BID ALTERNATIVE 1) - PUMP NO. 6, COMPLETE

0024 PUMP NO. 6 ADDITION, COMPLETE 1.00 LS $ 710,000.00 $ 710,000.00

0025 OPTION 2 (BID ALTERNATIVE 2) - FMB-1 ACTUATED GATES, COMPLETE

0025 FMB-1 ACTUATED GATES, COMPLETE 1.00 LS $ 445,000.00 $ 445,000.00

0026 OPTION 3 (BID ALTERNATIVE 3) - FORCEMAIN "E", COMPLETE

0026 FORCEMAIN "E", COMPLETE 1.00 LS $ 3,700,000.00 $ 3,700,000.00

TOTAL (OPTIONS 1, 2 AND 3) $ 4,855,000.00

TOTAL (BASE BID AND OPTIONS 1, 2 AND 3) $ 28,405,631.45

* QUANTITY IS AN ESTIMATED AMOUNT. SEE SECTION 00700, FAR 52.211-18, FOR VARIATION IN ESTIMATED QUANTITY CONTRACT CLAUSE.

RTA SUBMITTAL &12SECTION 00010-&P

& Bold Italic)

PENICK_SHANEK

SECTION 00010 - PRICING SCHEDULE
TRES RIOS ENVIRONMENTAL RESTORATION PROJECT, PHASE II
IN-PLANT SECONDARY EFFLUENT PUMP STATION (IPSEPS)
AMERICAN RECOVERY REINVESTMENT ACT (ARRA) FUNDED

PENICK/SHANEK JV

The undersigned hereby proposes and agrees that on award by the Government under this Bid, and in accordance with the provisions therein stated, to execute the Agreement, with necessary bonds, to furnish and install any and all labor, materials, equipment transportation, and services for the construction of the Tres Rios Environmental Restoration Project - Phase II, In-Plant Secondary Effluent Pump Station, in accordance with the Contract Documents therefore adopted and on file with the Government within the time hereinafter set forth and at the prices named in this Bid as follows:

ESTIMATEDUNIT OFUNITTOTAL
ITEM NO.DESCRIPTION_ QTYMEASUREPRICEPRICE
BASE BID (Line Items 0001 thru 0023)
Period of Performance: 550 Calendar Days

0001 MOBILIZATION/DEMOBILIZATION 1.00 LS $ - 0 $ 300,000.00

0002 GENERAL CONDITIONS 1.00 LS $ - 0 $ 1,400,000.00

0003 DIVERSION & CONTROL OF STORMWATER 1.00 LS $ - 0 $ 40,000.00

0004 AS-BUILT DRAWINGS 1.00 LS $ - 0 $ 20,000.00

0005 SITE DEMOLITION 1.00 LS $ - 0 $ 150,000.00

0006 TRAFFIC CONTROLS 1.00 LS $ - 0 $ 40,000.00

0007 CLEARING & GRUBBING 8.00 * ACRE $ 15,000.00 $ 120,000.00

0008 STOCK PILE PREPARATION 800.00 * SY $ 50.00 $ 40,000.00

0009 EXCAVATE & HAUL TO GENERAL FILL 33,521.00 * CY $ 2.00 $ 67,042.00

0010 EXCAVATE & HAUL TO STOCKPILE 1,890.00 * CY $ 3.00 $ 5,670.00

0011 SPREAD AND COMPACT GENERAL FILL 33,521.00 * CY $ 2.00 $ 67,042.00

0012 MAINTENANCE ROAD/ STORAGE AREA - 6 INCH DG 150.00 * SY $ 30.00 $ 4,500.00

0013 MAINTENANCE ROAD - 2 INCH ASPHALT 14,332.00 * SY $ 20.00 $ 286,640.00

0014 RESTORE EXISTING SURFACES 1.00 * LS $ 59,106.00 $ 59,106.00

0015 96-INCH CEFF PIPE AND FITTINGS 375.00 * LF $ 2,000.00 $ 750,000.00

0016 84-INCH CEFF PIPE AND FITTINGS 310.00 * LF $ 1,100.00 $ 341,000.00

0017 IPSEPS INCLUDING EJB-1 & FMB-1 1.00 LS $ 12,120,000.00 $ 12,120,000.00

0018 PLANT 3 EFFLUENT JUNCTION STRUCTURE 1.00 LS $ 420,000.00 $ 420,000.00

0019 PLANTS 1, 2 AND 3 EFFLUENT JUNCTION STRUCTURE 1.00 LS $ 930,000.00 $ 930,000.00

0020 IPSEPS ELECTRICAL BUILDING 1.00 LS $ 690,000.00 $ 690,000.00

0021 CHLORINE PIPING RELOCATION 1.00 LS $ 60,000.00 $ 60,000.00

0022 POTABLE WATER YARD PIPING INCLUDING POTABLE WATER, NON-POTABLE WATER, SCUM & DECANT 1.00 LS $ 275,000.00 $ 275,000.00

ESTIMATEDUNIT OFUNITTOTAL
ITEM NO.DESCRIPTION_ QTYMEASUREPRICEPRICE

0023 ELECTRICAL AND INSTRUMENTATION 1.00 LS $ 6,950,000.00 $ 6,950,000.00

TOTAL BASE BID (Line Items 0001 thru 0023) $ 25,136,000.00

0024 OPTION 1 (BID ALTERNATIVE 1) - PUMP NO. 6, COMPLETE

0024 PUMP NO. 6 ADDITION, COMPLETE 1.00 LS $ 970,000.00 $ 970,000.00

0025 OPTION 2 (BID ALTERNATIVE 2) - FMB-1 ACTUATED GATES, COMPLETE

0025 FMB-1 ACTUATED GATES, COMPLETE 1.00 LS $ 510,000.00 $ 510,000.00

0026 OPTION 3 (BID ALTERNATIVE 3) - FORCEMAIN "E", COMPLETE

0026 FORCEMAIN "E", COMPLETE 1.00 LS $ 4,930,000.00 $ 4,930,000.00

TOTAL (OPTIONS 1, 2 AND 3) $ 6,410,000.00

TOTAL (BASE BID AND OPTIONS 1, 2 AND 3) $ 31,546,000.00

* QUANTITY IS AN ESTIMATED AMOUNT. SEE SECTION 00700, FAR 52.211-18, FOR VARIATION IN ESTIMATED QUANTITY CONTRACT CLAUSE.

RTA SUBMITTAL &12SECTION 00010-&P

& Bold Italic)

HUNTER

SECTION 00010 - PRICING SCHEDULE
TRES RIOS ENVIRONMENTAL RESTORATION PROJECT, PHASE II
IN-PLANT SECONDARY EFFLUENT PUMP STATION (IPSEPS)
AMERICAN RECOVERY REINVESTMENT ACT (ARRA) FUNDED

HUNTER CONTRACTING

The undersigned hereby proposes and agrees that on award by the Government under this Bid, and in accordance with the provisions therein stated, to execute the Agreement, with necessary bonds, to furnish and install any and all labor, materials, equipment transportation, and services for the construction of the Tres Rios Environmental Restoration Project - Phase II, In-Plant Secondary Effluent Pump Station, in accordance with the Contract Documents therefore adopted and on file with the Government within the time hereinafter set forth and at the prices named in this Bid as follows:

ESTIMATEDUNIT OFUNITTOTAL
ITEM NO.DESCRIPTION_ QTYMEASUREPRICEPRICE
BASE BID (Line Items 0001 thru 0023)
Period of Performance: 550 Calendar Days

0001 MOBILIZATION/DEMOBILIZATION 1.00 LS $ - 0 $ 140,000.00

0002 GENERAL CONDITIONS 1.00 LS $ - 0 $ 1,372,000.00

0003 DIVERSION & CONTROL OF STORMWATER 1.00 LS $ - 0 $ 23,200.00

0004 AS-BUILT DRAWINGS 1.00 LS $ - 0 $ 23,200.00

0005 SITE DEMOLITION 1.00 LS $ - 0 $ 70,000.00

0006 TRAFFIC CONTROLS 1.00 LS $ - 0 $ 3,500.00

0007 CLEARING & GRUBBING 8.00 * ACRE $ 4,400.00 $ 35,200.00

0008 STOCK PILE PREPARATION 800.00 * SY $ 4.40 $ 3,520.00

0009 EXCAVATE & HAUL TO GENERAL FILL 33,521.00 * CY $ 3.70 $ 124,027.70

0010 EXCAVATE & HAUL TO STOCKPILE 1,890.00 * CY $ 3.70 $ 6,993.00

0011 SPREAD AND COMPACT GENERAL FILL 33,521.00 * CY $ 6.20 $ 207,830.20

0012 MAINTENANCE ROAD/ STORAGE AREA - 6 INCH DG 150.00 * SY $ 25.00 $ 3,750.00

0013 MAINTENANCE ROAD - 2 INCH ASPHALT 14,332.00 * SY $ 13.00 $ 186,316.00

0014 RESTORE EXISTING SURFACES 1.00 * LS $ 154,000.00 $ 154,000.00

0015 96-INCH CEFF PIPE AND FITTINGS 375.00 * LF $ 2,120.00 $ 795,000.00

0016 84-INCH CEFF PIPE AND FITTINGS 310.00 * LF $ 860.00 $ 266,600.00

0017 IPSEPS INCLUDING EJB-1 & FMB-1 1.00 LS $ 4,478,000.00 $ 4,478,000.00

0018 PLANT 3 EFFLUENT JUNCTION STRUCTURE 1.00 LS $ 458,000.00 $ 458,000.00

0019 PLANTS 1, 2 AND 3 EFFLUENT JUNCTION STRUCTURE 1.00 LS $ 1,071,000.00 $ 1,071,000.00

0020 IPSEPS ELECTRICAL BUILDING 1.00 LS $ 1,543,000.00 $ 1,543,000.00

0021 CHLORINE PIPING RELOCATION 1.00 LS $ 101,900.00 $ 101,900.00

0022 POTABLE WATER YARD PIPING INCLUDING POTABLE WATER, NON-POTABLE WATER, SCUM & DECANT 1.00 LS $ 266,000.00 $ 266,000.00

ESTIMATEDUNIT OFUNITTOTAL
ITEM NO.DESCRIPTION_ QTYMEASUREPRICEPRICE

0023 ELECTRICAL AND INSTRUMENTATION 1.00 LS $ 3,185,000.00 $ 3,185,000.00

TOTAL BASE BID (Line Items 0001 thru 0023) $ 14,518,036.90

0024 OPTION 1 (BID ALTERNATIVE 1) - PUMP NO. 6, COMPLETE

0024 PUMP NO. 6 ADDITION, COMPLETE 1.00 LS $ 817,000.00 $ 817,000.00

0025 OPTION 2 (BID ALTERNATIVE 2) - FMB-1 ACTUATED GATES, COMPLETE

0025 FMB-1 ACTUATED GATES, COMPLETE 1.00 LS $ 340,000.00 $ 340,000.00

0026 OPTION 3 (BID ALTERNATIVE 3) - FORCEMAIN "E", COMPLETE

0026 FORCEMAIN "E", COMPLETE 1.00 LS $ 3,573,000.00 $ 3,573,000.00

TOTAL (OPTIONS 1, 2 AND 3) $ 4,730,000.00

TOTAL (BASE BID AND OPTIONS 1, 2 AND 3) $ 19,248,036.90

* QUANTITY IS AN ESTIMATED AMOUNT. SEE SECTION 00700, FAR 52.211-18, FOR VARIATION IN ESTIMATED QUANTITY CONTRACT CLAUSE.

RTA SUBMITTAL &12SECTION 00010-&P

& Bold Italic)

LEDCOR

SECTION 00010 - PRICING SCHEDULE
TRES RIOS ENVIRONMENTAL RESTORATION PROJECT, PHASE II
IN-PLANT SECONDARY EFFLUENT PUMP STATION (IPSEPS)
AMERICAN RECOVERY REINVESTMENT ACT (ARRA) FUNDED

LEDCOR CMI INC.

The undersigned hereby proposes and agrees that on award by the Government under this Bid, and in accordance with the provisions therein stated, to execute the Agreement, with necessary bonds, to furnish and install any and all labor, materials, equipment transportation, and services for the construction of the Tres Rios Environmental Restoration Project - Phase II, In-Plant Secondary Effluent Pump Station, in accordance with the Contract Documents therefore adopted and on file with the Government within the time hereinafter set forth and at the prices named in this Bid as follows:

ESTIMATEDUNIT OFUNITTOTAL
ITEM NO.DESCRIPTION_ QTYMEASUREPRICEPRICE
BASE BID (Line Items 0001 thru 0023)
Period of Performance: 550 Calendar Days

0001 MOBILIZATION/DEMOBILIZATION 1.00 LS $ - 0 $ 205,000.00

0002 GENERAL CONDITIONS 1.00 LS $ - 0 $ 3,206,000.00

0003 DIVERSION & CONTROL OF STORMWATER 1.00 LS $ - 0 $ 15,000.00

0004 AS-BUILT DRAWINGS 1.00 LS $ - 0 $ 25,000.00

0005 SITE DEMOLITION 1.00 LS $ - 0 $ 135,000.00

0006 TRAFFIC CONTROLS 1.00 LS $ - 0 $ 44,000.00

0007 CLEARING & GRUBBING 8.00 * ACRE $ 605.00 $ 4,840.00

0008 STOCK PILE PREPARATION 800.00 * SY $ 6.00 $ 4,800.00

0009 EXCAVATE & HAUL TO GENERAL FILL 33,521.00 * CY $ 2.00 $ 67,042.00

0010 EXCAVATE & HAUL TO STOCKPILE 1,890.00 * CY $ 2.00 $ 3,780.00

0011 SPREAD AND COMPACT GENERAL FILL 33,521.00 * CY $ 2.00 $ 67,042.00

0012 MAINTENANCE ROAD/ STORAGE AREA - 6 INCH DG 150.00 * SY $ 23.00 $ 3,450.00

0013 MAINTENANCE ROAD - 2 INCH ASPHALT 14,332.00 * SY $ 16.00 $ 229,312.00

0014 RESTORE EXISTING SURFACES 1.00 * LS $ 92,000.00 $ 92,000.00

0015 96-INCH CEFF PIPE AND FITTINGS 375.00 * LF $ 1,200.00 $ 450,000.00

0016 84-INCH CEFF PIPE AND FITTINGS 310.00 * LF $ 650.00 $ 201,500.00

0017 IPSEPS INCLUDING EJB-1 & FMB-1 1.00 LS $ 10,423,120.00 $ 10,423,120.00

0018 PLANT 3 EFFLUENT JUNCTION STRUCTURE 1.00 LS $ 435,000.00 $ 435,000.00

0019 PLANTS 1, 2 AND 3 EFFLUENT JUNCTION STRUCTURE 1.00 LS $ 1,120,000.00 $ 1,120,000.00

0020 IPSEPS ELECTRICAL BUILDING 1.00 LS $ 780,000.00 $ 780,000.00

0021 CHLORINE PIPING RELOCATION 1.00 LS $ 113,000.00 $ 113,000.00

0022 POTABLE WATER YARD PIPING INCLUDING POTABLE WATER, NON-POTABLE WATER, SCUM & DECANT 1.00 LS $ 275,000.00 $ 275,000.00

ESTIMATEDUNIT OFUNITTOTAL
ITEM NO.DESCRIPTION_ QTYMEASUREPRICEPRICE

0023 ELECTRICAL AND INSTRUMENTATION 1.00 LS $ 6,242,000.00 $ 6,242,000.00

TOTAL BASE BID (Line Items 0001 thru 0023) $ 24,141,886.00

0024 OPTION 1 (BID ALTERNATIVE 1) - PUMP NO. 6, COMPLETE

0024 PUMP NO. 6 ADDITION, COMPLETE 1.00 LS $ 771,000.00 $ 771,000.00

0025 OPTION 2 (BID ALTERNATIVE 2) - FMB-1 ACTUATED GATES, COMPLETE

0025 FMB-1 ACTUATED GATES, COMPLETE 1.00 LS $ 587,000.00 $ 587,000.00

0026 OPTION 3 (BID ALTERNATIVE 3) - FORCEMAIN "E", COMPLETE

0026 FORCEMAIN "E", COMPLETE 1.00 LS $ 4,600,000.00 $ 4,600,000.00

TOTAL (OPTIONS 1, 2 AND 3) $ 5,958,000.00

TOTAL (BASE BID AND OPTIONS 1, 2 AND 3) $ 30,099,886.00

* QUANTITY IS AN ESTIMATED AMOUNT. SEE SECTION 00700, FAR 52.211-18, FOR VARIATION IN ESTIMATED QUANTITY CONTRACT CLAUSE.

RTA SUBMITTAL &12SECTION 00010-&P

& Bold Italic)

PCL

SECTION 00010 - PRICING SCHEDULE
TRES RIOS ENVIRONMENTAL RESTORATION PROJECT, PHASE II
IN-PLANT SECONDARY EFFLUENT PUMP STATION (IPSEPS)
AMERICAN RECOVERY REINVESTMENT ACT (ARRA) FUNDED

PCL CONSTRUCTION

The undersigned hereby proposes and agrees that on award by the Government under this Bid, and in accordance with the provisions therein stated, to execute the Agreement, with necessary bonds, to furnish and install any and all labor, materials, equipment transportation, and services for the construction of the Tres Rios Environmental Restoration Project - Phase II, In-Plant Secondary Effluent Pump Station, in accordance with the Contract Documents therefore adopted and on file with the Government within the time hereinafter set forth and at the prices named in this Bid as follows:

ESTIMATEDUNIT OFUNITTOTAL
ITEM NO.DESCRIPTION_ QTYMEASUREPRICEPRICE
BASE BID (Line Items 0001 thru 0023)
Period of Performance: 550 Calendar Days

0001 MOBILIZATION/DEMOBILIZATION 1.00 LS $ - 0 $ 750,000.00

0002 GENERAL CONDITIONS 1.00 LS $ - 0 $ 1,500,000.00

0003 DIVERSION & CONTROL OF STORMWATER 1.00 LS $ - 0 $ 50,000.00

0004 AS-BUILT DRAWINGS 1.00 LS $ - 0 $ 25,000.00

0005 SITE DEMOLITION 1.00 LS $ - 0 $ 50,000.00

0006 TRAFFIC CONTROLS 1.00 LS $ - 0 $ 5,000.00

0007 CLEARING & GRUBBING 8.00 * ACRE $ 100.00 $ 800.00

0008 STOCK PILE PREPARATION 800.00 * SY $ 2.50 $ 2,000.00

0009 EXCAVATE & HAUL TO GENERAL FILL 33,521.00 * CY $ 1.00 $ 33,521.00

0010 EXCAVATE & HAUL TO STOCKPILE 1,890.00 * CY $ 5.00 $ 9,450.00

0011 SPREAD AND COMPACT GENERAL FILL 33,521.00 * CY $ 0.80 $ 26,816.80

0012 MAINTENANCE ROAD/ STORAGE AREA - 6 INCH DG 150.00 * SY $ 8.00 $ 1,200.00

0013 MAINTENANCE ROAD - 2 INCH ASPHALT 14,332.00 * SY $ 8.75 $ 125,405.00

0014 RESTORE EXISTING SURFACES 1.00 * LS $ 200,000.00 $ 200,000.00

0015 96-INCH CEFF PIPE AND FITTINGS 375.00 * LF $ 1,300.00 $ 487,500.00

0016 84-INCH CEFF PIPE AND FITTINGS 310.00 * LF $ 1,100.00 $ 341,000.00

0017 IPSEPS INCLUDING EJB-1 & FMB-1 1.00 LS $ 10,573,829.00 $ 10,573,829.00

0018 PLANT 3 EFFLUENT JUNCTION STRUCTURE 1.00 LS $ 250,000.00 $ 250,000.00

0019 PLANTS 1, 2 AND 3 EFFLUENT JUNCTION STRUCTURE 1.00 LS $ 650,000.00 $ 650,000.00

0020 IPSEPS ELECTRICAL BUILDING 1.00 LS $ 600,000.00 $ 600,000.00

0021 CHLORINE PIPING RELOCATION 1.00 LS $ 96,000.00 $ 96,000.00

0022 POTABLE WATER YARD PIPING INCLUDING POTABLE WATER, NON-POTABLE WATER, SCUM & DECANT 1.00 LS $ 50,000.00 $ 50,000.00

ESTIMATEDUNIT OFUNITTOTAL
ITEM NO.DESCRIPTION_ QTYMEASUREPRICEPRICE

0023 ELECTRICAL AND INSTRUMENTATION 1.00 LS $ 3,000,000.00 $ 3,000,000.00

TOTAL BASE BID (Line Items 0001 thru 0023) $ 18,827,521.80

0024 OPTION 1 (BID ALTERNATIVE 1) - PUMP NO. 6, COMPLETE

0024 PUMP NO. 6 ADDITION, COMPLETE 1.00 LS $ 500,000.00 $ 500,000.00

0025 OPTION 2 (BID ALTERNATIVE 2) - FMB-1 ACTUATED GATES, COMPLETE

0025 FMB-1 ACTUATED GATES, COMPLETE 1.00 LS $ 324,000.00 $ 324,000.00

0026 OPTION 3 (BID ALTERNATIVE 3) - FORCEMAIN "E", COMPLETE

0026 FORCEMAIN "E", COMPLETE 1.00 LS $ 3,132,000.00 $ 3,132,000.00

TOTAL (OPTIONS 1, 2 AND 3) $ 3,956,000.00

TOTAL (BASE BID AND OPTIONS 1, 2 AND 3) $ 22,783,521.80

* QUANTITY IS AN ESTIMATED AMOUNT. SEE SECTION 00700, FAR 52.211-18, FOR VARIATION IN ESTIMATED QUANTITY CONTRACT CLAUSE.

RTA SUBMITTAL &12SECTION 00010-&P

& Bold Italic)

File details come from the government source that posted it. Updated .