Amend 0002 IGE and bids.xlsx
XLSX spreadsheet 92 KB Posted
- Solicitation number
- W912PL-10-B-0009
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend 0002 IGE and bids.xlsx | XLSX spreadsheet | |
| W912PL-10-B-0009 Bid Abstract.pdf | ||
| Plans_Am3.pdf | ||
| Am3.pdf | ||
| Am2.pdf | ||
| Am2-Dwg.zip | ZIP file | |
| Am1.pdf | ||
| Site Visit List 2010-03-17.pdf | ||
| Architectural.pdf | ||
| W912PL-10-B-0009Vol1.pdf | ||
| W912PL-10-B-0009Vol3.pdf | ||
| Electrical.pdf | ||
| Mechanical.pdf | ||
| Instrumentation.pdf | ||
| Structural.pdf | ||
| Civil.pdf | ||
| Hvac.pdf | ||
| Plumbing.pdf | ||
| General.pdf | ||
| W912PL-10-B-0009Vol2.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IGE
| SECTION 00010 - PRICING SCHEDULE | |
| TRES RIOS ENVIRONMENTAL RESTORATION PROJECT, PHASE II | |
| IN-PLANT SECONDARY EFFLUENT PUMP STATION (IPSEPS) | |
| AMERICAN RECOVERY REINVESTMENT ACT (ARRA) FUNDED |
IGE
The undersigned hereby proposes and agrees that on award by the Government under this Bid, and in accordance with the provisions therein stated, to execute the Agreement, with necessary bonds, to furnish and install any and all labor, materials, equipment transportation, and services for the construction of the Tres Rios Environmental Restoration Project - Phase II, In-Plant Secondary Effluent Pump Station, in accordance with the Contract Documents therefore adopted and on file with the Government within the time hereinafter set forth and at the prices named in this Bid as follows:
| ESTIMATED | UNIT OF | UNIT | TOTAL | ||
| ITEM NO. | DESCRIPTION | _ QTY | MEASURE | PRICE | PRICE |
| BASE BID (Line Items 0001 thru 0023) |
| Period of Performance: 550 Calendar Days |
0001 MOBILIZATION/DEMOBILIZATION 1.00 LS $ - 0 $ 2,000,000.00
0002 GENERAL CONDITIONS 1.00 LS $ - 0 $ 69,000.00
0003 DIVERSION & CONTROL OF STORMWATER 1.00 LS $ - 0 $ 250,000.00
0004 AS-BUILT DRAWINGS 1.00 LS $ - 0 $ 66,000.00
0005 SITE DEMOLITION 1.00 LS $ - 0 $ 20,000.00
0006 TRAFFIC CONTROLS 1.00 LS $ - 0 $ 100,000.00
0007 CLEARING & GRUBBING 8.00 * ACRE $ 10,000.00 $ 80,000.00
0008 STOCK PILE PREPARATION 800.00 * SY $ 100.00 $ 80,000.00
0009 EXCAVATE & HAUL TO GENERAL FILL 33,521.00 * CY $ 11.50 $ 385,491.50
0010 EXCAVATE & HAUL TO STOCKPILE 1,890.00 * CY $ 11.50 $ 21,735.00
0011 SPREAD AND COMPACT GENERAL FILL 33,521.00 * CY $ 6.50 $ 217,886.50
0012 MAINTENANCE ROAD/ STORAGE AREA - 6 INCH DG 150.00 * SY $ 20.00 $ 3,000.00
0013 MAINTENANCE ROAD - 2 INCH ASPHALT 14,332.00 * SY $ 16.00 $ 229,312.00
0014 RESTORE EXISTING SURFACES 1.00 * LS $ 173,000.00 $ 173,000.00
0015 96-INCH CEFF PIPE AND FITTINGS 375.00 * LF $ 1,200.00 $ 450,000.00
0016 84-INCH CEFF PIPE AND FITTINGS 310.00 * LF $ 780.00 $ 241,800.00
0017 IPSEPS INCLUDING EJB-1 & FMB-1 1.00 LS $ 9,731,000.00 $ 9,731,000.00
0018 PLANT 3 EFFLUENT JUNCTION STRUCTURE 1.00 LS $ 514,000.00 $ 514,000.00
0019 PLANTS 1, 2 AND 3 EFFLUENT JUNCTION STRUCTURE 1.00 LS $ 1,564,000.00 $ 1,564,000.00
0020 IPSEPS ELECTRICAL BUILDING 1.00 LS $ 671,000.00 $ 671,000.00
0021 CHLORINE PIPING RELOCATION 1.00 LS $ 100,000.00 $ 100,000.00
0022 POTABLE WATER YARD PIPING INCLUDING POTABLE WATER, NON-POTABLE WATER, SCUM & DECANT 1.00 LS $ 335,000.00 $ 335,000.00
| ESTIMATED | UNIT OF | UNIT | TOTAL | ||
| ITEM NO. | DESCRIPTION | _ QTY | MEASURE | PRICE | PRICE |
0023 ELECTRICAL AND INSTRUMENTATION 1.00 LS $ 3,858,000.00 $ 3,858,000.00
TOTAL BASE BID (Line Items 0001 thru 0023) $ 21,160,225.00
0024 OPTION 1 (BID ALTERNATIVE 1) - PUMP NO. 6, COMPLETE
0024 PUMP NO. 6 ADDITION, COMPLETE 1.00 LS $ 1,200,000.00 $ 1,200,000.00
0025 OPTION 2 (BID ALTERNATIVE 2) - FMB-1 ACTUATED GATES, COMPLETE
0025 FMB-1 ACTUATED GATES, COMPLETE 1.00 LS $ 405,000.00 $ 405,000.00
0026 OPTION 3 (BID ALTERNATIVE 3) - FORCEMAIN "E", COMPLETE
0026 FORCEMAIN "E", COMPLETE 1.00 LS $ 6,200,000.00 $ 6,200,000.00
TOTAL (OPTIONS 1, 2 AND 3) $ 7,805,000.00
TOTAL (BASE BID AND OPTIONS 1, 2 AND 3) $ 28,965,225.00
* QUANTITY IS AN ESTIMATED AMOUNT. SEE SECTION 00700, FAR 52.211-18, FOR VARIATION IN ESTIMATED QUANTITY CONTRACT CLAUSE.
W912PL-10-B-0009
RTA SUBMITTAL &12SECTION 00010-&P
Amendment 0002 (Strikethrough & Bold Italic)
LAKESHORE
| SECTION 00010 - PRICING SCHEDULE | |
| TRES RIOS ENVIRONMENTAL RESTORATION PROJECT, PHASE II | |
| IN-PLANT SECONDARY EFFLUENT PUMP STATION (IPSEPS) | |
| AMERICAN RECOVERY REINVESTMENT ACT (ARRA) FUNDED |
LAKESHORE
The undersigned hereby proposes and agrees that on award by the Government under this Bid, and in accordance with the provisions therein stated, to execute the Agreement, with necessary bonds, to furnish and install any and all labor, materials, equipment transportation, and services for the construction of the Tres Rios Environmental Restoration Project - Phase II, In-Plant Secondary Effluent Pump Station, in accordance with the Contract Documents therefore adopted and on file with the Government within the time hereinafter set forth and at the prices named in this Bid as follows:
| ESTIMATED | UNIT OF | UNIT | TOTAL | ||
| ITEM NO. | DESCRIPTION | _ QTY | MEASURE | PRICE | PRICE |
| BASE BID (Line Items 0001 thru 0023) |
| Period of Performance: 550 Calendar Days |
0001 MOBILIZATION/DEMOBILIZATION 1.00 LS $ - 0 $ 459,000.00
0002 GENERAL CONDITIONS 1.00 LS $ - 0 $ 3,164,000.00
0003 DIVERSION & CONTROL OF STORMWATER 1.00 LS $ - 0 $ 161,000.00
0004 AS-BUILT DRAWINGS 1.00 LS $ - 0 $ 45,000.00
0005 SITE DEMOLITION 1.00 LS $ - 0 $ 803,000.00
0006 TRAFFIC CONTROLS 1.00 LS $ - 0 $ 516,000.00
0007 CLEARING & GRUBBING 8.00 * ACRE $ 37,000.00 $ 296,000.00
0008 STOCK PILE PREPARATION 800.00 * SY $ 144.00 $ 115,200.00
0009 EXCAVATE & HAUL TO GENERAL FILL 33,521.00 * CY $ 14.00 $ 469,294.00
0010 EXCAVATE & HAUL TO STOCKPILE 1,890.00 * CY $ 21.00 $ 39,690.00
0011 SPREAD AND COMPACT GENERAL FILL 33,521.00 * CY $ 6.00 $ 201,126.00
0012 MAINTENANCE ROAD/ STORAGE AREA - 6 INCH DG 150.00 * SY $ 161.00 $ 24,150.00
0013 MAINTENANCE ROAD - 2 INCH ASPHALT 14,332.00 * SY $ 53.00 $ 759,596.00
0014 RESTORE EXISTING SURFACES 1.00 * LS $ 803,000.00 $ 803,000.00
0015 96-INCH CEFF PIPE AND FITTINGS 375.00 * LF $ 2,300.00 $ 862,500.00
0016 84-INCH CEFF PIPE AND FITTINGS 310.00 * LF $ 2,180.00 $ 675,800.00
0017 IPSEPS INCLUDING EJB-1 & FMB-1 1.00 LS $ 21,235,000.00 $ 21,235,000.00
0018 PLANT 3 EFFLUENT JUNCTION STRUCTURE 1.00 LS $ 803,000.00 $ 803,000.00
0019 PLANTS 1, 2 AND 3 EFFLUENT JUNCTION STRUCTURE 1.00 LS $ 2,294,000.00 $ 2,294,000.00
0020 IPSEPS ELECTRICAL BUILDING 1.00 LS $ 3,222,000.00 $ 3,222,000.00
0021 CHLORINE PIPING RELOCATION 1.00 LS $ 746,000.00 $ 746,000.00
0022 POTABLE WATER YARD PIPING INCLUDING POTABLE WATER, NON-POTABLE WATER, SCUM & DECANT 1.00 LS $ 459,000.00 $ 459,000.00
| ESTIMATED | UNIT OF | UNIT | TOTAL | ||
| ITEM NO. | DESCRIPTION | _ QTY | MEASURE | PRICE | PRICE |
0023 ELECTRICAL AND INSTRUMENTATION 1.00 LS $ 2,294,000.00 $ 2,294,000.00
TOTAL BASE BID (Line Items 0001 thru 0023) $ 40,447,356.00
0024 OPTION 1 (BID ALTERNATIVE 1) - PUMP NO. 6, COMPLETE
0024 PUMP NO. 6 ADDITION, COMPLETE 1.00 LS $ 2,638,000.00 $ 2,638,000.00
0025 OPTION 2 (BID ALTERNATIVE 2) - FMB-1 ACTUATED GATES, COMPLETE
0025 FMB-1 ACTUATED GATES, COMPLETE 1.00 LS $ 3,211,000.00 $ 3,211,000.00
0026 OPTION 3 (BID ALTERNATIVE 3) - FORCEMAIN "E", COMPLETE
0026 FORCEMAIN "E", COMPLETE 1.00 LS $ 6,306,000.00 $ 6,306,000.00
TOTAL (OPTIONS 1, 2 AND 3) $ 12,155,000.00
TOTAL (BASE BID AND OPTIONS 1, 2 AND 3) $ 52,602,356.00
* QUANTITY IS AN ESTIMATED AMOUNT. SEE SECTION 00700, FAR 52.211-18, FOR VARIATION IN ESTIMATED QUANTITY CONTRACT CLAUSE.
RTA SUBMITTAL &12SECTION 00010-&P
& Bold Italic)
ARCHER WESTERN
| SECTION 00010 - PRICING SCHEDULE | |
| TRES RIOS ENVIRONMENTAL RESTORATION PROJECT, PHASE II | |
| IN-PLANT SECONDARY EFFLUENT PUMP STATION (IPSEPS) | |
| AMERICAN RECOVERY REINVESTMENT ACT (ARRA) FUNDED |
ARCHER WESTERN
The undersigned hereby proposes and agrees that on award by the Government under this Bid, and in accordance with the provisions therein stated, to execute the Agreement, with necessary bonds, to furnish and install any and all labor, materials, equipment transportation, and services for the construction of the Tres Rios Environmental Restoration Project - Phase II, In-Plant Secondary Effluent Pump Station, in accordance with the Contract Documents therefore adopted and on file with the Government within the time hereinafter set forth and at the prices named in this Bid as follows:
| ESTIMATED | UNIT OF | UNIT | TOTAL | ||
| ITEM NO. | DESCRIPTION | _ QTY | MEASURE | PRICE | PRICE |
| BASE BID (Line Items 0001 thru 0023) |
| Period of Performance: 550 Calendar Days |
0001 MOBILIZATION/DEMOBILIZATION 1.00 LS $ - 0 $ 1,900,000.00
0002 GENERAL CONDITIONS 1.00 LS $ - 0 $ 541,000.00
0003 DIVERSION & CONTROL OF STORMWATER 1.00 LS $ - 0 $ 10,000.00
0004 AS-BUILT DRAWINGS 1.00 LS $ - 0 $ 2,000.00
0005 SITE DEMOLITION 1.00 LS $ - 0 $ 50,000.00
0006 TRAFFIC CONTROLS 1.00 LS $ - 0 $ 3,000.00
0007 CLEARING & GRUBBING 8.00 * ACRE $ 2,000.00 $ 16,000.00
0008 STOCK PILE PREPARATION 800.00 * SY $ 10.00 $ 8,000.00
0009 EXCAVATE & HAUL TO GENERAL FILL 33,521.00 * CY $ 1.00 $ 33,521.00
0010 EXCAVATE & HAUL TO STOCKPILE 1,890.00 * CY $ 1.00 $ 1,890.00
0011 SPREAD AND COMPACT GENERAL FILL 33,521.00 * CY $ 1.00 $ 33,521.00
0012 MAINTENANCE ROAD/ STORAGE AREA - 6 INCH DG 150.00 * SY $ 11.00 $ 1,650.00
0013 MAINTENANCE ROAD - 2 INCH ASPHALT 14,332.00 * SY $ 11.00 $ 157,652.00
0014 RESTORE EXISTING SURFACES 1.00 * LS $ 20,000.00 $ 20,000.00
0015 96-INCH CEFF PIPE AND FITTINGS 375.00 * LF $ 1,200.00 $ 450,000.00
0016 84-INCH CEFF PIPE AND FITTINGS 310.00 * LF $ 900.00 $ 279,000.00
0017 IPSEPS INCLUDING EJB-1 & FMB-1 1.00 LS $ 6,995,000.00 $ 6,995,000.00
0018 PLANT 3 EFFLUENT JUNCTION STRUCTURE 1.00 LS $ 270,000.00 $ 270,000.00
0019 PLANTS 1, 2 AND 3 EFFLUENT JUNCTION STRUCTURE 1.00 LS $ 580,000.00 $ 580,000.00
0020 IPSEPS ELECTRICAL BUILDING 1.00 LS $ 560,000.00 $ 560,000.00
0021 CHLORINE PIPING RELOCATION 1.00 LS $ 40,000.00 $ 40,000.00
0022 POTABLE WATER YARD PIPING INCLUDING POTABLE WATER, NON-POTABLE WATER, SCUM & DECANT 1.00 LS $ 110,000.00 $ 110,000.00
| ESTIMATED | UNIT OF | UNIT | TOTAL | ||
| ITEM NO. | DESCRIPTION | _ QTY | MEASURE | PRICE | PRICE |
0023 ELECTRICAL AND INSTRUMENTATION 1.00 LS $ 5,700,000.00 $ 5,700,000.00
TOTAL BASE BID (Line Items 0001 thru 0023) $ 17,762,234.00
0024 OPTION 1 (BID ALTERNATIVE 1) - PUMP NO. 6, COMPLETE
0024 PUMP NO. 6 ADDITION, COMPLETE 1.00 LS $ 690,000.00 $ 690,000.00
0025 OPTION 2 (BID ALTERNATIVE 2) - FMB-1 ACTUATED GATES, COMPLETE
0025 FMB-1 ACTUATED GATES, COMPLETE 1.00 LS $ 418,000.00 $ 418,000.00
0026 OPTION 3 (BID ALTERNATIVE 3) - FORCEMAIN "E", COMPLETE
0026 FORCEMAIN "E", COMPLETE 1.00 LS $ 2,966,000.00 $ 2,966,000.00
TOTAL (OPTIONS 1, 2 AND 3) $ 4,074,000.00
TOTAL (BASE BID AND OPTIONS 1, 2 AND 3) $ 21,836,234.00
* QUANTITY IS AN ESTIMATED AMOUNT. SEE SECTION 00700, FAR 52.211-18, FOR VARIATION IN ESTIMATED QUANTITY CONTRACT CLAUSE.
RTA SUBMITTAL &12SECTION 00010-&P
& Bold Italic)
MCCARTHY BUILDING
| SECTION 00010 - PRICING SCHEDULE | |
| TRES RIOS ENVIRONMENTAL RESTORATION PROJECT, PHASE II | |
| IN-PLANT SECONDARY EFFLUENT PUMP STATION (IPSEPS) | |
| AMERICAN RECOVERY REINVESTMENT ACT (ARRA) FUNDED |
MCCARTHY BUILDING
The undersigned hereby proposes and agrees that on award by the Government under this Bid, and in accordance with the provisions therein stated, to execute the Agreement, with necessary bonds, to furnish and install any and all labor, materials, equipment transportation, and services for the construction of the Tres Rios Environmental Restoration Project - Phase II, In-Plant Secondary Effluent Pump Station, in accordance with the Contract Documents therefore adopted and on file with the Government within the time hereinafter set forth and at the prices named in this Bid as follows:
| ESTIMATED | UNIT OF | UNIT | TOTAL | ||
| ITEM NO. | DESCRIPTION | _ QTY | MEASURE | PRICE | PRICE |
| BASE BID (Line Items 0001 thru 0023) |
| Period of Performance: 550 Calendar Days |
0001 MOBILIZATION/DEMOBILIZATION 1.00 LS $ - 0 $ 100,000.00
0002 GENERAL CONDITIONS 1.00 LS $ - 0 $ 1,465,000.00
0003 DIVERSION & CONTROL OF STORMWATER 1.00 LS $ - 0 $ 5,600.00
0004 AS-BUILT DRAWINGS 1.00 LS $ - 0 $ 12,000.00
0005 SITE DEMOLITION 1.00 LS $ - 0 $ 15,000.00
0006 TRAFFIC CONTROLS 1.00 LS $ - 0 $ 85,000.00
0007 CLEARING & GRUBBING 8.00 * ACRE $ 5,200.00 $ 41,600.00
0008 STOCK PILE PREPARATION 800.00 * SY $ 4.25 $ 3,400.00
0009 EXCAVATE & HAUL TO GENERAL FILL 33,521.00 * CY $ 3.20 $ 107,267.20
0010 EXCAVATE & HAUL TO STOCKPILE 1,890.00 * CY $ 3.30 $ 6,237.00
0011 SPREAD AND COMPACT GENERAL FILL 33,521.00 * CY $ 1.00 $ 33,521.00
0012 MAINTENANCE ROAD/ STORAGE AREA - 6 INCH DG 150.00 * SY $ 5.00 $ 750.00
0013 MAINTENANCE ROAD - 2 INCH ASPHALT 14,332.00 * SY $ 10.00 $ 143,320.00
0014 RESTORE EXISTING SURFACES 1.00 * LS $ 131,000.00 $ 131,000.00
0015 96-INCH CEFF PIPE AND FITTINGS 375.00 * LF $ 1,180.00 $ 442,500.00
0016 84-INCH CEFF PIPE AND FITTINGS 310.00 * LF $ 740.00 $ 229,400.00
0017 IPSEPS INCLUDING EJB-1 & FMB-1 1.00 LS $ 7,740,000.00 $ 7,740,000.00
0018 PLANT 3 EFFLUENT JUNCTION STRUCTURE 1.00 LS $ 300,000.00 $ 300,000.00
0019 PLANTS 1, 2 AND 3 EFFLUENT JUNCTION STRUCTURE 1.00 LS $ 642,000.00 $ 642,000.00
0020 IPSEPS ELECTRICAL BUILDING 1.00 LS $ 541,000.00 $ 541,000.00
0021 CHLORINE PIPING RELOCATION 1.00 LS $ 63,000.00 $ 63,000.00
0022 POTABLE WATER YARD PIPING INCLUDING POTABLE WATER, NON-POTABLE WATER, SCUM & DECANT 1.00 LS $ 154,000.00 $ 154,000.00
| ESTIMATED | UNIT OF | UNIT | TOTAL | ||
| ITEM NO. | DESCRIPTION | _ QTY | MEASURE | PRICE | PRICE |
0023 ELECTRICAL AND INSTRUMENTATION 1.00 LS $ 5,525,000.00 $ 5,525,000.00
TOTAL BASE BID (Line Items 0001 thru 0023) $ 17,786,595.20
0024 OPTION 1 (BID ALTERNATIVE 1) - PUMP NO. 6, COMPLETE
0024 PUMP NO. 6 ADDITION, COMPLETE 1.00 LS $ 785,000.00 $ 785,000.00
0025 OPTION 2 (BID ALTERNATIVE 2) - FMB-1 ACTUATED GATES, COMPLETE
0025 FMB-1 ACTUATED GATES, COMPLETE 1.00 LS $ 380,000.00 $ 380,000.00
0026 OPTION 3 (BID ALTERNATIVE 3) - FORCEMAIN "E", COMPLETE
0026 FORCEMAIN "E", COMPLETE 1.00 LS $ 3,570,000.00 $ 3,570,000.00
TOTAL (OPTIONS 1, 2 AND 3) $ 4,735,000.00
TOTAL (BASE BID AND OPTIONS 1, 2 AND 3) $ 22,521,595.20
* QUANTITY IS AN ESTIMATED AMOUNT. SEE SECTION 00700, FAR 52.211-18, FOR VARIATION IN ESTIMATED QUANTITY CONTRACT CLAUSE.
RTA SUBMITTAL &12SECTION 00010-&P
& Bold Italic)
SLETTEN
| SECTION 00010 - PRICING SCHEDULE | |
| TRES RIOS ENVIRONMENTAL RESTORATION PROJECT, PHASE II | |
| IN-PLANT SECONDARY EFFLUENT PUMP STATION (IPSEPS) | |
| AMERICAN RECOVERY REINVESTMENT ACT (ARRA) FUNDED |
SLETTEN CONSTRUCTION
The undersigned hereby proposes and agrees that on award by the Government under this Bid, and in accordance with the provisions therein stated, to execute the Agreement, with necessary bonds, to furnish and install any and all labor, materials, equipment transportation, and services for the construction of the Tres Rios Environmental Restoration Project - Phase II, In-Plant Secondary Effluent Pump Station, in accordance with the Contract Documents therefore adopted and on file with the Government within the time hereinafter set forth and at the prices named in this Bid as follows:
| ESTIMATED | UNIT OF | UNIT | TOTAL | ||
| ITEM NO. | DESCRIPTION | _ QTY | MEASURE | PRICE | PRICE |
| BASE BID (Line Items 0001 thru 0023) |
| Period of Performance: 550 Calendar Days |
0001 MOBILIZATION/DEMOBILIZATION 1.00 LS $ - 0 $ 500,000.00
0002 GENERAL CONDITIONS 1.00 LS $ - 0 $ 1,500,000.00
0003 DIVERSION & CONTROL OF STORMWATER 1.00 LS $ - 0 $ 5,000.00
0004 AS-BUILT DRAWINGS 1.00 LS $ - 0 $ 6,008.00
0005 SITE DEMOLITION 1.00 LS $ - 0 $ 40,000.00
0006 TRAFFIC CONTROLS 1.00 LS $ - 0 $ 20,000.00
0007 CLEARING & GRUBBING 8.00 * ACRE $ 15,000.00 $ 120,000.00
0008 STOCK PILE PREPARATION 800.00 * SY $ 30.00 $ 24,000.00
0009 EXCAVATE & HAUL TO GENERAL FILL 33,521.00 * CY $ 2.00 $ 67,042.00
0010 EXCAVATE & HAUL TO STOCKPILE 1,890.00 * CY $ 6.00 $ 11,340.00
0011 SPREAD AND COMPACT GENERAL FILL 33,521.00 * CY $ 6.00 $ 201,126.00
0012 MAINTENANCE ROAD/ STORAGE AREA - 6 INCH DG 150.00 * SY $ 10.00 $ 1,500.00
0013 MAINTENANCE ROAD - 2 INCH ASPHALT 14,332.00 * SY $ 12.00 $ 171,984.00
0014 RESTORE EXISTING SURFACES 1.00 * LS $ 100,000.00 $ 100,000.00
0015 96-INCH CEFF PIPE AND FITTINGS 375.00 * LF $ 1,408.00 $ 528,000.00
0016 84-INCH CEFF PIPE AND FITTINGS 310.00 * LF $ 1,000.00 $ 310,000.00
0017 IPSEPS INCLUDING EJB-1 & FMB-1 1.00 LS $ 8,144,000.00 $ 8,144,000.00
0018 PLANT 3 EFFLUENT JUNCTION STRUCTURE 1.00 LS $ 200,000.00 $ 200,000.00
0019 PLANTS 1, 2 AND 3 EFFLUENT JUNCTION STRUCTURE 1.00 LS $ 750,000.00 $ 750,000.00
0020 IPSEPS ELECTRICAL BUILDING 1.00 LS $ 750,000.00 $ 750,000.00
0021 CHLORINE PIPING RELOCATION 1.00 LS $ 50,000.00 $ 50,000.00
0022 POTABLE WATER YARD PIPING INCLUDING POTABLE WATER, NON-POTABLE WATER, SCUM & DECANT 1.00 LS $ 250,000.00 $ 250,000.00
| ESTIMATED | UNIT OF | UNIT | TOTAL | ||
| ITEM NO. | DESCRIPTION | _ QTY | MEASURE | PRICE | PRICE |
0023 ELECTRICAL AND INSTRUMENTATION 1.00 LS $ 6,000,000.00 $ 6,000,000.00
TOTAL BASE BID (Line Items 0001 thru 0023) $ 19,750,000.00
0024 OPTION 1 (BID ALTERNATIVE 1) - PUMP NO. 6, COMPLETE
0024 PUMP NO. 6 ADDITION, COMPLETE 1.00 LS $ 400,000.00 $ 400,000.00
0025 OPTION 2 (BID ALTERNATIVE 2) - FMB-1 ACTUATED GATES, COMPLETE
0025 FMB-1 ACTUATED GATES, COMPLETE 1.00 LS $ 250,000.00 $ 250,000.00
0026 OPTION 3 (BID ALTERNATIVE 3) - FORCEMAIN "E", COMPLETE
0026 FORCEMAIN "E", COMPLETE 1.00 LS $ 3,000,000.00 $ 3,000,000.00
TOTAL (OPTIONS 1, 2 AND 3) $ 3,650,000.00
TOTAL (BASE BID AND OPTIONS 1, 2 AND 3) $ 23,400,000.00
* QUANTITY IS AN ESTIMATED AMOUNT. SEE SECTION 00700, FAR 52.211-18, FOR VARIATION IN ESTIMATED QUANTITY CONTRACT CLAUSE.
RTA SUBMITTAL &12SECTION 00010-&P
& Bold Italic)
HAYDEN
| SECTION 00010 - PRICING SCHEDULE | |
| TRES RIOS ENVIRONMENTAL RESTORATION PROJECT, PHASE II | |
| IN-PLANT SECONDARY EFFLUENT PUMP STATION (IPSEPS) | |
| AMERICAN RECOVERY REINVESTMENT ACT (ARRA) FUNDED |
HAYDEN BUILDING
The undersigned hereby proposes and agrees that on award by the Government under this Bid, and in accordance with the provisions therein stated, to execute the Agreement, with necessary bonds, to furnish and install any and all labor, materials, equipment transportation, and services for the construction of the Tres Rios Environmental Restoration Project - Phase II, In-Plant Secondary Effluent Pump Station, in accordance with the Contract Documents therefore adopted and on file with the Government within the time hereinafter set forth and at the prices named in this Bid as follows:
| ESTIMATED | UNIT OF | UNIT | TOTAL | ||
| ITEM NO. | DESCRIPTION | _ QTY | MEASURE | PRICE | PRICE |
| BASE BID (Line Items 0001 thru 0023) |
| Period of Performance: 550 Calendar Days |
0001 MOBILIZATION/DEMOBILIZATION 1.00 LS $ - 0 $ 250,000.00
0002 GENERAL CONDITIONS 1.00 LS $ - 0 $ 1,500,000.00
0003 DIVERSION & CONTROL OF STORMWATER 1.00 LS $ - 0 $ 20,000.00
0004 AS-BUILT DRAWINGS 1.00 LS $ - 0 $ 15,000.00
0005 SITE DEMOLITION 1.00 LS $ - 0 $ 85,000.00
0006 TRAFFIC CONTROLS 1.00 LS $ - 0 $ 7,500.00
0007 CLEARING & GRUBBING 8.00 * ACRE $ 400.00 $ 3,200.00
0008 STOCK PILE PREPARATION 800.00 * SY $ 1.00 $ 800.00
0009 EXCAVATE & HAUL TO GENERAL FILL 33,521.00 * CY $ 4.50 $ 150,844.50
0010 EXCAVATE & HAUL TO STOCKPILE 1,890.00 * CY $ 4.50 $ 8,505.00
0011 SPREAD AND COMPACT GENERAL FILL 33,521.00 * CY $ 1.95 $ 65,365.95
0012 MAINTENANCE ROAD/ STORAGE AREA - 6 INCH DG 150.00 * SY $ 18.00 $ 2,700.00
0013 MAINTENANCE ROAD - 2 INCH ASPHALT 14,332.00 * SY $ 13.00 $ 186,316.00
0014 RESTORE EXISTING SURFACES 1.00 * LS $ 150,000.00 $ 150,000.00
0015 96-INCH CEFF PIPE AND FITTINGS 375.00 * LF $ 1,050.00 $ 393,750.00
0016 84-INCH CEFF PIPE AND FITTINGS 310.00 * LF $ 715.00 $ 221,650.00
0017 IPSEPS INCLUDING EJB-1 & FMB-1 1.00 LS $ 12,650,000.00 $ 12,650,000.00
0018 PLANT 3 EFFLUENT JUNCTION STRUCTURE 1.00 LS $ 325,000.00 $ 325,000.00
0019 PLANTS 1, 2 AND 3 EFFLUENT JUNCTION STRUCTURE 1.00 LS $ 915,000.00 $ 915,000.00
0020 IPSEPS ELECTRICAL BUILDING 1.00 LS $ 625,000.00 $ 625,000.00
0021 CHLORINE PIPING RELOCATION 1.00 LS $ 60,000.00 $ 60,000.00
0022 POTABLE WATER YARD PIPING INCLUDING POTABLE WATER, NON-POTABLE WATER, SCUM & DECANT 1.00 LS $ 115,000.00 $ 115,000.00
| ESTIMATED | UNIT OF | UNIT | TOTAL | ||
| ITEM NO. | DESCRIPTION | _ QTY | MEASURE | PRICE | PRICE |
0023 ELECTRICAL AND INSTRUMENTATION 1.00 LS $ 5,800,000.00 $ 5,800,000.00
TOTAL BASE BID (Line Items 0001 thru 0023) $ 23,550,631.45
0024 OPTION 1 (BID ALTERNATIVE 1) - PUMP NO. 6, COMPLETE
0024 PUMP NO. 6 ADDITION, COMPLETE 1.00 LS $ 710,000.00 $ 710,000.00
0025 OPTION 2 (BID ALTERNATIVE 2) - FMB-1 ACTUATED GATES, COMPLETE
0025 FMB-1 ACTUATED GATES, COMPLETE 1.00 LS $ 445,000.00 $ 445,000.00
0026 OPTION 3 (BID ALTERNATIVE 3) - FORCEMAIN "E", COMPLETE
0026 FORCEMAIN "E", COMPLETE 1.00 LS $ 3,700,000.00 $ 3,700,000.00
TOTAL (OPTIONS 1, 2 AND 3) $ 4,855,000.00
TOTAL (BASE BID AND OPTIONS 1, 2 AND 3) $ 28,405,631.45
* QUANTITY IS AN ESTIMATED AMOUNT. SEE SECTION 00700, FAR 52.211-18, FOR VARIATION IN ESTIMATED QUANTITY CONTRACT CLAUSE.
RTA SUBMITTAL &12SECTION 00010-&P
& Bold Italic)
PENICK_SHANEK
| SECTION 00010 - PRICING SCHEDULE | |
| TRES RIOS ENVIRONMENTAL RESTORATION PROJECT, PHASE II | |
| IN-PLANT SECONDARY EFFLUENT PUMP STATION (IPSEPS) | |
| AMERICAN RECOVERY REINVESTMENT ACT (ARRA) FUNDED |
PENICK/SHANEK JV
The undersigned hereby proposes and agrees that on award by the Government under this Bid, and in accordance with the provisions therein stated, to execute the Agreement, with necessary bonds, to furnish and install any and all labor, materials, equipment transportation, and services for the construction of the Tres Rios Environmental Restoration Project - Phase II, In-Plant Secondary Effluent Pump Station, in accordance with the Contract Documents therefore adopted and on file with the Government within the time hereinafter set forth and at the prices named in this Bid as follows:
| ESTIMATED | UNIT OF | UNIT | TOTAL | ||
| ITEM NO. | DESCRIPTION | _ QTY | MEASURE | PRICE | PRICE |
| BASE BID (Line Items 0001 thru 0023) |
| Period of Performance: 550 Calendar Days |
0001 MOBILIZATION/DEMOBILIZATION 1.00 LS $ - 0 $ 300,000.00
0002 GENERAL CONDITIONS 1.00 LS $ - 0 $ 1,400,000.00
0003 DIVERSION & CONTROL OF STORMWATER 1.00 LS $ - 0 $ 40,000.00
0004 AS-BUILT DRAWINGS 1.00 LS $ - 0 $ 20,000.00
0005 SITE DEMOLITION 1.00 LS $ - 0 $ 150,000.00
0006 TRAFFIC CONTROLS 1.00 LS $ - 0 $ 40,000.00
0007 CLEARING & GRUBBING 8.00 * ACRE $ 15,000.00 $ 120,000.00
0008 STOCK PILE PREPARATION 800.00 * SY $ 50.00 $ 40,000.00
0009 EXCAVATE & HAUL TO GENERAL FILL 33,521.00 * CY $ 2.00 $ 67,042.00
0010 EXCAVATE & HAUL TO STOCKPILE 1,890.00 * CY $ 3.00 $ 5,670.00
0011 SPREAD AND COMPACT GENERAL FILL 33,521.00 * CY $ 2.00 $ 67,042.00
0012 MAINTENANCE ROAD/ STORAGE AREA - 6 INCH DG 150.00 * SY $ 30.00 $ 4,500.00
0013 MAINTENANCE ROAD - 2 INCH ASPHALT 14,332.00 * SY $ 20.00 $ 286,640.00
0014 RESTORE EXISTING SURFACES 1.00 * LS $ 59,106.00 $ 59,106.00
0015 96-INCH CEFF PIPE AND FITTINGS 375.00 * LF $ 2,000.00 $ 750,000.00
0016 84-INCH CEFF PIPE AND FITTINGS 310.00 * LF $ 1,100.00 $ 341,000.00
0017 IPSEPS INCLUDING EJB-1 & FMB-1 1.00 LS $ 12,120,000.00 $ 12,120,000.00
0018 PLANT 3 EFFLUENT JUNCTION STRUCTURE 1.00 LS $ 420,000.00 $ 420,000.00
0019 PLANTS 1, 2 AND 3 EFFLUENT JUNCTION STRUCTURE 1.00 LS $ 930,000.00 $ 930,000.00
0020 IPSEPS ELECTRICAL BUILDING 1.00 LS $ 690,000.00 $ 690,000.00
0021 CHLORINE PIPING RELOCATION 1.00 LS $ 60,000.00 $ 60,000.00
0022 POTABLE WATER YARD PIPING INCLUDING POTABLE WATER, NON-POTABLE WATER, SCUM & DECANT 1.00 LS $ 275,000.00 $ 275,000.00
| ESTIMATED | UNIT OF | UNIT | TOTAL | ||
| ITEM NO. | DESCRIPTION | _ QTY | MEASURE | PRICE | PRICE |
0023 ELECTRICAL AND INSTRUMENTATION 1.00 LS $ 6,950,000.00 $ 6,950,000.00
TOTAL BASE BID (Line Items 0001 thru 0023) $ 25,136,000.00
0024 OPTION 1 (BID ALTERNATIVE 1) - PUMP NO. 6, COMPLETE
0024 PUMP NO. 6 ADDITION, COMPLETE 1.00 LS $ 970,000.00 $ 970,000.00
0025 OPTION 2 (BID ALTERNATIVE 2) - FMB-1 ACTUATED GATES, COMPLETE
0025 FMB-1 ACTUATED GATES, COMPLETE 1.00 LS $ 510,000.00 $ 510,000.00
0026 OPTION 3 (BID ALTERNATIVE 3) - FORCEMAIN "E", COMPLETE
0026 FORCEMAIN "E", COMPLETE 1.00 LS $ 4,930,000.00 $ 4,930,000.00
TOTAL (OPTIONS 1, 2 AND 3) $ 6,410,000.00
TOTAL (BASE BID AND OPTIONS 1, 2 AND 3) $ 31,546,000.00
* QUANTITY IS AN ESTIMATED AMOUNT. SEE SECTION 00700, FAR 52.211-18, FOR VARIATION IN ESTIMATED QUANTITY CONTRACT CLAUSE.
RTA SUBMITTAL &12SECTION 00010-&P
& Bold Italic)
HUNTER
| SECTION 00010 - PRICING SCHEDULE | |
| TRES RIOS ENVIRONMENTAL RESTORATION PROJECT, PHASE II | |
| IN-PLANT SECONDARY EFFLUENT PUMP STATION (IPSEPS) | |
| AMERICAN RECOVERY REINVESTMENT ACT (ARRA) FUNDED |
HUNTER CONTRACTING
The undersigned hereby proposes and agrees that on award by the Government under this Bid, and in accordance with the provisions therein stated, to execute the Agreement, with necessary bonds, to furnish and install any and all labor, materials, equipment transportation, and services for the construction of the Tres Rios Environmental Restoration Project - Phase II, In-Plant Secondary Effluent Pump Station, in accordance with the Contract Documents therefore adopted and on file with the Government within the time hereinafter set forth and at the prices named in this Bid as follows:
| ESTIMATED | UNIT OF | UNIT | TOTAL | ||
| ITEM NO. | DESCRIPTION | _ QTY | MEASURE | PRICE | PRICE |
| BASE BID (Line Items 0001 thru 0023) |
| Period of Performance: 550 Calendar Days |
0001 MOBILIZATION/DEMOBILIZATION 1.00 LS $ - 0 $ 140,000.00
0002 GENERAL CONDITIONS 1.00 LS $ - 0 $ 1,372,000.00
0003 DIVERSION & CONTROL OF STORMWATER 1.00 LS $ - 0 $ 23,200.00
0004 AS-BUILT DRAWINGS 1.00 LS $ - 0 $ 23,200.00
0005 SITE DEMOLITION 1.00 LS $ - 0 $ 70,000.00
0006 TRAFFIC CONTROLS 1.00 LS $ - 0 $ 3,500.00
0007 CLEARING & GRUBBING 8.00 * ACRE $ 4,400.00 $ 35,200.00
0008 STOCK PILE PREPARATION 800.00 * SY $ 4.40 $ 3,520.00
0009 EXCAVATE & HAUL TO GENERAL FILL 33,521.00 * CY $ 3.70 $ 124,027.70
0010 EXCAVATE & HAUL TO STOCKPILE 1,890.00 * CY $ 3.70 $ 6,993.00
0011 SPREAD AND COMPACT GENERAL FILL 33,521.00 * CY $ 6.20 $ 207,830.20
0012 MAINTENANCE ROAD/ STORAGE AREA - 6 INCH DG 150.00 * SY $ 25.00 $ 3,750.00
0013 MAINTENANCE ROAD - 2 INCH ASPHALT 14,332.00 * SY $ 13.00 $ 186,316.00
0014 RESTORE EXISTING SURFACES 1.00 * LS $ 154,000.00 $ 154,000.00
0015 96-INCH CEFF PIPE AND FITTINGS 375.00 * LF $ 2,120.00 $ 795,000.00
0016 84-INCH CEFF PIPE AND FITTINGS 310.00 * LF $ 860.00 $ 266,600.00
0017 IPSEPS INCLUDING EJB-1 & FMB-1 1.00 LS $ 4,478,000.00 $ 4,478,000.00
0018 PLANT 3 EFFLUENT JUNCTION STRUCTURE 1.00 LS $ 458,000.00 $ 458,000.00
0019 PLANTS 1, 2 AND 3 EFFLUENT JUNCTION STRUCTURE 1.00 LS $ 1,071,000.00 $ 1,071,000.00
0020 IPSEPS ELECTRICAL BUILDING 1.00 LS $ 1,543,000.00 $ 1,543,000.00
0021 CHLORINE PIPING RELOCATION 1.00 LS $ 101,900.00 $ 101,900.00
0022 POTABLE WATER YARD PIPING INCLUDING POTABLE WATER, NON-POTABLE WATER, SCUM & DECANT 1.00 LS $ 266,000.00 $ 266,000.00
| ESTIMATED | UNIT OF | UNIT | TOTAL | ||
| ITEM NO. | DESCRIPTION | _ QTY | MEASURE | PRICE | PRICE |
0023 ELECTRICAL AND INSTRUMENTATION 1.00 LS $ 3,185,000.00 $ 3,185,000.00
TOTAL BASE BID (Line Items 0001 thru 0023) $ 14,518,036.90
0024 OPTION 1 (BID ALTERNATIVE 1) - PUMP NO. 6, COMPLETE
0024 PUMP NO. 6 ADDITION, COMPLETE 1.00 LS $ 817,000.00 $ 817,000.00
0025 OPTION 2 (BID ALTERNATIVE 2) - FMB-1 ACTUATED GATES, COMPLETE
0025 FMB-1 ACTUATED GATES, COMPLETE 1.00 LS $ 340,000.00 $ 340,000.00
0026 OPTION 3 (BID ALTERNATIVE 3) - FORCEMAIN "E", COMPLETE
0026 FORCEMAIN "E", COMPLETE 1.00 LS $ 3,573,000.00 $ 3,573,000.00
TOTAL (OPTIONS 1, 2 AND 3) $ 4,730,000.00
TOTAL (BASE BID AND OPTIONS 1, 2 AND 3) $ 19,248,036.90
* QUANTITY IS AN ESTIMATED AMOUNT. SEE SECTION 00700, FAR 52.211-18, FOR VARIATION IN ESTIMATED QUANTITY CONTRACT CLAUSE.
RTA SUBMITTAL &12SECTION 00010-&P
& Bold Italic)
LEDCOR
| SECTION 00010 - PRICING SCHEDULE | |
| TRES RIOS ENVIRONMENTAL RESTORATION PROJECT, PHASE II | |
| IN-PLANT SECONDARY EFFLUENT PUMP STATION (IPSEPS) | |
| AMERICAN RECOVERY REINVESTMENT ACT (ARRA) FUNDED |
LEDCOR CMI INC.
The undersigned hereby proposes and agrees that on award by the Government under this Bid, and in accordance with the provisions therein stated, to execute the Agreement, with necessary bonds, to furnish and install any and all labor, materials, equipment transportation, and services for the construction of the Tres Rios Environmental Restoration Project - Phase II, In-Plant Secondary Effluent Pump Station, in accordance with the Contract Documents therefore adopted and on file with the Government within the time hereinafter set forth and at the prices named in this Bid as follows:
| ESTIMATED | UNIT OF | UNIT | TOTAL | ||
| ITEM NO. | DESCRIPTION | _ QTY | MEASURE | PRICE | PRICE |
| BASE BID (Line Items 0001 thru 0023) |
| Period of Performance: 550 Calendar Days |
0001 MOBILIZATION/DEMOBILIZATION 1.00 LS $ - 0 $ 205,000.00
0002 GENERAL CONDITIONS 1.00 LS $ - 0 $ 3,206,000.00
0003 DIVERSION & CONTROL OF STORMWATER 1.00 LS $ - 0 $ 15,000.00
0004 AS-BUILT DRAWINGS 1.00 LS $ - 0 $ 25,000.00
0005 SITE DEMOLITION 1.00 LS $ - 0 $ 135,000.00
0006 TRAFFIC CONTROLS 1.00 LS $ - 0 $ 44,000.00
0007 CLEARING & GRUBBING 8.00 * ACRE $ 605.00 $ 4,840.00
0008 STOCK PILE PREPARATION 800.00 * SY $ 6.00 $ 4,800.00
0009 EXCAVATE & HAUL TO GENERAL FILL 33,521.00 * CY $ 2.00 $ 67,042.00
0010 EXCAVATE & HAUL TO STOCKPILE 1,890.00 * CY $ 2.00 $ 3,780.00
0011 SPREAD AND COMPACT GENERAL FILL 33,521.00 * CY $ 2.00 $ 67,042.00
0012 MAINTENANCE ROAD/ STORAGE AREA - 6 INCH DG 150.00 * SY $ 23.00 $ 3,450.00
0013 MAINTENANCE ROAD - 2 INCH ASPHALT 14,332.00 * SY $ 16.00 $ 229,312.00
0014 RESTORE EXISTING SURFACES 1.00 * LS $ 92,000.00 $ 92,000.00
0015 96-INCH CEFF PIPE AND FITTINGS 375.00 * LF $ 1,200.00 $ 450,000.00
0016 84-INCH CEFF PIPE AND FITTINGS 310.00 * LF $ 650.00 $ 201,500.00
0017 IPSEPS INCLUDING EJB-1 & FMB-1 1.00 LS $ 10,423,120.00 $ 10,423,120.00
0018 PLANT 3 EFFLUENT JUNCTION STRUCTURE 1.00 LS $ 435,000.00 $ 435,000.00
0019 PLANTS 1, 2 AND 3 EFFLUENT JUNCTION STRUCTURE 1.00 LS $ 1,120,000.00 $ 1,120,000.00
0020 IPSEPS ELECTRICAL BUILDING 1.00 LS $ 780,000.00 $ 780,000.00
0021 CHLORINE PIPING RELOCATION 1.00 LS $ 113,000.00 $ 113,000.00
0022 POTABLE WATER YARD PIPING INCLUDING POTABLE WATER, NON-POTABLE WATER, SCUM & DECANT 1.00 LS $ 275,000.00 $ 275,000.00
| ESTIMATED | UNIT OF | UNIT | TOTAL | ||
| ITEM NO. | DESCRIPTION | _ QTY | MEASURE | PRICE | PRICE |
0023 ELECTRICAL AND INSTRUMENTATION 1.00 LS $ 6,242,000.00 $ 6,242,000.00
TOTAL BASE BID (Line Items 0001 thru 0023) $ 24,141,886.00
0024 OPTION 1 (BID ALTERNATIVE 1) - PUMP NO. 6, COMPLETE
0024 PUMP NO. 6 ADDITION, COMPLETE 1.00 LS $ 771,000.00 $ 771,000.00
0025 OPTION 2 (BID ALTERNATIVE 2) - FMB-1 ACTUATED GATES, COMPLETE
0025 FMB-1 ACTUATED GATES, COMPLETE 1.00 LS $ 587,000.00 $ 587,000.00
0026 OPTION 3 (BID ALTERNATIVE 3) - FORCEMAIN "E", COMPLETE
0026 FORCEMAIN "E", COMPLETE 1.00 LS $ 4,600,000.00 $ 4,600,000.00
TOTAL (OPTIONS 1, 2 AND 3) $ 5,958,000.00
TOTAL (BASE BID AND OPTIONS 1, 2 AND 3) $ 30,099,886.00
* QUANTITY IS AN ESTIMATED AMOUNT. SEE SECTION 00700, FAR 52.211-18, FOR VARIATION IN ESTIMATED QUANTITY CONTRACT CLAUSE.
RTA SUBMITTAL &12SECTION 00010-&P
& Bold Italic)
PCL
| SECTION 00010 - PRICING SCHEDULE | |
| TRES RIOS ENVIRONMENTAL RESTORATION PROJECT, PHASE II | |
| IN-PLANT SECONDARY EFFLUENT PUMP STATION (IPSEPS) | |
| AMERICAN RECOVERY REINVESTMENT ACT (ARRA) FUNDED |
PCL CONSTRUCTION
The undersigned hereby proposes and agrees that on award by the Government under this Bid, and in accordance with the provisions therein stated, to execute the Agreement, with necessary bonds, to furnish and install any and all labor, materials, equipment transportation, and services for the construction of the Tres Rios Environmental Restoration Project - Phase II, In-Plant Secondary Effluent Pump Station, in accordance with the Contract Documents therefore adopted and on file with the Government within the time hereinafter set forth and at the prices named in this Bid as follows:
| ESTIMATED | UNIT OF | UNIT | TOTAL | ||
| ITEM NO. | DESCRIPTION | _ QTY | MEASURE | PRICE | PRICE |
| BASE BID (Line Items 0001 thru 0023) |
| Period of Performance: 550 Calendar Days |
0001 MOBILIZATION/DEMOBILIZATION 1.00 LS $ - 0 $ 750,000.00
0002 GENERAL CONDITIONS 1.00 LS $ - 0 $ 1,500,000.00
0003 DIVERSION & CONTROL OF STORMWATER 1.00 LS $ - 0 $ 50,000.00
0004 AS-BUILT DRAWINGS 1.00 LS $ - 0 $ 25,000.00
0005 SITE DEMOLITION 1.00 LS $ - 0 $ 50,000.00
0006 TRAFFIC CONTROLS 1.00 LS $ - 0 $ 5,000.00
0007 CLEARING & GRUBBING 8.00 * ACRE $ 100.00 $ 800.00
0008 STOCK PILE PREPARATION 800.00 * SY $ 2.50 $ 2,000.00
0009 EXCAVATE & HAUL TO GENERAL FILL 33,521.00 * CY $ 1.00 $ 33,521.00
0010 EXCAVATE & HAUL TO STOCKPILE 1,890.00 * CY $ 5.00 $ 9,450.00
0011 SPREAD AND COMPACT GENERAL FILL 33,521.00 * CY $ 0.80 $ 26,816.80
0012 MAINTENANCE ROAD/ STORAGE AREA - 6 INCH DG 150.00 * SY $ 8.00 $ 1,200.00
0013 MAINTENANCE ROAD - 2 INCH ASPHALT 14,332.00 * SY $ 8.75 $ 125,405.00
0014 RESTORE EXISTING SURFACES 1.00 * LS $ 200,000.00 $ 200,000.00
0015 96-INCH CEFF PIPE AND FITTINGS 375.00 * LF $ 1,300.00 $ 487,500.00
0016 84-INCH CEFF PIPE AND FITTINGS 310.00 * LF $ 1,100.00 $ 341,000.00
0017 IPSEPS INCLUDING EJB-1 & FMB-1 1.00 LS $ 10,573,829.00 $ 10,573,829.00
0018 PLANT 3 EFFLUENT JUNCTION STRUCTURE 1.00 LS $ 250,000.00 $ 250,000.00
0019 PLANTS 1, 2 AND 3 EFFLUENT JUNCTION STRUCTURE 1.00 LS $ 650,000.00 $ 650,000.00
0020 IPSEPS ELECTRICAL BUILDING 1.00 LS $ 600,000.00 $ 600,000.00
0021 CHLORINE PIPING RELOCATION 1.00 LS $ 96,000.00 $ 96,000.00
0022 POTABLE WATER YARD PIPING INCLUDING POTABLE WATER, NON-POTABLE WATER, SCUM & DECANT 1.00 LS $ 50,000.00 $ 50,000.00
| ESTIMATED | UNIT OF | UNIT | TOTAL | ||
| ITEM NO. | DESCRIPTION | _ QTY | MEASURE | PRICE | PRICE |
0023 ELECTRICAL AND INSTRUMENTATION 1.00 LS $ 3,000,000.00 $ 3,000,000.00
TOTAL BASE BID (Line Items 0001 thru 0023) $ 18,827,521.80
0024 OPTION 1 (BID ALTERNATIVE 1) - PUMP NO. 6, COMPLETE
0024 PUMP NO. 6 ADDITION, COMPLETE 1.00 LS $ 500,000.00 $ 500,000.00
0025 OPTION 2 (BID ALTERNATIVE 2) - FMB-1 ACTUATED GATES, COMPLETE
0025 FMB-1 ACTUATED GATES, COMPLETE 1.00 LS $ 324,000.00 $ 324,000.00
0026 OPTION 3 (BID ALTERNATIVE 3) - FORCEMAIN "E", COMPLETE
0026 FORCEMAIN "E", COMPLETE 1.00 LS $ 3,132,000.00 $ 3,132,000.00
TOTAL (OPTIONS 1, 2 AND 3) $ 3,956,000.00
TOTAL (BASE BID AND OPTIONS 1, 2 AND 3) $ 22,783,521.80
* QUANTITY IS AN ESTIMATED AMOUNT. SEE SECTION 00700, FAR 52.211-18, FOR VARIATION IN ESTIMATED QUANTITY CONTRACT CLAUSE.
RTA SUBMITTAL &12SECTION 00010-&P
& Bold Italic)