View the file

Other files

File Type Posted
Amend 0002 IGE and bids.xlsx XLSX spreadsheet
Amend 0002 IGE and bids.xlsx XLSX spreadsheet
W912PL-10-B-0009 Bid Abstract.pdf PDF
Plans_Am3.pdf PDF
Am2.pdf PDF
Am2-Dwg.zip ZIP file
Am1.pdf PDF
Site Visit List 2010-03-17.pdf PDF
Architectural.pdf PDF
W912PL-10-B-0009Vol1.pdf PDF
W912PL-10-B-0009Vol3.pdf PDF
Electrical.pdf PDF
Mechanical.pdf PDF
Instrumentation.pdf PDF
Structural.pdf PDF
Civil.pdf PDF
Hvac.pdf PDF
Plumbing.pdf PDF
General.pdf PDF
W912PL-10-B-0009Vol2.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICIATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPIRATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION ( Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

1 1

0003 31 MAR 2010

W912PL

USACE, Los Angeles District CONTRACTING DIVISION, East Region Branch

P.O. BOX 532711

LOS ANGELES, CA 90053-2325

SEE ITEM #6

W912PL-10-B-0009

5 MAR 2010

RECOVERY - Y -- PROJECT NUMBER 013398 TRES RIOS ENVIRONMENTAL RESTORATION PROJECT - PHASE II

IN-PLANT SECONDARY EFFLUENT PUMP STATION (IPSEPS), MARICOPA COUNTY, AZ

See attached continuation sheet.

All other terms and conditions remain unchanged.

W912PL-10-B-0009

SF 30 Continuation

1. Remove and Replace Section 00700 Contract Clauses (pages 3 and 129) as provided.

2. Remove and Replace Specs Section 01270A.

3. Remove and Replace Contract Drawing Sheets: C-34, M-8, M-11, M-14

4. Add shop drawings: Standpipe Detail and Generator Structural Details.

SECTION 00700 - 3

AMEND 0003

52.236-14 AVAILABILITY AND USE OF UTILITY SERVICES (APR 1984)

52.236-15 SCHEDULES FOR CONSTRUCTION CONTRACTS (APR 1984)

52.236-17 LAYOUT OF WORK (APR 1984)

52.236-26 PRECONSTRUCTION CONFERENCE (FEB 1995)

52.242-13 BANKRUPTCY (JUL 1995)

52.242-14 SUSPENSION OF WORK (APR 1984)

52.243-4 CHANGES (JUN 2007)

52.243-7 NOTIFICATION OF CHANGES (APR 1984)

52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996)

52.246-21 WARRANTY OF CONSTRUCTION (MAR 1994)

52.248-3 VALUE ENGINEERING--CONSTRUCTION (SEP 2006)

52.249-2 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE) (MAY 2004) . 102

52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)

52.252-4 ALTERATIONS IN CONTRACT (APR 1984)

252.201-7000 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 1991)

252.203-7001 PROHIBITION ON PERSONS CONVICTED OF FRAUD OR OTHER DEFENSE-CONTRACT-

RELATED FELONIES (DEC 2008)

252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS (JAN 2009) .. 107

252.204-7000 DISCLOSURE OF INFORMATION (DEC 1991)

252.204-7003 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT (APR 1992)

252.209-7004 SUBCONTRACTING WITH FIRMS THAT ARE OWNED OR CONTROLLED BY THE

GOVERNMENT OF A TERRORIST COUNTRY (DEC 2006)

252.215-7000 PRICING ADJUSTMENTS (DEC 1991)

252.219-7003 SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS) (APR. 2007)

252.223-7004 DRUG-FREE WORK FORCE (SEP 1988)

252.223-7006 PROHIBITION ON STORAGE AND DISPOSAL OF TOXIC AND HAZARDOUS

MATERIALS (APR 1993)

252.225-7012 PREFERENCE FOR CERTAIN DOMESTIC COMMODITIES (DEC 2008)

252.225-7031 SECONDARY ARAB BOYCOTT OF ISRAEL (JUN 2005)

252.226-7001 UTILIZATION OF INDIAN ORGANIZATIONS AND INDIAN-OWNED ECONOMIC

ENTERPRISES, AND NATIVE HAWAIIAN SMALL BUSINESS CONCERNS (SEP 2004)

252.227-7000 NON-ESTOPPEL. (OCT 1966)

252.227-7013 RIGHTS IN TECHNICAL DATA--NONCOMMERCIAL ITEMS. (NOV 1995)

252.227-7022 GOVERNMENT RIGHTS (UNLIMITED) (MAR 1979)

252.227-7033 RIGHTS IN SHOP DRAWINGS (APR 1966)

252.231-7000 SUPPLEMENTAL COST PRINCIPLES (DEC 1991)

252.232-7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS

(MAR 2008)

252.232-7010 LEVIES ON CONTRACT PAYMENTS (DEC 2006)

252.236-7000 MODIFICATION PROPOSALS - PRICE BREAKDOWN. (DEC 1991)

252.236-7008 CONTRACT PRICES - BIDDING SCHEDULES. (DEC 1991)

252.243-7001 PRICING OF CONTRACT MODIFICATIONS (DEC 1991)

252.243-7002 REQUESTS FOR EQUITABLE ADJUSTMENT (MAR 1998)

252.247-7023 Transportation of Supplies by Sea (MAY 2002) 252.247-7024 Notification of Transportation of Supplies by Sea (MAR 2000)

**52.249-10 DEFAULT (FIXED-PRICE CONSTRUCTION) (APR 1984) ……………………………………129

52.0000-4001 UNAUTHORIZED INSTRUCTIONS FROM GOVERNMENT OR OTHER PERSONNEL (MAY

2000)

Authorities/Technical Direction: The Contractor shall take no direction from any Government employee or any other person other than the Government contracting Officer that changes the terms and conditions of this contract action, the scope, or any change that impacts the cost, price, or schedule. Changes authorized by the Contracting Officer will be in the form of a written, official, signed modification to the contract action received by the Contract

SECTION 00700 - 129

Contractor as an improper invoice for the purposes of the Prompt Payment clause of this contract. In the event there has been unauthorized use of non-U.S.-flag vessels in the performance of this contract, the Contracting Officer is entitled to equitably adjust the contract, based on the unauthorized use.

(h) In the award of subcontracts for the types of supplies described in paragraph (b)(2) of this clause, the Contractor shall flow down the requirements of this clause as follows:

(1) The Contractor shall insert the substance of this clause, including this paragraph (h), in subcontracts that exceed the simplified acquisition threshold in part 2 of the Federal Acquisition Regulation.

(2) The Contractor shall insert the substance of paragraphs (a) through (e) of this clause, and this paragraph (h), in subcontracts that are at or below the simplified acquisition threshold in part 2 of the Federal Acquisition Regulation.

(End of clause)

252.247-7024 Notification of Transportation of Supplies by Sea (MAR 2000)

(a) The Contractor has indicated by the response to the solicitation provision, Representation of Extent of Transportation by Sea, that it did not anticipate transporting by sea any supplies. If, however, after the award of this contract, the Contractor learns that supplies, as defined in the Transportation of Supplies by Sea clause of this contract, will be transported by sea, the Contractor --

(1) Shall notify the Contracting Officer of that fact; and

(2) Hereby agrees to comply with all the terms and conditions of the Transportation of Supplies by Sea clause of this contract.

(b) The Contractor shall include this clause; including this paragraph (b), revised as necessary to reflect the relationship of the contracting parties--

(1) In all subcontracts under this contract, if this contract is a construction contract; or

(2) If this contract is not a construction contract, in all subcontracts under this contract that are for--

(i) Noncommercial items; or

(ii) Commercial items that--

(A) The Contractor is reselling or distributing to the Government without adding value (generally, the Contractor does not add value to items that it subcontracts for f.o.b. destination shipment);

(B) Are shipped in direct support of U.S. military contingency operations, exercises, or forces deployed in humanitarian or peacekeeping operations; or

(C) Are commissary or exchange cargoes transported outside of the Defense Transportation System in accordance with 10 U.S.C. 2643.

(End of clause)

52.249-10 DEFAULT (FIXED-PRICE CONSTRUCTION) (APR 1984)

(a) If the Contractor refuses or fails to prosecute the work or any separable part, with the diligence that will insure its completion within the time specified in this contract including any extension, or fails to complete the work within this time, the Government may, by written notice to the Contractor, terminate the right to proceed with the work (or

SECTION 00700 - 130

the separable part of the work) that has been delayed. In this event, the Government may take over the work and complete it by contract or otherwise, and may take possession of and use any materials, appliances, and plant on the work site necessary for completing the work. The Contractor and its sureties shall be liable for any damage to the Government resulting from the Contractor's refusal or failure to complete the work within the specified time, whether or not the Contractor's right to proceed with the work is terminated. This liability includes any increased costs incurred by the Government in completing the work.

(b) The Contractor's right to proceed shall not be terminated nor the Contractor charged with damages under this clause, if--

(1) The delay in completing the work arises from unforeseeable causes beyond the control and without the fault or negligence of the Contractor. Examples of such causes include

(i) acts of God or of the public enemy,

(ii) acts of the Government in either its sovereign or contractual capacity,

(iii) acts of another Contractor in the performance of a contract with the Government,

(iv) fires,

(v) floods,

(vi) epidemics,

(vii) quarantine restrictions,

(viii) strikes,

(ix) freight embargoes,

(x) unusually severe weather, or delays of subcontractors or suppliers at any tier arising from unforeseeable causes beyond the control and without the fault or negligence of both the Contractor and the subcontractors or suppliers;

and

(2) The Contractor, within 10 days from the beginning of any delay (unless extended by the Contracting Officer), notifies the Contracting Officer in writing of the causes of delay. The Contracting Officer shall ascertain the facts and the extent of delay. If, in the judgment of the Contracting Officer, the findings of fact warrant such action, the time for completing the work shall be extended. The findings of the Contracting Officer shall be final and conclusive on the parties, but subject to appeal under the Disputes clause.

(c) If, after termination of the Contractor's right to proceed, it is determined that the Contractor was not in default, or that the delay was excusable, the rights and obligations of the parties will be the same as if the termination had been issued for the convenience of the Government.

The rights and remedies of the Government in this clause are in addition to any other rights and remedies provided by law or under this contract.

(End of clause)

US ARMY CORPS OF ENGINEERS, LOS ANGELES DISTRICT

TRES RIOS ENVIRONMENTAL RESTORATION PHASE II, IN-PLANT SECONDARY

EFFLUENT PUMP STATION

PROJECT NO.: W912PL-10-B-0009

Ready To Advertise (RTA) 02742-1 March 2010 Amendment 0003 (Strikethrough & Bold Italic)

SECTION 01270A

MEASUREMENT AND PAYMENT

IN-PLANT SECONDARY EFFLUENT PUMP STATION

PART 1 - GENERAL

1.1 PAYMENT INCLUSION

A. Payment items for the work of this contract for which contract lump sum payment will be made are listed in the BIDDING SCHEDULE (Attachment A) and described below. All costs for items of work, which are not specifically mentioned to be included in a particular lump sum or unit price payment item, shall be included in the listed lump sum item most closely associated with the work involved. No direct or separate payment shall be made for providing miscellaneous temporary or accessory works, plant services, layout surveys, job signs, sanitary requirements, testing, safety devices, approval and Record Drawings, water supplies, power, traffic maintenance, removal of waste, environmental protection, watchmen, bonds, insurance, coordination with other contractors working in the area, or for performing all work required for which separate payment is not otherwise provided.

Compensation for all such services, items and materials shall be included in the prices stipulated for the lump sum or unit bid prices listed herein.

B. Each lump sum and unit bid price shall be deemed to include an amount considered by CONTRACTOR to be adequate to cover CONTRACTOR'S overhead and profit for each separately identified item.

1.2 UNIT PRICE PAYMENT ITEMS

A. Payment items for the work of this contract on which the contract unit price payments will be made are listed in the BIDDING SCHEDULE (Attachment A) and described below.

The unit price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated CONTRACTOR quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for each of the unit price items.

1. CLEARING AND GRUBBING (BID ITEM 0007)

a. Measurement: Measurement for Clearing and Grubbing shall be per acre.

Payment shall constitute full compensation for clearing existing surface debris including but not limited to tree trimmings, and clearing improvements including but not limited to existing corrugated metal pipe (CMP) , existing reinforced concrete pipe (RCP) , existing steel pipe, existing fence and gates, existing asphalt concrete (AC) roads, existing posts, and existing concrete headwalls where indicated on the plans and specifications, and vegetation and grubbing areas of excavation, and areas to be graded, and areas to -receive fill, including stock pile sites or other approved areas necessary for the CONTRACTOR’S operations within the limits of the project. Dispose off-site all vegetation and removed

Ready To Advertise (RTA) 02742-2 March 2010 improvements and existing debris such as old pavement, tree trimmings, trash, etc. Measurement shall be by acre of land cleared and grubbed.

b. Payment: Payment shall be made at the applicable unit price for each acre of clearing and grubbing. This unit price is the average cost plus overhead and profit per acre of the entire area as defined in the drawings.

2. STOCK PILE PREPARATION (BID ITEM 0008)

a. Measurement: North East stockpile preparation includes any surface preparation required at this permanent stockpile site that is being used for excess excavated material, grading of excess excavated material to meet specification, installation and maintenance of any haul roads, and dust control required for temporary storage of excavated material.

b. Payment: Payment shall be made at the applicable unit price for each square yard required. The CONTRACTOR is responsible for providing sufficient stockpile area to meet the project requirements.

3. EXCAVATE AND HAUL TO GENERAL FILL (BID ITEM 0009)

a. Measurement: Includes excavation and hauling of excavated material to general fill. Measurement of excavation where removed material is hauled directly to a fill location within the project site shall be by cubic yards in-situ of material excavated.

b. Payment: Payment for excavation, haul to general fill, shall be made at the applicable contract unit price per cubic yard of material excavated.

4. EXCAVATE AND HAUL TO STOCKPILE (BID ITEM 0010)

a. Measurement: Includes excavation and hauling of excavated material to stockpile. Measurement of excavation where excess excavated material is hauled directly to the North East Stockpile location shown on the drawings shall be by cubic yards in-situ of material excavated.

b. Payment: Payment for Excavation, haul to North East stockpile, shall be made at the applicable contract unit price per cubic yard of material excavated.

5. SPREAD AND COMPACT GENERAL FILL (BID ITEM 0011)

a. Measurement: Includes subgrade preparation, placement and spreading of fill, compaction and testing, and finish grading. Measurement for spreading and compacting fill shall be by cubic yards of material compacted, as measured in its compacted state

b. Payment: Payment for spread and compact fill, shall be made at the applicable contract unit price per cubic yard of material compacted in its compacted state.

6. MAINTENANCE ROAD/STORAGE AREA – 6-INCH DG (BID ITEM 0012)

a. Measurement: Measurement of the maintenance road and storage area will be by square yard of constructed surface as measured from edge of road to edge of road.

Construction shall include either processing of on-site material or importation of the material, moisture conditioning, stabilization, compaction and testing, and finish grading as shown on the contract drawings, and as required to provide a smooth, crowned surface.

b. Payment: Payment for the Maintenance Road and storage area shall be made at the applicable contract unit price per square yard of road constructed for costs associated with preparing the roadbed, installing DG, as shown on the contract drawings, and as required to provide a smooth, crowned surface. No additional

Ready To Advertise (RTA) 02742-3 March 2010 amount will be paid for temporary roads constructed for project construction purposes.

7. MAINTENANCE ROAD – 2-INCH ASPHALT (BID ITEM 0013)

a. Measurement: Measurement of the maintenance road will be by square yard of road constructed as measured from edge of road to edge of road. Construction shall include materials and labor for road bed preparation, including 6" ABC subgrade, surface preparation, and installation of asphalt road surface as shown on the contract drawings, and as required to provide a smooth, crowned surface.

b. Payment: Payment for the Maintenance Road shall be made at the applicable contract unit price per square yard of road constructed for costs associated with preparing the roadbed, installing asphalt, as shown on the contract drawings, and as required to provide a smooth, crowned surface. No additional amount will be paid for temporary roads constructed for project construction purposes.

8. 96-INCH CEFF PIPE AND FITTINGS (BID ITEM 0015)

a. Measurement: Measurement of the 96-inch CEFF Pipe and Fittings will be made at the applicable contract price, which payment shall constitute full compensation for all materials, labor, and other costs associated with materials and installation of the pipeline as shown on the drawings, and described in the specifications. This includes all excavation, pressure testing, and connections (including connection to the conveyance piping installed under of the UP05 Project A contract and the Tres Rios Flow Regulating Wetlands contract), piping, thrust restraint, and backfill materials. , and surface restoration upon completion.

b. Payment: Payment for the 96-inch CEFF influent pipe and fittings shall be made at the applicable contract unit price per linear feet of pipe installed and by cubic yard of concrete for thrust restraints.

9. 84-INCH CEFF PIPE AND FITTINGS (BID ITEM 0016)

a. Measurement: Measurement of the84 -inch CEFF Pipe and Fittings will be made at the applicable contract price, which payment shall constitute full compensation for all materials, labor, and other costs associated with materials and installation of the pipeline as shown on the drawings, and described in the specifications. This includes all excavation, pressure testing, and connections (including connection to FMB-1 pipe and conveyance pipe of the UP05 Project A contract and the Tres Rios Flow Regulating Wetlands contract), piping, thrust restraint, and backfill materials. , and surface restoration upon completion.

b. Payment: Payment for the 84-inch CEFF influent pipe and fittings shall be made at the applicable contract unit price per linear feet of pipe installed and by cubic yard of concrete for thrust restraints.

1.3 LUMP SUM PAYMENT ITEMS

A. Payment items for the work of this contract for which contract lump sum payments will be made are listed in the BIDDING SCHEDULE (Attachment A) and described below. All costs for items of work, which are not specifically mentioned to be included in a particular lump sum, shall be included in the listed lump sum item most closely associated with the work involved. The lump sum price and payment made for each item listed shall

Ready To Advertise (RTA) 02742-4 March 2010 constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated CONTRACTOR quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided. Some of the lump sum payment items reference drawings, plans and specifications for verification purposes.

1. MOBILIZATION/DEMOBILIZATION (BID ITEM 0001)

a. Payment shall be lump sum for all expenses associated with setting up and taking down temporary construction facilities, transporting equipment to and from project site, and providing other necessary facilities or services such as Equipment lay down areas, temporary roads, temporary parking areas, temporary fencing, temporary utility connections etc. This Bid Item includes all mobilization and demobilization for the base bid items and does not include similar efforts for Bid Alternatives 1, 2 and 3.the Flow Regulating Wetlands and the Storm Water Channel.

2. GENERAL CONDITIONS (BID ITEM 0002)

a. Payment shall be lump sum for all expenses associated with general conditions and general maintenance not included in other bid items.

3. DIVERSION AND CONTROL OF STORMWATER (BID ITEM 0003)

a. Payment shall be lump sum for all expenses associated with diversion and control of stormwater. This includes, but is not limited to products and labor associated with soil stabilization, silt fences, straw bales, diversion dikes, and any other control and measure that may be required. Maintenance of these control measures is also included in the lump sum.

4. AS-BUILT DRAWINGS (BID ITEM 0004)

a. Payment shall be lump sum for all expenses associated with providing as-built drawings as required and described in the contract specifications.

5. SITE DEMOLITION (BID ITEM 0005)

a. Demolition includes removing and plugging abandoned utilities including waterlines, termination of existing concrete irrigation ditches, demolition, clearing & removal of buildings or other structures within the limits of the project including but not limited to the improvements and structures shown on the drawings, and including foundations, subgrade structures, utilities and all features associated with the removed structure. The CONTRACTOR is responsible for the protection of existing facilities to remain in place, and scheduling and coordination of clearing the site and removing obstructions.

b. Payment shall be a lump sum to include all demolition as discussed above and shown on the contract drawings.

6. TRAFFIC CONTROLS (BID ITEM 0006)

a. Traffic Controls includes providing barricades, signs, and lights, construction of necessary detours, maintaining safe access to residences, businesses, and stock pile sites using flaggers and guards, and all other work identified in the Specifications required to perform work near, or affecting public or private roads.

b. Payment shall be a lump sum to include all traffic controls required to perform the contract work.

7. RESTORE EXISTING SURFACES (BID ITEM 0014)

Ready To Advertise (RTA) 02742-5 March 2010

a. Measurement: Includes either processing of on-site material or importation of material to restore all existing finishes other than asphalt (see Bid Item 0013).

Measurement of riprap will be by tons (2000 Ibs) of rip-rap installed and riprap shall be installed 8 inches thick. Measurement of asphalt road surfaces will be by square yard of road constructed as measured from edge of road to edge of road.

Construction shall include materials and labor for road bed preparation, including 6" ABC subgrade, surface preparation, and installation of asphalt road surface as shown on the contract drawings, and as required to provide a smooth, crowned surface. Measurement of the DG road and areas will be by square yard of constructed surface as measured from edge to edge. Construction shall include either processing of on-site material or importation of the material, moisture conditioning, stabilization, compaction and testing, and finish grading as shown on the contract drawings, and as required to provide a smooth, crowned surface.

Includes furnishing, installing, and seam testing of geotextile. Measurement of geotextiles will be by square yards of textile installed. Installation shall include all areas indicated on the drawings, and shall constitute full compensation for all materials, labor, and other costs associated with materials and installation.

Installation shall include all areas indicated on the drawings..

b. Payment: Payment for restoration of existing surfaces will be lump sum.

8. IPSEPS STRUCTURE (BID ITEM 0017)

a. Lump Sum Payment for the IPSEPS Structure, including Effluent Junction Box 1, Approach Channel No. 1, Scum Pump Station and Force Main Box 1 (FMB 1) will be made at the applicable contract price, which payment shall constitute full compensation for all materials, labor, and other costs associated with the structure.

This includes all earthwork, reinforced concrete, stop plates and guides, pumps, FSIs, pipe & fittings and equipment that make up the structure, and are attached to the structure. Piping entering and leaving the structure is not included, though wall sleeves, and flexible couplings associated with the structure connection shall be included. All equipment associated with the structure as shown in the drawings shall be included except instrumentation that is identified in the Electrical and Instrumentation Bid Item. All steel piping, fittings, FSIs, pipe supports, wall thimbles, gates and coatings will be included in this price. NPW and PW piping and valves and pipe supports are not included.

9. PLANT 3 EFFLUENT JUNCTION STRUCTURE (BID ITEM 0018)

a. Payment for the Plant 3 Effluent Junction Structure will be made at the applicable contract price, which payment shall constitute full compensation for all materials, labor, and other costs associated with the structure. This includes all earthwork, reinforced concrete, gates and equipment that make up the structure, and are attached to the structure. Equipment and materials implied or specified, but not shown, that is required for complete operation as required by the specifications shall be included. Piping is not' included in this bid item, nor is instrumentation that is identified in the Electrical and Instrumentation Bid Item.

10. PLANTS 1, 2 AND 3 EFFLUENT JUNCTION STRUCTURE (BID ITEM 0019)

a. Payment for the Plants 1, 2 and 3 Effluent Junction Structure will be made at the applicable contract price, which payment shall constitute full compensation for all materials, labor, and other costs associated with the structure. This includes all

Ready To Advertise (RTA) 02742-6 March 2010 earthwork, reinforced concrete, gates and equipment that make up the structure, and are attached to the structure. Equipment and materials implied or specified, but not shown, that is required for complete operation as required by the specifications shall be included. Piping is not' included in this bid item, nor is instrumentation that is identified in the Electrical and Instrumentation Bid Item.

11. IPSEPS ELECTRICAL BUILDING (BID ITEM 0020)

a. Payment for the IPSEPS Electrical Building will be made at the applicable contract price, which payment shall constitute full compensation for all materials, labor, and other costs associated with the structure and equipment installed in the building. This work includes fire protection installations within the building, and any piping within 2 feet of the structure. The IPSEPS Electrical Building Structure includes all excavation, concrete, masonry, structural steel, and building materials required as indicated in the structural and architectural drawings, and the specifications. Mechanical and architectural features such as piping, doors, decorative steel are also included. This item includes the masonry screen wall near the Analyzer Building.

b. Utilities: Applicable work includes all signage, safety equipment, lighting, and electrical work excluded from the Electrical and Instrumentation Bid item.

c. HVAC: Applicable work includes installation and start-up of the HVAC system.

This includes the heat pumps installed as specified, all ductwork and louvers, all refrigerant piping and insulation, equipment pads and mounting hardware to provide a complete, working system.

d. Fire Protection: Applicable work includes piping, valves, sprinklers, smoke detectors, alarms, and control panels as indicated on the drawings, specified, and required by the City of Phoenix Fire Code.

12. CHLORINE PIPING RELOCATION (BID ITEM 0021)

a. Payment for the Chlorine Piping Relocation will be made at the applicable contract price, which payment shall constitute full compensation for all materials, labor, and other costs associated with materials and installation of the chlorine piping and appurtenances as shown on the drawings, and described in the specifications. This piping is located south of the IPSEPS. This includes all excavation, connections, piping, pressure testing, backfill materials, concrete cutting and asphalt cutting., concrete and asphalt repair, and surface restoration upon completion. It also includes pipe supports as shown on the drawings, including expenses related to tying in the piping to 91st Ave WWTP Chlorine system, including coordination and any expenses related to overtime pay if the work must proceed outside of regular working hours. This work includes potholing to verify utilities shown and not shown within the proposed alignment, and contingency for providing necessary fittings to avoid unforeseen field conditions relating to existing utilities.

13. MISCELLANEOUS YARD PIPING (BID ITEM 0022)

a. Payment for the miscellaneous yard piping will be made at the applicable contract price, which payment shall constitute full compensation for all materials, labor, and other costs associated with materials and installation of the piping and appurtenances as shown on the drawings, and described in the specifications that are not included in other bid items. This includes all excavation, connections, Ready To Advertise (RTA) 02742-7 March 2010 piping, pressure testing, tracer wire, and backfill materials., and surface restoration upon completion. This item includes potable, non-potable, decant, scum and any other buried piping shown in the drawings, and not included in other Bid Items.

14. ELECTRICAL AND INSTRUMENTATION (BID ITEM 0023)

a. Payment for the Electrical and Instrumentation will be made at the applicable contract price, which payment shall constitute full compensation for all materials, labor, and other costs associated with materials and installation of all electrical and instrumentation items as shown on the drawings, and described in the specifications that are not included in other bid items. This includes all excavation, connections, conduits, tracer wire, concrete and reinforcement for duct banks, and backfill materials. and surface restoration upon completion. This includes any handholes required to pull cables. This includes material and labor for all copper cabling as specified or required for power, signal, and ground. This includes all materials and labor associated with the power service entrance, power distribution panels, the Uninterupted Power System, transformers, voltage regulators, remote I/O panels, radio systems, and other items as shown on the drawings and in the specifications includes any programming, testing, or coordination studies required complete the installation. Instrumentation includes all level sensors, flow meters, and all devices with signals to the PLC shown on the instrumentation drawings. This excludes the gate actuators, pumps, and other items specifically included in another bid item, but includes the conduit and wire, and associated labor with connecting these devices. All associated panels, wire, conduit, and labor for these devices are included. All costs associated with connecting to existing power, and communications will be included in this bid item. All costs associated with PLC programming, remote I/O terminations, radio telemetry configuration, and modifications to the existing CCS software shall be included in this bid.

15. OPTION 1 (BID ALTERNATE 1) PUMP NO 6 (BID ITEM 0024)

a. Lump Sum Payment for PUMP NO 6 in IPSEPS Structure, including piping, supports, anchors, and applicable equipment will be made at the applicable contract price, which payment shall constitute full compensation for all materials, labor, and other costs associated with the pump. This includes all earthwork, reinforced concrete, air/vacuum valve, butterfly valve, tilted check valves, other piping & fittings and equipment that make up the pump system, and are attached to the pump and structure. Flexible couplings associated with the piping connection shall be included. All steel piping, fittings, pipe supports and coatings will be included in this price. SWR piping, valves and pipe supports are included.

Payment for the Electrical and Instrumentation will be made at the applicable contract price, which payment shall constitute full compensation for all materials, labor, and other costs associated with materials and installation of all electrical and instrumentation items as shown on the drawings, and described in the specifications that are not included in other bid items. This includes all connections, conduits, tracer wire, and surface restoration upon completion. This includes any handholes required to pull cables. This includes material and labor for all copper cabling as specified or required for power, signal, and ground. This

Ready To Advertise (RTA) 02742-8 March 2010 includes all materials and labor associated with the power service entrance, power distribution panels, transformers, voltage regulators, remote I/O panels, radio systems, and other items as shown on the drawings and in the specifications. This item includes any programming, testing, or coordination studies required complete the installation. Instrumentation includes all sensors and all devices with signals to the PLC shown on the instrumentation drawings. All associated panels, wire, conduit, and labor for these devices are included. All costs associated with connecting to existing power, and communications will be included in this bid item. All costs associated with PLC programming, remote I/O terminations, radio telemetry configuration, and modifications to the existing CCS software shall be included in this bid. All equipment associated with Bid Alternate 1 as shown in the drawings shall be included.

16. OPTION 2 (BID ALTERNATE 2) FMB-1 ACTUATED GATES (BID ITEM 0025)

a. Lump Sum Payment for the IPSEPS Structure sluice gates 9 and 10, located in

Force Main Box 1 (FMB 1) will be made at the applicable contract price, which payment shall constitute full compensation for all materials, labor, and other costs associated with the gates. This includes all anchorage to reinforced concrete, actuators and guides, fittings and equipment that make up the gate system, and are attached to the structure. Payment for the Electrical and Instrumentation will be made at the applicable contract price, which payment shall constitute full compensation for all materials, labor, and other costs associated with materials and installation of all electrical and instrumentation items as shown on the drawings, and described in the specifications that are not included in other bid items. This includes all connections, conduits, tracer wire, and surface restoration upon completion. This includes any handholes required to pull cables. This includes material and labor for all copper cabling as specified or required for power, signal, and ground. This includes all materials and labor associated with the power service entrance, power distribution panels, transformers, voltage regulators, remote I/O panels, radio systems, and other items as shown on the drawings and in the specifications. This item includes any programming, testing, or coordination studies required complete the installation. Instrumentation includes all sensors and all devices with signals to the PLC shown on the instrumentation drawings. All associated panels, wire, conduit, and labor for these devices are included. All costs associated with connecting to existing power, and communications will be included in this bid item. All costs associated with PLC programming, remote I/O terminations, radio telemetry configuration, and modifications to the existing CCS software shall be included in this bid. All equipment associated with Bid Alternate 2 as shown in the drawings shall be included.

17. OPTION 3 (BID ALTERNATE 3) FORCEMAIN “E” BID (BID ITEM 0026)

a. Lump Sum Payment for Forcemain “E”, noted as Bid Alternate 3 as shown on the drawings, will be made at the applicable contract price, which payment shall constitute full compensation for all materials, labor, and other costs associated with the gates. The lump sum for bid item 0026 shall include the work described under each of the sub tasks listed undet article 17 b. through 17.w. below.

b. MOBILIZATION/DEMOBILIZATION

Ready To Advertise (RTA) 02742-9 March 2010

1) Payment shall be lump sum for all expenses associated with setting up and taking down temporary construction facilities, transporting equipment to and from project site, and providing other necessary facilities or services such as Equipment lay down areas, temporary roads, temporary parking areas, temporary fencing, temporary utility connections etc. This Bid Item includes all the Flow Regulating Wetlands and the Storm Water Channel.

c. DIVERSION AND CONTROL OF STORMWATER

1) Payment shall be lump sum for all expenses associated with diversion and control of stormwater. This includes, but is not limited to products and labor associated with soil stabilization, silt fences, straw bales, diversion dikes, and any other control and measure that may be required. Maintenance of these control measures is also included in the lump sum.

d. AS-BUILT DRAWINGS

1) Payment shall be lump sum for all expenses associated with providing as-built drawings as required and described in the contract specifications.

e. SITE DEMOLITION

1) Demolition includes removing and plugging abandoned utilities including waterlines, termination of existing concrete irrigation ditches, demolition, clearing & removal of buildings or other structures within the limits of the project including but not limited to the improvements and structures shown on the drawings, and including foundations, subgrade, structures, utilities and all features associated with the removed structure. The CONTRACTOR is responsible for the protection of existing facilities to remain in place, and scheduling and coordination of clearing the site and removing obstructions.

f. TRAFFIC CONTROLS

1) Traffic Controls includes providing barricades, signs, and lights, construction of necessary detours, maintaining safe access to residences, businesses, and stock pile sites using flaggers and guards, and all other work identified in the Specifications required to perform work near, or affecting public or private roads.

g. EXCAVATE AND HAUL TO GENERAL FILL

1) Measurement: Includes excavation and hauling excavated materials to general fill. Measurement of excavation where removed material is hauled directly to a fill location within the project site shall be by cubic yards in-situ of material excavated.

h. SPREAD AND COMPACT GENERAL FILL

1) Measurement: Includes subgrade preparation, placement and spreading of fill, compaction and testing, and finish grading. Measurement for spreading and compacting fill shall be by cubic yards of material compacted, as measured in its compacted state

i. SPREAD AND COMPACT EMBANKMENT FILL

1) Measurement: Includes subgrade preparation, moisture conditioning, placement and spreading of fill, compaction and testing, and finish grading.

Measurement for spreading and compacting fill shall be by cubic yards of material compacted, as measured in its compacted state.

j. MAINTENANCE ROAD AND STORAGE AREA 6-INCH DG

Ready To Advertise (RTA) 02742-10 March 2010

1) Measurement: Measurement of the maintenance road and storage area will be by square yard of constructed surface as measured from edge of road to edge of road. Construction shall include either processing of on-site material or importation of the material, moisture conditioning, stabilization, compaction and testing, and finish grading as shown on the contract drawings, and as required to provide a smooth, crowned surface.

k. MAINTENANCE ROAD – 2-INCH ASPHALT

1) Measurement: Measurement of the maintenance road will be by square yard of road constructed as measured from edge of road to edge of road.

Construction shall include materials and labor for road bed preparation, including 6" ABC subgrade, surface preparation, and installation of asphalt road surface as shown on the contract drawings, and as required to provide a smooth, crowned surface.

l. RESTORE EXISTING SURFACES (BID ITEM 0014)

1) Measurement: Includes either processing of on-site material or importation of material. Measurement of riprap will be by tons (2000 Ibs) of rip-rap installed and riprap shall be installed 8 inches thick. Measurement of asphalt road surfaces will be by square yard of road constructed as measured from edge of road to edge of road. Construction shall include materials and labor for road bed preparation, including 6" ABC subgrade, surface preparation, and installation of asphalt road surface as shown on the contract drawings, and as required to provide a smooth, crowned surface. Measurement of the DG road and areas will be by square yard of constructed surface as measured from edge to edge. Construction shall include either processing of on-site material or importation of the material, moisture conditioning, stabilization, compaction and testing, and finish grading as shown on the contract drawings, and as required to provide a smooth, crowned surface. Includes furnishing, installing, and seam testing of geotextile. Measurement of geotextiles will be by square yards of textile installed. Installation shall include all areas indicated on the drawings, and shall constitute full compensation for all materials, labor, and other costs associated with materials and installation. Installation shall include all areas indicated on the drawings.

m. FORCEMAIN BOX 1 (BID ITEM 0029L)

1) Lump Sum Payment for the addition to Force Main Box 1 (FMB 1) will be made at the applicable contract price, which payment shall constitute full compensation for all materials, labor, and other costs associated with the structure. This includes all earthwork, reinforced concrete, actuators and guides, pipe & fittings and equipment that make up the addition to the structure, and are attached to the structure. Piping entering and leaving the structure is not included, though wall sleeves, and flexible couplings associated with the structure connection shall be included. All equipment associated with the structure as shown in the drawings shall be included except instrumentation that is identified in the Electrical and Instrumentation Bid Item 0029V. All steel piping, fittings, FSIs, pipe supports, wall thimbles, gates and coatings will be included in this price.

n. CHAIN LINK FENCING (BID ITEM 0029M)

Ready To Advertise (RTA) 02742-11 March 2010

1) Measurement: Measurement of fencing shall be by linear feet installed.

Installation shall include all fencing indicated on the drawings. This work includes fencing around the perimeter of the wetlands and within the wetlands as shown on the Civil drawings. Work includes furnishing and installing poles, chain link fabric, and excavation and concrete required for installing posts as detailed on C-Drawings. Also included are any man gates as shown on the drawings.

o. FENCE CONCRETE BARRIER WALL (12" x 12") (BID ITEM 0029N)

1) Measurement: Measurement of the fence concrete Barrier Wall shall be by linear feet installed. Installation shall include where indicated on the drawings.

The barrier wall is provided as needed under all chain link fencing to return fencing to existing conditions. Work includes excavation and concrete required to provide an impermeable barrier that extends 12 inches below grade.

p. 84-INCH CEFF FORCEMAIN PIPE AND FITTINGS (BID ITEM 0029O)

1) Measurement: Measurement of the 84-inch CEFF Pipe and Fittings will be made at the applicable contract price, which payment shall constitute full compensation for all materials, labor, and other costs associated with materials and installation of the pipeline as shown on the drawings, and described in the specifications. This includes all excavation, pressure testing, and connections (including connection to the existing forcemains of the UP05 Project A contract and the Tres Rios Flow Regulating Wetlands contract), piping, thrust restraint, backfill materials, and surface restoration upon completion.

q. FORCE MAIN BOX 2 (FMB 2) STRUCTURE (BID ITEM 0029P)

1) Payment for the FMB 2 Structure will be made at the applicable contract price, which payment shall constitute full compensation for all materials, labor, and other costs associated with the structure. This includes all earthwork, reinforced concrete, retaining wall and equipment that make up the structure, and are attached to the structure. Equipment implied or specified, but not shown, that is required for complete operation as required by the specifications shall be included. Piping, is not included in this bid item, nor is instrumentation that is identified in the Electrical and Instrumentation Bid Item.

r. FORCE MAIN BOX 3 (FMB 3) STRUCTURE (BID ITEM 0029Q)

1) Payment for the FMB 3 Structure will be made at the applicable contract price, which payment shall constitute full compensation for all materials, labor, and other costs associated with the structure. This includes all earthwork, reinforced concrete and equipment that make up the structure, and are attached to the structure. Equipment implied or specified, but not shown, that is required for complete operation as required by the specifications shall be included. Piping, is not included in this bid item, nor is instrumentation that is identified in the Electrical and Instrumentation Bid Item.

s. FORCE MAIN BOX 4 (FMB 4) STRUCTURE (BID ITEM 0029R)

1) Payment for the FMB 4 Structure will be made at the applicable contract price, which payment shall constitute full compensation for all materials, labor, and other costs associated with the structure. This includes all earthwork, reinforced concrete and equipment that make up the structure, and are attached

Ready To Advertise (RTA) 02742-12 March 2010 to the structure. Equipment implied or specified, but not shown, that is required for complete operation as required by the specifications shall be included. Piping, is not included in this bid item, nor is instrumentation that is identified in the Electrical and Instrumentation Bid Item.

t. FORCE MAIN BOX 5 (FMB 5) STRUCTURE (BID ITEM 0029S)

1) Payment for the FMB 5 Structure will be made at the applicable contract price, which payment shall constitute full compensation for all materials, labor, and other costs associated with the structure. This includes all earthwork, reinforced concrete and equipment that make up the structure, and are attached to the structure. Equipment implied or specified, but not shown, that is required for complete operation as required by the specifications shall be included. Piping, is not included in this bid item, nor is instrumentation that is identified in the Electrical and Instrumentation Bid Item.

u. FLOW METER AREA (BID ITEM 0029T)

1) Payment for the Flow Meter Area will be made at the applicable contract price, which payment shall constitute full compensation for all materials, labor, and other costs associated with installation of shotcrete, storm drainage structure and pipe supports that are located at the Flow Meter Area. Shotcrete, concrete work, and pipe supports as required per specifications and as shown on the drawings are included.

v. MISCELLANEOUS YARD PIPING (BID ITEM 0029U)

1) Payment for the miscellaneous yard piping will be made at the applicable contract price, which payment shall constitute full compensation for all materials, labor, and other costs associated with materials and installation of the piping and appurtenances as shown on the drawings, and described in the specifications that are not…