About this file

Amendment 1 - Bid Date Change and other Revisions

View the file

Other files

File Type Posted
Am3.pdf PDF
Am2.pdf PDF
Instrumentation.zip ZIP file
StormDrainChannel.zip ZIP file
MechanicalHVAC.zip ZIP file
Irragation.zip ZIP file
Archectectural.zip ZIP file
Electrical.zip ZIP file
Landscape.zip ZIP file
Structural.zip ZIP file
Civil4.zip ZIP file
Civil3.zip ZIP file
Civil2.zip ZIP file
Civil1.zip ZIP file
General.zip ZIP file
4DIrrig139-154.exe EXE file
1CGen1-24.exe EXE file
2LCivil25-118.exe EXE file
2KCivil25-118.exe EXE file
9BInstru298-373.exe EXE file
2ACivil25-118.exe EXE file
3ELscp119-138.exe EXE file
2FCivil25-118.exe EXE file
4CIrrig139-154.exe EXE file
8Eelec260-297.exe EXE file
2GCivil25-118.exe EXE file
6EStruc159-224.exe EXE file
4BIrrig139-154.exe EXE file
StormDrainChannel.exe EXE file
7Bmechvac225-259.exe EXE file
7Amechvac225-259.exe EXE file
3FLscp119-138.exe EXE file
1BGen1-24.exe EXE file
Volume 2.pdf PDF
2OCivil25-118.exe EXE file
6CStruc159-224.exe EXE file
6DStruc159-224.exe EXE file
2DCivil25-118.exe EXE file
5Arch155-158.exe EXE file
2MCivil25-118.exe EXE file
3ALscp119-138.exe EXE file
7Cmechvac225-259.exe EXE file
3BLscp119-138.exe EXE file
8Belec260-297.exe EXE file
8Delec260-297.exe EXE file
9CInstru298-373.exe EXE file
9DInstru298-373.exe EXE file
6BStruc159-224.exe EXE file
9EInstru298-373.exe EXE file
2ECivil25-118.exe EXE file
Show 40 more

Latest 50 of 67 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICIATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPIRATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION ( Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

W912PL-08-B-0001

AMEND 0001

Enclosure Listing:

1) Remove and Replace SF 1442 – Solicitation, Offer, and Award

2) Remove and Replace Section 00010 – Bid Schedule

3) Site Visit Sign In List – 20 May 2008

4) Revised - Specs Project Table of Contents

5) Delete and Replace Drawings: 002-G-2, 003-G-2A, 091-CU100, 094-CU103, 095-CU104, 107-CU116, 112-CU303, 119-L-1, 120-L-2, 121-L-3, 122-L-4, 123-L-5, 124-L-6, 125-L-7, 126-L-8, 127-L-9, 128-L-10, 129-L-11, 130-L-12, 131-L-13, 132-L-14, 133-L-15, 134-L-16, 135-L-17, 136-L-18, 137-L-19, 138-L-20, 249-M-123, 250-M-124, 252-M-126, 259-H-2

6) Add Drawing 047-C-23

All other terms and conditions remain unchanged.

W81EYN80720001

TRES RIOS ENVIRONMENTAL RESTORATION PROJECT - PHASE II FLOW REGULATING WETLANDS, MARICOPA COUNTY, AZ.

The project consists of constructing regulating wetlands, flow control structures, discharge structures, weir gates, and spillways. Project includes construction of roads, access ramps, landscaping, excavation, and stone/riprap. Project includes construction of trapezoidal Earthen channel, installation of right-of-way fences and gates, removal and disposal of debris.

This is an UNRESTRICTED competitive Invitation for Bid (IFB) with HUBZONE PRICE EVALUATION PREFERENCE. The award of this contract will be made by utilizing a continuing contract (CC) .

The Small Business subcontracting goals for this contract are at a minimum of the total planned subcontracting dollars. The referenced subcontracting goals will be placed with Small Businesses (SB) 70.0%, Small Disadvantaged Businesses (SDB) 6.2%, Woman-Owned Businesses (WOB) 7.0%, Hubzone Businesses 9.8%, Veteran-Owned Small Businesses (VOSB) 3.0% and Service Disabled Veteran-Owned Small Business (SDVOSB) 0.9%.

The estimated cost range of this project is between $10,000,000 and $25,000,000.

ALL BIDDERS ARE ADVISED THAT THIS PROCUREMENT MAY BE DELAYED, CANCELLED OR REVISED AT ANY TIME DURING THE

SOLICITATION, EVALUATION AND/OR FINAL AWARD PROCESS.

X

CHRISTINA M CHAVEZ 213/452-3246

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

29-Apr-2008

(RFP)

(IFB)

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance within _______10 calendar days and complete it within ________490 calendar days after receiving award, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________00800

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________ 0 copies to perform the work required are due at the place specified in Item 8 by ___________ local time ______________ 5 June 2008 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______ 90 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

CONTRACTING DIVISION

P.O. BOX 532711

LOS ANGELES CA 90053-2325

W912PL

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

01:00 PM (hour) Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

213.452.4184FAX: TEL: TEL: FAX:

W912PL-08-B-0001 1732

Amend 0001 * Denote Change

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY: 26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your offer on this solicitation, is hereby accepted as to the items listed. This award con-to furnish and deliver all items or perform all work, requisitions identified summates the contract, which consists of (a) the Government solicitation and on this form and any continuation sheets for the consideration stated in this your offer, and (b) this contract award. No further contractual document is contract. The rights and obligations of the parties to this contract shall be necessary.

governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by refer-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(Must be fully completed by offeror) OFFER

DUNS: CAGE:

FAX NO:

SECTION 00010 - BID SCHEDULE

TRES RIOS ENVIRONMENTAL RESTORATION PROJECT - PHASE II

PART A

FLOW REGULATING WETLAND

ESTIMATED UNIT OF UNIT TOTAL

ITEM NO. DESCRIPTION QUANTITY MEASURE PRICE PRICE

0001 Mobilization/Demobilization 1 Job Lump Sum

0002 Diversion & Control Of Stormwater 1 Job Lump Sum

0003 As-Built Drawings 1 Job Lump Sum

0004 Site Demolition 1 Job Lump Sum

0005 Traffic Controls 1 Job Lump Sum

0006 Clearing and Grubbing 343 ACRE

0007 North East Stockpile Preparation 193,600 SY

0008 OBW Stockpile Preparation 72,600 SY

0009 Excavate and Haul To General Fill 544,133 CY

0010 Excavate and Haul To North East Stockpile 192,967 CY

0011 Excavate and Haul To OBW Stockpile 135,305 CY

0012 Spread and Compact General Fill 263,314 CY

Section 00010 - 1

0013 Spread and Compact Embankment Fill 280,819 CY

0014 Maintenance Road/Storage Area - 6-Inch DG 100,365 SY

0015 Maintenance Road -2-inch Asphalt 3,757 SY

0016 Riprap (D50=6 Inch) - 12-Inch Thick 13,794 TONS

0017 Riprap (D50=8 Inch) - 16-Inch Thick 32 TONS

0018 Riprap (D50=12 Inch) - 24- Inch Thick 2,264 TONS

0019 Geotextiles 22,410 SY

0020 Native Tree Salvage 22 EACH

0021 Mesquite Bosque/Perimeter Planting - 1 Gallon 2,232 EACH

0022 Mesquite Bosque/ Frontage Planting - 15 Gallon 563 EACH

0023 Mesquite Bosque/ Perimeter Planting - 5 Gallon 1,577 EACH

0024 Flood Terrace & Stockpile (Hydroseed) 95.7 ACRE

0025 Flood Terrace - 5 Gallon 355 EACH

0026 Riparian Forest 7.3 ACRE

Section 00010 - 2

0027 Riparian Waters Edge 34.7 ACRE

0028 Emergent Marsh/Hummock & Shoreline 37.2 ACRE

0029 Emergent Marsh /Deep 34.3 ACRE

0030 Aquatic Floating 1.5 ACRE

0031 Aquatic Submerged 7.5 ACRE

0032 Inorganic Mulch 12.6 ACRE

0033 Underground Irrigation System (Per Emitter) 4,727 EACH

0034 Temporary Spray Irrigation System 1 Job Lump Sum

0035 Chain Link Fencing 17,751 LF

0036 Fence Concrete Barrier Wall

(12” X 12”) 17,751 LF

0037 Sliding Gate - 24-Feet Wide 1 EACH

0038 Double Swing Gate - 20-Feet Wide 6 EACH

0039 Pipe Double Swing Entry 6 EACH

0040 DW Equalization Pipe - 24- Inch HDPE 2,296 LF

0041 84-Inch CEFF Influent Pipe and Fittings 277 LF

0042 84-Inch CEFF Effluent Pipe and Fittings 342 LF

Section 00010 - 3

0043 Concrete Access Ramps - 6- Inch 2,433 SY

0044 Dewatering Structures 5 EACH

0045 DW Spillways 4 EACH

0046 FRW Spillways 3 EACH

0047 Salt River Spillway 1 EACH

0048 Low Flow Channel and Sump 1 Job Lump Sum

0049 84-Inch CEFF Effluent Pipe Headwall 2 EACH

Salvaging, Hauling, and Placement of Riprap and Gabions at Existing Dike

149 CY

0051 FRW Inlet Structure 1 Job Lump Sum

0052 DWA-1 Flow Control Structure 1 Job Lump Sum

0053 DWA-2 Flow Control

0054 DWB-2 Flow Control

0055 DWB-3 Flow Control

0056 FRW-1 Discharge Structure 1 Job Lump Sum

0057 FRW-2 Discharge Structure 1 Job Lump Sum

0058 FRW-3 Discharge Structure 1 Job Lump Sum

Section 00010 - 4

0059 Salt River Discharge Structure 1 Job Lump Sum

0060 OBW North & South Inlet

0061 Analyzer & Electrical Building 1 Job Lump Sum

0062 Chemical Injection Pit 1 Job Lump Sum

0063 Sodium Bisulfite Double Containment System 1 Job Lump Sum

0064 Potable Water Yard Piping 1 Job Lump Sum

0065 Non-Potable Water Yard Piping 1 Job Lump Sum

0066 Miscellaneous Yard Piping 1 Job Lump Sum

0067 Recreational Components 1 Job Lump Sum

0068 Electrical & Instrumentation 1 Job Lump Sum

0069 Excavation & Disposal of Underground Buried Debris 500 CY

PART B

STORM WATER CHANNEL

0070 Clear Site and Remove Obstructions, Channel 16 ACRES

0071 Stripping and Disposal of 6” Top Soil, Channel 12,400 CY

Excavation, Channel

34,300

CY

Section 00010 - 5

Compacted Fill, Channel and Berms

10,150

3” Gravel/Rock Mulch Side Slope Protection Sta. 9+05.00 To 84+30.00 Including Back Side Compacted Fill Slope

1,850

TONS

6” Angular Riprap Slope Protection Sta. 45+25.00 to 84+30.00

1,500

12” Riprap Protection, Channel Outfall Sta. 8+65.00 to 9+05.00 Including Apron shown on the drawings

Grouted Protection, Channel Outfall Sta. 8+65.00 to 9+05.00 Including Apron Shown on the Drawings

Concrete, Channel Inlet Sta.

84+30 to 84+90 including Cutoff Walls

0079 Rebar, Channel Inlet Including Cutoff Walls 5 TON

As-Built Drawings

Job Lump Sum

TOTAL (Part A Line Item No. 0001 – 0069 and Part B 0070 -0080)

NOTE: IN ADDITION TO DIVISION 3 SPECIFICATIONS FOR CONCRETE, THE

FOLLOWING PARAGRAPH SHALL APPLY TO ALL CONCRETE WORK.

Section 00010 - 6

“CONCRETE QUANTITIES WILL BE WITHIN THE NEATHLINE AND FINISHED LINE

INDICATED ON THE CONTRACT DRAWINGS. PAYMENT FOR CONCRETE WILL BE

MADE TO THE NEATLINE ONLY UNLESS OTHERWISE APPROVED”.

Abbreviations:

CY = Cubic Yard SY = Square Yard Ton = Ton (2000 pounds) Acre = Acre

Section 00010 - 7

Bidder’s Notes

1. All extensions of the unit prices shown will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered to be the bid.

2. If a modification to a bid based on unit prices is submitted which provides for a lump sum adjustment to the total estimated amount, the application of the lump sum adjustment to each unit price in the Bid Schedule must be stated. If it is not stated, the bidder agrees that the lump sum adjustment shall be applied on a pro rata basis to every unit price in the Bid Schedule.

3. Prices must be submitted on all individual items of the Bidding Schedule; otherwise the bid will be considered non-responsive and will be rejected.

4. For the purpose of initial evaluation of bids, the following will be utilized in resolving arithmetic discrepancies found on the face of the Bidding Schedule as submitted by the bidder:

a. Obviously misplaced decimal points will be corrected;

b. In case of discrepancy between the unit price and the extended price, the unit price will govern;

c. Apparent errors in extensions of unit prices will be corrected;

d. Apparent errors in addition of lump sum and extended prices will be corrected.

5. For the purpose of bid evaluation, the Government will proceed on the assumption that the bidder intends the bid to be evaluated on the basis of unit prices the totals arrived at by the resolution of arithmetic discrepancies as provided above and the bid will be so reflected on the abstract of bids.

6. The lump sum "LS" line items in the Bidding Schedule are not "Estimated Quantity" line items and are not subject to the "Variation in Estimated Quantity" contract clause.

7. The Contract Clause 52.232-27, "Prompt Payment for Construction Contracts" requires that the name and address of the contractor official, to whom payment is to be sent, be the same as that in the contract or in a proper Notice of Assignment.

8. Principal Contracting Officer. The Contracting Officer who signs this contract will be the Principal Contracting Officer for this contract. However, any Contracting Officer assigned to the Los Angeles District, contracting within his authority, may take formal action on this contract when the Principal Contracting Officer is unavailable and the action needs to be taken.

9. Amounts and prices shall be indicated in either words or figures, NOT BOTH.

10. Payment of Electronic Funds Transfer (EFT) is the mandatory method of payment.

Section 00010 - 8

The Contractors attention is directed to Contract Clause NO. 52.232-33 "Mandatory Information for Electronic Funds Transfer" located in Section 00800.

11. The bidder shall distribute his indirect costs (overhead, profit, bond, etc.,) over all items in the Bid Schedule. The Government will review all submitted Bid Schedules for any unbalancing of the items. Any submitted Bid Schedule determined to be unbalanced may be considered nonresponsive and cause the bidder to be ineligible for contract award.

12. The bidder shall furnish all plant, labor, material, equipment, etc., necessary to perform all work in strict accordance with the terms and conditions set forth in the contract in include all attachments thereto.

13. Some quantities are ESTIMATED, the bidders prices MUST BE FIRM.

14. Quantity is an estimated amount. See Section 00700 and 00800, FAR52.211-18, for Variation in Estimated Quantity Contract Clause.

15. Bidder is cautioned to check his Bid Schedule carefully prior to submission. If the Bid Schedule contains unit prices, they should be round off to the second decimal point only NOT EXTENDED FURTHER.

16. Bidders attention is directed to Section 00100 "Instructions to Bidders" Clause No.

52.0214-4001, entitled "Directions for Submitting Bids". Please note that there are Special Instructions Pertaining to Hand-Carried Bids.

17. Contractor is required to fill in Cage code (Reference Section 00600, entitled "Required Central Contractor Registration" Mar 1998) and DUNS Number (Reference Section 00600, entitled, "Data Universal Numbering System (DUNS) Number" Jun1999) in Block No. 15 on Standard Form 1442, Name and Address Block (Cage Code under Code and DUNS No. under Facility Code respectively).

18. The Government contemplates award on one contract to the responsive, responsible bidder who submits the low bid for the total of all the items in the Bidding Schedule.

19. The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration in accordance with Federal Acquisition Regulation subpart 42.5.0

20. SUBCONTRACTING PLAN: A subcontracting plan must be submitted by the bidder selected for the award in accordance with the goals listed on that part of the work it intends to subcontract. The Small Business subcontracting goals for these contracts are a minimum of 70.0% of the contractors intended subcontracting opportunities. The referenced subcontracting goals will be placed with Small Businesses (SB), including Small Disadvantaged Businesses (SDB) 6.2%, Woman-Owned Businesses (WOB) 7.0%, Hubzone Businesses 9.8%, Veteran-Owned Small Businesses (VOSB) 3.0% and Service

Section 00010 - 9

Disabled Veteran-Owned Small Business (SDVOSB) 0.9%. Please see FAR Clause 52.219.9, Small Business Subcontracting Plan (NOV 2007), Section 00700.

Section 00010 - 10

CERTIFICATE OF CORPORATE PRINCIPAL

1) IF THE OFFEROR IS A JOINT VENTURE, COMPLETE THE FOLLOWING:

(Company Name) (Signature) (Title)

(Company Name) (Signature) (Title)

(Company Name) (Signature) (Title)

2) IF THE OFFEROR IS PARTNERSHIP, LIST FULL NAME OF ALL PARTNERS:

(Company Name) (Signature) (Title)

(Company Name) (Signature) (Title

(Company Name) (Signature) (Title)

3) IF THE OFFEROR IS A CORPORATION, THE FOLLOWING CERTIFICATION SHOULD BE

COMPLETED:

CERTIFICATION AS TO CORPORATE PRINCIPAL

I, , certify that I am the Secretary of the corporation named as principal in the within contract; that , who signed the said contract on behalf of the principal, was the of the corporation; that I know his signature and that his signature is genuine; and that said contract was duly signed, sealed and attested for in behalf of said corporation by authority of its governing body.

CORPORATE PRINCIPAL

CORPORATE SEAL

SECRETARY

Section 00010 - 11

(4) IF THE OFFEROR IS A LIMITED LIABILITY COMPANY, LIST FULL NAME OF ALL MANAGERS

BELOW. SIGNATURES BY ALL MANAGERS HERE SIGNIFY THAT THAT THE INDIVIDUAL WHO

SIGNED THE OFFER IN BLOCK 20B HAS THE AUTHORITY TO BIND THE LIMITED LIABILITY

COMPANY.

Name Signature

Section 00010 - 12

Tres Rios Environ. Restor. Proj.-Regulating & Overbank Wetland 030400 W912PL-04-C-0008 Ready To Advertise (RTA) /Submittal

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01110 SUMMARY OF WORK

01143 COORDINATION WITH 91ST AVENUE WWTP OPERATION AND

MAINTENANCE DEPARTMENT

01270A MEASUREMENT AND PAYMENT

01310 ADMINISTRATIVE REQUIREMENTS

01312A QUALITY CONTROL SYSTEM (QCS)

01320A PROJECT SCHEDULE

01320N CONSTRUCTION PROGRESS DOCUMENTATION

01330 SUBMITTAL PROCEDURES

01355A ENVIRONMENTAL PROTECTION

01356A STORM WATER POLLUTION PREVENTION MEASURES

01420 SOURCES FOR REFERENCE PUBLICATIONS

01451A CONTRACTOR QUALITY CONTROL

01500A TEMPORARY CONSTRUCTION FACILITIES

01525 SAFETY AND OCCUPATIONAL HEALTH REQUIREMENTS

01572 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

01651 TRANSPORTATION AND HANDLING OF MATERIALS AND EQUIPMENT

01661 STORAGE OF MATERIALS AND EQUIPMENT

01670 RECYCLED / RECOVERED MATERIALS

01770N CLOSEOUT PROCEDURES

01780A CLOSEOUT SUBMITTALS

01781 OPERATION AND MAINTENANCE DATA

DIVISION 02 - SITE CONSTRUCTION

02080 PRECAST STRUCTURES

02100 DIVERSION AND CONTROL OF WATER

02220 DEMOLITION

02230 CLEARING AND GRUBBING

02300 EARTHWORK

02318 CRUSHED STONE AND GRAVEL

02373 GEOTEXTILE

02510 ASPHALTIC CONCRETE PAVING

02580 PAVEMENT MARKING

02630 CULVERT PIPE

&. 02661 nOPE LIHER

02703 HOT-MIX ASPHALT (HMA) FOR ROADS

02722 AGGREGATE BASE COURSE

02724 INORGANIC MULCH

02725 STABILIZED DECOMPOSED GRANITE

02785 BITUMINOUS FOG COATS

02810 UNDERGROUND IRRIGATION SYSTEMS

02821 FENCING

02914 NATIVE PLANT SALVAGE

02921 SEEDING

it. 02930 TERRESTRIAL PLANTS

02931 AQUATIC PLANTS

02935 LANDSCAPE MAINTNEANCE

DIVISION 03 - CONCRETE

03100A STRUCTURAL CONCRETE FORMWORK

03150A EXPANSION JOINTS, CONTRACTION JOINTS, AND WATERSTOPS

03200A CONCRETE REINFORCEMENT

03201 STEEL BARS AND WELDED WIRE FABRIC FOR CONCRETE

& Addendum NO.1 05-22-08

PROJECT TABLE OF CONTENTS Page 1

W9l2PL-04-C-0008 Ready To Advertise (RTA) /Submittal

REINFORCEMENT FOR CIVIL WORKS

03300A CAST-IN-PLACE STRUCTURAL CONCRETE

03371 SHOTCRETE

03600 GROUT

DIVISION 04 - MASONRY

04200 MASONRY

04270 GLASS MASONRY UNITS

DIVISION 05 - METALS

05051 ANCHOR BOLTS, TOGGLE BOLTS AND CONCRETE INSERTS

05055A METALWORK FABRICATION, MACHINE WORK, MISCELLANEOUS

PROVISIONS

05090A WELDING, STRUCTURAL

05093 WELDING PRESSURE PIPING

05502 METALS: MISCELLANEOUS, STANDARD ARTICLES, SHOP

FABRICATED ITEMS FOR CIVIL WORKS STRUCTURES

05522 ALUMINUM HANDRAILS AND RAILINGS

05532 ALUMINUM GRATING

05561 CASTINGS

05602 STEEL BULKHEAD STOP PLATES

DIVISION 06 - WOOD AND PLASTICS

06100 ROUGH CARPENTRY

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07121 BUILT-UP BITUMINOUS WATERPROOFING

07600 FLASHING AND SHEET METAL

07611N STEEL STANDING SEAM ROOFING

07920 JOINT SEALANTS

DIVISION 08 - DOORS AND WINDOWS

08110 STEEL DOORS AND FRAMES

08710S DOOR HARDWARE

DIVISION 09 - FINISHES

09510S ACOUSTICAL CEILINGS

09900 PAINTING

DIVISION 10 - SPECIALTIES

10201 METAL WALL AND DOOR LOUVERS

10400 IDENTIFICATION DEVICES

DIVISION 11 - EQUIPMENT

11200 480 VOLT MOTOR-OPERATED VALVE/GATE ACTUATORS

11215 SELF-PRIMING CENTRIFUGAL PUMPS

11286 ALUMINUM WEIR GATES AND APPURTENANCES

11289 SLUICE GATES AND APPURTENANCES

DIVISION 13 - SPECIAL CONSTRUCTION

PROJECT TABLE OF CONTENTS Page 2

W9l2PL-04-C-0008

13001 13005

13007

13008 13051 13052

13053 13100A 13101 13226 13260 13265 13266 13850A 13930A

DIVISION

15050N 15051 15108 15110 15119 15182 15200 15400 15700A 15950N 15995A

DIVISION

16050N 16065S 16121 16122 16131 16132 16134 16135 16136 16137 16138 16141 16142 16143 16271 16282 16375A 16402 16441 16442 16501

Ready To Advertise

REFERENCE FORMS

PROCESS CONTROL

INSTRUMENTATION

PROCESS CONTROL

TESTING

PROCESS CONTROL

COMPUTER CONTROL

PROCESS CONTROL

INSTRUMENTS

PROCESS CONTROL

(RTA) /Submittal

SYSTEM GENERAL REQUIREMENTS FOR PROCESS

SYSTEM,

SYSTEM

SYSTEM

SYSTEM

SYSTEM

START-UP, COMMISSIONING AND FIELD

TRAINING

PROCESS CONTROL DESCRIPTION

PRIMARY SENSORS AND FIELD

INSTRUMENT

LIGHTNING PROTECTION SYSTEM

PROCESS CONTROL SYSTEM FIBER OPTIC

PROCESS CONTROL SYSTEM I/O LIST

CONTROL PANELS

PROCESS CONTROL SYSTEM PANELS AND

INDEX

CABLING - OUTDOOR

ENCLOSURES

PROCESS CONTROL SYSTEM PANEL INSTRMENTS AND DEVICES

FIRE DETECTION AND ALARM SYSTEM, DIRECT CURRENT LOOP

WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

MECHANICAL

BASIC MECHANICAL MATERIALS AND METHODS

BURIED PIPING INSTALLATION

FIBERGLASS-REINFORCED POLYMER MORTAR PIPE

VALVE SCHEDULE

SPECIALTY VALVES AND APPURTENANCES

REFRIGERANT PIPING

PIPELINES, LIQUID PROCESS PIPING

PLUMBING, GENERAL PURPOSE

UNITARY HEATING AND COOLING EQUIPMENT

HVAC TESTING/ADJUSTING/BALANCING

COMMISSIONING OF HVAC SYSTEMS

ELECTRICAL

BASIC ELECTRICAL MATERIALS AND METHODS

SECONDARY GROUNDING

INTRUMENTATION CABLE

600 VOLT CABLE

RIGID CONDUIT

FLEXIBLE CONDUITS

EXPANSION/DEFLECTION FITTINGS

PULL BOXES

OUTLET BOXES

UNDERGROUND DUCT BANKS

MANHOLES AND HANDHOLES

RECEPTACLES

SNAP SWITCHES

DISCONNECT SWITCHES

DRY TYPE TRANSFORMERS

TRANSIENT VOLTAGE SURGE SUPPRESSION

ELECTRICAL DISTRIBUTION SYSTEM, UNDERGROUND

INTERIOR DISTRIBUTION SYSTEM

LOW-VOLTAGE DISTRIBUTION SWITCHBOARDS

LIGHTING, INSTRUMENTATION AND DISTRIBUTION PANELBOARDS

LIGHTING FIXTURES AND CONTROLS

- End of Project Table of Contents -

~ Addendum No. 1 05-22-08

PROJECT TABLE OF CONTENTS Page 3

Addendum No.1 Modification to the specifications

• Spec Section 02661, HDPE liner, Delete this specification.

• Spec Section 02930, Paragraph 1.6.1 Planting Dates, should be replaced with the following:

1.6.1 Planting Dates

1.6.1.1 Terrestrial Materials

Plant all container plants with drip irrigation. Plants can be planted any time during the year.

1.6.1.2 Aquatic Material

Plant aquatic material only within the time period of April to September.

• Section 13053. The instrument index incorrectly refers to section 17052. This should read 13052.

• Section 13930A. The first two sentences of Paragraph 1.2.1.1 shall be changed to read "The design of the system shall be based upon a water supply with a static pressure of 80 psig, and a flow of 1,500 gpm at a residual pressure of 20 psig.

Water supply shall be presumed available at the point of connection to existing 12" PW line shown on drawing CU-303." The third sentence remains unchanged.

Amend 0001 For Specs Sections 02661, 02930, 13053 & 13930A

SF30
SECTION 00650
APPENDIX II - Standard Fence Details
topmostSubform[0]:
Page1[0]:
IDCode[0]:
Page[0]: 1
Pages[0]: 2
AmendNo[0]: 0001
EffDate[0]: 23 MAY 2008
ReqNo[0]:
ProjNo[0]:
IssCode[0]: W912PL
IssuedBy[0]: CONTRACTING DIVISION

P.O. BOX 532711

LOS ANGELES, CA 90053-2325

AdmCode[0]:
AdminBy[0]: SEE ITEM #6
ContName[0]:
ContStrt[0]:
ContCnty[0]:
ContSt[0]:
ContZIP[0]:
Code[0]:
FacCode[0]:
SolChgYs[0]: Yes
SolChgNo[0]: Off
SolAmdNo[0]: W912PL-08-B-0001
AmendDate[0]: 29 APRIL 2008
ModNo[0]:
ModDate[0]:
NoCopies[0]: 1
Amended[0]: Yes
OffrExt[0]: Yes
OffrNoEx[0]: Off
ApprData[0]:
ChgeOrd[0]: Off
ChgeOrder[0]:
Modify[0]: Off
SuppAgre[0]: Off
SuppAuth[0]:
ModOthr[0]: Off
OthrSpec[0]:
NoReq[0]: Off
Require[0]: Off
Copies[0]:
Descript[0]: TRES RIOS ENVIRONMENTAL RESTORATION PROJECT – PHASE II FLOW REGULATING WETLANDS, MARICOPA COUNTY, AZ.

THE BID OPENING DATE HAS BEEN EXTENDED FROM 29 MAY 2008 TO 5 JUNE 2008 AT 1:00 PM P.S.T.

SEE PAGE 2 FOR ENCLOSURES

SignName[0]:
SignTitl[0]:
ContDate[0]:
CoName[0]:
CoTitle[0]:
CODate[0]:

File details come from the government source that posted it. Updated .