E.01.02 ATTACH 2.1 JOCPB Guidebookv5.pdf

PDF 458 KB Posted

Attached to
414th Contracting Support Brigade - FY26 Italy Construction Job Order Contract (JOC) Pre-Solicitation Notice
Solicitation number
W912PF25RA002
Issued by

About this file

This document is a Job Order Contract (JOC) Unit Pricebook for the Europe District, dated 2025, which serves as a comprehensive pricing and guidelines manual for construction and maintenance tasks across multiple European locations. The pricebook covers 55,151 line items across 41 divisions, including earth work, sewer work, landscaping, construction, electrical systems, and demolition services, with prices denominated in Euros and updated based on German construction price indices.

The document provides detailed guidelines for contractors, including unit price calculations, coefficient applications, working height considerations, and conversion factors for measurements. Prices include direct labor, equipment, and material costs, with contractors required to propose coefficients that account for indirect costs, overhead, profit, and other project-related expenses. The pricebook is designed for Job Order Contracts in various European regions, including Italy, Poland, Bavaria, Hessen, Rheinland Pfalz, Baden Wurttemberg, and Benelux, with an average cost escalation factor of 46% compared to 2020 pricing.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Job Order Contract Unit Pricebook Europe District – 2025

Table of Contents

PRICEBOOK OVERVIEW:

JOC UNIT PRICE BOOK

The Unit Prices Include:

LABOR COSTS:

EQUIPMENT COSTS:

MATERIAL COSTS:

The COEFFICIENTS Include:

Unit Pricebook Coefficient

Burdened Coefficient

PRICE VARIATIONS:

SUMMARY:

General Rules on Using the JOCPB:

DEMOLITION:

WORKING HEIGHT:

FIELD ENGINEERING:

Or Equals and Brand Names:

Useful Information:

UNIT OF MEASURE DEFINITIONS:

BULK FACTORS FOR DEMOLITION:

CONVERSIONS:

INSERT JOCPB (UPB Europe_2025)

PRICEBOOK OVERVIEW:

JOC UNIT PRICE BOOK

The JOC Price Book (JOCPB), titled “UPB Europe_2025”, is to be used as the contract specification in the execution of work under the following contracts:

• Italy JOC - W912GB23R0007

• Poland JOC - W912GB23R0006

• Bavaria (incl. Ansbach) JOC – W912GB23R0004

• Hessen JOC – W912GB23R0001

• Rheinland Pfalz JOC – W912GB23R0002

• Baden Wurttemberg JOC – W912GB23R0005

• Benelux JOC – W912GB23R0003

The JOCPB “JOC Price Book” is a compilation of repair, maintenance, and minor construction tasks, associated units of measure and unit prices that are used in this JOC. JOC unit prices include direct material, labor and equipment costs, but not indirect costs or profits which are addressed in the coefficient(s). The various tasks are organized into sections by trade. Each section contains a large volume of items. Table 1 shows the current trades or divisions and number of line items in each trade.

DIVISIONS # Items

00 - EARTH WORK 699

06 - SEWER WORK 1,393

07 - PRESSURE PIPELINES OUTSIDE BUILDINGS WORK 988

08 - DRAINAGE AND SEEPAGE WORK 684

15 - TRAFFIC CONSTRUCTION WORK 1,721

20 - LANDSCAPING WORKS 2,526

21 - INSULATION AND FIRE PROTECTION WORK ON TECHNICAL SYSTEMS 2,429

30 - MASONRY WALL WORK 1,172

31 - CONCRETE WORK 1,287

34 - CARPENTRY AND TIMBER CONSTRUCTION WORK 1,244

38 - ROOFING AND ROOF WATERPROOFING WORK 2,597

39 - ROOF PLUMBING / DRAINAGE WORK 1,349

40 - DRY CONSTRUCTION WORKS 2,564

50 - PLASTERING AND STUCCO WORK 1,480

51 - SCAFFOLDING WORK 328

52 - TILE AND SLAB WORK 505

53 - SCREED WORK 2,137

55 - JOINERY WORK 1,855

56 - PARQUET AND WOOD FLOORING WORK 652

57 - HARDWARE WORK 1,527

60 - METAL CONSTRUCTION AND STRUCTURAL STEEL WORK 1,916

61 - GLAZING WORKS 1,464

63 - PAINTING AND VARNISHING - COATINGS; WALLPAPER WORK 4,223

65 - FLOOR COVERING WORK 734

79 - AIR-HANDLING SYSTEMS WORK 1,502

80 - HEATING SYSTEMS AND CENTRAL WATER HEATING SYSTEMS WORK 2,782

81 - GAS, WATER AND SEWAGE INSTALLATION WORK 3,498

82 - ELECTRIC, CABLING, LIGHTING, AND COMMUNICATION SYSTEMS WORK 3,635

84 - LIGHTNING PROTECTION SYSTEMS WORK 649

92 - INCIDENTAL LABOR AND EQUIPMENT 32

93 - DEMO OF HEATING SYSTEMS AND CENTRAL WATER HEATING SYSTEMS WORK 1,415

94 - DEMO OF LANDSCAPING WORK 824

95 - DEMO OF CONCRETE WORK 622

96 - DEMO OF PLASTERING AND STUCCO WORK 1,023

97 - DEMO OF GLAZING WORK 387

98 - ASBESTOS REMOVAL 811

FP - 219 ANTI-TERRORISM FORCE PROTECTION 497

TOTAL 55,151

Table 1. Summary of Current JOC Pricebook Divisions.

The JOCPB is a document that the government developed and the government updates annually for pricing throughout Europe. The book is based on the German construction industry standards (DIN) and Standardleistungsbuch für das Bau (STLB-Bau), specifically the STLB Bau-Z ver 2020-07 data (https://www.gaeb.de/en/products/stlb-bauz/). STLB Bau-Z is a database-oriented line-item text and unit price system for regularly occurring building and construction maintenance services. The data were purchased in October 2020 and incorporated into the Europe JOC Pricebook along with various US-specified line items and the Anti-Terrorism and Force Protection (ATFP) line items, with the final Unit Price Book developed April 2021 (UPB Europe_2021).

The latest JOCPB, titled “UPB Europe_2025”, has been updated to reflect modernized pricing for the 2025 JOC Base Contract Solicitations. Major changes include the elimination of duplicate line items from the ATFP division that were included in other divisions, and the pricing was escalated to modern (mid-2025) levels based on forecasted German construction price indices trends from the German Federal Statistical Office (Stastistiches Bundesamt) via DESTATIS. The escalation or cost factor was computed for each trade as the ratio of index at required pricing date (June 2025) divided by index at time of initial cost (June 2020), as suggested in BKI formula for updating costs (BKI Baupreisindex). An average cost factor for all trades over this period was 1.46, or an increase of 46%.

https://www.gaeb.de/en/products/stlb-bauz/ https://www.destatis.de/EN/Themes/Economy/Short-Term-Indicators/Prices/bpr210.html https://bki.de/baupreisindex

The JOCPB will be undergo annual updates following the award, with updates occurring each January. Updates are based on the latest DESTATIS construction price indices and STLB-Bau data, ensuring the most recent version of the STLB-Bau, including all updated line items and pricing, is utilized. Additionally, the ATFP line items and pricing will be modernized accordingly. The initial post-award update cost factor will be calculated using relative price indices from June-2025 to January-2026 (using most recent published price indices and STLB- Bau data). Subsequent pricing updates will use the June-2025 pricing as the baseline and escalated using relative price indices for that period. Pricing remains valid for the calendar year, with no mid-point construction price escalation.

The Unit Prices Include:

LABOR COSTS:

• Labor costs include direct labor through the working foreperson level at straight-time prevailing wage rates including associated payroll taxes, but excludes vacations, sick leave or any labor overheads whether by the Prime or Subcontractor, or both.

• Labor costs include unloading equipment, materials, and tools, and transporting the same up or down 2 stories and 15-feet to reach the project site; layout; measuring and cutting to fit; performing the task; disposal of excess material; and time for lunch and breaks.

EQUIPMENT COSTS:

• Equipment costs include all equipment required to accomplish the task.

• Mobilization is included for all equipment except large equipment (e.g. cranes, bulldozers, excavators, backhoes, bobcats etc.), which exclude mobilization.

• Equipment costs include all operating expenses such as fuel, electricity, lubricants, etc.

MATERIAL COSTS:

• Material costs include the cost of the material, delivery, and all incidentals and accessories integral to the installation.

• Material costs include manufacturer's and/or fabricator's shop drawings.

• Material costs for roofing, drywall, VCT, carpet, wall covering, ceiling tile, pipe, conduit, concrete, etc. include an allowance for waste. This list is not intended to be all inclusive, but descriptive of the types of construction materials that are typically sold in standard lengths, sizes, and weights.

• Material costs for imported materials (e.g. aggregate, sand, soil, etc.) include delivery up to 15 miles (25 km) from the closest approved source.

The costs in the Unit Price Book are denominated in Euros. For the duration of the base contract and any exercised options, the Government will make all Task Order awards and payments in either Euros or U.S. dollars, as specified at the time of award.

The COEFFICIENTS Include:

The contractor's coefficients are as a numerical factor increase, (e.g., 1.100) or decrease (e.g., 0.85) in association with performance of a Task Order. Coefficients are contractor proposed factors to adjust the contractor’s bottom line for any and all, efficiencies, costs (generally indirect costs), adjustments to listed prices, and/ or profit not included in the JOCPB (updated annually).

The contractor’s coefficients shall encompass all contractor costs, inclusive of profit, overhead (home office and field), labor burden, insurance, adjustments to listed prices, general and administrative expenses, subcontractor mark-up, mobilization and demobilization, and any other costs. These include, but are not limited to, compliance with environmental laws, permits, preparation of reports, correspondence and documentation required by law or specifications, tax compliance, protection and/or relocation of government property, and engineering services.

Engineering services refer to those incidental to construction and include completing submittals for construction work.The coefficients includes all operating costs including the costs for labor, material, transportation, profit etc, unless otherwise stated in the JOCPB.

The coefficients are proposed by the contractor, incorporated in the contract and used in establishing price for Task Orders. In accordance with AFARS 5117-9004-2 (e) Solicitation this JOC contract will use an annually updated JOCPB, rather than an annual coefficient adjustment.

Both are not permitted under the regulation. For this reason, the contractor will provide one set of coefficients for the duration of the JOC base contract as directed in Attachment 3 JOC Pricing Schedule..Separate coefficients shall be provided to account for a) adjustments to the listed JOCPB unit prices to reflect fair market value (Unit Pricebook Coefficient), and b) indirect or burdened costs (Burdened Coefficient) during “Regular Hours” and “Other than Regular Hours”.

Unit Pricebook Coefficient The Unit Pricebook Coefficient shall only include adjustments to the pre-priced line item costs (direct labor, equipment, and material) necessary to establish a current local market value for those items.

Burdened Coefficient The Burdened Coefficient shall only include adjustments to reflect the indirect or business/project-related costs associated with the work that go beyond the direct expenses of labor, equipment, and material. Furthermore, the coefficients must cover costs associated with interfacing with government representatives and coordinating with occupants and other contractors as necessary. The burdened coefficient(s) shall also include, but are not limited to, costs for:

BUSINESS COSTS:

• Corporate, Regional, and Site offices (i.e. Office buildings, office spaces, office trailers, office management, office equipment and supplies, etc)

• Contractor’s overhead and profit.

• Subcontractor’s overhead and profit.

• All associated costs with Performance and Payment Bonds (per Army Federal

Regulation Supplement 17.94 2(h))

• Business taxes, contributions, memberships, corporate headquarters support (legal, financial, etc.)

• Employee payroll taxes, insurances, and fringe benefits

• Other insurances.

• Compliance with environmental laws (overhead {indirect} cost associated with performing work in compliance with EPA/OSHA regulations including local Government requirements, including obtaining any necessary licenses and permits, reporting requirements, etc.)

• Job Order development services, Government meetings, and other administrative services required by the Contract Documents.

• Cost of financing the work.

• All taxes for which a waiver is not available including material sales tax and equipment rental.

• Business risks such as the risk of a lower-than-expected volume of work, smaller than anticipated Job Orders, poor Subcontractor performance, currency exchange, and inflation or material cost fluctuations.

PROJECT RELATED COSTS:

• Project management and project supervision.

• Contractor adjustments to Government Unit Prices.

• Price quotations.

• Submittal preparation.

• Quality Control.

• Collaboration/face-to-face meetings with all Program/Project stakeholders (i.e.

progress reviews, negotiations, etc.)

• Services required to complete project filings and obtain permits.

• Preparation and modification of sketches, drawings, submittals, as-built drawings, and other project records.

• Incidental engineering and architectural services.

• Permits, licenses, and fees.

• Project trailer, equipment and supplies, and portable toilets for Contractor’s use.

• Gang boxes and storage containers for Contractor's tools, equipment and materials.

• Basic safety and warning signage, traffic signage, minor barricades (e.g., construction tape, etc.) and personnel safety equipment (e.g., hard hats, safety harnesses with lifeline or cabling, protective clothing, safety glasses, face shields, etc.).

• Meeting Government’s security requirements.

• Protection of Government property

• Removing and returning Government's furniture and furnishings (e.g. chairs, tables, pictures, etc. but excluding modular furniture, furnishings fastened to the wall or floor, safes and other furniture requiring disassembly).

• Sealing windows doors, and other openings with plastic to contain construction dust and debris within the work area, or to protect existing surfaces.

• Compliance with protection and safety laws (i.e., safety rails, face and clothing

• protection, etc.)

• Working in extreme temperatures (below or above normal) or adverse conditions such as rain, wind, sleet or snow. Costs resulting from inadequate supply of building materials, fuel, electricity, or skilled labor.

• Daily clean-up.

• Final professional clean-up.

• O&M Manual.

• O&M Training.

PRICE VARIATIONS:

Contractors may experience direct costs that are different than the unit prices set forth in the JOCPB. While diligent effort was made to provide accurate, unit prices, it is the Contractor’s responsibility to review and analyze the unit prices, and to calculate, prior to bidding, the coefficients or adjustment factors accordingly.

SUMMARY:

This list is not exhaustive and is intended to provide general examples of costs to be included in the Contractor's Coefficients.

The only compensation to be paid to the Contractor for unit price tasks will be:

TOTAL PRICE = Unit Price X Quantity X Coefficient

General Rules on Using the JOCPB:

• Unit prices are for complete and in-place construction and include all labor, equipment and material required to complete the task as described in the JOCPB.

• If the Contractor uses a crane or other lifting equipment (except a truck mounted boom lift or other equipment as part of the delivery process) to lift material onto a roof, even if that roof is less than 2 stories, the contractor will be paid for such crane or lifting equipment as a separate task.

• Unit prices include all fasteners such as anchor bolts, lag bolts, screws, adhesive, wedge anchors, expansion bolts, roofing clips (excluding hurricane clips) required. Fasteners listed separately in the JOCPB are for use with Government furnished material and equipment or relocating or reinstalling existing material and equipment.

• Unit prices exclude more substantial mounting material such as threaded rod or angle iron unless the task description states otherwise.

• Unit prices for doors and windows, duct work, plumbing fixtures, seamless floors, countertops, roof flashing, pitch pockets, skylights, roof curbs, exterior trim, etc. include sealant and caulking.

• Unit prices include testing, calibrating, balancing, start-up services and the like required to ensure proper installation, construction, and performance of the work (e.g. compaction test for backfill, balancing of heating ventilation and air conditioning, pneumatic or hydrostatic testing, soaping of joints, disinfection and flushing of water lines, etc.).

Contractor may be paid for testing, calibrating, balancing, start-up services and the like for Government supplied materials and equipment, or when working on or tying into existing materials and equipment.

• For the purpose of calculating the quantity of a task, quantities are calculated on a per project basis. The quantity so determined shall be used for the task and all appropriate modifiers, unless the task states otherwise.

• Whenever there are alternative tasks that may be selected to complete work, the Contractor shall select the most practical and economical tasks available (e.g. rental of equipment by weeks or months rather than days, or painting by roller or spray rather than brush).

DEMOLITION:

• Unit prices for demolition include all labor, equipment and material required for the complete removal of the items; clean-up of the area; and transporting the demolished items up or down 2 stories into a truck, dumpster, or to a Government designated area, located within 150-feet (~100m) of the project site.

• Unit prices for demolition exclude costs for hauling.

• If the item being demolished is attached to another item being removed and can be removed as one item, then that item shall not be priced as a separate demolition task, unless the component alone must be demolished to accomplish the task (e.g. demolition of pipe includes pipe fittings unless the fitting must be demolished separately to accomplish the task; demolition of a wood door includes hinges, hardware, closures, kick plates, etc.).

• The word "replace" includes removal of the existing item and installation of the new item.

• The words "remove and relocate" or "remove and reinstall" include removal, cleaning, and installation of the existing item in either the same location or another location.

• Salvageable materials are the property of the Government and shall, if directed, be turned over to the Government.

WORKING HEIGHT:

• Typical working height for work other than masonry is up to 11.5 ft (3.5 m) above the finished floor or stationary working surface. The Contractor will not be paid for scaffolding, lifts, or similar equipment for work below 11.5 ft (3.5m).

• Typical working height for masonry work is up to 4 ft (1.25m) above the finished floor or stationary working surface. The Contractor will not be paid for scaffolding, lifts, or similar equipment for masonry work below 4 ft (1.25m).

FIELD ENGINEERING:

• Surveying tasks shall be used only when the Government requests the Contractor to perform topographic surveys, property line surveys, or to establish horizontal and vertical control points. If the Government provides horizontal and vertical control points within or adjacent to the project site, all other surveying required to complete the work shall be considered construction staking or layout, and the cost thereof is included in the appropriate tasks.

• For areas likely to contain unexploded ordnance (UXO), specific line items, such as UXO labor hours, are available for surveys related to the visual inspection of potential UXO during excavation activities.

Or Equals and Brand Names:

• Whenever material, products, or equipment is identified in the JOCPB, or in the

Technical Specifications, by reference to a manufacturer’s name, make or model number, the identification is intended to establish a standard. Any material, product, or equipment of another manufacturer may be considered an or-equal provided that, in the opinion of the Government, the material, product, or equipment so proposed is of equal quality, substance and function to the named item. The Contractor shall not install any proposed material, product, or equipment without the prior written approval of the Government.

The burden of proof, and all costs related thereto, concerning whether the proposed material, product, or equipment is an or- equal, shall be borne by the Contractor.

Mccormick, John W CIV USARMY CENAU (USA) We tend to avoid any Brand Names. Are there any brand names for ATFP or HVAC Sections?

Useful Information:

UNIT OF MEASURE DEFINITIONS:

ACR – Acre, BAG – Bag, BBL – Barrel, BCY - Bank (In-place) Cubic Yards, BF - Board Foot, BOX - Box (each), BTU - British Thermal Unit, C - One Hundred, CCF - One Hundred Cubic Feet, CCY - Compacted Cubic Yards, CF - Cubic Foot, CFM - Cubic Feet Per Minute, CI – Cubic Inch, CLF - One Hundred Linear Feet, CSF - One Hundred Square Feet, CSY - Hundred Square Yards, CWT - Hundred Weight, CY - Cubic Yard, CYM - Cubic Yard Mile, DAY – Day, DRM - Drum (each), EA – Each, FLR - Floor (Per Floor), FT – Foot, GAL – Gallon, GSF - Ground Square Foot, HR – Hour, HWT - Hundred Carton Weight, HYR – Half Year, IN – Inch, JOB – Job, LAN – Lane, LB – Pound, LCY - Loose (Excavated) Cubic Yards, LF - Linear Foot, LFD - Linear Feet Per Day, LIT – Liter, LOT – Lot, MBF - One Thousand Board Feet, MBH - One Thousand British Thermal Units, MCF – One Thousand Cubic Feet, MF3 - One Thousand Cubic Feet Per Minute, MGL – One Thousand Gallons, MI – Mile, MLF - One Thousand Linear Feet, MO – Month, MSF - One Thousand Square Feet, MSY - One Thousand Square Yards, MT

- Metric Ton, MTK – Metric Ton Kilometer, M2 – Square Meter, M3K – Cubic Meter Kilometer, NTE – Note, OPN – Opening, OUT - Outlet or Output (each), OZ – Ounce, PKG – Package, PNT – Point, PR – Pair, QT – Quart, ROL - Roll (each), ROM – Room, ROW – Row, RSR - Riser (Per Rise), SEA – Seat, SET – Set, SF - Square Foot, SHT – Sheet, SI - Square Inch, STP - Stop (each), SQ - Square or One Hundred Square Feet, SY - Square Yard, SYI – Inches per Square Yard, TNM - Tons per Mile, TON – Ton, TRK – Truck Load, UI - United Inch, UNT

– Unit, VLF - Vertical Linear Foot, WK – Week, YD – Yard, YR – Year

BULK FACTORS FOR DEMOLITION:

The following bulk factors shall be used to calculate the volume of demolished material to be transported from the project site.

• Asphalt = 1.25

• Concrete = 1.4

CONVERSIONS:

Length Conversion:

Metric Unit Imperial Equivalent Conversion Factor Millimeter (mm) Inch (in) 1 mm = 0.0393701 in Meter (m) Foot (ft) 1 m = 3.28084 ft Meter (m) Yard (yd) 1 m = 1.09361 yd Kilometer (km) Mile (mi) 1 km = 0.621371 mi Area Conversion:

Metric Unit Imperial Equivalent Conversion Factor

Square Centimeter (cm²) Square Inch (in²) 1 cm² = 0.155000 in² Square Meter (m²) Square Foot (ft²) 1 m² = 10.7639 ft² Square Meter (m²) Square Yard (yd²) 1 m² = 1.19599 yd²

Mccormick, John W CIV USARMY CENAU (USA) Update: Provide SI and Metric System

Square Kilometer (km²) Square Mile (mi²) 1 km² = 0.386102 mi² Hectare (ha) Acre (ac) 1 ha = 2.47105 ac

Volume Conversion:

Cubic Centimeter (cm³) Cubic Inch (in³) 1 cm³ = 0.0610237 in³ Cubic Meter (m³) Cubic Foot (ft³) 1 m³ = 35.3147 ft³ Cubic Meter (m³) Cubic Yard (yd³) 1 m³ = 1.30795 yd³ Liter (L) Gallon (gal) 1 L = 0.264172 gal Liter (L) Quart (qt) 1 L = 1.05669 qt Liter (L) Pint (pt) 1 L = 2.11338 pt

Weight Conversion:

Kilogram (kg) Pound (lb) 1 kg = 2.20462 lb Metric Ton (tonne) Ton (short ton) 1 tonne = 1.10231 short ton Gram (g) Ounce (oz) 1 g = 0.035274 oz

INSERT JOCPB (UPB Europe_2025)

PRICEBOOK OVERVIEW:
JOC UNIT PRICE BOOK
The Unit Prices Include:
LABOR COSTS:
EQUIPMENT COSTS:
MATERIAL COSTS:
The COEFFICIENTS Include:
Unit Pricebook Coefficient
Burdened Coefficient
BUSINESS COSTS:
PROJECT RELATED COSTS:
PRICE VARIATIONS:
SUMMARY:
General Rules on Using the JOCPB:
DEMOLITION:
WORKING HEIGHT:
FIELD ENGINEERING:
Or Equals and Brand Names:
Useful Information:
UNIT OF MEASURE DEFINITIONS:
BULK FACTORS FOR DEMOLITION:
CONVERSIONS:

INSERT JOCPB (UPB Europe_2025)