Solicitation Amendment W912PF25QA0720001 SF 30.pdf
PDF 3 MB Posted
- Attached to
- TESTS AND CERTIFICATIONS OF LIGHTNING PROTECTION SYSTEMS Federal contract opportunity
- Solicitation number
- W912PF25QA072
About this file
This is an Amendment of Solicitation (Standard Form 30) for a contract to perform Tests and Certifications of Lightning Protection Systems at Camp Darby in Pisa, Italy. The solicitation (W912PF25QA072) involves testing and certifying lightning protection systems for approximately 160 facilities, including Earth Covered Magazines (ECMs), Above Ground Magazines (AGMs), and other military infrastructure. Key requirements include performing grounding measurements, bonding continuity tests, and comprehensive lightning protection system inspections every two years, with detailed documentation of resistivity values and compliance with specific standards.
The amendment includes a comprehensive Questions and Answers section addressing technical details such as testing points (20 for ECMs, 55 for AGMs), certification requirements, and logistical challenges. Potential contractors must submit certifications as part of their evaluation factors, with the possibility of obtaining Italian government authorization (Type A body) after award. Background checks and base access will take 2-3 months, and contractors will be assisted by another maintenance contractor during the work. The solicitation emphasizes detailed reporting, deficiency identification, and compliance with Italian and military regulations, with testing to be performed across two annual groups to ensure a 24-month compliance schedule.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B08-Attachment02_Past Experience Questionnaire_ Test and Certs of LPS_ - Updated Form_.pdf | ||
| B08-Attachment 05_Info on General Hazards List on Camp Darby.pdf | ||
| B08-Attachment 02_Past Experience Questionnaire_ Test and Certs of LPS_.pdf | ||
| B08-Attachment 06_Info on SOP Emergency Evac Plan_English_Italian.pdf | ||
| B08- Performance Work Statement - Tests and Certifications of Lightning Protection Systems.pdf | ||
| Solicitation - W912PF25QA072_Tests and Certs of LPS_15JUL2025_.pdf | ||
| B08-Attachment 01_Pricing Worksheet_Tests and Certifications of LPS FY2025-2029_.xlsx | XLSX spreadsheet | |
| B08-Attachment 04_DUVRI_.pdf | ||
| B08-Attachment 03_Self Certification for Antimafia Communication_.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Solicitation/Contract Form Continuation
The following changes have been made:
Miscellaneous text in this section has been added to:
Solicitation W912PF25QA072 - Tests and Certifications of Lightning Protection Systems
Location - Camp Darby, Pisa, Italy
Request for Information (RFI) - QUESTIONS AND ANSWERS
1. Specify how many points of grounding connection should be tested per listed building such as ECM and other locations.
For ECMs, readings are around 20, while for AGMs, they're around 55.Answer:
2. Provide the grounding and lightning plan for all listed buildings and locations.
can't disclose maps, pictures or any sketches regarding the Answer: Our office, Utilities Branch, area where the base is located.
3. The number of "quantities" stated in the pricing sheet, are those the number of testing points in that specific location such as the LPS for ECM?
The quantities indicated in the price list refer to the number of buildings, structures, or Answer:
facility that need to be certified.
4. Can you please provide a map and/or as-built LPS drawings of the 160 facilities? We need to fully understand the size, access, and complexity of these facilities to provide the most accurate quote.
can't disclose maps, pictures or any sketches regarding the Answer: Our office, Utilities Branch, area where the base is located.
5. Will a suitable boom lift be available to access the roofs of the facilities? We have OSHA certifications for boom lift operation. Will this be sufficient at Darby? Is additional training required?
During the development of the above service the contractor will be assisted by another Answer:
contractor who was assigned maintenance and repair of LPS than support for any manual work and support of any machinery necessary for reading ohms resistances. As shown in PWS at point 5.2.1-page bottom.
W912PF25QA0720001
6. Is the only requirement for bonding (continuity) measurements from the air terminals to the grounding system?
The requirements are those outlined in the reference regulations listed in PWS Point 6. Answer:
For certification, all critical points assessed by the certifier at the time of certification must be considered.
7. Are grounding measurements (three-point fall-off-potential) also required for each facility?
CorrectAnswer:
8. Are there any additional measurements or inspections required (surge protective devices, bonding of metallic infrastructure within the side flash distance of the LPS, antenna masts, etc.)?
Typically, the contractor performing the maintenance and visual inspections of the LPS Answer:
handles the assessment. However, it's the certifier's responsibility to identify any anomalies leading to a negative certification and to communicate these deficiencies, which would then result in a potentially negative certification.
9. Do inspection reports only need to include out-of-compliance measurements or do the customer require tabulated bonding measurements for each air terminal?
The certification must specify the reference regulations, test date, ohmmeter calibration Answer:
date, and the resistivity value for each individual measurement point along with the location where the resistivity values were taken.
10. What do these acronyms stand for: ECM, Milvan, PAD, AGM, SWS, ERI IDLS?
Answer:
ECM: Earth Covered Magazine
MILVAN: Military-owned demountable VAN
PAD: is a square stock area
AGM: Above Ground Magazine
SWS: Surveillance
METAL AGM: Metal Above Ground Magazine
ERI: Weapons Download Rail Station
ERI IDLS: Intermodal Depot Logistics Station
11. Qualification: "Contractor shall provide to be an agency authorized by the 'Ministero delle imprese e del made in Italy' which qualified the company as an 'Organismo di Tipo A', in accordance with Italian Law DPR 462/01", Is this mean The contractor must be recognized by the Italian government (specifically the Ministry of Enterprises and Made in Italy) as an independent inspection body ("Type A body") authorized to perform electrical safety inspections, including lightning protection system certifications, as required by Presidential Decree DPR 462/01. Should that statement eliminate foreign agencies not recently registered in the Ministry of Enterprises in Italy regardless of capabilities to perform the LPS testing certification? if, yes can the offeror register upon the award?
Answer: As stated in our solicitation, to be considered for award, prospective contractor, submitting a quote, SHALL demonstrate and provide ALL the certifications in Factor 1 to be evaluated as "Acceptable". Certifications and Past Performance Factors are to be submitted with the quote as they are part of the evaluation factors. We do not preclude or hinder prospective contractors submitting a quote without the accompanying certifications. We will evaluate all submissions based on the factors, and as stated in our solicitation, , the to be eligible for award quoter shall be rated "Acceptable" on all non-price factors.
12. Are the Italian-specific certifications listed on Page 39 - Evaluation(Certifications), Items A, B, and C of the PWS a hard requirement for bid acceptance?
Answer: We do not preclude or hinder prospective contractors submitting a quote without the accompanying certifications. We will evaluate all submissions based on the factors and as stated in our solicitation, , the quoter shall be rated "Acceptable" on all non-price to be eligible for award factors. All acceptable offers will then be evaluated for the low price, technically acceptable offer, of the total base and all option periods.
13. Are the certifications under Factor 1 required to have these on day one of the contract? Or can we apply for them either now or if we are awarded the contract? We did some research and it's a lengthy process (few months).
Answer: Factor 1 - Certifications are to be submitted with the quote as they are part of the evaluation factors in order to be eligible for award.
If a sample report is available, may we receive a copy?14.
Answer: These reports are generated using formats that are the company's property, and as users, we're not permitted to release them.
Can we incorporate our sample test report as part of the offer's submittal?15.
Answer: It is not a requirement to submit a sample test report but if you want to showcase a report, you can incorporate a sample test report as part of past performance experience questionnaire submission stating that a sample report submitted from a previous work.
Will we be responsible to denote deficiencies?16.
Answer: Yes, the service provider will be responsible for denoting deficiencies.
Which test standard(s) shall be used?17.
Answer: See PWS.
How long will background checks take?18.
Answer: Background checks to get access to the base may take from 2 to 3 months and apply to both new requests and renewals. Timing can be unpredictable as decision is based on the result made only by the Italian Base Commander.
What's involved in the badging process?19.
Answer: Documentation to be sent to the IACO Office of Livorno for External Firms (Including Access to the Installation during Italian and American Holidays). For the issuance of the DBIDS card (regular or temporary), the form AE Reg. 190-16 A must be correctly completed and signed by the requesting Authority, together with further supporting documentation and delivered to the IACO Office of Livorno at least 90 days in advance (also applies to renewals). The Requesting
Authority or Sponsor must have previously sent the necessary documentation to be able to act as an official Sponsor (DD Form 577, Sponsoring Training and Certificate) and have read the responsibilities as an official Sponsor.
20. Are there any scheduling conflicts throughout the year that we need to be aware of which would limit access to the buildings?
Answer: See PWS paragraphs 1.6 to 1.9. The service provider needs to closely coordinate with the COR (Contracting Officer Representative).
21. Is it expected that the contractor performs maintenance testing once a year or semiannually?
Answer: See PWS paragraph 5.2.1. The test must be performed every two years as required standards. Buildings to be certified will be divided into two annual groups, with two lists of tables under paragraphs 5.2.1.1 and 5.2.1.1A of the PWS, which will alternate to ensure compliance with the 24-month schedule.
22. Does the past performance questionnaire need revision since the narrative states "test and inspection of fire pumps"?
Answer: Yes, an updated Past Performance Questionnaire will be included in an amendment to the solicitation together with the answers to the RFIs.
Will we have roof access to all these buildings, and will we need ladders or manlifts?23.
Answer: See PWS paragraph 5.2.1. During the development of the above service the contractor will be assisted by another contractor who was assigned maintenance and repair of all Lightning Protection Systems (LPS) than support for any manual work and the support of any machinery necessary for reading ohmic resistances. Adequate coordination within the two contractors is required and any problem will occur shall be notified immediately to COR.
May we request a base map with all the buildings associated with this contract?24.
Answer: Our office, Utilities branch, can not disclose maps, pictures or any sketches regarding the area where the base is located.
List of Contract Documents, Exhibits, or Attachments
The attachments table has changed from:
Identifier Document Name Document Description Reference Identifier
Date Line Item Page Numbers
Document Type
Provided Under Separate Cover
B08- Performance Work Statement - Tests & Certifications of Lightning Protection Systems
Performance Work Statement 08 Feb 2025 Attachment No
B08-Attachment 01_Pricing Worksheet_Tests & Certifications of
LPS FY2025-2029_
Pricing Worksheet 30 Jun 2025 Attachment No
B08-Attachment 02_Past Experience Questionnaire_ Test & Cert of LPS_
Past Experience Questionnaire 30 Jun 2025 1 Attachment No
B08-Attachment
03_Self Certification for Antimafia Communication_
Self Certification for Antimafia Communication_ 30 Jun 2025 Attachment No
B08-Attachment
04_DUVRI_
DUVRI 19 May 2025 Attachment No
B08-Attachment 05_Info on General Hazards List on Camp Darby
Informational General Hazards List on Camp Darby
01 Jul 2008 Attachment No
B08-Attachment 06_Info on SOP Emergency Evac Plan_English_Italian
Informational SOP Emergency Evac Plan_English_Italian
05 Oct 2020 Attachment No
To:
Identifier Document Name Document Description Reference Identifier
Date Line Item Page Numbers
Document Type
Provided Under Separate Cover
B08- Performance Work Statement - Tests & Certifications of Lightning Protection Systems
Performance Work Statement 08 Feb 2025 33 Attachment No
B08-Attachment 01_Pricing Worksheet_Tests & Certifications of
LPS FY2025-2029_
Pricing Worksheet 30 Jun 2025 3 Attachment No
B08-Attachment 03_Self Certification for Antimafia Communication_
Self Certification for Antimafia Communication_
30 Jun 2025 1 Attachment No
B08-Attachment
04_DUVRI_
DUVRI 19 May 2025 13 Attachment No
B08-Attachment 05_Info on General Hazards List on Camp Darby
Informational General Hazards List on Camp Darby
01 Jul 2008 14 Attachment No
B08-Attachment 06_Info on SOP Emergency Evac Plan_English_Italian
Informational SOP Emergency Evac Plan_English_Italian
05 Oct 2020 20 Attachment No
B08- Attachment02_Past Experience Questionnaire_ Test and Certs of LPS_ - Updated Form_
Past Experience Questionnaire - Updated Form
30 Jul 2025 1 Attachment No
The following contract documents were added:
B08-Attachment02_Past Experience Questionnaire_ Test and Certs of LPS_ - Updated Form_
The following contract documents were deleted:
B08-Attachment 02_Past Experience Questionnaire_ Test & Cert of LPS_
The following contract documents Page Counts were changed:
DOCUMENT PAGE COUNTS
DOCUMENT NAME FRO
M
T O
B08-Attachment02_Past Experience Questionnaire_ Test and Certs of LPS_ - Updated Form_
| IDCode: J |
| Page: 1 |
| Pages: 6 |
| AmendNo: 0001 |
| EffDate: 11 AUG 2025 |
| ReqNo: |
| ProjNo: |
| IssCode: W912PF |
| AdmCode: |
| IssuedBy: 0414 AQ HQ CONTRACT AUG |
KO DIRECTORATE OF CONTRACTING, UNIT 31423 BOX 77
APO, AE 09630
UNITED STATES
SOLOMON CUENCA, EMAIL: SOLOMON.P.CUENCA.CIV@ARMY.MIL TELEPHONE: 314- 645-8761
AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: W912PF25QA072 |
| SolDate: 15 JUL 2025 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: Off |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: SEE CONTINUATION |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: PROVIDE ANSWERS TO REQUEST FOR INFORMATION (RFI) AND ATTACHED AN UPDATED FORM OF THE PAST PERFORMANCE QUESTIONNAIRE. |
| ContNameTitle: |
| CoNameTitle: BRENDAN A. DELUCA |
| ContDate: |
| CODate: 07 AUG 2025 |