Amendment 1_RFQ W912PF22Q00023_TempShelters_CCU_QA_20220818.pdf
PDF 220 KB Posted
- Solicitation number
- W912PF22Q0023
About this file
This document provides answers to questions regarding solicitation number W912PF22Q0023 from the Department of the Army Materiel Command Army Contracting Command for the lease of two temporary storage shelters and one climate control unit. Offerors must provide pricing to lease the shelters and climate control unit, with the shelters requiring roller doors and personnel doors. The climate control unit must keep temperatures and humidity within specified ranges. The prior contract for these services was number W912PF-19-P-0120 and was held by Tendsystem SRL. Quotes are due by August 22, 2022. Site visits are not available and maintenance requirements for the climate control unit must be addressed.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912PF22Q0023 - Amendment 2.pdf | ||
| RFQ_W912PF22Q00023_20220802.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFQ-W912PF22Q0023
Amendment 1
Temp. Shelters & CCU
Q&A
Amendment 1 - RFQ W912PF-22-Q-0023, Temporary Shelters and Climate Control Unit (Questions &
Answers (Q&A)
The purpose of Amendment 1 is to incorporate the Q&A within the RFQ.
The RFQ due date remains unchanged, all quotes are due by 22 August 2022 by 10:00am Central European Time
(CET) via email to: roberto.schiavon2.ln@army.mil, shonna.l.glover.civ@army.mil and matthew.l.kindig.mil@army.mil.
RFQ W912PF-22-Q-0023 Q&A as of 17 Aug 2022
Question Answer
1.) Does the concrete slab on which the structures are to be placed have Any slopes?
If it has a slope towards the folding doors, how do we deal with the problem of the possible entry of water into the tents during an atmospheric precipitation?
How thick is the concrete of the slab in question?
- The structures will be placed on the existing asphalt. There is no Slab for the purpose of installing the structures.
- The asphalt is flat, however there might be some very minor sloping (do not know the degree of slope).
- The asphalt on the ground is approx. 6 inches thick.
*Note: Just to clarify the area where the structures will be placed is not a slab of concrete it's asphalt.
2.) STRUCTURES: we will insert 2 Double Slope 15X30 H4
(indicative drawing is attached) excluding lighting system, electrical system, earthing and installation against atmospheric discharges.
Do the PVC roofing and gable sheets have to be white or blackout white?
For the perimeter closure we provide rigid panels with a thickness of 40 mm as per the attached sheets. How many roller shutter doors per structure? Height, width and material type? Where will they be mounted on the structure, on the front or on the side? (Indicative drawing and data sheet are attached) How many personnel doors per structure? Height, width and type? Where will they be mounted on the structure, front or side?
- 1st paragraph - What is your question? We can not provide an answer because we do not understand your question. The drawings that were attached are written in Italian, per the
RFQ (under Instructions to Offerors), all correspondence including the quote, shall be in
English, except (Encl. 2) Anti-Mafia Self
Certification.
- The PVC roofing and gable sheets can be either as long as it can sustain snow, water and wind requirements (per Salient Characteristics specs)
- Each structures must have two roller doors
(4830mm x 3900mm). The doors will be on the front and back of each structure. Each structure can have one personnel door. Personnel doors can be mounted on the front, or back of the structure. Size is standard door size
(1000mmx2125mm). (Have not seen the drawings they are alluding)
3.) Air Conditioning: - As mentioned in SOW the air conditioning unit will be for “ONLY ONE” structure.
mailto:roberto.schiavon2.ln@army.mil mailto:shonna.l.glover.civ@army.mil mailto:matthew.l.kindig.mil@army.mil
RFQ-W912PF22Q0023
Amendment 1
Temp. Shelters & CCU
Q&A
The technical document show that there are two structures and an air conditioning system.
Will it be air-conditioned one tent or both?
If both are air-conditioned, will we have 13.30 Kw per tent at our disposal?
4.) Regarding the temperature and humidity ranges, must the machines remain within these ranges or will temperatures and humidity be given with established values and the control unit will have to respond to these settings?
Our machines guarantee to stay within these ranges but it becomes complex to have temperatures and humidity changed frequently.
Taking this fact into consideration, we ask, if possible, to have information and/or technical data sheets regarding air conditioning units you already use and which meet the parameters you have requested.
- The temperature and humidity levels must be within the prescribed range per Statement of
Work (SOW) requirement under point 5.
Maintenance, paragraph b.
- The current contract did not have a requirement for a Climate Control Unit (CCU) i.e air conditioning unit, therefore, there are no technical data sheets to provide Please refer to the RFQ requirement under point 5.
Maintenance, paragraph b for the parameters for the CCU.
5.) Is access to the site possible using any type of vehicle
(vans, trucks, forklifts)?
- Yes
6.) Is there a possibility of a telephone number for sharing with you any doubts or improvements that we may encounter in the event of an offer and, if deemed necessary, we will be able to make an inspection at your Air Force Base?
- As per the RFQ, all questions concerning the solicitation shall be submitted via email. A
Technical Representative (TR) Point of
Contact (POC) will be provided after contract award. At the present time, a site visit is not available.
7.) In the Pricing table (enclosure 1) we should indicate the quotation for the leasing prices but there is always the request for a climate control unit included.
If the climate control system is going to be realized by a company which is close the Air Base (for maintenance reasons etc).
- Yes you are required to indicate the leasing prices within Encl. 1 - Pricing Table. As stated within RFQ W912PF22Q0023, This requirement is to lease two (2) Storage Shelters and one (1) Climate Control Unit (CCU).
- You will have to determine and state how you will provide maintenance for the CCU.
8.) We would like to know if this is a brand new contract
OR if there is (was) an incumbent performing these services.
If not brand new, could you please provide the current / previous contract number?
- This is a follow-on with an existing contract.
The previous contract number and vendor is
W912PF-19-P-0120; Tendsystem SRL.