COMMITTENZA / COMMITTEE

COMANDO USA SETAF

DARBY MILITARY COMMUNITY

VIA AURELIA

56018 TIRRENIA (PI)

STRUTTURA ORGANIZZATIVA NELLA QUALE SARA’ SVOLTA L’ATTIVITA’ / ORGANIZATIONAL STRUCTURE WHERE ACTIVITY WILL TAKE PLACE

DATORE DI LAVORO / EMPLOYER

LPW-O

VIA AURELIA SS1

ZONA DEPOSITO

56018 TIRRENIA PISA

COMANDANTE / COMMANDER: COL, DANIEL J. VOGEL

DMC MANAGER: ROBERT J. CHARTIER

RSPP Ufficio SPP / Safety Officer _Ing. Chiara Chelossi_ UFFICIO / OFFICE PUBLIC WORKS OFFICE (PWO) Medico Competente / Occupational Health Doctor _Dr. Raffaele Peluso_

Manager del PWO/ PWO Manager

Stephen L. Donnelly, PE_

RLS / Workers’ Safety Representative

_ Manrico Bendinelli_ _Massimo Ferrari___ _Luca Vannucchi___ _Riccardo Kolman__

Responsabile di area / Area Supervisor

Committente / Commissioning Employer Comando USA SETAF

Addetti al pronto soccorso / First Aid qualified Employees

DES – Fire Section

Addetti all’antincendio / Building Fire Wardens

DITTA APPALTATRICE / CONTRACTOR

INDIRIZZO / ADDRESS

DATORE DI LAVORO / EMPLOYER: ___________________

Responsabile di cantiere / Contractor’s on-site Representative

Medico competente / OH Doctor

RSPP / Safety Officer _______________ Addetti al pronto soccorso (cantiere) / First Aid qualified Employees (Contractor)

Addetti all’antincendio (cantiere) / Fire Wardens (Contractor)

RLS / Employees’ Safety representative

PWO MANAGER

VERIFICATO/REVIEWED

Safety Office

VERIFICATO/REVIEWED

STEPHEN L. DONNELLY, PE

Date______ Signature_______________

Ing. Chiara Chelossi Date:

Signature________________

Anagrafica dell'Appaltatore

DUVRI

DOCUMENTO DI VALUTAZIONE DEI RISCHI DI INTERFERENZA

ART. 26 COMMA 3, D.LGS. 81/08

SINGLE DOCUMENT FOR THE ASSESSMENT OF INTERFERENTIAL RISKS

Article 26, paragraph 3, Legislative Decree 81/08

DESCRIZIONE ATTIVITÀ / DESCRIPTION OF ACTIVITY

Servizio di misura e certificazione impianti protezione scariche atmosferiche (Si prevedono: n.65 giorni di lavoro non continuativi e n.1 tecnico)

Test and certifications of lightining protection systems (Estimated completion: 65 working days and Nr.1 technician)

DARBY MILITARY COMMUNITY

DOCUMENTO UNICO DI VALUTAZIONE DEI RISCHI Art. 26 comma 3, D.Lgs 81/08

Oggetto del contratto Test and certifications of lightining protection systems

Edifici interessati USAG ITALY DMC protected by lightining protection systems

Datore di lavoro richiedente COMANDO USA SETAF

Numero di contratto

Appaltatore

Ragione sociale

Legale rappresentante

Sede legale

Sede operativa

Telefono/Fax e-Mail

Codice fiscale

Partita iva

Iscrizione alla C.C.I.A.A

Posizione assicurativa INAIL

Posizione INPS

C.C.N.L. applicato

Responsabile del Servizio di Prevenzione e Protezione (RSPP)

Rappresentante dei Lavoratori per la Sicurezza (RLS)

Medico Competente

Responsabile Prevenzione Incendi

Responsabile Pronto Soccorso

Referente della ditta appaltatrice per il coordinamento e la sicurezza

Periodo di lavoro PERIODO: Lunedi – Venerdi

ORARIO: dalle 8.00 alle 17.00

DARBY MILITARY COMMUNITY

Edifici interessati USAG ITALY DMC protected by lightining protection systems

Datore di lavoro richiedente COMANDO USA SETAF

RISCHI AMBIENTALI PRESENTI ALL’INTERNO DEGLI EDIFICI OGGETTO DELL’INTERVENTO / POTENTIAL RISKS PRESENT INSIDE THE

BUILDINGS OBJECT OF THIS WORK CONTRACT

Edifici Bldgs

N. Addetti –Descrizione Generale / No. Employees On site/description

Attrezzature – Macchinari / Machinery - equipment

Rischi presenti / Risks

USAG ITALY

DMC Areas

Affollamento addetti per area di lavoro:

nr.2/3

Employees per bldg/area:

nr.2/3

Macchinari ed attrezzature:

apparecchi di sollevamento, attrezzature varie / Machines and equipment: various type of elevator, various tools.

Rischio di caduta dall’alto.

Utilizzo di utensili rumorosi e prova di motori rumorosi.

Presenza in stoccaggio di liquidi combustibili.

Presenza di lavorazioni che comportano la proiezione di schegge.

Movimentazione eseguita con carrelli elevatori.

Spostamento di veicoli e mezzi tattici.

Movimentazione di carichi con carroponte.

Movimentazione di oggetti pesanti.

Rischio dovuto ad elementi elettrici in tensione.

Rischio Generico.

Risk of falling Noisy equipment and engine test (ground hop).

Bulk Flammable / Combustible liquid present.

Risk of flying particles by using machines / tools.

MHE movement on site.

Tactical vehicle traffic.

Overhead crane movement.

Manual handling of heavy loads.

Risk of electrical equipment’s under voltage.

Generic Risk.

ALTRI RISCHI PRESENTI nelle Aree/ OTHER GENERAL HAZARDS PRESENT IN THE AREAS

1. Traffico veicolare; automezzi privati, muletti, (talvolta questi ultimi sprovvisti di segnalatori acustici e/o ottici), bus navetta, veicoli militari, cisterne rifornimento serbatoi di olio combustibile o GPL esterni agli edifici, veicoli per la raccolta dei rifiuti. / Vehicular Traffic: POVs, forklifts, (sometimes with no regular yellow/orange blinking light and backward maneuvering beeper), shuttle bus, military vehicles, refueling tanks for combustible oil or LPG, trash collection dumpers.

Rischi: collisione – schiacciamento – interferenza con operazioni di rifornimento/raccolta rifiuti. / Risks: collision – crushing – interference with refueling/trash collection operations.

2. Traffico pedonale (la zona Depot e’ per lo piu’ sprovvista di marciapiedi). / pedestrian traffic (almost no side walks in the Depot area).

Rischi: investimento. / Risks: hitting a pedestrian.

DARBY MILITARY COMMUNITY

Edifici interessati USAG ITALY DMC protected by lightining protection systems

Datore di lavoro richiedente COMANDO USA SETAF

3. Segnaletica si sicurezza non sempre conforme alle vigenti norme di sicurezza e non sempre bilingue. / Road signs / marking not always IAW traffic code and not always bilingual.

Rischi: fraintendimento dei segnali. / Risks: misinterpretation of road signs / marking.

4. Presenza di personale di lingua non Italiana. / Presence of non-Italian speaking personnel.

Rischi: fraintendimento nelle comunicazioni verbali. / Risks: verbal communication misinterpretation.

5. Possibile interazione con personale della sicurezza militare all’interno dell’area/edificio per esigenze di carattere operativo. / Potential interaction with security personnel in the area/facility due to operational contingencies.

Rischi: interferenza con operazioni di pubblica sicurezza -fraintendimento nelle comunicazioni verbali. / Risks: interference with security forces operations - verbal communication misinterpretation.

6. Gli edifici circondati da prato possono ospitare nelle adiacenze nidi di insetti, (vespe ad esempio), o altri animali. / Green area surrounding facilities may hide insects or other animals’ nests.

Rischi: biologico. / Risks: biological.

7. Presenza di alberi intorno i parcheggi e/o lungo le vie di passaggio. / Trees surrounding parking areas and/or along cross ways.

Rischi: esposizione alle pine che cadono dagli alberi. / Risks:

exposure to pine cones falling.

8. Incrocio a 4 vie (STOP sui quattro lati – non conforme). / 4-Way stop crossroad (not European traffic code compliant).

Rischi: fraintendimento della precedenza – collisione. / Risks: yield misinterpretation - collision.

9. Armadi chiusi riportanti l’indicazione “Materiale Infiammabile. – Flammable materials” / Closed cabinets/storage room with “Materiale Infiammabile – Flammable materials” signs.

Rischi: incendi - esposizione accidentale. / Risks: fire – accidental exposure.

10. Presenza di depositi di materiali pericolosi segnalati con la scritta “HAZARDOUS WASTE”. / Presence of dangerous materials with HAZARDOUS WASTE signs.

Rischi: esposizione accidentale. / Risks: accidental exposure.

11. Presenza di cassoni porta rifiuti e relative operazioni periodiche di svuotamento con mezzi pesanti. / Presence of trash collectors on related removal operations performed with dumpers.

Rischi: collisione – schiacciamento – interferenza con operazioni di rimozione rifiuti. / Risks: collision – crushing – interference with trash collection.

12. Segnaletica stradale orizzontale non sempre chiaramente leggibile. / Marking on the roads signs not always readable.

Rischi: collisione. / Risks: collision.

13. Presenza di sostanze corrosive acide a base di cloro contenute in appositi e segnalati contenitori. / Presence of corrosive and acid substances having chlorine base contained in specific and signaled tanks.

Rischi: contatto con pelle, occhi e inalazione potenziali gas sviluppati. / Risks: contact with skin, eyes and inhaling potential gases.

14. Presenza di pompe, tubazioni e condutture acque all’interno dei locali oggetto di manutenzione (impianti trattamento acque). / Presence of pumps, pipings and water conduits within working areas (water treatment plant).

Rischi: inciampo, caduta, collisione con gli arti (braccia e gambe) e testa. / Risks: fall, stumbling, fall, collision with arms, legs and head.

ATTIVITA’ SVOLTA DALL’APPALTATORE E FASI LAVORATIVE / CONTRACTOR WORK ACTIVITIES

Servizio di Servizio di misura e certificazione impianti protezione scariche atmosferiche

DARBY MILITARY COMMUNITY

Edifici interessati USAG ITALY DMC protected by lightining protection systems

Datore di lavoro richiedente COMANDO USA SETAF

(Si prevedono: n.65 giorni di lavoro non continuativi e n.1 tecnico) Test and certifications of lightining protection systems

(Estimated completion: 65 working days and Nr.1 technician)

Fasi lavorative previste / Scheduled Work Phases:

a) Arrivo della ditta all’ingresso di un’area di competenza dell’USAG Italia DMC. Il personale della ditta dovra’ gia’ essere in possesso dell’autorizzazione e dei relativi pass, e si rechera’ autonomamente presso gli edifici ove si deve svolgere il lavoro. Per recarsi presso l’edificio dovra’ essere seguita la strada piu’ breve procedendo ad una velocita’ non superiore ai 40Km/h e rispettando tutte le regole del codice della strada incluso l’obbligo di indossare le cinture di sicurezza / Arrival of Contractor at one of USAG Italy DMC area entrance, the Contractor personnel shall be already in possession of authorization and relative passes and it can proceed to buildings were the works should be done on its own. In order to reach the building the Contractor must take the shortest route and travel at a speed not to exceed 40km/h and observe all traffic regulations including compulsory wearing of seat belts.

b) Arrivati presso l’edificio il rappresentante della ditta’, prima di iniziare qualsiasi attivita’, dovra’ recarsi dal responsabile di area o da un suo rappresentante, per coordinare le attivita’. / On arrival at the building a representative of the Contractor, before starting any work, must meet with the person responsible or representative for that area, to coordinate all activity.

c) Al fine di evitare le interferenze le attivita’ saranno svolte adottando le seguenti precauzioni / In order to avoid interference work will be accomplished adopting the following precautions:

- La zona prospicente il sistema oggetto dell’intervento dovra’ essere preventivamente sgomberata dal responsabile di area; / Prior to any work activity the zone overlooking the system on which work is to be performed must be cleared by the person responsible for that area;

- Il responsabile di area dovra’ evitare l’esecuzione di attivita’ particolari che possano determinare rischi all’interno della zona di lavoro perimetrata; / The person responsible for the area will prevent any particular activity that can put at risk anyone present in the cordoned off work area;

- Considerando i possibili rischi presenti nell’edificio transito e’ consentito solo adottando scarponi antinfortunistici; / Considering the possible risks present into the building, transit is only permitted wearing safety shoes;

- All’interno della zona perimetrata la ditta potra’ eseguire l’intervento di certificazione previsto in autonomia utilizzando le proprie attrezzature; / On the inside of the cordoned off area the Contractor can perform the certifications work as scheduled in autonomy and with the use of its own tools;

- Il responsabile di cantiere della ditta incaricata dovra’ evitare l’esecuzione di attivita’ che possano comportare rischi per le aree di lavoro al di fuori dell’area perimetrata di propria competenza. / the Contractor responsible for the work site must avoid performing any activity which may be of risk for the work areas outside of the cordoned off area for which he/she is responsible.

d) Esecuzione degli interventi di assistenza e manutenzione richiesti. / Perform maintenance work required.

e) Terminati gli interventi il responsabile di cantiere comunichera la fine dei lavori al responsabile di area che provvedera’ a riaprire la zona. / Once tests and inspections have been completed the Contractor responsible for the work site will inform the person responsible for the area of work completion so that he may proceed to reopen the area.

ATTREZZATURE UTILIZZATE DALL’APPALTATORE / CONTRACTOR SPECIAL TOOLS

DARBY MILITARY COMMUNITY

Edifici interessati USAG ITALY DMC protected by lightining protection systems

Datore di lavoro richiedente COMANDO USA SETAF

Tester, Strumenti Elettrci di Misura, Attrezzature Varie, Scale, Elevatori, Smerigliatrici, Chiavi, etc… / Testers, Electrical Measurements Instruments, Stairs, Cherry Picker, Trimmer, varied tools, etc… Ogni altra attrezzatura idonea ad effettuare i lavori di manutenzione inerenti il servizio. / Any other instruments or tools adequate to perform maintenance works under the service.

L’utilizzo delle macchine ed attrezzature da parte dell’appaltatore non comporta rischi al di fuori dell’area perimetrata. Non sono previste ulteriori misure di prevenzione e protezione oltre alla perimetrazione delle aree. / Use of machinery and equipment by the Contractor do not pose any risks outside of the cordoned area. No other preventive or protective measures apart from cordoning off the work area are prospected.

RISCHI DI INTERFERENZA DELL’ATTIVITÀ OGGETTO DELL’APPALTO, SVOLTA ALL’INTERNO DELLE ARRE DI LAVORO, DERIVANTI DA

UTENSILI/ATTREZZATURE/SOSTANZE/MEZZI UTILIZZATI / SUMMARY OF RISKS DUE TO USE OF TOOLS / EQUIPMENT / CHEMICALS /

VEHICLES

N. DESCRIZIONE / HAZARD DESCRIPTION RISCHIO / RISK

MISURE DI PREVENZIONE-PROTEZIONE /

PREVENTIVE-PROTECTIVE MEASURES

MOVIMENTAZIONE MANUALE DEI CARICHI /

MANUAL HANDLING OF HEAVY LOADS

Assenti / Not applicable Non necessarie / Not applicable

AGENTI FISICI: Rischi utilizzo utensili/attrezzature VIBRANTI PHYSICAL AGENTS: use of vibrating tools / equipment

Assenti / Not applicable Non necessarie / Not applicable

AGENTI FISICI: Rischio di utilizzo attrezzature che emettono CAMPI ELETTROMAGNETICI

PERICOLOSI

PHYSICAL AGENTS: use of tools / equipment emitting dangerous electromagnetic fields

Assenti / Not applicable Non necessarie / Not applicable

AGENTI FISICI: Rischio di utilizzo attrezzature che emettono RADIAZIONI OTTICHE

PERICOLOSE

PHYSICAL AGENTS: use of tools / equipment emitting dangerous radiation / optic fields

Assenti / Not applicable Non necessarie / Not applicable

SOSTANZE PERICOLOSE: Rischi utilizzo sostanze/preparati chimici pericolosi CHEMICALS: use of hazardous chemicals

Assenti / Not applicable Non necessarie / Not applicable

SOSTANZE PERICOLOSE: Rischi utilizzo sostanze/preparati chimici cancerogeni/mutageni CHEMICALS: use of cancerous / mutagen chemicals

Assenti / Not applicable Non necessarie / Not applicable

AGENTI BIOLOGICI: Rischi di utilizzo agenti biologici pericolosi BIOLOGICAL AGENTS: use of hazardous biological agents

Assenti / Not applicable Non necessarie / Not applicable

ATMOSFERE ESPLOSIVE: Rischi di sviluppo di atmosfere esplosive durante svolgimento attività EXPLOSIVE ATMOSPHERES: Development of explosive atmospheres during operations

Presente / Present Ventilazione e monitoraggio ambientale se necessaria/ Ventilation and environemntal monitoring if occurr

ATMOSFERE ESPLOSIVE: Rischio utilizzo di utensili, attrezzature, mezzi che possono innescare atmosfere esplosive EXPLOSIVE ATMOSPHERES: use of tools, equipment, vehicles that could ignite explosive atmospheres

Presente / Present

Nelle condizioni di lavoro previste non si rendono necessarie misure di sicurezza particolari / No particular safety measures are expected for this work

Rischi utilizzo sostanze infiammabili/facilmente combustibili Use of flammables / combustibles

Presente / Present Ventilazione e monitoraggio ambientale se necessaria/Ventilation and environemntal monitoring if occurr

DARBY MILITARY COMMUNITY

Edifici interessati USAG ITALY DMC protected by lightining protection systems

Datore di lavoro richiedente COMANDO USA SETAF

N. DESCRIZIONE / HAZARD DESCRIPTION RISCHIO / RISK

MISURE DI PREVENZIONE-PROTEZIONE /

PREVENTIVE-PROTECTIVE MEASURES

Rischi caduta materiale dall’alto Risk of falling objects

Presente / Present Le attivita’ lavorative svolte nell’area e dall’appaltante possono determinare il rischio di caduta di oggetti dall’alto /

The work performed in the area and by the Contractor can pose a risk of falling objects from above.

Per eliminare tali rischi di interferenza dovra’ essere adottata la perimetrazione dell’area oggetto dedegli interventi di manutenzione / To avoid such risks of interference the area object of maintenance work will be cordoned off.

Rischi utilizzo corrente elettrica Electrical equipments

Presente / Present Il preposto del contrattore dovra’ operare una volta assicurato l’impianto fuori tensione / Contractor’s operator could operate only after assure the system without power

Attrezzature idonee a verificare la presenza di tensione all’interno dell’impianto prima di effettuare ogni attivita’ / Contractor shall utilize special equipments to verify the voltage presence inside plants equipment before operate

Rischio apparecchiature in tensione Risk of equipments under voltage

Presente / Present

Gli operatori dovranno esssere qualificati ai lavori sotto tensione e dovranno utilizzare idonei DPI ed idonee attrezzature isolate / Operators shall be qualified and certified to perform works under voltage and they shall use proper DPI and special tools

Rischio spostamento con automezzi Moving traffic

Gli spostamenti all’interno della base devono essere preventivamente autorizzati dalla committente. Devono essere seguite scrupolosamente le regole di circolazione interna. In assenza di indicazioni particolari, procedere a passo d’uomo (5Km/ora). Vietato parcheggiare davanti a mezzi di salvataggio, soccorso, antincendio / All internal traffic needs to be previously authorized by the Commissioning Employer. All rules governing traffic will be observed. In the absense of signs, procede at walking pace (5 Km/h). Parking in front of emergency vehicles is prohibited

Rischio Acustico Acoustic Risk

Gli operatori dovranno utilizzare idonei DPI Operators shall use proper DPI

MISURE DI PREVENZIONE-PROTEZIONE AGGIUNTIVE / OTHER PREVENTIVE-PROTECTIVE MEASURES

1. Prima di accedere alle aree interessate dall’intervento, concordare con il COR dell’appalto le modalità di effettuazione delle attività e formalizzare le misure di prevenzione e protezione concordate. / Before entering the premises subject to the contract work, coordination with Contract COR must be done in order to establish the procedures of performance activities and the agreed on preventive and protective measures.

DARBY MILITARY COMMUNITY

Edifici interessati USAG ITALY DMC protected by lightining protection systems

Datore di lavoro richiedente COMANDO USA SETAF

2. Esporre la tessera di riconoscimento corredata di fotografia contenente le generalità del lavoratore e l'indicazione del datore di lavoro per tutto il tempo di permanenza nell’azienda (ai sensi dell’art.26 c.8 del D.Lgs.81/08). / Wear a badge equipped with photograph, name and address of contractor during the entire permanence inside the premises (IAW art. 26 para 8 of Law 81/08).

3. Localizzare i percorsi di emergenza e le vie di uscita. / Locate emergency exits.

4. In caso di evacuazione attenersi alle procedure vigenti. / In case of evacuation of bldg follow emergency evacuation plan.

5. Indossare i dispositivi di Protezione Individuale ove siano prescritti. / Wear personal Protective Equipment as prescribed.

6. Non ingombrare le vie di fuga con strumenti e attrezzature. / Do not block emergency exits with instruments and equipment.

7. Non operare su macchine, impianti e attrezzature se non autorizzati. / Do not operate machinery, equipment and tools if not authorized.

8. Evitare l’uso di cuffie o auricolari per l’ascolto della musica durante l’attività perché potrebbero impedire la corretta percezione dei segnali acustici di allarme in caso di emergenza (allarme incendio, allarme evacuazione, cicalini dei mezzi e delle macchine, ecc.). / Refrain from using headphones or earphones while working because they could prevent hearing emergency alarms (i.e. fire alarm, evacuation alarm, equipment and machinery buzzers, etc.).

9. Le attivita’ oggetto del contratto dovranno essere svolte perimetrando e isolando preventivamente la zona oggetto dell’intervento di manutenzione. / The activities object of the contract will be performed after having previously cordoned off the area object of the maintenance intervention.

10. E’ comunque vietato transitare all’interno dell’officine durante attivita’ di spostamento di mezzi o durante attivita’ di movimentazione eseguite con il carroponte. / In all cases it is forbidden to walk about the workshops when equipment/vehicles are being moved or the overhead crane is being operated.

11. Il responsabile di area dovra’ evitare l’esecuzione di attivita’ particolari che possano determinare rischi all’interno della zona di lavoro perimetrata. / The person responsible for the area will prevent any particular activity that can put at risk anyone present in the cordoned off work area.

12. Il responsabile di cantiere della ditta incaricata dovra’ evitare l’esecuzione di attivita’ che possano comportare rischi per le aree di lavoro al di fuori dell’area perimetrata di propria competenza. / The Contractor responsible for the work site must avoid performing any activity which may be of risk for the work areas outside of the cordoned off area for which he/she is responsible.

COSTI DELLA SICUREZZA

Sono quantificabili come costi della sicurezza tutte quelle misure preventive e protettive necessarie per l’eliminazione o la riduzione dei rischi interferenti individuate, così come indicativamente riportato di seguito:

gli apprestamenti previsti nel DUVRI (come ponteggi, trabattelli, etc.);

le misure preventive e protettive e dei dispositivi di protezione individuale eventualmente previsti nel DUVRI per lavorazioni interferenti;

DARBY MILITARY COMMUNITY

Edifici interessati USAG ITALY DMC protected by lightining protection systems

Datore di lavoro richiedente COMANDO USA SETAF gli eventuali impianti di terra e di protezione contro le scariche atmosferiche, degli impianti antincendio, degli impianti di evacuazione fumi previsti nel DUVRI;

i mezzi e servizi di protezione collettiva previsti nel DUVRI (come segnaletica di sicurezza, avvisatori acustici, etc.);

le procedure contenute nel DUVRI e previste per specifici motivi di sicurezza;

gli eventuali interventi finalizzati alla sicurezza e richiesti per lo sfasamento spaziale o temporale delle lavorazioni interferenti previsti nel DUVRI;

le misure di coordinamento previste nel DUVRI relative all'uso comune di apprestamenti, attrezzature, infrastrutture, mezzi e servizi di protezione collettiva.

informazione/formazione al personale dell’Appaltatore, riunioni periodiche e straordinarie di coordinamento.

La stima, analitica per voci singole, a corpo o a misura (quindi NON A PERCENTUALE), viene riferita ad elenchi prezzi standard o specializzati, oppure basata su prezziari o listini ufficiali vigenti nell'area interessata, o sull'elenco prezzi delle misure di sicurezza del committente; nel caso in cui un elenco prezzi non sia applicabile o non disponibile, si farà riferimento ad analisi costi complete e desunte da indagini di mercato.

Stima dei costi della sicurezza per le situazioni di rischio interferenti (Selezionare il paragrafo pertinente tra i due sotto elencati)

PER L’APPALTO IN OGGETTO, È RAGIONEVOLE RITENERE CHE I RISCHI DA INTERFERENZA POSSONO ESSERE RESI COMPATIBILI, RIDOTTI O ELIMINATI APPLICANDO CORRETTAMENTE LE MISURE GENERALI DI TUTELA CHE L’APPALTATORE DEVE ORDINARIAMENTE

ADOTTARE PER L’ESECUZIONE DELLA FORNITURA/SERVIZIO; PERTANTO I RELATIVI COSTI SONO RICONDUCIBILI AI COSTI DELLA SICUREZZA

PROPRI DELL’APPALTATORE DETERMINATI IN SEDE DI APPALTO QUINDI NON SI RILEVANO COSTI SPECIFICI DERIVANTI DALLE MISURE PER

ELIMINARE I RISCHI DA INTERFERENZA DELLE LAVORAZIONI.

PER L’APPALTO IN OGGETTO, È RAGIONEVOLE RITENERE CHE I RISCHI DA INTERFERENZA POSSONO ESSERE RESI COMPATIBILI, RIDOTTI O ELIMINATI ADOTTANDO MISURE CHE DANNO LUOGO A COSTI AGGIUNTIVI RISPETTO A QUELLI PROPRI DELL’APPALTATORE.

PERTANTO LA SEGUENTE STIMA DEI COSTI È EFFETTUATA SULLA BASE DELLE RILEVAZIONI DEI RISCHI INTERFERENTI IN FASE PROGETTUALE

DI APPALTO, DI CUI ALLA MATRICE DELLE INTERFERENZE (ALLEGATO I). I COSTI SONO INDIVIDUATI FACENDO RIFERIMENTO AL PREZZARIO

APPROVATO DALLA REGIONE TOSCANA. NEL CASO IN CUI NON SI RITROVINO VOCI ATTINENTI NEL PREZZARIO, LA STIMA È IN RELAZIONE AI

CORRENTI PREZZI DI MERCATO.

GESTIONE DELLE EMERGENZE / EMERGENCY MANAGEMENT

In caso di emergenza e/o infortunio dovranno essere adottate le procedure specificate nel “Piano di pronto intervento per l’evacuazione delle persone infortunate per la comunita’ USAG Vicenza DMC di Livorno” allegato al contratto di appalto. / In case of emergency and/or injury, follow the procedures contained in the Emergency plan for the evacuation of injured people for USAG Vicenza DMC areas.

TIPO EMERGENZA

EMERGENCY TYPE

DESCRIZIONE

DESCRIPTION

RIFERIMENTI

REFERENCES

X

X X

DARBY MILITARY COMMUNITY

Edifici interessati USAG ITALY DMC protected by lightining protection systems

Datore di lavoro richiedente COMANDO USA SETAF

Sicurezza Security

La gestione della sicurezza è assicurata dal servizio interno di polizia militare.

Security services are the responsibility of the internal military police.

Servizi Interni/ Internal Services

MILITARY POLICE DSN 633-7575

Commercial 050-54-7575

CARABINIERI DSN633-8701/8711

Commercial 050-54-8701/8711 Servizi esterni / External Services

CARABINIERI tel. 112

Incendio- Esplosione

Fire-Explosion

La gestione delle emergenze legate agli incendi/esplosioni è affidato agli addetti alla lotta antincendio designati dall’appaltatore ai quali saranno affiancati gli addetti alla lotta antincendio presenti nei repati e al dipartimento interno per la lotta antincendio.

Fire/explosion emergency management is the responsibility of the contractor’s qualified fire wardens, supported by the building fire wardens present in the area

Servizi Interni/ Internal Services Addetti di reparto / BFW:

FIRE DEPARTEMENT DSN 117

Commercial 050-54-7117

Servizi esterni / External Services Vigili del Fuoco tel. 115

Infortunio – malore Accident – Illness

La gestione delle emergenze legate ad infortunio/malore è affidato agli addetti designati dall’appaltatore ai quali potranno essere affiancati gli addetti presenti nei repati.

Medical emergency management is the responsibility of the contractor’s first aid qualified employees, supported by the area firs aid qualified employees

Servizi Interni/ Internal Services Addetti al primo soccorso / First-Aiders Servizi esterni / External Services

Pronto Soccorto (esterno) First Aid (external)

Tel. Fisso/From fixed telephone: 118Tel Cellulare /From Cell Phone: 800011800

Others general dispositions to eliminate interference / Disposizioni generali aggiuntive per l’eliminazione delle interferenze.

Utilizzare solo le area autorizzate Non accedere in altri locali o edifici

Non presentarsi sul luogo di lavoro sotto l’influenza di alcool, medicinali o sostanze psicotrope

Non manomettere e/o escludere protezioni, dispositivi di sicurezza o sistemi di segnalazione e controllo.

Non oltrepassare o disattivare le protezioni.

Non usare fiamme libere in azienda se non ESPRESSAMENTE AUTORIZZATI (tramite form MD 00 0277 “Richiesta permesso di lavoro”)

È vietato fumare in locali chiusi e all’esterno a 15 metri dalle porte.

È vietato introdurre bevande alcoliche all’interno dell’azienda

È vietato arrampicarsi su scaffali, ripiani, macchinari e comunque su qualsiasi altra postazione sopraelevata; obbligatorio l’impiego di scale e/o trabattelli conformi alla normativa vigente, di proprietà.

DARBY MILITARY COMMUNITY

Edifici interessati USAG ITALY DMC protected by lightining protection systems

Datore di lavoro richiedente COMANDO USA SETAF

È vietato toccare gli apparati elettrici alle persone non autorizzate e qualificate.

È obbligatorio:

farsi riconoscere all’ingresso presso il gate;

ricevere autorizzazione per l’ingresso di auto – furgoni – mezzi ed esporre il pass sul mezzo;

camminare percorrendo solo le aree pedonali segnalate;

rispettare la segnaletica orizzontale e verticale (percorsi pedonali e carrabili, aree di stoccaggio merci, vie di evacuazione, cartelli di divieto, d’obbligo, di segnalazione e di avvertimento, altro);

astenersi dall’utilizzare, manutenere, verificare, oliare, registrare, ingrassare, macchine e/o impianti di Ns. proprietà;

utilizzare esclusivamente Vs. macchine o attrezzature, previa Ns. autorizzazione scritta, conformi ai requisiti antinfortunistici;

rispettare le procedure di sicurezza aziendali;

mantenere ordinate e pulite le zone di passaggio, deposito e lavoro riprestinando le condizioni presenti prima dell’esecuzione degli interventi;

provvedere in proprio al trasporto e smaltimento dei rifiuti decadenti dallo svolgimento del/i Vs. incarico/i, salvo Ns.

diversa disposizione da comunicarvi per iscritto;

segnalare a Ns. addetto qualsiasi situazione ritenuta a rischio, oltre che di altre condizioni di pericolo di cui si è a conoscenza;

prendersi cura della propria sicurezza e della propria salute e di quella delle altre persone presenti, conformemente alla propria formazione ed alle istruzioni e ai mezzi forniti dal datore di lavoro.;

l’utilizzo degli idonei DPI forniti.

Rispettare tutte le procedure di sicurezza indicate dall’Ufficio Sicurezza della Committente.

RISCHI INTRODOTTI DALL’APPALTATORE (DA COMPILARE UNA VOLTA SELEZIONATO L’APPALTATORE):

N. DESCRIZIONE / HAZARD DESCRIPTION MISURE DI PREVENZIONE-PROTEZIONE ADOTTATE / PREVENTIVE-PROTECTIVE MEASURES

DARBY MILITARY COMMUNITY

Edifici interessati USAG ITALY DMC protected by lightining protection systems

Datore di lavoro richiedente COMANDO USA SETAF

N. DESCRIZIONE / HAZARD DESCRIPTION MISURE DI PREVENZIONE-PROTEZIONE ADOTTATE / PREVENTIVE-PROTECTIVE MEASURES

CONSIDERAZIONI CONCLUSIVE / CONCLUSIONS:

Il Committente dichiara di aver fornito all’Appaltatore / The Commissioning Employer provided the Contractor with:

tutte le informazioni tecniche relative allo stato dei luoghi sede dell’attività e dettagliate informazioni sui rischi specif ici esistenti nell’ambiente dove dovrà operare e sulle misure di sicurezza e emergenza adottate; / all the technical info regarding the status of the work places and detailed information on the specific risks in the locations where the Contractor is going to work and the safety and emergency measures adopted;

DARBY MILITARY COMMUNITY

Edifici interessati USAG ITALY DMC protected by lightining protection systems

Datore di lavoro richiedente COMANDO USA SETAF tutte le informazioni per evitare inutili rischi e per lavorare in sicurezza in relazione alla contemporanea presenza sul luogo di lavoro o nelle immediate vicinanze di altre imprese appaltatrici e sui rischi specifici relativi. / all the information to avoid unnecessary risks and to work in safety, in relation to the contemporary presence on the work-place, or in the immediate vicinities, of other contractors and relative specific risks.

Con la firma riportata in calce la ditta appaltatrice attesta / With the following signature the contractor states:

di aver preso atto delle dettagliate informazioni ricevute sui rischi specifici esistenti nell’ambiente in cui è chiamata ad operare e sulle misure di prevenzione e di emergenza adottate in relazione all’attività del committente; / understood the detailed information received regarding the specific risks in the workplace where is going to perform the activity and regarding the prevention measures and corrective actions adopted in relation to the Contractor’s activity.

dell’avvenuta cooperazione in merito all’attuazione delle misure di prevenzione e protezione dai rischi sul lavoro e incidenti sull’attività lavorativa oggetto dell’appalto; / will cooperate for the implementation of the prevention and protection measusres regarding the on the job risks and injuries on the work activity subject of the contract.

dell’avvenuto scambio reciproco di informazioni, attraverso i documenti di cui si allega copia, al fine di eliminare i rischi dovuti alle eventuali interferenze tra i lavori svolti dalle parti; / the mutual exchange of information, through the attached documents, to avoid the risks/hazards due to potential interferences between works performed by the involved contractors and committing part.

che rimane a carico della ditta appaltatrice la valutazione e l’adozione di idonee misure di prevenzione e protezione inerenti i rischi della propria attività. / the contractor has the responsability for the evaluation and implemenatation of the required prevention and protection measusres for the own activity.

In corso d’opera, se dovessero venirsi a modificare le condizioni sopra esposte, sarà cura del committente promuovere una nuova iniziativa di coordinamento e cooperazione al fine dell’eliminazione dei rischi che tale nuova situazione potrebbe comportare. / During the contract activity, in case the conditions above axplained change, the Contractor has the responsability to implement action for the coordination and cooperation in order to eliminate the risks rised from the new condition.

Data / Date:

FIRME / SIGNATURES:

Per la Commitenza (POC) /

For the Commissioning Employer (KO)

Per l’Appaltatore /

For the Contractor