AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1) Address the offerors' questions;
2) Add Technical Exhibit 2 "Inventory";
3) Amend Addendum to 52.212-1, paragraph 6 "Additional Information";
4) Extend the solicitation closing date through 21 June 2019 at 11.00 a.m. C.E.T.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 24
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 14-Jun-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912PF19Q0028
X 9B. DATED (SEE ITEM 11)
15-May-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
14-Jun-2019
CODE
414TH CSB - PARC AFRICA
VIA DELLA PACE #197
VICENZA (VI) 36100
W912PF 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912PF19Q0028
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
Q&AS
QUESTIONS AND ANSWERS
Q1: In the documentation there is a spreadsheet in which you esteemed a number of hours for each labor category, as well as demanding a percentage discount for materials based on your amount.
Is it possible to have a rough calculations for components of plants, to know the type of systems into detail, the brand of materials to supply and any other relevant information to see how set our offer?
R1: The two brands currently in use for the fire protection systems are Notifier and Tyco. For Ederle, Villaggio, Longare, Lerino, Torri, ASP7 and Poggio Renatico the fire detection systems installed are Notifier; for del Din, the majority of the fire detection systems installed are Tyco.
Technical Exhibit 2 “ Inventory” has been incorporated with this amendment to provide the location by building number, the type and the quantity of the applicable Fire Alarm Systems (FASs), Fire Suppression Systems and Sprinkler Systems to be serviced under this contract. Other information such as the number of Fire Extinguishers, the number of Fire Rated Doors, etc. is provided to allow the contractor to properly estimate the size of the systems/equipment installed for each building.
Q2: In the SAM (System for Award Management registration) we must be registered already in the offer or after awarding contract?
R2: See amended Addendum to 52.212-1 “Instructions to Offerors”, paragraph 6 c).
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 17-Jun-2019 02:00 PM to 21-Jun-2019 11:00 AM.
The following have been modified:
AADDENDUM TO 52.212-1
A.INSTRUCTIONS. The offeror shall provide a written Quote (IN ENGLISH) that MUST address each of the factors listed on the table below. The only documents that can be submitted in a language other than English is the Certificate of Chamber Of Commerce and mandatory documents. The offeror shall submit electronic copies of their quotation package via email with the subject line “W912PF-19-Q-0028 – Repair of fire suppression systems at USAG – Italy, Vicenza” to the following points of contacts: Francesca Candia / francesca.candia.ln@mail.mil AND Lindsay Jaime / lindsay.r.jaime.civ@mail.mil.
Quotation packages must be received no later than the solicitation closing date and time listed on the solicitation.
The offeror is responsible for verifying that their quotation package was received before the solicitation closing date and time. Only email submissions will be accepted.
Page Limitations and Format. The Offeror’s quotation package shall consist of five (5) volumes. Each respective volume shall comply with the following format and page limitations in accordance with the table below.
Volume Description/Title Page limit
I Mandatory Documentation Required No Page limit
II Factor I – Certifications 20 Pages
III Factor II – Experience 20 Pages
IV Factor III - Past Performance 20 pages
V Factor IV – Price (Solicitation/Contract/Standard Form 1449) No page limit
*Document Format: Times New Roman, Size 10 Font, single spaced.
Use of hyperlinks is prohibited.
1. All information shall be confined to the appropriate Volume. The Quote shall be prepared clearly and concisely to demonstrate that the offeror has a complete understanding of the requirements. Offeror shall prepare their quotes on the presumption that the Government has no previous knowledge of the offeror’s capabilities. Quotes will be evaluated only on the information specifically presented in respective submittals.
2. Quotes shall not merely repeat to perform work in accordance with the Performance Work Statement (PWS). The PWS reflects the objectives of the program; therefore, repeating the PWS without sufficient elaboration will not be accepted. Offerors that submit generic Quotes risk receiving unacceptable ratings.
3. The cover of each volume shall include the solicitation number, volume number, and firm name, address, POC, CAGE Code (NCAGE Code) and DUNS number.
NOTE: Pages exceeding the “Page Limits” stated in the Table above will not be evaluated ( e.g. Volume III, Description/Title, Factor 2 –Experience, Page Limit – 20 Pages: the 21st + pages will not be evaluated).
4. This requirement is for the repair of the fire prevention and protection system for USAG Italy (Vicenza) and Poggio Renatico, Italy. It does not include inspection and testing services. A separate requirement has been competed for the inspection and testing services. The offeror (individual, subcontractor, or part of a Pool of Firms (Consorzio) that is awarded the contract for the inspection and testing shall not be awarded the contract for the maintenance/repair services.
B. VOLUME CONTENT. Each Volume shall contain the information outlined below:
1. VOLUME I - MANDATORY DOCUMENTATION REQUIRED WITH THE QUOTE
The following documentation shall be submitted with the offerors’ quote and shall be in accordance with Italian requirements and laws:
a. The offeror must provide a copy of a Historical Chamber of Commerce Certificate of Membership (Certificato Storico di Iscrizione alla Camera di Commercio) OR EQUIVALENT (for foreign companies) NOT older than 90 days at the time set forth for the receipt of Quotes. Self-certifications are NOT allowed and will be rejected. The business purpose (oggetto sociale) should include but is not limited to: Repair of Fire Suppression Systems.
b. DURC: The offeror shall provide with the Quotation a copy NOT older than ninety (90) days from the date for initial receipt of quotation of the DURC (Documento Unico di Regolarità Contributiva). Self- certifications (autocertificazioni) are NOT allowed. The document MUST include the following statement: “Con il presente documento si dichiara che l’impresa RISULTA REGOLARE ai fini del DURC” (“This document declares that the company is regular for the DURC purposes”).
c. The offeror must provide Attachment 1 "Self-Certification for Antimafia" duly filled out.
d. The offeror shall provide Attachment 3 “Suitability of the contractor”, blocks A and B1), duly filled out.
e. If proposing as a Pool of Firms (Consorzio/ATI), the Offeror shall also provide with their Quote the below listed required documents/certificates:
1. A copy of the notarized legal document that established the Pool of Firms (Consorzio/ATI).
2. The name and addresses of all the associated firms. The associated firms are NOT allowed to submit their individual Quotes under this solicitation otherwise the Quote of the Pool of Firms (Consorzio/ATI) and the Quote of any associated firm will be rejected.
3. The names and the addresses of the associated firms proposed to perform the work.
4. A statement describing all legal or administrative proceedings currently pending or concluded, conducted against your firm within the last three years from the solicitation release date which relate to procurement or performance of any public or private contracts. Disclose whether the prime contractor (or its predecessors, if any) has been insolvent or filed for bankruptcy within the past three years. Offeror shall disclose any other information which could reasonably call into question the responsibility of the Offeror to perform this contract.
2. VOLUME II – FACTOR I –CERTIFICATIONS
Offerors shall provide ALL the information below. Offerors that do NOT submit all the required documents and information shall be evaluated as unacceptable.
1. Provide for each technician (technicians shall be employed directly by the Offeror, not by a subcontractor) that will be performing testing/inspection services under this contract, copy of one or more educational certificates issued by institutions or associations authorized in Italy including but not limited to i.e.: M.A.I.A; UMAN;
VIGILI DEL FUOCO.
2. Provide evidence of the following for the technical supervisor in the company: Each company shall have one technical supervisor that is enrolled in the “Albo professionisti anticendio” with the proper qualification, as per Decreto 05/08/2011. The technical supervisor shall be an employee of the company submitting the offer or an employee of the Prime company, in case on an ATI/ Joint venture.
3. Provide current certifications of the company's qualification as per DM 37/08 “Lettera G”, and a quality system certification in accordance with UNI EN ISO 9001:2008 norms.
3. VOLUME III – FACTOR II – EXPERIENCE
The offeror shall provide at least one (1), but NO MORE than three (3) examples of contracts performed by the company that are recent (within the last 3 years form the solicitation release date) and relevant to work requirements specified in pargraphs 1.1 and 1.4 of the PWS.
1. Relevant in scope means that the contract must be for the repair and maintenance of fire suppression systems.
Refer to paragraphs 1.1 and 1.4 of the PWS.
2. If the offeror is a Pool of Firms (Consorzio)/ATI, recent and relevant experience should be submitted for projects completed by the Pool of Firms (Consorzio)/ATI entity. If the Pool of Firms (Consorzio)/ATI does not have such experience, relevant experience shall be submitted for at least one partner. The experience factor for a Pool of Firms (Consorzio)/ATI is still limited to a total of three (3) relevant experience projects.
3. It is the offeror’s responsibility to clearly explain and demonstrate to the Government how its work experience (and the experience of each teaming partner, if applicable) in each submitted project is relevant to the contract requirements in this solicitation.
4. VOLUME IV – FACTOR III – PAST PERFORMANCE
4. Offerors shall provide contract information of NO MORE than three (3) projects performed within the last three
(3) years from the solicitation release date, and that are relevant to this solicitation, by the offeror and any major subcontractors or partnerships. The information shall be presented by completing the Past Performance Questionnaire (Attachment of solicitation), one (1) for each contract. Relevant to this solicitation means that the contract must be for the repair and maintenance of fire suppression systems. Refer to paragraphs 1.1 and 1.4 of the PWS.
1. It is the offeror’s responsibility to provide accurate points of contact, current telephone numbers and email addresses for each identified contract. If there are subcontractors or partnerships, they will be evaluated in the same manner as the Prime. The offeror is highly encouraged to submit past performance information with evidence of customer satisfaction such as performance evaluation, special commendation, recognition, letters of appreciation, awards of excellence, offeror’s quality certifications etc.; as long as these references are relevant to the effort set out in this solicitation.
5. VOLUME V – FACTOR IV – PRICE - SOLICITATION/CONTRACT/STANDARD FORM 1449
a. Providing Pricing. The offeror shall provide pricing by filling in the prices on Technical Exhibit 1, T&M Rates, which includes labor rates and a discount rate for spare parts for the base and the two option years.
(1) In the spreadsheet, the Government has provided an estimated number of hours for each labor category.
Offerors shall provide a labor rate for each of the categories in the column labeled "Labor Rate". The spreadsheet will automatically provide a total for labor.
(2) Then in the block below "Percentage Discount for Materials", put in the discount to be applied to parts from the price book. Example: you wish to provide a 15.5% discount to the price book for all parts. You would enter the number 15.5 in the block.
(3) The offeror shall report the Grand Total for each Contract Line Item Number (CLIN) from Technical Exhibit 1 to each CLIN of SF 1449. The offeror shall ensure that prices are entered for all CLINs for which space has been provided. Offeror shall enter a total price for each CLIN.
b. SINGLE AWARD. The Government intends to make a single award; therefore, Quotes must be submitted for all the line items indicated in the solicitation. No award will be made for less than the full requirements shown in the solicitation. Any Offeror offering less than all of the solicitation requirements may be excluded from consideration for award if the Contracting Officer elects to make an award without opening discussions.
c. SUBMISSION OF QUOTES IN EURO CURRENCY. Quotes submitted in response to this solicitation will be in terms of EUROS. Quotes received in other than EUROS shall be rejected.
6. ADDITIONAL INFORMATION
a. PRE-SOLICITATION CONFERENCE: will be held on 05 June 2019 at 10.00, on Caserma Ederle, Vicenza, Italy, RCO Italy conference room, Bld. 3. All interested parties are required to indicate their interest by submitting a written request not later than Close of Business (COB) 29 May 2019 to the following e-mail addresses:
francesca.candia.ln@mail.mil and lindsay.r.jaime.civ@mail.mil..
Please indicate in your e- mail the solicitation number (W912PF-19-Q-0028), the name of the company along with the address, phone number, fax, and e-mail address. Please indicate the name of the person(s) (maximum of 2) who will be present at the site visit: first name, last name, date of birth, place of birth, and type and number of identification document. Your information will allow your representative(s) to go through the security checkpoints on base.
b. QUESTIONS: All questions concerning the solicitation shall be submitted via email to the following addresses:
Francesca.candia.ln@mail.mil and lindsay.r.jaime.civ@mail.mil no later than 01:00 PM Central European Time (CET) on 07 June 2019 Answers to offerors' questions will be posted to FedBizOpps.gov in an amendment to the solicitation as needed.
c. SAM REGISTRATION: to be awarded a Government contract the offeror MUST:
a. Have a DUNS number (Dun & Bradstreet); Phone: 01-28-455-379;
-American: http://fedgov.dnb.com/webform);
-Italian: https://www.dnb.it
b. Have a CAGE/NCAGE number;
-American Contractor: CAGE code will be generated upon completion of SAM registration.
- Italian Contractor: NCAGE code can be obtained via https://www.siac.difesa.it/tiki/tikiindex.php?page=NCAGE
c. Be registered in the System for Award Management (SAM) website (https://www.sam.gov/portal/public/SAM/)
Please ensure that your firm is registered with SAM and that all information is current. If you are not registered or your information is not current, you need to go to https://www.sam.gov/portal/public/SAM/ and fill out a web based application. You must have a DUNS number in order to start this process. If you do not have a DUNS number, you can obtain one at http://www.dnb.com/. It takes two to three business days to receive a DUNS number and two to three business days to receive a CAGE code.
Please begin the process as soon as you receive this RFQ in order to speed up the contracting process in the event that you are the winning bidder. Not being registered in SAM does not preclude the offeror from submitting a quote. However, the SAM registration shall be valid to be awarded the contract.
PWS
PERFORMANCE WORK STATEMENT (PWS)
REPAIR OF FIRE PREVENTION AND PROTECTION SYSTEM AT USAG-ITALY (VICENZA) AND POGGIO
RENATICO (FE), ITALY
Part 1
General Information
1. GENERAL: This is a non-personal service contract to provide annual repair of fire suppression system/fire alarm and related device, mass notification system, emergency signs, hydrants and hose reels, emergency lighting, fire rated doors, release buttons of the electrical power, sprinkler system, related communication system and fire monitoring system. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government. The repair service of the fiber optic wires and of the related equipment pertaining to the Communication System is not part of this contract
1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, transportation, tools, materials, supervision, and other items and non-personal services necessary to repair all aspects concerning the repair and emergency call services of the U.S.Government owned fire suppression system/fire alarm system and related device, mass notification system, hydrants and hose reels, emergency lighting, fire rated doors, release buttons of the electrical power, sprinkler system, related communication system and fire monitoring system as defined in this Performance Work Statement except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.
1.2 Background: N/A
1.3 Objectives: This is in order to ensure the continuity of operations of the fire prevention and protection system inside the existing facilities of the U.S. Garrison Italy. This trouble-free goal can be achieved only by maintaining the full functionality of the Fire Prevention and Protection System together with the Communication System which is connected to it.
1.4 Scope: The Contractor shall perform the service in strict compliance with the terms and conditions of this Contract, the PWS, any attachment related to it, and the latest applicable Italian and European Standards, Laws and Regulations. Repair services required under this Contract shall comply in particular with Italian Law 37-2008, 151- 2011, 81-2008 and NFPA (see Paragraph 6 Applicable Publication of PWS for Laws and Regulations).
1.5 Period of Performance: The period of performance shall be for one (1) Base Year of 12 months and two (2) 12-month option years. The Period of Performance reads as follows:
Base Year: 12 September 2019 – 11 September 2020 Option Year I: 12 September 2020 – 11 September 2021 Option Year II: 12 September 2021 – 11 September 2022
1.6 General Information
1.6.1 Quality Control: (Deliverable 0005) The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s quality control program is the means by which he assures himself that his work complies with the requirement of the contract. The Contractor shall submit his/her Quality Control Plan (QCP) to the C.O.R. for approval within seven (7) calendar days after contract award. After acceptance of the quality control plan the contractor shall receive the contracting officer’s acceptance in writing of any proposed change to his QC system.
1.6.2 Quality Assurance: The government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
1.6.3 Recognized Holidays:
U.S. HOLIDAYs DATE New Year's Day January 1st Martin Luther King Memorial Day 3rd Monday in January Presidents' Day 3rd Monday in February Memorial Day Last Monday in May Independence Day July 4th Labor Day 1st Monday in September Columbus Day 2nd Monday in October Veterans' Day November 11t Thanksgiving Day 4th Thursday in November Christmas Day December 25th
ITALIAN HOLIDAYS DATE
New Year's Day 1 January Epiphany Day 6 January Easter Monday Varies yearly Liberation Day 25 April Labor Day 1 May Republic Day 2 June Assumption Day 15 August Local Holiday * 8 September * All Saints’ Day 1 November Immaculate Conception Day 8 December Christmas Day 25 December Saint Stephen’s Day 26 December
Any routine service called for under this Contract shall be performed during normal duty hours, 08.00 through 17.00, Monday through Saturday. When an American holiday occurs on a Saturday or a Sunday, the holiday is observed on the preceding Friday or following Monday, respectively. The Government reserves the right to request service during other than normal duty hours, on Sunday or during Italian and American Holidays. When the Government makes this request, the work will be compensated as work performed as overtime.
1.6.4 Contractor’s Request to Perform work outside normal duty hours: Except for when requested by the Government, work during other than normal duty hours, on Sunday and Italian and American Holidays shall not be performed without prior written approval of the C.O.R. The Contractor shall submit request for such approval to the C.O.R. at least 48 hours in advance. If the Contractor’s request is approved, the service performed will be compensated as work performed under normal duty hours.
1.6.5 Hours of Operation: The contractor is responsible for conducting business, between the hours of 08.00 through 17.00 Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.
1.6.6 Place of Performance: The work to be performed under this contract will be performed at U.S. Army Garrison Italy which includes the following installations: caserma Ederle (VI), Villaggio della Pace (VI), Del Din (VI), Longare site (VI), ASA#7 site (Tormeno-VI), Lerino Leased area (VI), Torri di Quartesolo Leased Area (VI) and Poggio Renatico (FE).
1.6.7 Type of Contract: The Government will award a Time and Material (T&M) type of contract. The Contractor who performs the inspection and testing service shall not be involved in the repair and emergency calls service contract.
1.6.8 Subcontracting: The Contractor shall provide all subcontracting information to the Contracting Officer in accordance with FAR provision 52.212-1. The Contractor shall perform on the installations, and with its own organization, services (labor hours) equivalent to at least 70 percent of the total amount of the services to be performed under the contract.
1.6.9 Security Requirements:
1.6.9.1 Training
1.6.9.1.1 AT Level I Training (Deliverable 0003): see DFARS Clause 252.204-7004.
1.6.9.1.2 . IWATCH/iSALUTE Training. ( Deliverable 0002) The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 30 calendar days after contract award.
1.6.9.1.3 Per AR 530-1 Operations Security, the contractor employees must complete Level I OPSEC Awareness training. New employees must be trained within 30 calendar days of their reporting for duty and annually thereafter.
1.6.9.2 PHYSICAL Security: The Contractor shall be responsible for safeguarding all Government equipment, information and property provided for Contractor use. At the close of each work phase, Government facilities, equipment, and materials shall be secured. The Contractor’s personnel shall assure that all equipment is turned off and stored in designated storage areas together with supplies upon completion of work. The Contractor shall be held responsible for the safe storage of materials and equipment in Government area and near the work site. The Contractor shall prepare his own “Piano Operativo di Sicurezza” (POS) and shall establish a safety and health program, which shall provide safety and health protection to this employees as required by Italian Law 81/2008. All the work described in these specifications shall be accomplished in strict compliance with the ISPESL (Superior Institute Assurance of Work) standards. The POS shall have the Safety Coordinator concur before any work phase commencement.
1.6.10 Special Qualifications: All work under this Contract shall be performed in a skillful and workmanlike manner. All Contractor personnel must be qualified and experienced in the skills and responsibilities of the position to which they are assigned, and must be supervised by a technician enrolled on the “Albo professionisti antincendio” with the proper qualification. All facilities designed in accordance with NFPA regulations shall be maintained in accordance with NFPA rules/regulations. All contractor personnel shall be qualified to perform work in accordance with NFPA standards. The Contracting Officer may require, in writing, that the Contractor remove from the work any employee the Contracting Officer deems incompetent, careless, or otherwise objectionable.
1.6.11 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The contracting officer, Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the contracting officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced.
Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.
1.6.12 Interferences: During the performance of work, special care is to be taken not to interfere with ongoing activities on nearby facilities. Materials shall be loaded / unloaded inside the work site. Access to other buildings shall not be hindered by Contractor’s personnel, vehicles or stored materials. Vehicles for the transport of materials can be temporarily parked near the building site to load/unload materials if they do not obstruct traffic.
1.6.13 Contracting Officer Representative (COR): The (COR) will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract:
perform inspections necessary in connection with contract performance: maintain written and oral communications with the Contractor concerning technical aspects of the contract: issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; provide site entry of Contractor personnel.
A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates.
The COR is not authorized to change any of the terms and conditions of the resulting order.
1.6.14 Key Personnel (Deliverable 0004): The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available 24/7. They shall have full authority to act for the Contractor on all Contract manners relating to daily operation of this Contract, and shall be responsible for the performance of the work. The name of these persons shall be designated in writing to the Contracting Officer, and shall be provided to the C.O.R. together with their telephone numbers no later than seven (7) working days after the Contract award date.
1.6.15 Identification of Contractor Employees: All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.
1.6.16 Access and General Protection/Security Policy and Procedures: The Contractor shall obtain entry passes for each employee from the C.O.R. The Contractor shall inform his personnel that they may be subjected to search when entering or leaving the installation at the discretion of the Installation Commander.
Contractor and all associated sub-contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
1.6.17 Contractor Identification (Deliverable 0001): Prior to commencement of Contract performance, the Contractor shall furnish the COR in writing and in triplicate a list of the personnel identified for work under the Contract. The list shall contain:
A. Name and address of each employee.
B. Identification Document of each employee.
C. Copy of personnel register.
D. “Centro per l’impiego” Identification Document E. The Contractor shall furnish a list of private and commercial vehicles which will be used in conjunction with Contract work. The Contractor vehicles shall be clearly marked with the Contractor’s name or company logo. The Contractor shall maintain all Contractors’ furnished vehicles in an operational condition. All vehicles shall meet all requirements as per Italian “Codice della Strada”. The Contractor personnel shall comply with all standard signs and regulations in regard to parking on the Government installations. The list of such vehicles shall be submitted together with the list of personnel and shall contain:
(1) Make of vehicle;
(2) Model and year of manufacture
(3) License Plate Number
F. A valid Chamber of Commerce certificate updated (not older than 3 months at the time set forth for the receipt of Quotes).
G. A certification attesting skills and technical requirements of the Contractor or self-employed workers H. Suitability of Contractor MD 00 0266 (Idoneità dell’appaltatore) filled up IAW legislative decree 81/2008, (DUVRI).
1.6.18 Uniforms: The Contractor shall provide a uniform (shirt or shop-coat) with the Company name inscribed on the back and the employee nametag on front, for each employee. Contractor’s employees shall wear the uniform at all times while engaged in the performance of this contract. Uniform similar in
1.6.19 Other Direct Costs N/A
1.6.20 Insurance coverage: Considering the sensitivity of the systems and equipment, the Contractor shall, at its own expense, provide and maintain during the entire performance of this contract, at least the kinds and minimum amounts of insurance required below:
a) The Contractor shall procure and maintain during the entire period of performance under this contract a specific insurance (in addition to all the insurances mandatory by Law), that covers damages occurred to any equipment being repaired under this contract or to the personnel employed by the company in the performance of these contract services, for a coverage amount not less than 1,000,000.00 Euros.
b) Copy of the certificate of the policy shall be provided to the Contracting Officer ten (10) working days after the award of the contract (Deliverable 0007). The Contractor shall also furnish a similar certificate of insurance as evidence of the existence of such coverage of all subcontractors who will work on the job.
1.6.21 Organizational Conflict of Interest: Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.
1.6.22 Combating Trafficking in persons: IAW FAR 52.222-50, Alt I.
1.6.23 Contractor Manpower Reporting (Deliverable 0009): The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the "Repair of Fire Suppression Systems” via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil/, and then click on “Department of the Army CMRA” or the icon of the DOD organization that is receiving or benefitting from the contracted services.
Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 and at the end of the period of performance for each calendar year, beginning with 2019.
Contractors may direct questions to the help desk by clicking on “Send an email” which is located under the Help Resources ribbon on the right side of the login page of the applicable Service/Component’s CMR website.
Final payment will not be processed until final CMR relating to the last option year of the contract is provided to the COR and to the Contracting Officer.
PART 2
DEFINITIONS & ACRONYMS
2. DEFINITIONS AND ACRONYMS:
2.1. DEFINITIONS
2.1.1. CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.
2.1.2. CONTRACTING OFFICER. A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
2.1.3. CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
2.1.4. DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.
2.1.5. DELIVERABLE. Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.
2.1.6. KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.7. PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.
2.1.8. QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
2.1.9. QUALITY ASSURANCE Surveillance Plan (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
2.1.10. QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
2.1.11. SUBCONTRACTOR. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
2.1.12. WORK DAY. The number of hours per day the Contractor provides services in accordance with the contract.
2.1.13. WORK WEEK. Monday through Friday, unless specified otherwise.
2.2. ACRONYMS:
ACOR Alternate Contracting Officer's Representative AFARS Army Federal Acquisition Regulation Supplement AR Army Regulation
CCE Contracting Center of Excellence CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer Representative COTR Contracting Officer's Technical Representative COTS Commercial-Off-the-Shelf DA Department of the Army DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DMDC Defense Manpower Data Center DOD Department of Defense FAR Federal Acquisition Regulation HIPAA Health Insurance Portability and Accountability Act of 1996 KO Contracting Officer OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program TE Technical Exhibit
PART 3. GOVERNMENT FURNISHED PROPERTY. (RESERVED).
PART 4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:
4.1 General: The contractor shall furnish all supplies, equipment, and services required to perform work under this contract that are not listed under Section 3 of this PWS. Before starting any work, the contractor shall submit to the KO a schedule indicating in detail each phase of work, safety precautions and protection of property. Schedule of work shall be approved by the KO before commencement of the contract.
4.2 Contractor’s Liabilities and responsibilities: The contractor shall be responsible for all materials delivered and work performed until completion and acceptance of the entire work, except for any completed unit of work which may have been accepted under the contract. The contractor shall safeguard all tenants and visitors in the facilities while performing the work under this contract.
4.3 Found article: The contractor or his employees shall turn in all personal articles found on the Government’s installations to the Military Police, located in building #4B, Caserma Ederle (Vicenza).
4.4 Contractor’s behavior: All contractor employees who enter the Government’s installations shall obey all regulations in effect during the contract period. The contractor shall be responsible for maintaining satisfactory standards of employees as necessary. The Government reserves the right to require removal from the job site of any employee who endangers persons or property, whose continued employment is inconsistent with the interests of military security, or whose presence deters the accomplishment of work. The removal from the job site of a contractor employee shall not relieve the contractor of the requirement to provide sufficient personnel to perform the work specified in the contract.
4.5. Utilities and services: The contractor shall be provided, for the sole scope of work, with electricity and water services available in the area. All temporary connections shall be cleared to the contractor, as shall be the restoration of said utilities to original conditions at the completion of the project. the connection shall comply with pertinent U.S. and Italian safety of work laws and CEI norms. All machinery and equipment shall be properly grounded. The contractor shall use Government furnished utilities in a prudent manner consistent with energy conservation. The contractor shall be directly responsible for instructing employees in utilites conservation practices.
4.6 Safety and fire: the contractor shall ensure all employees become familiar with the methods of reporting a fire and of fixing fire alarms. The contractor’s employees shall comply with all the applicable safety and fire laws and regulations. The contractor’s employees shall become aware of and observe all the requirements for handling and storage the combustible supplies.
4.7 Hot work permit: Contractor is responsible for coordinating with the C.O.R. to obtain a hot work permit from the DES Fire Department, IAW Fire Dept. USASETAF reg.420-1 Section III/26, 13 Sept 2007 before starting any work with an open flame.
4.8. Equipment: The Contractor shall provide all the materials and spare parts of the same type and brand of the componenets to be replaced, and shall be free from defects in material or workmanship. All the materials and spare parts required for the performance of this Contract shall be approved in advance by the C.O.R.
4.9 Accidents : The Contractor shall be responsible for complying with any, and municipal laws, codes and regulations applicable to the performance of the work. The Contractor shall also be responsible for all damages to persons or property that occurs as a result of the Contractor’s fault or negligence. The Contractor shall be responsible for all materials delivered and work performed until completion and acceptance of the entire work, except for any completed unit of work which have been accepted under the contract.
4.10 Reporting of on-site accidents and injuries The Contractor shall report immediately by telephone to the KO, the COR, the Garrison Safety Officer (tel. 0444-717045) any accident involving personal injury, death, damage to Government property, or accidental loss of Government property resulting from the activities of the Contractor, his Subcontractors, his agents, or employees. A written accident report shall be forwarded to the Contracting Officer within three (3) working days after the date of occurrence. In addition, the Contractor shall cooperate and provide data to any follow-up investigation of an accident by the installation or higher command.
4.11 Analysis of accident: The Contractor shall make a thorough investigation and analysis of all accidents and work toward eliminating the causes of such accidents.
4.12 Clean-up and Disposal: The Contractor shall clean up the works area at the completion of the specific task, or at the close of each workday, whichever comes first, and dispose of waste generated in the performance of this contract in compliance with all applicable Italian laws and regulations.
4.13 Discarded material: all discarded materials shall be recycled or disposed of to the dump authorized by the Regional and National regulation according to the typology of the related material. The transportation shall be extended, if required, even outside Caserma Ederle City Council Territory. It shall be the responsibility of the Contractor to provide containers for material disposal. The Contractor shall also provide all documents (and coordination work) necessary to obtain the authorization from the Local Environmental Authority for the eventual disposal of materials, for which the normal disposal procedures are not sufficient.
4.14 Asbestos or other contaminants: if the existence of material containing asbestos is discovered, the contractor shall immediately report the location and extent of asbestos to the CO.R. for determination and resolution.
4.15 Environmental protection: The Contractor shall comply with all local laws and standards regarding the Environmental protection.
4.16 Contractor shall submit a risk assessment document of the activities on site, containing the assessment of hazards of work covered by the contract either for work performed by employees and those entrusted to subcontractors or, where applicable, the AHA plan (works within the scope of the Directive of Temporary or Mobile contruction sites) or in absence of the risk assessment document, a completed DA form 7566 (Composite Risk Management Worksheet) shall be submitted for approval, by the Contractor to the C.O.R., within seven (7) working days after contract award.
4.17 Warranty: All the services, the materials, and spare parts furnished by the Contractor for the performance of this Contract shall be covered by two (2)…