DEPARTMENT OF THE ARMY
UNITED STATES ARMY GARRISON ITALY
MS 00220-7 CARE AND PRESERVATION
RENOVATION BLDGS. 5105 AND 5106
Supply & Maintenance area, Livorno, Italy
TECHNICAL SPECIFICATIONS
FINAL SUBMITTAL
AI&P ALBERTOIZZO&PARTNERS S.r.l.
architecture, engineering, planning & construction management
Via Mergellina n. 2, 80122, Napoli, Italia
A/E _______________________
June, 2018
THIS PAGE LEFT BLANK INTENTIONALLY
Table of Contents
TABLE OF CONTENTS
SECTION Ia - GENERAL PROVISIONS
SECTION Ib QUALITY CONTROL BY CONTRACTOR
SECTION IIa DESCRIPTION OF WORK
SECTION IIIa DEMOLITION AND REMOVAL
SECTION IIIb EXCAVATION AND BACKFILLING
SECTION IIIc REMOVAL AND DISPOSAL OF ASBESTOS MATERIALS
SECTION IVa REINFORCED CONCRETE WORK SECTION IVc STEEL WORK
SECTION Va MASONRY
SECTION Vc FIBROUS CEMENTITIOUS PANELS
SECTION Vd STEEL SHEET INSULATED PANELS
SECTION Ve MISCELLANEOUS METAL WORK
SECTION VIa FLOORING
SECTION VIb WAINSCOTING
SECTION VIIa SURFACE PREPARATION
SECTION VIIb PLASTERING
SECTION VIIc PAINTING SECTION VIIf RUST-INHIBITIVE TREATMENT FOR METAL SURFACES
SECTION IXa ALUMINUM DOORS AND WINDOWS
SECTION IXb STEEL DOORS
SECTION Xb FALSE CEILING
SECTION Xe BLANKET OF GRASS
SECTION XId ROAD PAVING REPAIR WORKS
SECTION XIIa PLUMBING
SECTION XIIb PLUMBING FIXTURES AND FIXTURE TRIMMINGS
SECTION XIIe THERMAL INSULATION FOR MECHANICAL SYSTEMS
SECTION XIIf AIR CONDITIONING SYSTEM
Table of Contents
SECTION XIIg VENTILATION SYSTEM SECTION XIIm COMPRESSED AIR SYSTEM
SECTION XIIIa ELECTRICAL SYSTEMS
SECTION XIIIb TELECOMMUNICATION SYSTEM
SECTION XIIIc FIRE ALARM SYSTEMS
SECTION Ia
GENERAL PROVISIONS
1a-01 WORK PHASING.
a. Work Schedule. Whenever the nature of the contract and the work location are such that the work is to be performed in an area assigned to activities and services that cannot be interrupted, work shall be scheduled with concurrence of COR in such a manner as to cause the least possible inconvenience to the normal operations of mentioned activities and services. Contractor shall submit his proposed work schedule to the COR at the time of the pre-construction conference.
Work start shall be contingent upon schedule approval.
b. Utilities Cut-Offs. As a rule, cut-off of power and other utilities (water, sewage, heating system, etc.) is not allowed. All temporary connections necessary to insure continuous power distribution shall be provided. If cut-offs are necessary, they shall not exceed the period of time strictly needed to make the temporary connections. Cut-off shall be scheduled with the COR not less than 15 days ahead of time.
c. Alarm, Telephone and Televisions Systems. Deenergizing of alarm, telephone and television systems is strictly prohibited. Should these systems, which may not appear on the drawing interfere with the contract work, they shall be temporarily diverted and fed by means of temporary connections to be adequately protected. Written approval must be obtained from COR prior to doing any temporary work.
d. System Reactivating. At the completion of the work, all existing systems, including water, electrical and heating systems, shall be reactivated and placed in their original locations.
e. Temporary Protections. Floors, carpets, and equipment that cannot be removed shall be adequately protected by temporary tarpaulins to be furnished and installed at no cost to the US
Government. In addition, temporary protections shall be furnished and installed in some particular areas so as to allow performance of activities that cannot be interrupted or transferred.
Also, the Contractor shall be responsible for removing, protecting, and reinstalling all furniture, shelves and furnishings that may interfere with the work course.
wrong or no evaluation of all requirements specified above does not constitute grounds for a request for additional compensation.
1a-02 JOBSITE CLEAN UP AND DUST CONTROL. The contractor shall have sufficient trash/waste bins on site, and shall clean the worksite so that all discarded materials, debris and trash are placed in these bins at the end of each workday, and not left or allowed to accumulate anywhere else on the jobsite. These waste bins shall not be allowed to overflow with debris, and shall be emptied as soon as they become full. Haul roads shall be watered sufficiently to prevent excessive dust. The work area shall be swept regularly to prevent accumulation of debris.
Equipment, construction materials and excavated soil shall be stored in a safe and orderly manner on the jobsite, in accordance with the contractor's approved area use plan.
1a-03 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT. The contractor is considered the waste generator of all salvage, re-usable, re-cyclable and disposable materials derived from the demolition and removal works included in this contract and shall handle these materials as hereinafter indicated.
a. Salvage Material. All salvage end items that the COR will have considered in good operating conditions shall be disassembled without damage, cleared of all dirt and scaling and then transported to the DPW Warehouse, Building 5156, Depot, where they shall be handled over undamaged.
b. Re-usable Material. End items removed during contract accomplishment which cannot be re-utilized in future construction but which still have a commercial value shall be delivered to the
DRMO, through DD Form 1348-1a. This material includes, but it is not limited to, canvas, textile consisting of scrap clothing, scrap aluminum including doors, windows and frames, copper, brass, bronze, and stainless steel, cables, electric motors, light and heavy metals in different sizes and thicknesses that the DRMO contractor can handle (3-4 long), electrical and electronic equipment, and kitchen appliances. All the above material must be free of hazardous property and need to be segregated. The scraps generated in the Supply &
Maintenance Area shall be transported to the DRMO yard only on Monday and Tuesday from
08:00 am to 15:00 pm by appointment through the COR. The scraps generated from other installations must be kept in place. DRMO will arrange the removal. However, the contractor shall request a pre-inspection of the material by DRMO through the COR.
c. Recyclable Material. All construction and demolition recyclable waste material shall be delivered to authorized treatment facilities by the contractor.
d. Special Waste. All special waste, either hazardous or not hazardous, shall be delivered by the contractor to authorized disposal facilities.
e. Waste Storage. Construction and demolition waste shall be stored in waste specific containers provided by the contractor. Containers will be in good conditions, free from severe rusting, bulging, or structural defects. Containers shall be placed in area identified by COR. Containers shall be removed once full or on COR’s decision.
f. Certificates and Authorizations.
(1) Recyclable Materials. As regards to recyclable materials, the Contractor shall submit copy of the authorization of the treatment facility which they are delivered to and will certify that waste have been removed in compliance with applicable law requirements.
(2) Disposable Materials. As regards to material delivery to disposal facilities, the contractor will provide the COR and DPW Environmental Office with copies of the following documents:
Authorization to transport construction and demolition waste;
Authorization of the landfill;
th copy of Formulario di Identificazione del Rifiuto.
(3) Waste Manifest. All transported waste will be accompanied by the Formulario di
Identificazione del Rifiuto (waste manifest) to ensure a complete audit trail from point of origin to ultimate disposal. The waste manifest must be completed in quadruplet, all dated and signed by the waste generator and countersigned by the transporter. The first copy of the manifest will remain with the waste generator; of the remaining three copies (countersigned and dated by the receiver), the second copy will remain with the transporter, the third copy will remain with the receiver, and the fourth copy must be returned by the transporter to the waste generator within 3 months of delivery of the waste to the disposal/treatment facility.
g. Costs. All operations included in this paragraph shall be carried out by the contractor with no additional cost to the US Government.
1a-04 AUTHORIZATION FOR INSTALLATION OF MATERIAL AND EQUIPMENT.
Before installing any material or equipment mentioned in the specifications, approval shall be obtained from the COR. Contractor shall submit material samples, shop drawings, manufacturer's literature, etc., to the COR 10 days prior to installation and shall proceed with installation only after receiving written approval from the COR. All material installed without
COR's approval shall be removed.
1a-05 ISPESL AND CEI STANDARDS. All work described in these specifications shall be accomplished in strict compliance with the ISPESL (Superior Institute of Prevention and
Assurance of Work) and CEI (Italian Electrotechnical Committee) standards. In particular, if the work under contract, such as roof repairs, building painting, etc., may cause Contractor's personnel or other individuals to come in contact with non insulated electric lines, these shall be temporarily protected by use of appropriate spiral plastic tubes available on the market.
1a-06 TRANSLATION AND TITLE ABBREVIATION. The terms COR and "Direzione dei
Lavori" used in the Italian version of these specifications are equivalent to the American term
"Contracting Officer's Representative," which in the English version is indicated by the letters
COR.
1a-07 DIGGING PERMIT. The Contractor shall obtain a digging permit for all work areas affected by this contract (to insure that all the as-built information for underground services is received). This permit and related drawings must be received by the Contractor prior to starting any work. After receipt of the digging permit, the Contractor shall immediately notify, in writing the Contracting Officer of the permit receipt. The Contractor will be held responsible for any damages caused to existing services, as indicated on the digging permit and related drawings, and will repair such damages at his own expense.
1a-08 ASBESTOS. Handling of a fuel oil boiler containing asbestos is included in this project.
Hauling and disposal of asbestos containing materials must be performed as per Section IIIc.
1a-09 PARTICULAR REQUIREMENT FOR WORK IN HEATING PLANTS. When the contract requires the work to be performed inside heating plants, the contractor shall provide a new cylinder in the door lock and shall deliver two keys of the new cylinder and the removed cylinder to the personnel in charge of the maintenance. At the work end the contractor shall restore the lock to the original conditions and the temporary cylinder will remain his own property.
1a-10 ANTI-TERRORISM TRAINING. The Contractor shall comply with the following security requirements:
a. AT Level I Training. All contractor employees, to include subcontractor employees, requiring access Army installations, facilities and controlled access areas shall complete AT
Level I awareness training within 30 calendar days after contract start date. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR within 10 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website:
httQ://jko.jten.mil.
b. OPSEC Training. According to AR 530-1, new contractor employees must complete Level I
OPSEC training within 30 calendar days after they report for duty. All contractor employees must complete annual OPSEC awareness training.
The contractor will develop an OPSEC standing operating procedure (SOP)/plan within 90 calendar days after the contract is awarded, to be reviewed and approved by the responsible
Government OPSEC officer, according to AR 530-1. This SOP/plan will include the
Government’s critical information, why it needs to be protected, where it is located, who is responsible for it, and how to protect it. The contractor will ensure this individual becomes
OPSEC Level II certified according to AR 530-1.
c. Access and general protection/security policy and procedures. Contractor and all associated sub-contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost
Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal
Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy.
In addition to the changes otherwise authorized by the changes clause of this contract, should the
Force Protection Condition (FPCON) at any individual facility or installation change, the
Government may require changes in contractor security matters or processes.
iWATCH Training. The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO).This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 40 calendar days after contract award.
1a-11 ENVIRONMENTAL PROTECTION SYSTEM. The contractor will provide the following information semi -annually to be used by the Government to address environmental performance relative to the goals of the USAG Vicenza Environmental Management System.
Please note that the amounts reported are those used/generated by the contractor regardless of source (private purchase or government furnished). Reports for January – June will be submitted by 15 July and reports for July-December will be submitted by 15 January each year.
Media Report Element #1 Report Element #1
Non-Hazardous Solid Total Waste Amount of Waste
Waste Generated (Kg) Diverted from
Landfill (Kg)
Construction Total Waste Amount of Waste
Debris/Demolition Generated (Kg) Diverted from
Materials Landfill (Kg)
Compostable/Organic Total Waste Amount of Waste
Material Generated (Kg) Diverted from
Landfill (Kg)
Hazardous Materials Total Used (Kg)
Hazardous Waste Total Generated (Kg) Total Recycled (Kg)
Energy Consumption - Total Energy
Electricity Consumed (MBtu)
Energy Consumption - Total Fuel Consumed
Fuel (L)
Renewable/Alternative Total Consumed
Energy (MW)
Facility Number of Buildings SqFt of buildings
Construction/Renovation LEED Certified LEED Certified
Silver or Higher
SECTION Ib
QUALITY CONTROL BY CONTRACTOR
1b-01 GENERAL. The Contractor shall establish and maintain an effective quality control system to implement the requirements of contract clause entitled "Inspection of Construction
(July 1986)". The quality control system shall comprise plans, schedules, and organization necessary to provide materials, equipment, workmanship, manufacture, construction, and operations which comply with contract requirements and shall identify personnel and forms to be used. The system shall cover construction operations, both indoors and outdoors, and shall be in accordance with the proposed construction sequence.
1b-02 COORDINATION MEETING. As soon as practicable after receipt of Notice to Proceed and before start of construction, the Contractor shall meet with the Contracting Officer's
Representative (COR) and discuss the Contractor's quality control (CQC) system. During the meeting a mutual understanding of the system details shall be developed including the forms for recording the CQC operations, control activities, testing, administration of the system for both indoors and outdoors construction, and the interrelationship of Contractor's inspection and control with the Government's inspection. Minutes of the meeting will be prepared by the COR and forwarded to the Contracting Officer who will make them a part of the contract file. There may also be other subsequent meetings will be called to reconfirm understandings. Minutes of these meetings will also be forwarded to the Contracting Officer.
1b-03 QUALITY CONTROL PLAN.
a. Prior to starting the construction, the Contractor shall furnish his CQC plan through the COR to the Contracting Officer for acceptance. Construction will be permitted to begin only after acceptance of the CQC plan or approval of that portion of the plan applicable to the particular feature of the work to be started. The QC plan proposed by the Contractor shall identify personnel, procedures, instructions, records and forms, and, as a minimum, shall include:
(1) A description of the quality management organization.
(2) The names, qualifications, duties, responsibilities, and authorities of each person assigned a quality control (QC) function.
(3) A copy of the letter to the QC manager, signed by an authorized official of the firm, which describes the responsibilities and delegates the authorities of the QC manager.
(4) Procedures to perform QC over other activities including subcontractors, manufacturers, and suppliers.
(5) Control testing procedures for each specific test.
(6) Reporting procedures for QC including proposed reporting formats.
b. After approval of the QC plan the Contractor shall notify the Contracting Officer in writing of any proposed change to his QC plan. Proposed changes are subject to acceptance by Contracting
Officer.
c. The acceptance of the QC plan is conditional and will be predicated on a satisfactory performance during the construction. If it is determined that the QC plan, personnel, instructions, controls, tests or records are not providing a construction conforming to contract requirements, the Government will reserve the right to require the Contractor to make changes in his QC plan and operations, as deemed necessary to obtain the specified quality. Any changes required to the plan will be made at no cost to the Government.
1b-04 QUALITY CONTROL ORGANIZATION.
a. The Contractor shall identify an individual within his organization at the site of the work who shall be responsible for overall management of CQC and have the authority to act in all CQC matters for the Contractor.
b. A staff shall be maintained under the direction of the system manager to perform all QC activities. The actual strength of the staff during any specific work period may vary to cover work phase needs, shifts and rates of placement. The personnel of his staff shall be fully qualified by experience and technical training to perform their assigned tasks, and shall be directly hired by and work for the prime Contractor.
1b-05 SUBMITTALS.
a. The Contractor shall develop procedures for purchasing materials and equipment, subcontracting, and processing shop drawings, samples, certificates, and other submittals. This procedure shall include the establishment of responsibilities to assure, at each level, adequate review and approval, timely delivery including verification procedures, and proper storage.
Submittals of the shop drawings and/or manufacturer's data shall be, as specified, in accordance with contract clauses entitled "Material and Workmanship (Apr 1984)" and "Specifications and
Drawings for Construction (Apr 1984) - Alternate I (Apr 1984)".
b. Actions shall be taken to ensure that only materials and equipment which comply with contract requirements are purchased and delivered to the job site or used in off site fabrication, unless specific deviations are approved, as specified hereinafter. The COR may request a copy of the document of transportation of the provided material.
c. The Contractor shall review the contract requirements and verify that submittals are confirming to contract compliance. Within 10 days after receipt of notice to proceed, the
Contractor shall submit a submittal control document listing and scheduling all submittal items required in the contract. This document shall be in duplicate and shall be addressed through the
COR to the Contracting Officer. The control document shall include such items as construction schedules, monthly progress reports, shop drawings, manufacturer's literature, certificates of compliance, material samples, and guarantees. The document shall schedule for each item the dates of submittals. The scheduling of submittals shall be coordinated with the approved progress schedule; the information contained therein shall be reviewed and updated at each schedule update. Adequate time shall be allowed to the US Government for approval of submittals. The Contractor shall review the listing at each progress schedule update and copies of updated documents shall be submitted through the COR to the Contracting Officer in the specified quantity. Payments to the Contractor will not be made for material or equipment which does not comply with the Contract requirements.
d. The CQC organization shall be responsible for certifying that all submittals are in compliance with the contract requirements. Submittals to the Contracting Officer without evidence of the certification will be returned for resubmission.
e. The Contractor shall submit copies of all submittals through the COR to the Contracting
Officer.
f. Delays in the approval process shall not be the basis for consideration of a time extension when such delay is the result of the Contractor's failure to make proper and timely submittal, or make corrections in accordance with the specifications or the Contracting Officer's comments, or is a result of a resubmittal which is required because of an unsatisfactory original submittal.
Approval action by the Contracting Officer will not relieve the Contractor of his responsibility for compliance with the contract but will indicate only that the general method of construction and detailing is satisfactory.
g. All proposed deviations from contract requirements shall be submitted in writing for approval by the Contracting Officer.
1b-06 CONTROL. Quality control is the means by which the Contractor assures himself that his construction complies with the requirements of the contract plans and specifications. The QC system shall include at least the following three phases of control and management for all definitive features of work:
(1) Preparatory. This control phase shall be performed before beginning work on each definable feature of work. It shall include a review of contract requirements to assure that materials, sample, and equipment conform to contract requirements and that control testing procedures are finalized. The control shall also include examination of the work area to verify that structures over which new work is to be placed conform to contract requirements;
Contractor shall also verify that the required materials be on hand and properly stored. The COR shall be notified at least 24 hours in advance of each preparatory activity.
(2) Initial. This phase of control must be accomplished as soon as a representative portion of the particular feature of work has been accomplished and shall include examination of the quality of workmanship and a review of control testing for compliance with contract requirements, identification of defective or damaged materials, omission, and dimensional requirements. The COR shall be notified at least 24 hours in advance of the initial inspection and such inspection shall be made a matter of record in the CQC documentation.
(3) Follow-Up. The follow-up phase shall be performed continuously to verify that control procedures are providing an end product which complies with contract requirements.
Adjustments to control procedures may be required based upon the results of this phase.
(4) Completion. At the completion of all work or any increment, the CQC representative shall conduct a joint review with the COR. During this review the work shall be examined, quality control shall be examined, and a list shall be developed of work not properly completed or not conforming to plans and specifications. This list shall be included in the quality control documentation with an estimated date for correction of each deficiency. The Contractor shall make sure that deficiencies be corrected prior to the contract completion date. Payment will be withheld for defective or deficient features until they are satisfactorily corrected except as otherwise provided in the contract.
1b-07 TESTS.
a. The Contractor shall perform tests specified or required to verify that control measures are adequate to provide a product which conforms to contract requirements. The Contractor shall procure the services of an industry recognized testing laboratory or he may establish an approved testing laboratory at the project site. A list of tests which Contractor believes necessary shall be furnished to the COR. The list shall give the test name, specification paragraph containing the test requirements, and the personnel and laboratory responsible for each type of test. The
Contractor shall perform the following activities and provide the following data:
(1) Verify that the testing procedures comply with contract requirements.
(2) Verify that facilities and testing equipment are available and comply with testing standards.
(3) Check test instrument calibration data against certified data.
(4) Verify that recording forms including all pertaining documentation have been prepared.
b. Testing.
(1) The Contracting Officer reserves the right to check laboratory equipment in the proposed laboratory for compliance with the standards set forth in the contract specifications and to check the laboratory technician's testing procedures and techniques.
(2) The Contracting Officer reserves the right to utilize the Contractor's control testing laboratory and equipment to make assurance tests and to check Contractor's testing procedures, techniques, and test results at no additional cost to the Government.
(3) Cost incidental to the transportation of samples or materials will be borne by the
Contractor.
1b-08 DEFECTIVE WORK. The Contractor shall not build upon or conceal a defective work.
1b-09 DOCUMENTATION.
a. The Contractor shall maintain current records, on an appropriate form, of quality control operations, activities and tests performed including the work of suppliers and subcontractors.
These records shall include factual evidence that the required activities or tests have been performed, including but not limited to the following:
(1) Type and number of control activities and tests involved.
(2) Results of control activities or tests.
(3) Nature of defects, causes for rejection, etc.
(4) Proposed remedial action.
(5) Corrective actions taken.
b. These records shall cover both conforming and defective or deficient features and shall include a statement saying that supplies and materials incorporated in the work comply with the contract. Legible copies of these records shall be furnished to the COR weekly. The records shall cover work performed during the time period for which the records are furnished and shall be verified by persons designated by the Contractor.
SECTION IIa
DESCRIPTION OF WORK
2a-01 STATEMENT OF WORK. Contractor shall furnish all plants, labor, equipment, material and transportation necessary for the accomplishment of the work described in these specifications and shown on drawings, both of which are an integral and binding part of the contract.
2a-02 DESCRIPTION OF THE WORK. The work included in this project will consist in the renovation of workshops 5105 and 5106, part of the Care and Preservation (C&P) Complex. The buildings are essentially rectangular, 50 x 10 meters, with low skirting concrete walls and arched roofing having steel bearing structure and cover made of corrugated steel slates with reflecting surfaces. The shorter sides are vertical with shop doors. The buildings will host new specific functions, currently present in nearby facilities.
Bldg 5105 is currently used mostly as storage space by the Base Fire Department, while Bldg
5106 is the Carpentry Shop of the AFSBn. The project scope includes the general repair of the two facilities and the following modifications:
- Building 5105 will be converted to Carpentry Shop, function presently performed at 5106.
- Building 5106 will be converted to “Preservation/Packaging”, function presently performed at
5103.
The works must be carried out in two distinct phases, as indicated on drawings, and until the first phase is not completed and accepted, the second can not start:
1. Phase 1 works will concern only building 5105. It will be completely renovated to accommodate a different function. Once the works required for this phase 1 have been completed, all equipment, accessories, furniture (ie. benches, shelving and cabinets), currently located in building 5106, must be relocated and installed into building 5105. The contractor is responsible for the removal, relocation and installation of all existing equipment including accessories and furniture for the entire duration of the works, as indicated on drawings. Few additional equipment will be purchased and installed by the contractor as indicated on drawings.
Only once building 5105 is completed, accepted and operative, the works related to phase 2, concerning building 5106 can start.
2. Phase 2, works will pertain to building 5106. It will be completely renovated and used for the
"Conservation and Packaging" function, now carried out in building 5103. Only once works concerning this phase 2 have been completed, all equipment, accessories, furniture (ie. benches, shelving and cabinets), currently located in building 5103 will be relocated and installed into building 5106. The contractor is responsible for the removal, relocation and installation of all existing equipment including accessories and furniture for the entire duration of the works, as indicated on drawings. Some additional equipment will be purchased and installed by the contractor as indicated on drawings.
Anything else included in the design will be part of the contract.
BUILDING 5105
Architectural, Civil and Structural This building has been modified internally with the construction of interior partitions of different types. Most of the partitions are lightweight, gypsum board or wooden, with the exception of the bathroom area that consists of masonry construction, and of a steel mezzanine with a staircase.
The entire building has the entire interior surface coated with insulation panels (wooden fiber type) with the exception of the front walls and the base sections of side walls; metal false ceiling are present throughout the building at various levels. There are several windows on the side walls of two different sizes. Shop doors on the two front walls. The required work, as shown on drawings, will include the following:
• Demolition of the exterior fence, basement and canopy of the mechanical equipment including removal and disposal of the fuel oil boiler containing asbestos;
• Provision of reinforced concrete slabs/platforms suitable to accommodate the mechanical equipment, including restoration of lawn areas;
• Removal and replacement of internal insulation panels, partitions, false ceiling and mezzanines;
• Windows closures, shop doors replacement with sectional doors and provision of new emergency exits;
• Repair of internal flooring;
• Construction of new small toilet/shower service;
• External base walls repair/painting;
• Relocation and installation of all existing equipment, accessories and furniture (ie.
benches, shelving and cabinets) from building 5106.
Mechanical/Plumbing The mechanical works for this project will include the complete removal and disposal of all building existing mechanical and plumbing systems currently installed in the building. The demolition works will include the existing fuel oil boiler, its chimney stack, the fuel oil tank, the air handling system, all related pipes, and accessories. Boiler contain asbestos. Air ducts and air devices inside and outside the building shall also be removed.
The current project design includes a new heating and ventilation only system in the building:
The heating source will be an electric heat pump. The toilet will have an electric radiator for heating, and air exhaust system.
The design will include a new sawdust exhaust system, and a new compressed air system.
The plumbing system will connect the sanitary fixtures with domestic cold and hot water, waste
& vent piping.
Electrical
• Existing electrical system shall be completely removed and replaced. The existing feeder
3,5x95sqmm + 1x95 sqmm (ground) will be moved from the 220/127V Panel to the 400V panel of the substation bldg 5109. The new electrical syetm in the building shall be 400-230V TN-S type.
• New power system shall be provided with a new main distribution panel, to feed new industrial and civil type power outlets in number and type as necessary for the building use.
Cable trays and conduits shall be metallic type. Power distribution will be mainly done by use of prefabricated power busducts.
• New interior lighting system, normal and emergency, shall be provide with lighting fixtures
LED type. Motion sensors shall be installed to turn on/off the light in rooms normally not occupied.
Additional new lighting fixtures shall be provided over building’s access
• The electrical system shall be connected to the existing grounding system.
Communication
• Existing communication system shall be completely removed and replaced. A new communication system shall be installed complying the last version of “USAREUR Internal
Cable Distribution System (ICDS)” standard and of “United States Army Information System
Engineer Command - Technical Guide for Installation Information Infrastructure Architecture”;
new rack and components shall be Cat 6 F/UTP.
Fire Alarm
• A new fire detection and alarm system shall be provided according to NFPA 72, UNI 9795 and other applicable norms.
Procurement and Installation of equipment and lockers/closet:
The following equipment shall be contractor furnished and installed as indicated on drawings:
1. BEAM SAW
Technical data measures Data Squaring length mm 2600-3200-3800
Blade diameter allowed mm 300-350
Inner Hole Blade mm 30
Blade projection 90°
D350 mm (D.300) mm 105 (80)
Blade projection D.350 mm 45° mm 72 (50)
Blade rotation speed g/min 4000
Blade carriage speed with inverter mt/min 40
Main motor power Hp (Kw) 7,5 (5)
Extraction outlet mm 120/100
Extraction air volume mt3/h 1800
Extraction air speed m/sec 25
Operating pressure bar 7
Air consumption L/h 85
Sound Emission according to Iso 7960 with blade cut from 350 z96 Db
Dust Emission according to Din 33893 7960 with saw cut mg/m3
2. DRILL BENCH
Self-locking Spindle capacity: 13 Mm.
Diameter Canotto : 40 Mm.
Diameter Column : 72 Mm.
Spindle Stroke: 85 Mm.
Distance Max. Mandrino – Column : 162 Mm.
Distance Max. Machine – Base : 625 Mm.
Distance Max. Machine - Table : 435 Mm.
Dimensions Table : 290 X 290 Mm.
Speed Spindle Stroke (12) : from 180 A 2'770 Giri / Min.
height : 980 Mm.
Engine : 230 V – 50 Hz – 500 W
3. MORTISING MACHINE
Dimension of table 560 X 300 Mm
Plan Tilt +45', 0', -45'
Maximum Depth of the Quarry 180 Mm
Maximum Quarry Length 200 Mm
Vertical Head Race 180 Mm
Universal Spindle Holder 0 - 20 Mm
Spindle Speed 4500 Rpm
Engine Power 2,2 Kw (3,0 Hp)
Anchorage of equipment on floor slab shall be performed by means of steel screws type M12 /
L132 as indicated on drawings
4. CABINETS WITH SHELVES -ARMADI ZINCOPLASTIFICATI A MENSOLE
Made of galvanized sheet of thick mm. 6-7/10.
Sides, doors, base and top bi-plastificati, color Light Gray Ral 7035.
Height . mm. 1800 with 2 doors with 2-way Cremonese style closure.
Key lock of the Yale type.
5. UTILITY CLOSET/CABINET - ARMADI ZINCOPLASTIFICATI PORTASCOPE
Sides, doors, base and top bi-plastificati, color Light Gray Ral 7035.
6. COIL COMPRESSOR AIR TUBE
Coil compressor air tube, 10 m, inclusive of quick disconnect coupling, as indicated on drawings.
BUILDING 5106
This building has almost no interior construction and no windows. The whole building has the entire interior surface coated with insulation panels (wooden fiber type) with the exception of the front walls and the base sections of side walls; no false ceiling is present. Shop doors on the two front walls. Adjacent to the building there is a steel shed dedicated to the wooden material storage. Required works will include, as indicated on drawings, the following:
Architectural/Civil/Structural
• Demolition of the exterior fence, basement and canopy of mechanical equipment ;
• Provision of reinforced concrete slabs/platforms suitable to accommodate the mechanical equipment;
• Filling and levelling of an existing old and unused vehicles inspection pit;
• Removal and replacement of internal insulation panels;
• Demolition of one small wooden structure in a building corner;
• One shop doors replacement with sectional door and provision of new emergency exits;
• Replacement of windows above shop doors;
• Repair of internal flooring;
• Construction of new small toilet/shower service;
• External base walls repair/painting;
• Replacement of a wooden fence enclosing part of the exterior shed with a steel fence with gate:
• Construction of a steel open shed for battery chargers, adjacent to an existing shed;
• Relocation and installation of all existing equipment, accessories and furniture (ie.
benches, shelving and cabinets) from building 5106 as indicated on drawings.
Mechanical/Plumbing The mechanical works for this project will include the complete removal and disposal of all building existing mechanical and plumbing systems currently installed in the building, with the exception of the existing heat pump rooftop unit, that shall remain in place and reused. The demolition works will include the existing air distribution system, all related ductwork, and accessories. The work includes the removal of existing sawdust extraction system, including exhaust fan and ductwork, the existing compressed air system, including compressor, piping, and accessories.
The current project design will provide a new heating, air conditioning and ventilation system in the building, fed by the existing air-to-air heat pump. The toilet will have an electric radiator for heating, and air exhaust system in bathroom. An independent heating and air conditioning system, heat pump, will serve the office.
The plumbing system will connect the sanitary fixtures with domestic cold and hot water, waste
& vent piping. A new compressed air system will serve the workshop.
Electrical
• Existing electrical system shall be completely removed and replaced. The existing feeder
3,5x95sqmm + 1x95 sqmm (ground) will be moved from the 220/127V Panel to the 400V panel of the substation bldg 5109. The new electrical system in the building shall be 400-230V, TN-S type.
• New power system shall be provided with a new main distribution panel, to feed new industrial and civil type power outlets in number and type as necessary for the building use.
Cable trays and conduits shall be metallic type. Power distribution will be mainly done by use of prefabricated power busducts.
• New interior lighting system, normal and emergency, shall be provide with lighting fixtures
LED type. Motion sensors shall be installed to turn on/off the light in rooms normally not occupied.
Additional new lighting fixtures shall be provided over building’s access
• The electrical system shall be connected to the existing grounding system.
Communication
• Existing communication system shall be completely removed and replaced, excepted the Rack which shall be upgraded with replacement of all interior components and devices.
A new communication system shall be installed complying the last version of “USAREUR
Internal Cable Distribution System (ICDS)” standard and of “United States Army Information
System Engineer Command - Technical Guide for Installation Information Infrastructure
Architecture”; new rack and components shall be Cat 6.
Fire Alarm
• A new fire detection and alarm system shall be provided according to NFPA 72, UNI 9795 and other applicable norms.
Procurement and Installation of lockers/closet:
The following equipment shall be contractor furnished and installed as indicated on drawings as indicated on drawings:
CABINETS WITH SHELVES
Made of galvanized sheet of thick mm. 6-7/10.
Sides, doors, base and top bi-plastificati, color Light Gray Ral 7035.
UTILITY CLOSET/CABINET
Sides, doors, base and top bi-plastificati, color Light Gray Ral 7035.
2a-03 SAFETY DURING CONSTRUCTION.
The project is performed assuming the possible presence of more than one firm, also not at the same time, on the work place, as per paragraphs 3 and 4 of art. 90 of Legislative Decree 81/2008. The “Piano di Sicurezza e Coordinamento” (safety and coordination plan) is included as part of the contract documentation. The Contractor shall provide his/her own
“Piano Operativo di Sicurezza” (operational safety plan) and comply with the requirements of the mentioned Law in all applicable parts.
2a-04 EMERGENCY SITUATIONS. Contractor will maintain the following documentation available and usable at the work site, to be provided by the COR:
- A copy of the Camp Darby Emergency Plan, to which contractor will refer in case of the emergency conditions indicated in the plan itself.
- Base Grid Coordinates layout, with the work site highlighted.
- List of emergency telephone numbers.
2a-06 PROJECT IDENTIFICATION SIGN. The contractor shall supply and install a sign identifying the project. The sign shall be of high-resistant plywood for outdoor installation, white painted. The dimensions shall be 1200x2400x12 mm. The letters of the wording shall be uppercase, black color, 5 cm high, except the letters of the project title which shall be 10 cm. The sign shall be fixed to a structure made of any lasting material in compliance with all safety requirements. The sign shall be well visible, with the lower side at
1.2 m from ground level.
SECTION IIIa
DEMOLITION AND REMOVAL
3a-01 GENERAL. All demolition and removal works will be provided in compliance with law prescriptions included in Legislative Decree n. 81, 9 April 2008,. Prior to beginning of the demolition and removal works and in compliance with the above described laws, the Contractor is responsible for the installation of the necessary scaffolding and for its maintenance during all the time period needed to complete the work. The work includes demolition and removal of all construction indicated or specified. Do not begin demolition until authorization is received from the DPW. All materials resulting from demolition work, except as indicated or specified otherwise, shall become the property of the Contractor and shall remove from the limits of the
Government property. Remove rubbish and debris from the station daily, unless otherwise directed; do not allow accumulations inside or outside the buildings. Store materials that cannot be removed daily in areas designated by the DPW. Existing work which is to remain in place or to be reused, shall be protected using temporary covers, shoring, bracing, and supports. Items which are to remain and which are damaged during performance of the work shall be repaired to their original condition or replace with new at the expense of the Contractor. Do not overload structural elements. Provide new supports and reinforcement for existing construction if weakened by demolition or removal work. Where removal of existing roofing is necessary to accomplish work, have materials and workmen ready to provide adequate and approved temporary covering of exposed areas. Do not leave any uncovered roof portion unprotected.
Temporary coverings shall be securely fastened to prevent displacement and insure positive attachment in case of strong winds or heavy downpour of rain. Sawcut masonry so as to prevent damage to surfaces to remain. Do not remove masonry work by pounding with sledge hammer.
Wherever existing surfaces to remain are damaged by the Contractor during the performance of the work, including openings, plaster work, demolition of raised floor, fixtures, and unfinished areas resulting from the removal of materials or equipment, the Contractor shall repair, patch, and finish such surfaces to match finish of adjacent undamaged surfaces. Waste material shall not be thrown down, but rather, it shall be conveyed or guided downward, after wetting it to prevent raising dust. During demolition or removal work, the Contractor shall adopt every measure suitable to avoid deterioration of the items which may be reinstalled, or which, in the opinion of the COR, may be used at a later date. These items shall be cleaned, guarded, hauled and set neatly in the storage areas indicated by the COR, at no cost to the US Government. The demolition work shall be limited to the work, or to its parts, and to the dimensions specified.
Reconstruction of structures demolished over and above the quantities indicated, as well as rehabilitation of work damaged as a result of lack or omission of precautions or shoring, shall be performed at no cost to the US Government. All waste material resulting from demolition and removal shall be disposed of at a public dump in accordance with the Italian Laws.
3a-02 REMOVALS OF ABOVE GROUND FUEL OIL TANKS Tanks shall be emptied by the contractor with his/her own means, after a notification to the
COR. The fuel oil shall be poured inside other tanks located inside the installation, as indicated by the COR.
After empting tanks to be removed shall be cleaned by a skilled firm, legally authorized. The cleaning shall consist of the removal of all oily residuals and in the subsequent washing of the interior with detergent and pressurized water. The oily residuals, the detergent and the used water shall be disposed of in compliance with the current Italian laws after taking a sample of all substances and having them analyzed by an authorized laboratory. The contractor shall provide the COR with a certification of the performed disposal.
A qualified engineer shall subsequently test the cleaned tanks (gas free), and the certification test shall be delivered to the COR.
All expenses for cleaning, taking in delivery, analyses and for the final tests shall be at contractor’s expense and included in the price offer at the bidding. The contractor shall transport reclaimed tanks to the DRMO, building 5138 Supply & Maintenance Area, and unloaded where indicated.
SECTION IIIb
EXCAVATION AND BACKFILLING
3b-01 EXCAVATION.
a. General. During excavation, material suitable for backfilling shall be piled at sufficient distance from the banks of the excavation to avoid backslides. All earthy material in excess or unsuitable for backfilling shall be delivered to the location indicated by the COR and within 20 km from work site. All costs for public dump of ordinary and/or special waste material shall be
Contractor charge. This does not apply to debris and rubble of all types, from which excavation material shall be rid of; these shall be disposed of at a dump, as prescribed at paragraph 1a-02. In case excavation is performed in presence of water and water level is below 20 cm height, the contractor shall remove water at his expense using the means he deems suitable. If water reaches higher levels, removal shall still be at contractor's expense only if the possible presence of groundwater is indicated on the drawings or in these specifications, and only to the extent indicated. In addition, the contractor shall prevent the access of water deriving from outside to the excavation site: in case water accumulates in excavated area, removal will be at contractor's expense. Struts and shoring shall be placed as necessary for the protection of the work and for the safety of personnel. Adequate precautions shall be taken for the protection of existing underground pipelines or electrical cables. Before any excavation is started, plans showing the approximate location of underground utility lines shall be furnished to the Contractor, upon his request. The area of excavation shall be delimited by trestles, gangplanks, and warning signs visible during night and day, to prevent injuries to persons, as prescribed by the ISPESL standards.
b. Trenches. Trenches shall be of the necessary width for the proper laying of the pipes and electric cables, and the banks shall be as nearly vertical as practicable. The bottom shall be accurately graded so as to provide bearing for the pipe on firm soil. The clear space between the pipe and the trenches wall shall not exceed 6" (15 cm.) on either side of the pipe. Further excavation will be required for housing and sealing of pipe joints. In proximity of buildings, existing underground utility lines, and wherever specifically requested in other sections of these specifications or on drawing notes, trenches shall be excavated manually.
c. Excavation for Foundation and Appurtenances. Excavation for manholes and similar structures shall be of sufficient dimensions as to leave a 12 inches (30 cm.) free space between their outer surfaces and the embankment or timber which may be used to hold the banks.
3b-02 BACKFILLING. Trenches shall not be backfilled until foundation, pipes or cables have been inspected and approved. Where, in the opinion of the COR, damage is likely to result from withdrawing of shoring, the latter shall be left in place.
a. Trenches on carrigeable roads: The pipes will be laid on a bed of dry sand of the thickness of 10-15 cm, one will furthermore provide for a backfilling and covering of the pipes for a minimum thickness of 10-15 cm with the same sand (0.8-2 mm).
As an alternative, when specifically required by the drawings, the bed and the backfilling shall be realized with lean concrete Rck 15 N/mmq.
When required the sand layer (or concrete) shall be covered with a layer of lean concrete, Rck 15
N/mmq, of the thickness of 10 cm. The quality, the characteristics and thickness of the backfilling materials are…