BID SCHEDULE

View the file

Other files

File Type Posted
Amendment_0003_signed.pdf PDF
Amendment_0002.pdf PDF
5._EZ-00021-6J_Bid_Schedule_20180613.xlsx XLSX spreadsheet
SOW_REVISED.pdf PDF
W912PF18R0016-0001.pdf PDF
W912PF18R0016-0001.pdf PDF
Attachment2-BidSchedule.xlsx XLSX spreadsheet
W912PF18R0016.pdf PDF
Enclosure1-Construction_Project_Information_Sheet.docx DOCX document
Attachment1-SOW.pdf PDF
Enclosure4-Format_of_a_Bid_Bond.doc DOC document
Enclosure2-PPQ.docx DOCX document
Enclosure3-Self_Certification_for_Antimafia.docx DOCX document
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Quantity/Quantità Material Cost/Costo Materiale Labor Cost/Costo Manodopera Total Cost/Costo Totale Item DESCRIPTION Unit "K" "L" Unit "K" "L" Unit "K" "L" "K" "L" "K+L"

Unità Unità Euro Euro Unità Euro Euro Euro Euro Euro

1 Total civil work - Totale lavoro civile 0 0 0 0 0 0 0 0 € 0.00 € 0.00 € 0.00 2 Total electrical work - Totale lavoro elettrico 0 0 0 0 0 0 0 0 € 0.00 € 0.00 € 0.00 3 Design efforts % € 0.00 € 0.00 € 0.00

TOTAL WORK € 0.00 € 0.00 € 0.00

$0.00 $0.00 $0.00

RATE $1.0000 = € 0.9329

Contingencies € 0.00

Overhead € 0.00 Profit € 0.00

GRAND TOTAL € 0.00

$0.00

EZ-00021-6J, Replace Theater Floor and Chairs, Caserma Ederle, Vicenza, Italy

Quantity/Quantità Material Cost/Costo Materiale Labor Cost/Costo Manodopera Total Cost/Costo Totale Item DESCRIPTION Unit "K" "L" Unit "K" "L" Unit "K" "L" "K" "L" "K+L"

Unità Unità Euro Euro Unità Euro Euro Euro Euro Euro

1 CIVIL WORK-LAVORI CIVILI

C3010 Interior Finishes - Wall Finishes Remove and dispose existing wall base LM 0.00 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00

Furnish and install new wall base LM 0.00 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 Wainscotting LM 0.00 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00

C3020 Interior Finishes - Floor Finishes Remove and dispose existing rubber floor SQM 0.00 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 Remove and dispose existing carpet floor SQM 0.00 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00

Furnish and Install new resin floor SQM 0.00 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 E2010 Furnishings - Fixed Furnishings

Removal of existing theater seats LS 0.00 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 Furnish and Install new theater seats Ha 0.00 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00

Total civil work - Totale lavoro civile 0.00 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00

2 ELECTRICAL WORK-LAVORI ELETTRICI

G4010 Electrical Distribuition Remove existing step-welllights complete with all connections Lin mt 0.00 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 Furnish and Install connections of new indicating number the end of each row will have built in LED on seats Ha 0.00 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00

Total electrical work - Totale lavoro elettrico 0.00 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00