5._EZ-00021-6J_Bid_Schedule_20180629_rev.pdf
PDF 66 KB Posted
- Attached to
- REPAIR THEATRE FLOOR AND CHAIRS
- Solicitation number
- W912PF18R0016
About this file
BID SCHEDULE
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_0003_signed.pdf | ||
| Amendment_0002.pdf | ||
| 5._EZ-00021-6J_Bid_Schedule_20180613.xlsx | XLSX spreadsheet | |
| SOW_REVISED.pdf | ||
| W912PF18R0016-0001.pdf | ||
| W912PF18R0016-0001.pdf | ||
| Attachment2-BidSchedule.xlsx | XLSX spreadsheet | |
| W912PF18R0016.pdf | ||
| Enclosure1-Construction_Project_Information_Sheet.docx | DOCX document | |
| Attachment1-SOW.pdf | ||
| Enclosure4-Format_of_a_Bid_Bond.doc | DOC document | |
| Enclosure2-PPQ.docx | DOCX document | |
| Enclosure3-Self_Certification_for_Antimafia.docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quantity/Quantità Material Cost/Costo Materiale Labor Cost/Costo Manodopera Total Cost/Costo Totale Item DESCRIPTION Unit "K" "L" Unit "K" "L" Unit "K" "L" "K" "L" "K+L"
Unità Unità Euro Euro Unità Euro Euro Euro Euro Euro
1 Total civil work - Totale lavoro civile 0 0 0 0 0 0 0 0 € 0.00 € 0.00 € 0.00 2 Total electrical work - Totale lavoro elettrico 0 0 0 0 0 0 0 0 € 0.00 € 0.00 € 0.00 3 Design efforts % € 0.00 € 0.00 € 0.00
TOTAL WORK € 0.00 € 0.00 € 0.00
$0.00 $0.00 $0.00
RATE $1.0000 = € 0.9329
Contingencies € 0.00
Overhead € 0.00 Profit € 0.00
GRAND TOTAL € 0.00
$0.00
EZ-00021-6J, Replace Theater Floor and Chairs, Caserma Ederle, Vicenza, Italy
Quantity/Quantità Material Cost/Costo Materiale Labor Cost/Costo Manodopera Total Cost/Costo Totale Item DESCRIPTION Unit "K" "L" Unit "K" "L" Unit "K" "L" "K" "L" "K+L"
Unità Unità Euro Euro Unità Euro Euro Euro Euro Euro
1 CIVIL WORK-LAVORI CIVILI
C3010 Interior Finishes - Wall Finishes Remove and dispose existing wall base LM 0.00 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00
Furnish and install new wall base LM 0.00 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 Wainscotting LM 0.00 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00
C3020 Interior Finishes - Floor Finishes Remove and dispose existing rubber floor SQM 0.00 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 Remove and dispose existing carpet floor SQM 0.00 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00
Furnish and Install new resin floor SQM 0.00 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 E2010 Furnishings - Fixed Furnishings
Removal of existing theater seats LS 0.00 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 Furnish and Install new theater seats Ha 0.00 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00
Total civil work - Totale lavoro civile 0.00 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00
2 ELECTRICAL WORK-LAVORI ELETTRICI
G4010 Electrical Distribuition Remove existing step-welllights complete with all connections Lin mt 0.00 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 Furnish and Install connections of new indicating number the end of each row will have built in LED on seats Ha 0.00 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00
Total electrical work - Totale lavoro elettrico 0.00 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00
File details come from the government source that posted it.