About this file

Attachment 2- technical specification

View the file

Other files

File Type Posted
Attachment3d11.tif TIF image
Attachment3d14.tif TIF image
Attachment3d7.tif TIF image
Attachment5constructionquest.pdf PDF
Attachment3d13.tif TIF image
Attachment1scopeofwork.pdf PDF
Solicitation.pdf PDF
Attachment3d15.tif TIF image
Attachment3d12.tif TIF image
Attachment3d1.tif TIF image
Attachment3d4.tif TIF image
Attachment3d3.tif TIF image
Attachment3d10.tif TIF image
Attachment8Preliminarysafetycoordinationanandtwodocuments.pdf PDF
Attachement6StatementofpossessionofGeneralrequirements.pdf PDF
Attachment3d6.tif TIF image
Attachment4designquest.pdf PDF
Attachment3d9.tif TIF image
Attachmenet7Statementofpossessionofgeneralrequirementsadditionalinformation.pdf PDF
Attachment3d2.tif TIF image
Attachment3d5.tif TIF image
Attachment3d8.tif TIF image
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE ARMY

UNITED STATES ARMY GARRISON VICENZA – DARBY MILITARY COMMUNITY

PUBLIC WORKS OFFICE

APO AE 09613

Projects

MS 00236-5

OD1 00187-7

RENOVATE HVAC, RELOCATE PHOSTO STUDIO

BUILDING 5052,

SUPPLY & MAINTENANCE AREA

TECHNICAL SPECIFICATIONS

Consisting of 80 pages

PAOLO SERRAGLINI

Chief, Engineering Services Branch

Prepared by: STEPHEN E. DONNELLY, P.E.

Public Works Manager

On ________________ APPROVAL DATE ________________

INDEX

SECTION Ia

GENERAL PROVISIONS

SECTION Ib

QUALITY CONTROL BY CONTRACTOR

SECTION IIIa

DEMOLITION AND REMOVAL

SECTION VIa

FLOORING

SECTION VIId

WALLS PAINTING

SECTION IXa

ALUMINUM DOORS AND WINDOWS

SECTION Xb

FALSE CEILING

SECTION XIIa

PLUMBING

SECTION XIIe

THERMAL INSULATION FOR MECHANICAL SYSTEMS

SECTION XIIf

AIR CONDITIONING SYSTEM

SECTION XIIIa

ELECTRICAL SYSTEMS

SECTION XIIIb

TELECOMMUNICATION SYSTEM

SECTION Ia

GENERAL PROVISIONS

1a-01 WORK PHASING.

a. Work Schedule. Whenever the nature of the contract and the work location are such that the work is to be performed in an area assigned to activities and services that cannot be interrupted, work shall be scheduled with concurrence of COR in such a manner as to cause the least possible inconvenience to the normal operations of mentioned activities and services.

Contractor shall submit his proposed work schedule to the COR at the time of the pre-construction conference. Work start shall be contingent upon schedule approval.

b. Utilities Cut-Offs. As a rule, cut-off of power and other utilities (water, sewage, heating system, etc.) is not allowed. All temporary connections necessary to insure continuous power distribution shall be provided. If cut-offs are necessary, they shall not exceed the period of time strictly needed to make the temporary connections. Cut-off shall be scheduled with the COR not less than 15 days ahead of time.

c. Alarm, Telephone and Televisions Systems. Deenergizing of alarm, telephone and television systems is strictly prohibited. Should these systems, which may not appear on the drawing interfere with the contract work, they shall be temporarily diverted and fed by means of temporary connections to be adequately protected. Written approval must be obtained from COR prior to doing any temporary work.

d. System Reactivating. At the completion of the work, all existing systems, including water, electrical and heating systems, shall be reactivated and placed in their original locations.

e. Temporary Protections. Floors, carpets, and equipment that cannot be removed shall be adequately protected by temporary tarpaulins to be furnished and installed at no cost to the US Government. In addition, temporary protections shall be furnished and installed in some particular areas so as to allow performance of activities that cannot be interrupted or transferred.

Also, the Contractor shall be responsible for removing, protecting, and reinstalling all furniture, shelves and furnishings that may interfere with the work course. A wrong or no evaluation of all requirements specified above does not constitute grounds for a request for additional compensation.

1a-02 JOBSITE CLEAN UP AND DUST CONTROL. The contractor shall have sufficient trash/waste bins on site, and shall clean the worksite so that all discarded materials, debris and trash are placed in these bins at the end of each workday, and not left or allowed to accumulate anywhere else on the jobsite. These waste bins shall not be allowed to overflow with debris, and shall be emptied as soon as they become full. Haul roads shall be watered sufficiently to prevent excessive dust. The work area shall be swept regularly to prevent accumulation of debris.

Equipment, construction materials and excavated soil shall be stored in a safe and orderly manner on the jobsite, in accordance with the contractor's approved area use plan.

1a-03 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT. The contractor is considered the waste generator of all salvage, re-usable, re-cyclable and disposable materials derived from the demolition and removal works included in this contract and shall handle these materials as hereinafter indicated.

a. Salvage Material. All salvage end items that the COR will have considered in good operating conditions shall be disassembled without damage, cleared of all dirt and scaling and then transported to the DPW Warehouse, Building 5156, Depot, where they shall be handled over undamaged.

b. Re-usable Material. End items removed during contract accomplishment which cannot be re-utilized in future construction but which still have a commercial value shall be delivered to the DRMO, through DD Form 1348-1a. This material includes, but it is not limited to, canvas, textile consisting of scrap clothing, scrap aluminum including doors, windows and frames, copper, brass, bronze, and stainless steel, cables, electric motors, light and heavy metals in different sizes and thicknesses that the DRMO contractor can handle (3-4 m long), electrical and electronic equipment, and kitchen appliances. All the above material must be free of hazardous property and need to be segregated. The scraps generated in the Supply & Maintenance Area shall be transported to the DRMO yard only on Monday and Tuesday from 08:00 am to 15:00 pm by appointment through the COR. The scraps generated from other installations must be kept in place. DRMO will arrange the removal. However, the contractor shall request a pre-inspection of the material by DRMO through the COR.

c. Recyclable Material. All construction and demolition recyclable waste material shall be delivered to authorized treatment facilities by the contractor.

d. Special Waste. All special waste, either hazardous or not hazardous, shall be delivered by the contractor to authorized disposal facilities.

e. Waste Storage. Construction and demolition waste shall be stored in waste specific containers provided by the contractor. Containers will be in good conditions, free from severe rusting, bulging, or structural defects. Containers shall be placed in area identified by COR.

Containers shall be removed once full or on COR’s decision.

f. Certificates and Authorizations.

(1) Recyclable Materials. As regards to recyclable materials, the Contractor shall submit copy of the authorization of the treatment facility which they are delivered to and will certify that waste have been removed in compliance with applicable law requirements.

(2) Disposable Materials. As regards to material delivery to disposal facilities, the contractor will provide the COR and DPW Environmental Office with copies of the following documents:

Authorization to transport construction and demolition waste;

Authorization of the landfill;

4th copy of Formulario di Identificazione del Rifiuto.

(3) Waste Manifest. All transported waste will be accompanied by the

Formulario di Identificazione del Rifiuto (waste manifest) to ensure a complete audit trail from point of origin to ultimate disposal. The waste manifest must be completed in quadruplet, all dated and signed by the waste generator and countersigned by the transporter. The first copy of the manifest will remain with the waste generator; of the remaining three copies, (countersigned and dated by the receiver), the second copy will remain with the transporter, the third copy will remain with the receiver, and the fourth copy must be returned by the transporter to the waste generator within 3 months of delivery of the waste to the disposal/treatment facility.

g. Costs. All operations included in this paragraph shall be carried out by the contractor with no additional cost to the US Government.

1a-04 AUTHORIZATION FOR INSTALLATION OF MATERIAL AND EQUIPMENT.

Before installing any material or equipment mentioned in the specifications, approval shall be obtained from the COR. Contractor shall submit material samples, shop drawings, manufacturer's literature, etc., to the COR 10 days prior to installation and shall proceed with installation only after receiving written approval from the COR. All material installed without COR's approval shall be removed.

1a-05 ISPESL AND CEI STANDARDS. All work described in these specifications shall be accomplished in strict compliance with the ISPESL (Superior Institute of Prevention and Assurance of Work) and CEI (Italian Electrotechnical Committee) standards. In particular, if the work under contract, such as roof repairs, building painting, etc., may cause Contractor's personnel or other individuals to come in contact with non insulated electric lines, these shall be temporarily protected by use of appropriate spiral plastic tubes available on the market.

1a-06 TRANSLATION AND TITLE ABBREVIATION. The terms COR and "Direzione dei Lavori" used in the Italian version of these specifications are equivalent to the American term "Contracting Officer's Representative," which in the English version is indicated by the letters

COR.

1a-07 DIGGING PERMIT. The Contractor shall obtain a digging permit for all work areas affected by this contract (to insure that all the as-built information for underground services is received). This permit and related drawings must be received by the Contractor prior to starting any work. After receipt of the digging permit, the Contractor shall immediately notify, in writing the Contracting Officer of the permit receipt. The Contractor will be held responsible for any damages caused to existing services, as indicated on the digging permit and related drawings, and will repair such damages at his own expense.

1a-08 ASBESTOS. No handling of asbestos containing material is included in this project. Use of asbestos containing materials is forbidden.

1a-09 PARTICULAR REQUIREMENT FOR WORK IN HEATING PLANTS. When the contract requires the work to be performed inside heating plants, the contractor shall provide a new cylinder in the door lock and shall deliver two keys of the new cylinder and the removed cylinder to the personnel in charge of the maintenance. At the work end the contractor shall restore the lock to the original conditions and the temporary cylinder will remain his own property.

1a-10 ANTI-TERRORISM TRAINING. The Contractor shall comply with the following security requirements:

a. AT Level I Training. All contractor employees, to include subcontractor employees, requiring access Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR within 10 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website: httQ://jko.jten.mil.

b. OPSEC Training. According to AR 530-1, new contractor employees must complete Level I OPSEC training within 30 calendar days after they report for duty. All contractor employees must complete annual OPSEC awareness training.

The contractor will develop an OPSEC standing operating procedure (SOP)/plan within 90 calendar days after the contract is awarded, to be reviewed and approved by the responsible Government OPSEC officer, according to AR 530-1. This SOP/plan will include the Government’s critical information, why it needs to be protected, where it is located, who is responsible for it, and how to protect it. The contractor will ensure this individual becomes OPSEC Level II certified according to AR 530-1.

c. Access and general protection/security policy and procedures. Contractor and all associated sub-contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office.

Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

d. iWATCH Training. The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO).This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 40 calendar days after contract award.

1a-11 ENVIRONMENTAL PROTECTION SYSTEM. The contractor will provide the following information semi-annually to be used by the Government to address environmental performance relative to the goals of the USAG Vicenza Environmental Management System.

Please note that the amounts reported are those used/generated by the contractor regardless of source (private purchase or government furnished). Reports for January – June will be submitted by 15 July and reports for July-December will be submitted by 15 January each year.

Media Report Element #1 Report Element #2

Non-Hazardous Solid Waste

Total Waste Generated (Kg)

Amount of Waste Diverted from Landfill (Kg)

Construction Debris/Demolition Materials

Total Waste Generated (Kg)

Amount of Waste Diverted from Landfill (Kg)

Compostable/Organic Material

Total Waste Generated (Kg)

Amount of Waste Diverted from Landfill (Kg)

Hazardous Materials Total Used (Kg) Hazardous Waste Total Generated (Kg) Total Recycled (Kg) Energy Consumption - Electricity

Total Energy Consumed (MBtu)

Energy Consumption - Fuel

Total Fuel Consumed (L)

Renewable/Alternative Energy

Total Consumed

(MW)

Facility Construction/Renovation

Number of Buildings LEED Certified Silver or Higher

SqFt of buildings LEED Certified

SECTION Ib

QUALITY CONTROL BY CONTRACTOR

1b-01 GENERAL. The Contractor shall establish and maintain an effective quality control system to implement the requirements of contract clause entitled "Inspection of Construction (July 1986)".

The quality control system shall comprise plans, schedules, and organization necessary to provide materials, equipment, workmanship, manufacture, construction, and operations which comply with contract requirements and shall identify personnel and forms to be used. The system shall cover construction operations, both indoors and outdoors, and shall be in accordance with the proposed construction sequence.

1b-02 COORDINATION MEETING. As soon as practicable after receipt of Notice to Proceed and before start of construction, the Contractor shall meet with the Contracting Officer's Representative (COR) and discuss the Contractor's quality control (CQC) system. During the meeting a mutual understanding of the system details shall be developed including the forms for recording the CQC operations, control activities, testing, administration of the system for both indoors and outdoors construction, and the interrelationship of Contractor's inspection and control with the Government's inspection. Minutes of the meeting will be prepared by the COR and forwarded to the Contracting Officer who will make them a part of the contract file. There may also be other subsequent meetings will be called to reconfirm understandings. Minutes of these meetings will also be forwarded to the Contracting Officer.

1b-03 QUALITY CONTROL PLAN.

a. Prior to starting the construction, the Contractor shall furnish his CQC plan through the COR to the Contracting Officer for acceptance. Construction will be permitted to begin only after acceptance of the CQC plan or approval of that portion of the plan applicable to the particular feature of the work to be started. The QC plan proposed by the Contractor shall identify personnel, procedures, instructions, records and forms, and, as a minimum, shall include:

(1) A description of the quality management organization.

(2) The names, qualifications, duties, responsibilities, and authorities of each person assigned a quality control (QC) function.

(3) A copy of the letter to the QC manager, signed by an authorized official of the firm, which describes the responsibilities and delegates the authorities of the QC manager.

(4) Procedures to perform QC over other activities including subcontractors, manufacturers, and suppliers.

(5) Control testing procedures for each specific test.

(6) Reporting procedures for QC including proposed reporting formats.

b. After approval of the QC plan the Contractor shall notify the Contracting Officer in writing of any proposed change to his QC plan. Proposed changes are subject to acceptance by Contracting Officer.

c. The acceptance of the QC plan is conditional and will be predicated on a satisfactory performance during the construction. If it is determined that the QC plan, personnel, instructions, controls, tests or records are not providing a construction conforming to contract requirements, the Government will reserve the right to require the Contractor to make changes in his QC plan and operations, as deemed necessary to obtain the specified quality. Any changes required to the plan will be made at no cost to the Government.

1b-04 QUALITY CONTROL ORGANIZATION.

a. The Contractor shall identify an individual within his organization at the site of the work who shall be responsible for overall management of CQC and have the authority to act in all CQC matters for the Contractor.

b. A staff shall be maintained under the direction of the system manager to perform all QC activities. The actual strength of the staff during any specific work period may vary to cover work phase needs, shifts and rates of placement. The personnel of his staff shall be fully qualified by experience and technical training to perform their assigned tasks, and shall be directly hired by and work for the prime Contractor.

1b-05 SUBMITTALS.

a. The Contractor shall develop procedures for purchasing materials and equipment, subcontracting, and processing shop drawings, samples, certificates, and other submittals. This procedure shall include the establishment of responsibilities to assure, at each level, adequate review and approval, timely delivery including verification procedures, and proper storage.

Submittals of the shop drawings and/or manufacturer's data shall be, as specified, in accordance with contract clauses entitled "Materials and Workmanship" and "Shop Drawings."

b. Actions shall be taken to ensure that only materials and equipment which comply with contract requirements are purchased and delivered to the job site or used in off site fabrication, unless specific deviations are approved, as specified hereinafter. The COR may request a copy of the document of transportation of the provided material.

c. The Contractor shall review the contract requirements and verify that submittals are confirming to contract compliance. Within 10 days after receipt of notice to proceed, the Contractor shall submit a submittal control document listing and scheduling all submittal items required in the contract. This document shall be in duplicate and shall be addressed through the COR to the Contracting Officer. The control document shall include such items as construction schedules, monthly progress reports, shop drawings, manufacturer's literature, certificates of compliance, material samples, and guarantees. The document shall schedule for each item the dates of submittals. The scheduling of submittals shall be coordinated with the approved progress schedule;

the information contained therein shall be reviewed and updated at each schedule update. Adequate time shall be allowed to the US Government for approval of submittals. The Contractor shall review the listing at each progress schedule update and copies of updated documents shall be submitted through the COR to the Contracting Officer in the specified quantity. Payments to the Contractor will not be made for material or equipment which does not comply with the Contract requirements.

d. The CQC organization shall be responsible for certifying that all submittals are in compliance with the contract requirements. Submittals to the Contracting Officer without evidence of the certification will be returned for resubmission.

e. The Contractor shall submit copies of all submittals through the COR to the Contracting Officer.

f. Delays in the approval process shall not be the basis for consideration of a time extension when such delay is the result of the Contractor's failure to make proper and timely submittal, or make corrections in accordance with the specifications or the Contracting Officer's comments, or is a result of a resubmittal which is required because of an unsatisfactory original submittal. Approval action by the Contracting Officer will not relieve the Contractor of his responsibility for compliance with the contract but will indicate only that the general method of construction and detailing is satisfactory.

g. All proposed deviations from contract requirements shall be submitted in writing for approval by the Contracting Officer.

1b-06 CONTROL. Quality control is the means by which the Contractor assures himself that his construction complies with the requirements of the contract plans and specifications. The QC system shall include at least the following three phases of control and management for all definitive features of work:

(1) Preparatory. This control phase shall be performed before beginning work on each definable feature of work. It shall include a review of contract requirements to assure that materials, sample, and equipment conform to contract requirements and that control testing procedures are finalized. The control shall also include examination of the work area to verify that structures over which new work is to be placed conform to contract requirements; Contractor shall also verify that the required materials be on hand and properly stored. The COR shall be notified at least 24 hours in advance of each preparatory activity.

(2) Initial. This phase of control must be accomplished as soon as a representative portion of the particular feature of work has been accomplished and shall include examination of the quality of workmanship and a review of control testing for compliance with contract requirements, identification of defective or damaged materials, omission, and dimensional requirements. The

COR shall be notified at least 24 hours in advance of the initial inspection and such inspection shall be made a matter of record in the CQC documentation.

(3) Follow-Up. The follow-up phase shall be performed continuously to verify that control procedures are providing an end product which complies with contract requirements.

Adjustments to control procedures may be required based upon the results of this phase.

(4) Completion. At the completion of all work or any increment, the CQC representative shall conduct a joint review with the COR. During this review the work shall be examined, quality control shall be examined, and a list shall be developed of work not properly completed or not conforming to plans and specifications. This list shall be included in the quality control documentation with an estimated date for correction of each deficiency. The Contractor shall make sure that deficiencies be corrected prior to the contract completion date. Payment will be withheld for defective or deficient features until they are satisfactorily corrected except as otherwise provided in the contract.

1b-07 TESTS.

a. The Contractor shall perform tests specified or required to verify that control measures are adequate to provide a product which conforms to contract requirements. The Contractor shall procure the services of an industry recognized testing laboratory or he may establish an approved testing laboratory at the project site. A list of tests which Contractor believes necessary shall be furnished to the COR. The list shall give the test name, specification paragraph containing the test requirements, and the personnel and laboratory responsible for each type of test.

The Contractor shall perform the following activities and provide the following data:

(1) Verify that the testing procedures comply with contract requirements.

(2) Verify that facilities and testing equipment are available and comply with testing standards.

(3) Check test instrument calibration data against certified data.

(4) Verify that recording forms including all pertaining documentation have been prepared.

b. Testing.

(1) The Contracting Officer reserves the right to check laboratory equipment in the proposed laboratory for compliance with the standards set forth in the contract specifications and to check the laboratory technician's testing procedures and techniques.

(2) The Contracting Officer reserves the right to utilize the Contractor's control testing laboratory and equipment to make assurance tests and to check Contractor's testing procedures, techniques, and test results at no additional cost to the Government.

(3) Cost incidental to the transportation of samples or materials will be borne by the Contractor.

1b-08 DEFECTIVE WORK. The Contractor shall not build upon or conceal a defective work.

1b-09 DOCUMENTATION.

a. The Contractor shall maintain current records, on an appropriate form, of quality control operations, activities and tests performed including the work of suppliers and subcontractors.

These records shall include factual evidence that the required activities or tests have been performed, including but not limited to the following:

(1) Type and number of control activities and tests involved.

(2) Results of control activities or tests.

(3) Nature of defects, causes for rejection, etc.

(4) Proposed remedial action.

(5) Corrective actions taken.

b. These records shall cover both conforming and defective or deficient features and shall include a statement saying that supplies and materials incorporated in the work comply with the contract. Legible copies of these records shall be furnished to the COR weekly. The records shall cover work performed during the time period for which the records are furnished and shall be verified by persons designated by the Contractor.

SECTION IIIa

DEMOLITION AND REMOVAL

3a-01 GENERAL. Breakups of predetermined dimensions and partial or total demolition of masonry and concrete surfaces, floor, etc., must be performed in a workmanlike manner, by taking the necessary precautions or by shoring the surfaces in order to avoid damages to the structures to be left in place, accidents, inconveniences or interference. Waste material shall not be thrown down, but rather, it shall be conveyed or guided downward, after wetting it to prevent raising dust.

During demolition or removal work, the Contractor shall adopt every measure suitable to avoid deterioration of the items which may be reinstalled, or which, in the opinion of the COR, may be used at a later date. These items shall be cleaned, guarded, hauled and set neatly in the storage areas indicated by the COR. The demolition work shall be limited to the work, or to its parts, and to the dimensions specified. Reconstruction of structures demolished over and above the quantities indicated, as well as rehabilitation of work damaged as a result of lack or omission of precautions or shoring, shall be performed by the Contractor. All waste material resulting from demolition and removal shall be handled by the contractor in accordance with para. 1a-02 of these specifications.

SECTION VIa

FLOORING

6a-01 GENERAL. The installation of floor tiles of any kind shall be performed as directed by the COR and in such a manner that the finished surface is perfectly even. Tiles shall fit neatly and with precision, shall be securely set in the subbase; no unevenness shall exist in the joints between the tiles. Floors shall penetrate by 15 mm. into the wall plaster, which shall be applied vertically and extended to the floor, thus avoiding cove type connection. Finished floors shall be completely polished, clean, and free from stains or mars. Samples of the prescribed floor tile shall be submitted to the COR. Each finished floor shall be protected for a minimum period of 7 days by temporarily closing it to traffic and by exercising accurate surveillance. In case of total or partial damage to the finished floor as a result of traffic or other similar causes, the damaged sections shall be repaired by the Contractor at no cost to the US Government. Flooring over deck ceilings shall be installed after levelling the subbase by application of a layer of cement mortar on the top surface of these structures to the prescribed elevation.

6a-02 CERAMIC TILE FLOORS. Ceramic tiles shall be laid on a setting bed consisting of one part Portland cement by volume and 5 parts moist sand, screened to a true plane, no less than 2 cm.

and no more than 3 cm. thick. As soon as the setting bed has set sufficiently to be worked on without damaging it, a coat of dry Portland cement, no more than 1.5 mm. thick, shall be applied over the surface. Tiles shall be set individually so that the joints between the ceramic tiles are uniform and no less than 0.5 mm. nor more than 1 mm. wide. Tile units shall then be tamped into the mortar to insure solid bedding and a thoroughly uniform and even finished surface. The grout mixture shall consist of Portland cement mixed with a minimum amount of water.

6a-03 RUBBER OR PVC FLOORS shall be installed on a subfloor consisting of a new concrete slab. The subfloor shall be screened to a true place by application of levelling compound, no more than 5 mm. thick, obtained by mixing the following components:

Saxolite B6, hydraulic 70% Plastimul 20% Water 10%

Prior to installation of new floor, the subfloor shall be thoroughly cleaned of dirt and dust. The new floors shall be laid as recommended by the floor manufacturer using an adhesive with epossidic resins basis. When the room temperature is below 12 degrees C, rubber floors shall not be laid. Adhesive shall be applied with an average consumption of 500/600 gr/SM. No traffic shall be allowed on the floor for a minimum of 24 hours after laying.

6a-04 CARPET FLOORS. The floor surfaces to be carpeted shall be clean, dry, smooth, cleaned of oil, dust, dirt or other foreign matters. In every case, the support layer shall be made fully level by following the requirements set forth in paragraph 6a-03. Carpet shall be installed only when all other work that may damage it is complete. Carpet joints shall be smooth and inconspicuous. Brass joint trims, 2.5 cm. wide, shall be installed between the carpet and floors of other types. The installed carpet shall be covered with a plastic sheet for protection from damages.

Following final inspection by the COR, all protective covers shall be removed and the carpet completely cleaned by vacuum cleaner. All stained or damaged surfaces shall be cleaned or repaired as recommended.

6a-05 SAMPLES. Prior to installation, samples of all materials to be installed will be subject to the approval of the COR. Unless indicated on the drawing, colors will be selected by the COR.

SECTION VIId

WALLS PAINTING

7d-01 GENERAL. All surfaces to be painted shall be carefully and adequately prepared by scraping, stripping, edge patching (if required) and whatever else may be required to make the surface smooth and even. All stains, grease, etc., shall be eliminated by suitable solvents. In particular cases the COR may request the application of an insulating coat. When repaired, the wall surfaces shall be made perfectly smooth by sandpapering and subsequently primed. All paints, enamels, special products, etc., shall be delivered to the site in original unbroken containers with intact labels and tags and used either pure or with the thinners indicated by the manufacturer.

Color selection is a prerogative of the COR, who will become the owner of the specimen submitted by the Contractor. The paint coats applied over the primer shall be of different shades so that at any time it may be possible to check the number of applied coats. Prior to starting the paint work, samples of the various finish work shall be prepared at the locations indicated and with methods specified. These samples are necessary for selection of colors and workmanship. If necessary, samples shall be prepared a second time with the modifications requested, until approval of the COR is obtained. All precautions and methods suitable to avoid paint splashes or stains on the finished surfaces will be adopted by the Contractor. All damages caused by the Contractor shall be repaired at no cost to the US Government.

7d-02 MATERIAL. The following materials shall be used:

a. Interior Masonry Surface.

- Primer, copolymer base in water emulsion.

- Water paint for interior surfaces, resin base.

b. Exterior Masonry Surfaces.

- Primer, pliolite resin base with thinner.

- Wall paint, quartz and resins powders base, rough finish.

SECTION IXa

ALUMINUM DOORS AND WINDOWS

9a-01 GENERAL RULES.

a. The direction in which the door is opened will be agreed upon with the COR. The existing doors will be made to open in the opposite direction if such is the request of the COR.

b. All bracing and shoring necessary to accomplish the work shall be prepared without claiming any right to increase prices agreed upon at the time of contract award.

c. The construction of the doors and windows will be started in the contractor's work shop upon written authorization from the COR. Authorization will be released for each building.

d. Any damage or deterioration caused to carpets, baseboards, floors, and masonry surfaces of any kind shall be restored by the Contractor at no cost to the US Government.

Therefore, the Contractor may adopt all protective measures deemed suitable to the purpose. The Contractor may ask the COR for a joint survey of the existing damages or deteriorated parts. In this case, a record of finding will be prepared and signed by both parties.

e. All interior door openings, either new ones or existing ones, shall be provided with a new aluminum or marble threshold as required in the drawings.

f. All new and replaced exterior doors shall be provided with marble thresholds.

g. All new or replaced windows shall be equipped with new marble sills. Marble shall be type TRANI. The new sills shall project from the masonry by 3 cm., both inside and outside the building. All marble sills will be of the same color and quality as approved by the COR. The sills shall consist of 3 cm. thick whole slabs and shall be complete with exterior rain drip and with a marble seal strip 2 cm. high and 1 cm. wide.

h. All new or modified openings shall be provided with lintels.

i. A master-key that will open all locks installed on the doors of each building shall be furnished in triplicate.

j. A floor mounted door stopper shall be installed at each interior door to prevent sash from hitting against the wall.

k. Jambs shall be perfectly plumb. Existing jambs shall be rectified if necessary.

l. If necessary, skirting boards must be fitted to a measure or restored if damaged.

Further, a new skirting board to match the existing one must be installed in the door opening.

m. All interior and exterior doors shall be provided with automatic door closer.

9a-02 ADDITIONAL NORMS FOR REPLACEMENT OF EXISTING DOORS AND

WINDOWS.

a. The door and window opening dimensions indicated on the drawing are indicative and are given only to enable the Contractor to make an approximate evaluation of the surfaces. Before preparing the doors and windows, the effective dimensions shall be verified on the field. Doors and windows shall fit the true dimensions of openings, except when an opening modification is requested.

b. Replacement of window sills calls for removal and reinstallation of all radiators and reflecting panels located under the windows.

c. The existing security bars and apparatus removed during windows replacement shall be reinstalled. The Contractor must work out a system to replace the windows without removing the iron grates or prepare temporary sheet iron shields to be installed during non working hours at no cost to the US Government. In any case such shields will offer the same security against breaking in from the outside as the grates removed.

d. The presence of staff angles of any material whatsoever will not add to the expense for the US Government.

9a-03 SUBMISSIONS.

a. Before the installation of any type of door or window, the following documentation shall be submitted for COR's approval:

(1) Shop drawings including layouts, sections on scale of 1:1, details on fixing, connections, installation methods, and accessories.

(2) Certificates of compliance as required at paragraph 9a-05.

b. After shop drawings have been approved by the COR, the contractor shall construct a sample on scale of 1:1 for each type of window or door he has to install. Samples shall be submitted to COR's approval; after this approval has been obtained, samples will be used in contract work.

9a-04 MATERIALS. Doors and windows shall be constructed of anodized aluminum tubular open type stiles and rails, natural color. Stiles and rails shall be extruded primary alloy UNI 3569- 66, hardened and tempered to TaA. Anodic oxidation shall conform to code UNI 4522-66. All members of doors and windows shall be selected as prescribed by code UNI 3952-66.

Complementary weatherstripping for doors and transom windows shall be of elastomer (Dutral, Neoprene) and tightness shall be obtained by turbulence space of great dimensions (open type joint). Complementary weatherstripping for slide sashes shall consist of strips made of high density water-repellant synthetic wool with central polypropylene flexible fin. The fin shall be one single body with the wool support. Parts subject to wear and tear shall be assembled and locked by contrast for easy adjustment or replacement also by unskilled personnel without any mechanical work. The glass pane shapes shall be snap-on type. Care shall be taken in avoiding that snap-on fastening is obtained through elasticity of the metal. Fastening shall afford maximum safety so that in case of wind pressure, the glass pane shape will not yield elastically. Glass panes or "vetrocamera" panes shall be installed in strict compliance with code UNI 6534-74. The metal fixed frames shall be sealed to the adjacent wall by silicone or Thiokol base sealant as recommended by the manufacturer. Joints shall be no less than 3 mm. and no more than 7 mm. in width; the depth shall be no less than 6 mm. The seal seam shall be supported by special closed cell, elastic, inert fill material. Rain water penetrated into the bottom rail of slide sashes shall runoff through the tubular space of the rail, through pressure jump, funnel principle, and pressure compensating tubes, so as to avoid sprinkle type backwash. In addition to the accessories listed below, all other collateral items recommended by the manufacturer shall be used for proper operation of doors and windows.

9a-05 RATINGS. The doors and windows furnished under this contract shall meet the following classification UNCSAAL, which shall be supported by a certificate issued by an authorized European institute:

- Airtightness: Class A3

- Watertightness: Class E4

- Resistance to wind pressure: Class V3

9a-06 INSTALLATION. All doors and windows shall be provided with steel tubular buck of the dimensions indicated on the drawing that shall extend over the three sides that do not rest on the floor or on the sill. The buck shall receive two coats of a rust-inhibitive paint approved by the COR. Except for type C door, the vertical sides of the buck shall be provided with 180x30x6 flat iron anchors, horizontally slanted toward the center of the jamb. The top of the buck shall be anchored to the lintel by three M8 bolts, screwed to expansion shields for reinforced concrete. The buck shall be bonded by cement mortar and anti-shrinkage additive at the rate recommended by the manufacturer. If it is not possible to anchor the top of the window buck with bolts screwed to expansion blocks, as indicated on the drawings, it will be necessary to weld iron brackets (no less than 2) to the top of the buck. Brackets shall be equally spaced one every meter and will be welded to the reinforcement of the lintels or into the flange of the metal lintels. The forward masonry must be built by means of a hollow flat block or of a lath in accordance with the COR's prescriptions. Opening existing above doors shall be blocked with brick masonry supported by a new concrete lintel. Existing jambs shall be altered to fit the new door dimensions. Jambs shape shall not be chanted. The surfaces covered by this work shall be smooth plastered with fine sand and painted with one coat fixative paint and two coats paint to match the existing surfaces. If, after removing the existing door or window frame, chipping away the plaster or forward masonry, and building seats for the anchoring brackets of the frame, it turns out that the existing masonry is not made of bricks, multiholes or double UNI bricks, or if it is necessary to build a forward masonry or plastering of over 3 cm to adjust the opening to the dimensions prescribed by general specifications, the Contractor will have to tear down the reveal and reconstruct it of concrete.

Jamb width must be the same of the wall; depth must be no less than 15 cm. The installation of the buck must take place at the same time of the concrete casting. The frame shall be fastened to the buck by spacers and 6 mm diameter stainless steel screws AISI 316, complete with stainless steel washers and tightened to a bolt welded to the interior side of the buck.

9a-07 INTERIOR DOORS.

a. Door Types.

Type A - Double panels, pressed wood, with double melaminic layer of a color to be selected in agreement with the COR, no less than 10 mm thick.

Type B - Bottom panel as type A. Top panel, clear glass (opaque, where requested), shatterproof, no less than 6 mm thick.

Type C - Panels as type A, with ceiling height transom section of same type panel. Buck is to be anchored to ceiling and floor. This type door is suitable for installation on partitions of gypsum board or of similar material.

Type D - Panels as type A, with aluminum ventilation louver.

Type F - Double sash; panels as type B.

Type H - Panels as type A, shall open independent of each other and shall be complete with tilting shelf for documents transfer (Dutch door).

Type K - As type D, double sash.

b. Miscellaneous Items. All interior doors shall be complete with:

(1) Three aluminum butts with double eccentric bushing for adjustment and strike plate.

(2) Lock, double throw, with reversible spring latch and strike plate.

(3) Cylinder, of nickel-plated brass.

(4) Handles, square section, naturally anodized.

(5) Door closer, with pinion and rack working for continuous closing, galvanized steel arm, light metal protection, and stop device.

(6) Seal caps, adjustable to 150 degree angle.

(7) Hair type weatherstripping.

(8) Bolt, double function, upper and lower, on second sash.

(9) All other accessories (braces, gaskets, etc.) designed for better operation of doors, as recommended by the doors and windows manufacturer.

9a-08 EXTERIOR DOORS.

a. Door Types, Type S - Single sash and openable transom window. Bottom panel shall be of pressed wood with double melaminic layer, color to be concurred with the COR, no less than 10 mm thick.

Top panel and openable transom window shall be of "vetrocamera". The glazed section shall consist of an interior ordinary glass, 3 mm thick, a 6 mm space, and an exterior 6 mm thick shatterproof glass. Sash panels and transom window shall be provided with anodized aluminum slats, natural color, 18x25 trapezium shaped section, approximately 10 cm. o.c., vertically fastened to the external side of the door.

Type P - Same as door S, without transom window.

Type Q - Same as door S, double sash and fixed transom window.

Type R - Same as door Q, without transom window. Top panel shall be same as bottom panel.

Type I - Safety door, single sash, two panels made of aluminum slats and insulating material filling.

Type J - Same as door I, one movable sash and one semifixed.

b. Miscellaneous Items.

(1) Hinges, 3 for each sash up to 2.20 meters in height, and 4 for sashes of greater height, shall be of aluminum with double eccentric bushing for lateral adjustment, two-wings type, for doors type A, R, S and "comb" type (3 wings) for doors type I and J.

(2) Lock shall be type double throw with reversible spring latch for doors type Q, R, S. For doors type I and S, a safety lock with three closing points and rotating sliding bar shall be adopted.

(3) Double sash doors shall be provided with safety latch with double function, upper and lower.

(4) Handles shall have spare section and shall be naturally anodized. On the interior side of doors type Q, P and S, and on the other doors indicated on the drawings, a panic push bar shall be installed. These doors shall open from the inside by means of a horizontal bar, and from the outside by handle with key.

(5) Auxiliary closing on butts side for doors type I and J.

(6) Door closer, seal caps, hair type weatherstripping, and any other incidental items required in para. 9a-05 b. for internal doors.

(7) Transom window of door type S shall be equipped with arms, spring latch, and butts as recommended by the manufacturer.

9a-09 WINDOWS.

a. Window Types.

Type L - Double sash, sliding type, with openable transom window. Sashes and transom window shall be of "vetrocamera," as requested for type S door, unless single glass is specifically requested (in this case, glass thickness shall be 5 mm.). Window shall be complete with sliding insect screen of same dimensions as one sash, and fixed insect screen on transom window.

Type M - Same as type L, without transom window and insect screen.

Type N - Fixed glass pane, 5 mm. thick.

Type NN - Multiple window, fixed glass pane, 5 mm. thick.

Type V - Openable transom window, glass as type L, and fixed insect screen.

Type W - Two-section transom window, both openable, glass as type L, and fixed insect screen.

Type Y - Two section window. Top section shall be openable transom window, bottom section shall be fixed; glass as type L; fixed insect screen on the openable section.

b. Miscellaneous Items.

(1) Sliding sash windows shall be provided with lateral handle and door closer for side wing of anodized aluminum. Rails, of aluminum, shall be adequate to wing dimensions and weight.

(2) Openable transom windows shall be equipped with arms, spring latch, and butts as recommended by the manufacturer.

(3) Insect screens shall be of glass fiber with PVC jacket.

(4) Contractor shall install any other accessories (braces, gaskets, weatherstripping, etc.)

suitable to a most satisfactory operation of the windows, as recommended by the windows manufacturer. In particular, accessory for water drainage shall be mounted on each window.

SECTION Xb

FALSE CEILING

10b-01 GENERAL. Prior to starting works, surfaces remaining above false ceiling shall be inspected to determine conditions that will prevent a satisfactory installation. Such conditions shall be corrected prior to work starting.

10b-02 INSTALLATION OF LAY-IN PANEL SUSPENSION SYSTEM. Installation of the suspension system for the suspended acoustical ceiling shall be in accordance with the requirements specified herein. Acoustical work shall be provided complete with all necessary fastenings, clips, and other accessories required for a complete installation. Mechanical fastenings shall not be exposed in the finished work. Hangers shall be laid out for each individual room.

Hangers shall be placed to support framing around beams, ducts, columns, grilles, and other penetration through ceilings. Main runners shall be kept clear of abutting walls and partitions. At least two main runners shall be provided for each ceiling span. Unless otherwise shown, the ceiling grid shall be symmetrically about the center lines of the space. Partial modules, when necessary due to non-modular spaces, shall occur at the perimeter and shall be arranged so that modules less than one half width are minimized.

a. Wall Molding. Wall molding shall be provided where ceilings abut vertical surfaces.

Wall molding shall be secured no more than 8 cm. (3 inches) from ends of each length and no more than 20 cm. (8 inches) on centers between end fastenings.

b. Ceiling Tiles. Ceiling tiles shall be installed in accordance with the approved installation instructions of the tile manufacturer. Edges of ceiling tiles shall be in close contact with metal supports, with each other, and in true alignment. Tile shall be arranged so that units less than one half width are minimized. Panels in exposed grid system shall be held in place with manufacturer's standard hold-down clips.

10b-03 CLEANING. Following installation, dirty or discolored surfaces of units shall be cleaned and left free from defects. Units that are damaged or improperly installed shall be removed and new units provided, as directed.

SECTION XIIa

PLUMBING

12a-01 WATER SYSTEM. All materials used in water systems for human use shall be certified in accordance with Decree 174/04.

a. Installation. All pipes shall be installed complete with special parts of all kinds (elbows, runouts, sleeves, brass fittings, etc.) and with the necessary threading, mastic, hangers, ties, anchors and supports. When making holes, chases, grooves, etc., in the masonry surface for pipe crossing, the utmost care shall be exercised to avoid damages and to keep the dimensions of the cuts to the minimum necessary. Pipes layout shall be such as to avoid sharp curves or chokes. Changes in pipe size shall be made with reducing fittings. Hot or cold pipe bending for the purpose of avoiding the use of fittings, is not allowed.