Rev#1 - Technical description for supply of Conference room and nine Cubicles

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL DESCRIPTION (REV#1)

CONFERENCE ROOM:

Contractor shall provide a 10.00 MT long by 5.00 MT wide and height of 2.50 MT conference room, the structure has to be in aluminum with transparent glasses 10/11 and has to have two transparent glass doors 1.00 MT wide on the opposite long side.

Conference room walls have to be entirely in glass with the possibility of glass decorations and realization of a logo to be applied on glass walls.

Contractor must indicate the size of the anchoring plugs (tasselli ad espansione) and limit their use to the minimum.

Contractor shall verify the presence of electric or communication cables before starting any drilling.

Contractor will be responsible for and will repair any damage to the electric/communication systems.

Contractor will be responsible for and will replace any tile damaged due to drilling or other operation with new ones of the same type color and size.

Contractor will install the components of the conference room as per manufacturer's instruction manual.

Contractor must state in writing the correctness of the installation and that manufacturer's instructions were followed.

All costs of installation have to be considered part of contract.

CUBICLES:

Contractor shall provide nine cubicles office complete with desks (desk cm. 180 x 80 complementary desk 120x60), chest of drawers, desk shelves, clothes stand and ergonomic chairs (See attached recommendation for chairs).

Desk, chest of drawers and desk shelves have to be made in melamine chipboard. Shelves have to be on the dattilo side, length as length of side is acceptable.

Cubicles have to be provided with a sound mitigation system (i.e. Sound absorbent panels) with acoustic absorbing coefficient at least of 0.6.

Cubicles line has to be 6.20 MT wide maximum, partition height 1.60 MT.

Three Clothes stands with hooks are required, one for each row of cubicles.

All measure, except the conference room and cubicles line width, can be plus or minus 10 cm.

Cubicles line has not to exceed 6.20 meters.

All materials, when applicable, have to be CE marked.

Materials have to be delivered and installed within 90 days from contract award.