Draft_Amendment.pdf

PDF 62 KB Posted

Attached to
REPAIR CHAPEL BLDG. 301, CAMP DARBY , TIRRENIA (PISA), ITALY
Solicitation number
W912PF17R0022
Issued by

About this file

Draft Amendment

View the file

Other files

File Type Posted
amendment0002.pdf PDF
Addendum2Chapel.pdf PDF
Addendum_0001.pdf PDF
amendment.pdf PDF
Addendum_0001.pdf PDF
0018.tif TIF image
0010.tif TIF image
0012.tif TIF image
0011.tif TIF image
Attachmenet9Statementofpossessionofgeneralrequirementsadditionalinformation.pdf PDF
0015.tif TIF image
0005.tif TIF image
0014.tif TIF image
Solicitationw912pf17r0022.pdf PDF
0004.tif TIF image
Attachment5Designpastexperience.pdf PDF
Attachment3technicalspecifications.pdf PDF
0009.tif TIF image
Attachement8StatementofpossessionofGeneralrequirements.pdf PDF
0019.tif TIF image
0017.tif TIF image
Attachment1scopeofwork.pdf PDF
Attachment6Constructionpastexperience.pdf PDF
0006.tif TIF image
0007.tif TIF image
Attachment7pastperformancequestionnaire.pdf PDF
0008.tif TIF image
0002.tif TIF image
0016.tif TIF image
0001.tif TIF image
Attachment2enclosurestoscopeofwork.pdf PDF
0020.tif TIF image
0003.tif TIF image
0013.tif TIF image
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0011024989 JD1 00152-6

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to include the addendum no. 0001 to the scope of w ork of project JD1-00152-6 " Repair Chapel Fellow ship Hall, Bldg. 301, Camp Darby" consisting of tw o sheets dated 29 June 2017.

The project is funded The closing date has been postponed to 19 July 2017 at 12:00 hrs

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912PF-17-R-0022

X 9B. DATED (SEE ITEM 11)

15-Jun-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

U0001

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

30-Jun-2017

CODE

414TH CSB RCO ITALY SUBOFFICE LIVORNO

VIA AURELIA, EDIFICIO 5131

ZONA DEPOSITO

56128 TIRRENIA (PISA)

W912PF 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912PF-17-R-0022

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 17-Jul-2017 12:00 PM to 19-Jul-2017 12:00 PM.

The following have been modified:

SECTION A

A. The magnitude of this project is between $500,000 (Euro 449,500.00) and $1,000,000.00 (Euro 899,000.00) (Rate used: $1 = Euro 0.8990)

B. To be awarded a government contract you MUST have DUNS (Dun & Bradstreet) (http:fedgov.dnb.com/webform) and NCAGE (www.dlis.dla.mil/Forms/Form_AC135.asp) numbers and to be registered in System for Award Management (SAM) website (https://www.sam.gov/portalpublic/sam/)

C. See clause 52.236-17 ALT I for site visit information

D. Request for Information (RFI) will be accepted until 7 (working days) before the closing date as identified on Page 1, Block 13A E. For this project, the US Government intends to combine design and construction in a single contract with one contractor. The US Government has developed in‐house a scope of work statement that defines the project and provides prospective offerors with sufficient information regarding the US Government's requirements to enable the offerors to submit proposals which meet the US Government's needs. The work statement inclusive of drawings is herewith attached.

F. Vendors are required to indicate the cost for the design in strict accordance with all terms and conditions of the work described in the Scope of Work/Performance Work Schedule.

G. Funds are not presently available for this acquisition. No contract award will be made until appropriated funds are made available. ( DELETED)

(End of Summary of Changes)