About this file

Final amendment 0001

View the file

Other files

File Type Posted
amendment0002.pdf PDF
Addendum2Chapel.pdf PDF
Addendum_0001.pdf PDF
Addendum_0001.pdf PDF
Draft_Amendment.pdf PDF
0018.tif TIF image
0010.tif TIF image
0012.tif TIF image
0011.tif TIF image
Attachmenet9Statementofpossessionofgeneralrequirementsadditionalinformation.pdf PDF
0015.tif TIF image
0005.tif TIF image
0014.tif TIF image
Solicitationw912pf17r0022.pdf PDF
0004.tif TIF image
Attachment5Designpastexperience.pdf PDF
Attachment3technicalspecifications.pdf PDF
0009.tif TIF image
Attachement8StatementofpossessionofGeneralrequirements.pdf PDF
0019.tif TIF image
0017.tif TIF image
Attachment1scopeofwork.pdf PDF
Attachment6Constructionpastexperience.pdf PDF
0006.tif TIF image
0007.tif TIF image
Attachment7pastperformancequestionnaire.pdf PDF
0008.tif TIF image
0002.tif TIF image
0016.tif TIF image
0001.tif TIF image
Attachment2enclosurestoscopeofwork.pdf PDF
0020.tif TIF image
0003.tif TIF image
0013.tif TIF image
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0011024989 JD1 00152-6

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

1.The purpose of this amendment is to include the addendum no. 0001 to the scope of w ork of project JD1-00152-6 " Repair Chapel Fellow ship Hall, Bldg. 301, Camp Darby" consisting of tw o sheets dated 29 June 2017.

2. The project is funded.

3. The closing date has been postponed to 19 July 2017 at 12:00 hrs " Local Time".

4. All other terms and consitions remain in effect.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 10-Jul-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912PF-17-R-0022

X 9B. DATED (SEE ITEM 11)

15-Jun-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

10-Jul-2017

CODE

414TH CSB RCO ITALY SUBOFFICE LIVORNO

VIA AURELIA, EDIFICIO 5131

ZONA DEPOSITO

56128 TIRRENIA (PISA)

W912PF 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912PF-17-R-0022

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 17-Jul-2017 12:00 PM to 19-Jul-2017 12:00 PM.

The following have been modified:

SECTION A

A. The magnitude of this project is between $500,000 (Euro 449,500.00) and $1,000,000.00 (Euro 899,000.00) (Rate used: $1 = Euro 0.8990)

B. To be awarded a government contract you MUST have DUNS (Dun & Bradstreet) (http:fedgov.dnb.com/webform) and NCAGE (www.dlis.dla.mil/Forms/Form_AC135.asp) numbers and to be registered in System for Award Management (SAM) website (https://www.sam.gov/portalpublic/sam/)

C. See clause 52.236-17 ALT I for site visit information

D. Request for Information (RFI) will be accepted until 7 (working days) before the closing date as identified on Page 1, Block 13A E. For this project, the US Government intends to combine design and construction in a single contract with one contractor. The US Government has developed in‐house a scope of work statement that defines the project and provides prospective offerors with sufficient information regarding the US Government's requirements to enable the offerors to submit proposals which meet the US Government's needs. The work statement inclusive of drawings is herewith attached.

F. Vendors are required to indicate the cost for the design in strict accordance with all terms and conditions of the work described in the Scope of Work/Performance Work Schedule.

G. Funds are not presently available for this acquisition. No contract award will be made until appropriated funds are made available. ( DELETED)

SECTION I - CONTRACT CLAUSES

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)

(a) Definitions. As used in this clause--

Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely identifies a unit, activity, or organization.

Document type means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

Local processing office (LPO) is the office responsible for payment certification when payment certification is done external to the entitlement system.

(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall--

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:

(1) Document type. The Contractor shall use the following document type(s).

Construction Payment

(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.

W582RR

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table* Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC W56FJW Issue By DoDAAC W912PF Admin DoDAAC W912PF Inspect By DoDAAC W582RR Ship To Code N/A Ship From Code N/A Mark For Code N/A Service Approver (DoDAAC) N/A Service Acceptor (DoDAAC) W582RR Accept at Other DoDAAC N/A LPO DoDAAC N/A

DCAA Auditor DoDAAC N/A Other DoDAAC(s) N/A

(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.

(5) WAWF email notifications. The Contractor shall enter the email address identified below in the “Send Additional Email Notifications” field of WAWF once a document is submitted in the system.

Paolo.serraglini2.ln@mail.mil ( for the design phase)

(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

USARMY.VICENZA.266-FMC.MBX.266FMC-IFO-CVS-WAWF-OFFICIAL@MAIL.MIL

(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.

(End of clause)

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

ATTACHMENTS

The following documents are incorporated into the solicitation:

Attachment #1 - Scope of work consisting of 21 pages dated 26 April 2017 Attachment # 2 - Enclosures to Scope of work consisting of three pages Attachment # 3-Technical specifications related to subject project consisting of 156 pages Attachment #4 - Drawing sheets concerning the existing situation of the building consisting of 20 sheets Attachment # 5- Design Past Experience Questionnaire consisting of onepage Attachment # 6- Construction Past Experience Questionnaire consisting of one page Attachment # 7- Past Performance Questionnaire consisting of one page Attachment #8-Dichiarazione del possesso dei requisiti generali ( Statement of possession of General requirements) consisting of two pages Attachment # 9 - Dichiarazione del possesso dei requisiti generali bis ( Statement of possession of General requirements-Additional information) consisting of one page Attachment # 10 - Addendum 0001 to the Scope of work consisting of two sheets dated 29 June 2017

(End of Summary of Changes)

File details come from the government source that posted it. Updated .