Project No. E8-44013-4J IGE-Water-Softener
Installation of Water Softener, Bldg. #53, Del Din site, Vicenza, Italy 05-April 2016
Quantity/Quantità Material Cost/Costo Materiale Labor Cost/Costo Manodopera Total Cost/Costo Totale Item DESCRIPTION Unit "K" "L" Unit "K" "L" Unit "K" "L" "K" "L" "K+L"
Unità Unità Euro Euro Unità Euro Euro Euro Euro Euro
1 Total civil work - Totale lavoro civile 2 Total mechanical work - Totale lavoro meccanico 3 Total electrical work - Totale lavoro elettrico 4 Total comm work - Totale lavoro di comunicazion
5 Design efforts %
GRAND TOTAL WORK
1 CIVIL WORK-LAVORI CIVIL
1.01 Excavation works and backfilling LS
1.02 Concrete platform for Pre-Fab LS
INDEPENDENT GOVERNMENT COST ESTIMATE
Project # E8 - 44013 - 4J Installation of Water Softener, Building 53, Del Din, Vicenza
Installation of Water Softener, Bldg. #53, Del Din site, Vicenza, Italy 05-April 2016
Quantity/Quantità Material Cost/Costo Materiale Labor Cost/Costo Manodopera Total Cost/Costo Totale Item DESCRIPTION Unit "K" "L" Unit "K" "L" Unit "K" "L" "K" "L" "K+L"
Unità Unità Euro Euro Unità Euro Euro Euro Euro Euro
1.03 Concrete sidewalk LS
1.04 Pre-Fab LS
Total civil work - Totale lavoro civile
Installation of Water Softener, Bldg. #53, Del Din site, Vicenza, Italy 05-April 2016
Quantity/Quantità Material Cost/Costo Materiale Labor Cost/Costo Manodopera Total Cost/Costo Totale Item DESCRIPTION Unit "K" "L" Unit "K" "L" Unit "K" "L" "K" "L" "K+L"
Unità Unità Euro Euro Unità Euro Euro Euro Euro Euro
2 MECHANICAL WORK-LAVORI MECCANIC
2.01 Filtering system LS
2.02 Water softener LS
2.03 Resin disinfection system LS
2.04 Underground water lines LS
3 ELECTRICAL WORK-LAVORI ELETTRICI
3.01 New underground feeder LS
3.02 Low voltage cables LS
3.03 Lighting system LS
3.04 Distribution system LS
Total electrical work - Totale lavoro elettrico
Total mechanical work - Totale lavoro meccanico