W912PF-16-R-0023_Amendment_0001.pdf
PDF 6 MB Posted
- Attached to
- Construct running track, Darby Military Community, Italy Federal contract opportunity
- Solicitation number
- W912PF-16-R-0022
About this file
Amendment 001 with replacement Attachment 1 and Attachment 4
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Technical_Specifications.pdf | ||
| Attachment10RequistiGeneraliBIS.pdf | ||
| Attachment7PPQuestionnaire.pdf | ||
| Attachment4SatelliteViewTrackField-4_lanes-A3-1-500.pdf | ||
| Attachment6ConstructionPExQuest.pdf | ||
| Attachment1StatementOfWork.pdf | ||
| Attachment9RequistiGenerali.pdf | ||
| Attachment3GeoSurvey.pdf | ||
| SolicitationW912PF16R0023.pdf | ||
| Attachment8WiringDiagramPanelsSC3SC8.pdf | ||
| Attachment2AreaforConstruction.pdf | ||
| Attachment5DesignPExQuest.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0010895430
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
1) To answ er a vendor request for information as show n on page 2 of this Amendment,
2) To add "Addendum 001" to "Attachment 1 Statement of Work", and
3) To replace "Attachment 4 Satellite View Track Field - 4 Lanes - A3 - 1-500" w ith a new version entitled "Attachment 4 Satellite View Track and Field - 4 Lanes - A3 - 1-500 REV 1" A replacement copy of Attachment 1 and Attachment 4 are included w ith this Amendment and replace the previously posted copies.
Offerors are permitted to return a signed copy of this Amendment to the address listed in Block 7 of the solicitation SF 1442 or by e-mail to elisa.orsini2.ln@mail.mil
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 12-Aug-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912PF-16-R-0023
X 9B. DATED (SEE ITEM 11)
14-Jul-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
12-Aug-2016
CODE
414TH CSB RCO ITALY SUBOFFICE LIVORNO
VIA AURELIA, EDIFICIO 5131
ZONA DEPOSITO
56128 TIRRENIA (PISA)
W912PF 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912PF-16-R-0023
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The following have been added by full text:
AMENDMENT 0001
This following information is provided in response to a vendor request for information:
Question 1 : Can companies use a Joint Venture (Italian ATI) to satisfy the solicitation requirements?
Response: For the purposes of this contract and in accordance with FAR 9.603 the Government will recognize the integrity and validity of contractor team arrangements; provided, the arrangements are identified and company relationships are fully disclosed in an offer or, for arrangements entered into after submission of an offer, before the arrangement becomes effective.
“Contractor team arrangement,” as used in FAR 9.601, means an arrangement in which— A. Two or more companies form a partnership or joint venture to act as a potential prime contractor B. A potential prime contractor agrees with one or more other companies to have them act as its subcontractors under a specified Government contract or acquisition program.
Joint Venture offerors shall furnish with their proposal a notarized legal document (or an agreement signed by both parties) that establishes the Joint Venture. The Joint Venture Agreement shall take effect upon the submission of the proposal and remain irrevocable until two (2) years after the work has been finally inspected and accepted by the Government. The Joint Venture Agreement shall include, at a minimum, the following:
A. Name of firms that form the Joint Venture and the name of the Joint Venture.
B. Name and title of the corporate officials signing in behalf of each party. The lead or prime Company has to be registered in SAM.
C. Solicitation number.
D. The statement "The composition and structure of the Joint Venture will remain unchanged from award to two (2) year after the work has been finally inspected and accepted by the Government.”.
E. Date of issuance of the agreement (and notarized signature of the corporate officials) signing in behalf of each party. The U.S. Government reserves the right to review the actual Joint Venture agreement to determine its basis and compliance with the applicable laws. Any internal agreements affecting the internal composition of the existing Joint Venture and its potential liabilities in relation to the contract (bonds, insurance, etc) will be sent to the Contracting Officer to provide notice of the same. Any change in the composition of the Joint Venture will require the Joint Venture to formally request a Novation Agreement in accordance with FAR 42.12, which will be approved/disapproved at the discretion of the Contracting Officer.
Question 2: Are "external" design firms allowed?
Response: Yes, an "external" design firm is allowable. The design firm's past experience must meet the experience requirements of Solicitation Sections L/M and provide a signed Letter of Intent. If the design work will be performed "in-house" by the prime contractor, a letter must be submitted stating this fact.
(End of Summary of Changes)
CARABINIERI
PREFABRICATED CONTAINER
WIND INDICATOR POLE
GYM EQUIPMENT
SC4
ELECTRICAL PANEL
DP
ELECTRICAL PANEL BUS STOP
PANEL SC5
ELECTRICAL
TELEPHONE POLE
LIGHTING POLE 1
LIGHTING POLE 2
FLOWERS CONCRETE VASES
LIGHTING POLE 3
HELICOPTER LANDING PAD
VARIOUS FACILITIES
SC3
ELECTRICAL PANEL
SC6
ELECTRICAL PANEL
SC7
ELECTRICAL PANEL
SC8
ELECTRICAL PANEL
HANDHOLE
COMMUNICATION
HANDHOLE
COMMUNICATION
HANDHOLE
COMMUNICATION
COMMUNICATION LINES DIRECTLY BURIED
WATER FAUCET
PANEL
OUTLETS
ELECTRIC
TRAFFIC LIGHTS
INSPECTION
PORTABLE
LV ELECTRICAL LINES
MANHOLE
COMMUNICATION
MODULE
PREFABRICATED
MANHOLE 1
ELECTRIC
2 AND 3
MANHOLES
ELECTRIC
MANHOLE 5
ELECTRIC
MANHOLE 6
ELECTRIC
GATE
ELECTRICAL PANEL
MANHOLE 4
ELECTRIC
BARRIER
| W912PF-16-R-0023 Amendment 0001 |
| Attachment1StatementOfWorkwAddendum0001 |
| Attachment1StatementOfWork |
| Add1 to SOW DB RT |
Attachment4Satellite View Track Field - 4 lanes - A3 - 1-500 REV 1