ELIN Sheet W912PB25Q3002 Railroad.xlsx
XLSX spreadsheet 15 KB Posted
- Attached to
- Railroad Tracks Inspection at USAG Bavaria
- Solicitation number
- W912PB25Q3002
About this file
This document is an ELIN (Exhibit Line Item Number) Sheet for an IDT (Indefinite Delivery Task Order) Service Contract for the Inspection of Railroad Tracks, Switches and Signals at the United States Army Garrison (USAG) Bavaria. The contract has a Period of Performance from January 1, 2025 through December 31, 2027, with a one-year Base Period and two one-year Option Periods. The contract will be a Firm Fixed Price Requirements Type Contract, awarded based on low price technically acceptable evaluation factors. Key services to be provided include inspection and measurement of railroad tracks, switches, derailers, and signal systems. The solicitation is issued by the 409th Contracting Command, 928th Contracting Battalion (CBN) / Regional Contracting Office Bavaria (RCO) for the Department of the Army Materiel Command Army Contracting Command. Offerors must be registered in the System for Award Management (SAM) and complete the entire solicitation document, including representations, certifications, and technical compliance documentation.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
CONTROLLED UNCLASSIFIED INFORMATION
| ELIN Sheet for IDT Service Contract Inspection of Railroad Tracks, Switches and Signals at USAG Bavaria |
| PoP: 01 January 2025 thru 31 December 2027 |
| Period of Performance 01 January 2025 thru 31 December 2025 | Base Year | |||||
| Item | ELIN | Description | Qty/EA | Unit | Unit € | Total € |
| 0001 | A001 | Inspection/measurement railroad tracks | 1 | Job |
A002 Measurement railroad switches 1 Job
A003 Inspection railroad switches/derailers 3 Each
A004 Inspection railroad signal systems 1 Job
A005 Inspection railroad buffers 2 Each
Total
| Period of Performance 01 January 2026 thru 31 December 2026 | First Option Year | |||||
| Item | ELIN | Description | Qty/EA | Unit | Unit € | Total € |
| 1001 | B001 | Inspection/measurement railroad tracks | 1 | Job |
B002 Measurement railroad switches 1 Job
B003 Inspection railroad switches/derailers 3 Each
B004 Inspection railroad signal systems 1 Job
B005 Inspection railroad buffers 2 Each
Total
| Period of Performance 01 January 2027 thru 31 December 2027 | Second Option Year | |||||
| Item | ELIN | Description | Qty/EA | Unit | Unit € | Total € |
| 2001 | C001 | Inspection/measurement railroad tracks | 1 | Job |
C002 Measurement railroad switches 1 Job
C003 Inspection railroad switches/derailers 3 Each
C004 Inspection railroad signal systems 1 Job
C005 Inspection railroad buffers 2 Each
Total
| Total Amount Basic thru Fourth Option Year | Total € : |
| CF: 0.9249 | Total $ : |
CONTROLLED UNCLASSIFIED INFORMATION
Sheet2
Sheet3
File details come from the government source that posted it. Updated .