W912PB24R3022_Amendment 0002.pdf
PDF 413 KB Posted
- Attached to
- Remedy Deficiencies on Electrical Systems Federal contract opportunity
- Solicitation number
- W912PB24R3022
About this file
This document is an amendment to Solicitation W912PB24R3022 for Remedy Deficiencies on Electrical Systems at USAG Bavaria, Ansbach. The amendment provides responses to questions received from potential offerors during the site visit. Key details include:
The solicitation is being amended to answer questions, with no extension to the offer due date. The contracting officer's name and contact information are provided. The amendment clarifies that a DIN EN ISO 14001 environmental certification is not a mandatory requirement for bidders, though the contractor must still comply with environmental terms in the Performance Work Statement. The period of performance is expected to start on September 16, 2024 and includes two option years. The contracting agency is the Army Contracting Command. No other significant changes to the original solicitation requirements are noted in this amendment.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912PB24R3022_Amendment 0003.pdf | ||
| W912PB24R3022_Amendment 0001.pdf | ||
| Attachment 2 List of Deficiencies.pdf | ||
| Attachment 4 Repair Work Template.pdf | ||
| W912PB24R3022.pdf | ||
| IRS Form W-14 - Sample.pdf | ||
| IRS Form W-14.pdf | ||
| Attachment 3 Repair Schedule Template.xlsx | XLSX spreadsheet | |
| Attachment 1 PWS Remedy Deficiencies.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0012093690
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provi ded herei n, all t erms and condit ions of t he document refere nced in Item 9A or 10A, as heretofore change d, remai ns unchanged and in ful l force and effect .
15A. NAME AND TIT LE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
ST ANDARD FORM 30 (Rev. 10-83) Prescr ibed by GSA
FAR (48 CFR) 53.243
The porpose of this Amendment is to answ er questions from potential off erors received sur ing the site visit.
The point of contact f or this amendment is:
Contract Specialist: Sequita Harris
COMM: (+49) 09641-83-8703
DSN: 314-526-8703
Email: sequita.d.harris.civ@army.mil
1. CO NTRACT ID CODE P AGE OF P AGES
Y 1 2
16A. NAME AND T ITLE OF CONTRACTING OFFICER (Type or print)
16C. DAT E SIGNED
BY
16B. UNITED ST AT ES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contract ing Officer )(Signature of person authorized t o sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, Count y, Stat e and Zip Code) X W912PB24R3022
X 9B. DAT ED (SEE IT EM 11)
19-Aug-2024
10B. DAT ED (SEE IT EM 13)
9A. AMENDMENT OF SOLICITAT ION NO.
11. THIS IT EM ONLY APPLIES T O AMENDMENT S OF SOLICITATIONS
X The above numbered soli cit ati on i s amended as set forth in It em 14. The hour and date specified for rece ipt of Offer is ext ended, X is not extended.
Offer must acknowl edge rece ipt of t his amendment pri or to the hour and date specified in the sol ici tat ion or as amended by one of t he fol lowing methods:
(a) By compl eti ng Items 8 and 15, and returning 1 copi es of the amendment ; (b) By acknowledgi ng recei pt of thi s a mendment on each copy of t he offer submit ted;
or (c) By s epara te let ter or t elegram whi ch i ncludes a refe rence t o t he s olic ita tion and amendment numbers . FA ILURE OF YOU R A CKNOWLEDGMENT TO BE RECEIVED AT TH E P LACE D ESIGNATED FOR TH E RECEIPT OF OFFERS P RIO R TO THE HOUR AN D DATE SP ECIFIED MA Y RESULT IN
REJECTIO N OF YOUR OFFER. If by vir tue of thi s amendment you desire t o change an offer already submit ted, s uch c hange ma y be made by t ele gram or let ter, provided each t elegram or l ett er makes reference to the sol ici tat ion and this amendment , and is re ceived prior to the openi ng hour and dat e speci fi ed.
12. ACCOUNTING AND APPROPRIATION DAT A (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORT H IN ITEM 14 ARE MADE IN THE
CONT RACT ORDER NO. IN ITEM 10A.
B. T HE ABOVE NUMBERED CONT RACT /ORDER IS MODIFIED T O REFLECT THE ADMINIST RATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORT H IN ITEM 14, PURSUANT TO T HE AUTHORITY OF FAR 43.103(B).
C. T HIS SUPPLEMENT AL AGREEMENT IS ENT ERED INTO PURSUANT TO AUTHORITY OF:
D. OT HER (Specify type of modification and authorit y)
E. IMPORTANT: Contract or is not, is required to sign this document and return copies t o the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/cont ract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
U0002
2. AMENDMENT/ MODIFICATION NO. 5. P ROJECT NO .(If appli cable)
6. ISSUED BY
3. EFFECTIVE DATE
05-Sep-2024
CODE
RCO BAVARIA
AMERIKANISCHE BESCHAFFUNGSSTELLE
GEB 542
92655 GRAFENWOEHR LAGER
GERM ANY
W912PB 7. AD MINISTERED BY (If other t han item 6)
4. REQUISITION/PU RCHASE REQ. NO.
CODE
See I tem 6
FACILITY CODECODE
EMAIL:TEL:
W912PB24R3022
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SUMMARY OF CHANGES
The questions/response from the site visit are below.
Question: Q: Do a priority list, of which building where to start, exist?
Answer: No official priority list exists. Nevertheless, buildings which are occupied and not safe (such as housing, offices) can be prioritized during performance. All will depend on the accessibility and the emergency of/in the building.
Answer: Yes
Question: PWS - pages 8,9,10-1.22 on page 3 deals with Environmental Compliance.
Our interpretation of the PWS was, that the contractor shall follow the guidelines, which are listed in the PWS. Now with the answer to the questions, the requirement is intensified by demanding a certification in accordance with DIN EN ISO 14001. This certification is not usual in construction industry and especially not in "small" electrical firms. Is this a mandatory requirement for all bidders? If yes, this will limit the challenge, as this will form a criterion for exclusion for many companies.
Answer: The DIN EN ISO 14001 is not required. However, the contractor still must comply with the terms and conditions of the contract and the Performance Work Statement.
File details come from the government source that posted it. Updated .