Lock Foundation and Site Preparation - Plan Set - 95 Percent DQC Review - 08-22-25_Part8.pdf

PDF 51 MB Posted

Attached to
LOCK FOUNDATION AND SITE PREPARATION FOR LOCK and DAM 25 NAVIGATION ECOSYSTEM SUSTAINABILITY PROGRAM (NESP)
Solicitation number
W912P926RA001
Issued by

About this file

The file is a plan set for the Lock Foundation and Site Preparation at Lock and Dam 25, currently at 95% Design Quality Check (DQC) review stage. The project is part of the Navigation Ecosystem Sustainability Program (NESP) by the U.S. Army Corps of Engineers, St. Louis District. Located approximately 61.5 river miles upstream from St. Louis, the contract is anticipated to be a Firm-Fixed-Price Construction contract with a 365-calendar day performance period from the notice to proceed. The document appears to be a technical plan set detailing the foundational and site preparation requirements for the lock and dam infrastructure project, providing comprehensive engineering details at an advanced design stage.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .