Lock Foundation and Site Preparation - Plan Set - 95 Percent DQC Review - 08-22-25_Part4.pdf

PDF 6 MB Posted

Attached to
LOCK FOUNDATION AND SITE PREPARATION FOR LOCK and DAM 25 NAVIGATION ECOSYSTEM SUSTAINABILITY PROGRAM (NESP)
Solicitation number
W912P926RA001
Issued by

About this file

These are cross-section engineering drawings for the Upper Mississippi River Navigation Ecosystem Sustainability Project (NESP), specifically for Lock and Dam No. 25 located in the St. Louis District. The detailed technical drawings, prepared by the U.S. Army Corps of Engineers, illustrate foundation preparation, riprap excavation, and separator wall installation across multiple station points from 0+00 to 14+00.

The drawings provide comprehensive technical specifications for a complex river infrastructure project, including excavation phases, riprap placement, sand fill grading, and wall embedment. Key technical details include a separator wall with a 20-foot embedment depth, a top elevation of 433.6' NAVD88, and specific requirements for riprap and sand backfill placement in controlled lifts. The project involves careful excavation around existing timber cribbing, intermediate walls, and riprap, with precise elevation and slope specifications to ensure structural integrity and scour protection.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A1

SCALE: 1"=20'

CROSS SECTIONS - RIPRAP EXCAVATION AND SEPARATOR WALL

1+50

-240 -220 -200 -180 -160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 160 180 200 220 240

360 360

380 380

400 400

420 420

440 440

460 460

480 480

RIVER BOTTOM

AVERAGE SURVEYED

DERRICK STONE ON LUMBER MATTRESS

STONE PROTECTION ON LUMBER MATTRESS

DERRICK STONERIPRAP EXCAVATION PHASE 1

RIPRAP EXCAVATION PHASE 2

EXISTING TIMBER MATTRESS

REMOVE PORTION OF

.0

E

L

.0

O

F

.0

.0

O

.0

.0

O

.6

.9

O

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

D Q

C R

E V

IE

W

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

B

D

IR

K S

P

.E

S T

L

O U

IS

D

IS

T

R

IC

T

E N

G

IN

E E

R S

U .S

A

R M

Y C

O R

P S

O F

IN

L

A N

D N

A V

IG

A

T

IO

N D

E S

IG

N

C E

N T

E R

1+46

-240 -220 -200 -180 -160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 160 180 200 220 240

340 340

360 360

380 380

400 400

420 420

440 440

460 460

480 480

EL 406.6

EXISTING DAM END SILL DERRICK STONE

.0

.0

O

.0

.0

O

.0

.0

O

.6

.9

O

START IMMEDIATELY AFTER DAM END SILL

RIPRAP EXCAVATION PHASE 1

PHASE 2

RIPRAP EXCAVATION

RIVER BOTTOM

AVERAGE SURVEYED

LUMBER MATTRESS

STONE PROTECTION ON

BEGIN EXCAVATION STA. 1+46.00

R

IP

R A

P E

X C

A V

A T

IO

N

A N

D S

E P

A R

A T

O R

W A

CG301

U P

P E

R M

IS

S

IS

S

IP

P

I R

IV

E

R

N A

V

IG

A T

IO

N

E C

O S

Y S

T E

M S

U S

T A

IN

A

B

IL

IT

Y

P R

O J E

C T

N

E S

P

L O

C K

A N

D D

A M

N O

L O

C K

F O

U N

D A

T

IO

N A

N D

S

IT

E P

R E

P A

R A

T

IO

N

A

C O

M B

S

P .E

B S

A Y

L O

R

K D

O R

S C

H P

.E

N

S I

D

A U

G U

S T

W

P

-2

-R -A

W P

-X

X -X

-X X

X

S T

L

O U

IS

D

IS

T

R

IC

T

S P

R U

C E

S T

R E

E T

S T

L

O U

IS

M

IS

S O

U R

I

B

M R

L D

L o c k s a n d

D a m

W in fi e ld

\B

M R

L D

L o c k

F o u n d a ti o n a n d S it e P re p a ra ti o n

\B

M

R L

D

-C

A D

S

H E

E T

-2

-0

-1

-C -C

G

S

H T

.d g n

D S

A

E C

S c re e n F u ll

S iz e .d s c ri p t

P D

A

E C p d f.

p lt c fg

:2

:5

P

M

/1 /2

C R

O S

S S

E C

T

IO

N

20' 40'0

5'

CROSS SECTIONS - RIPRAP EXCAVATION AND SEPARATOR WALL

2+00

-240 -220 -200 -180 -160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 160 180 200 220 240

360 360

380 380

400 400

420 420

440 440

460 460

480 480

RIVER BOTTOM

AVERAGE SURVEYED

1000 LB RIPRAP

DERRICK STONE

STONE PROTECTION ON LUMBER MATTRESS

DERRICK STONE

TIMBER CRIB DO NOT DISTURB

.5

.0

O

.5

.0

O

.5

.0

O

.6

.8

O

PHASE 2

RIPRAP EXCAVATION

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

D Q

C R

E V

IE

W

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

B

D

IR

K S

P

.E

S T

L

O U

IS

D

IS

T

R

IC

T

E N

G

IN

E E

R S

U .S

A

R M

Y C

O R

P S

O F

IN

L

A N

D N

A V

IG

A

T

IO

N D

E S

IG

N

C E

N T

E R

2+14

-240 -220 -200 -180 -160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 160 180 200 220 240

340 340

360 360

380 380

400 400

420 420

440 440

460 460

480 480

.0

.0

O

.0

.0

O

.0

.0

O

.6

.8

O

AVERAGE SURVEYED RIVER BOTTOM

RIPRAP EXCAVATION PHASE 1 PHASE 2

RIPRAP EXCAVATION

TIMBER CRIB DO NOT DISTURB

DERRICK STONE

1000LB RIPRAP

C-STONE

STONE PROTECTION ON LUMBER MATTRESS

R

IP

R A

P E

X C

A V

A T

IO

N

A N

D S

E P

A R

A T

O R

W A

CG302

P

P E

R M

IS

S

IS

S

IP

P

I R

IV

E

R

N A

V

IG

A T

IO

N

E C

O S

Y S

T E

M S

U S

T A

IN

A

B

IL

IT

Y

P R

O J E

C T

N

E S

P

L O

C K

A N

D D

A M

N O

L O

C K

F O

U N

D A

T

IO

N A

N D

S

IT

E P

R E

P A

R A

T

IO

N

A

C O

M B

S

P .E

B S

A Y

L O

R

K D

O R

S C

H P

S I

D

A U

G U

S T

W

P

-2

-R -A

W P

-X

X -X

-X X

L

O U

IS

D

IS

T

R

IC

T

S P

R U

C E

S T

R E

E T

S T

L

O U

IS

M

IS

S O

U R

I

B

M R

L D

L o c k s a n d

D a m

W in fi e ld

\B

M R

L D

L o c k

F o u n d a ti o n a n d S it e P re p a ra ti o n

\B

M

R L

D

-C

A D

S

H E

E T

-2

-0

-1

-C -C

G

S

H T

.d g n

D S

A

E C

S c re e n F u ll

S iz e .d s c ri p t

P D

A

E C p d f.

p lt c fg

:2

:0

P

M

/1 /2

C R

O S

S S

E C

T

IO

N

CROSS SECTIONS - RIPRAP EXCAVATION AND SEPARATOR WALL

2+50

-240 -220 -200 -180 -160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 160 180 200 220 240

360 360

380 380

400 400

420 420

440 440

460 460

480 480

RIVER BOTTOM

AVERAGE SURVEYED

1000 LB RIPRAP

C-STONE

.0

.0

O

.6

.0

O

.9

.0

O

.6

.8

O

RIPRAP EXCAVATION PHASE 2

3+00

-240 -220 -200 -180 -160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 160 180 200 220 240

360 360

380 380

400 400

420 420

440 440

460 460

480 480

RIVER BOTTOM

AVERAGE SURVEYED

1000 LB RIPRAP

C-STONE

5000 LB RIPRAP

.8

.0

O

.1

.0

O

.0

.0

O

.6

.8

O

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

D Q

C R

E V

IE

W

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

B

D

IR

K S

P

.E

S T

L

O U

IS

D

IS

T

R

IC

T

E N

G

IN

E E

R S

U .S

A

R M

Y C

O R

P S

O F

IN

L

A N

D N

A V

IG

A

T

IO

N D

E S

IG

N

C E

N T

E R

R

IP

R A

P E

X C

A V

A T

IO

N

A N

D S

E P

A R

A T

O R

W A

CG303

P

P E

R M

IS

S

IS

S

IP

P

I R

IV

E

R

N A

V

IG

A T

IO

N

E C

O S

Y S

T E

M S

U S

T A

IN

A

B

IL

IT

Y

P R

O J E

C T

N

E S

P

L O

C K

A N

D D

A M

N O

L O

C K

F O

U N

D A

T

IO

N A

N D

S

IT

E P

R E

P A

R A

T

IO

N

A

C O

M B

S

P .E

B S

A Y

L O

R

K D

O R

S C

H P

S I

D

A U

G U

S T

W

P

-2

-R -A

W P

-X

X -X

-X X

L

O U

IS

D

IS

T

R

IC

T

S P

R U

C E

S T

R E

E T

S T

L

O U

IS

M

IS

S O

U R

I

B

M R

L D

L o c k s a n d

D a m

W in fi e ld

\B

M R

L D

L o c k

F o u n d a ti o n a n d S it e P re p a ra ti o n

\B

M

R L

D

-C

A D

S

H E

E T

-2

-0

-1

-C -C

G

S

H T

.d g n

D S

A

E C

S c re e n F u ll

S iz e .d s c ri p t

P D

A

E C p d f.

p lt c fg

:2

:0

P

M

/1 /2

C R

O S

S S

E C

T

IO

N

CROSS SECTIONS - RIPRAP EXCAVATION AND SEPARATOR WALL

3+50

-240 -220 -200 -180 -160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 160 180 200 220 240

360 360

380 380

400 400

420 420

440 440

460 460

480 480

RIVER BOTTOM

AVERAGE SURVEYED

1000 LB RIPRAP

C-STONE

5000 LB RIPRAP

C-STONE

.5

.0

O

.9

.0

O

.0

.0

O

.6

.8

O

4+00

-240 -220 -200 -180 -160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 160 180 200 220 240

340 340

360 360

380 380

400 400

420 420

440 440

460 460

480 480

RIVER BOTTOM

AVERAGE SURVEYED

5000 LB RIPRAP

C-STONE

DERRICK STONE

TIMBER CRIB DO NOT DISTURB

.8

.0

O

.8

.0

O

.9

.0

O

.6

.8

O

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

D Q

C R

E V

IE

W

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

B

D

IR

K S

P

.E

S T

L

O U

IS

D

IS

T

R

IC

T

E N

G

IN

E E

R S

U .S

A

R M

Y C

O R

P S

O F

IN

L

A N

D N

A V

IG

A

T

IO

N D

E S

IG

N

C E

N T

E R

R

IP

R A

P E

X C

A V

A T

IO

N

A N

D S

E P

A R

A T

O R

W A

CG304

P

P E

R M

IS

S

IS

S

IP

P

I R

IV

E

R

N A

V

IG

A T

IO

N

E C

O S

Y S

T E

M S

U S

T A

IN

A

B

IL

IT

Y

P R

O J E

C T

N

E S

P

L O

C K

A N

D D

A M

N O

L O

C K

F O

U N

D A

T

IO

N A

N D

S

IT

E P

R E

P A

R A

T

IO

N

A

C O

M B

S

P .E

B S

A Y

L O

R

K D

O R

S C

H P

S I

D

A U

G U

S T

W

P

-2

-R -A

W P

-X

X -X

-X X

L

O U

IS

D

IS

T

R

IC

T

S P

R U

C E

S T

R E

E T

S T

L

O U

IS

M

IS

S O

U R

I

B

M R

L D

L o c k s a n d

D a m

W in fi e ld

\B

M R

L D

L o c k

F o u n d a ti o n a n d S it e P re p a ra ti o n

\B

M

R L

D

-C

A D

S

H E

E T

-2

-0

-1

-C -C

G

S

H T

.d g n

D S

A

E C

S c re e n F u ll

S iz e .d s c ri p t

P D

A

E C p d f.

p lt c fg

:2

:2

P

M

/1 /2

C R

O S

S S

E C

T

IO

N

CROSS SECTIONS - RIPRAP EXCAVATION AND SEPARATOR WALL

4+50

-240 -220 -200 -180 -160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 160 180 200 220 240

340 340

360 360

380 380

400 400

420 420

440 440

460 460

480 480

RIVER BOTTOM

AVERAGE SURVEYED

5000 LB RIPRAP

C-STONE

.9

.0

O

.9

.0

O

.3

.0

O

.6

.8

O

5+00

-240 -220 -200 -180 -160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 160 180 200 220 240

340 340

360 360

380 380

400 400

420 420

440 440

460 460

480 480

RIVER BOTTOM

AVERAGE SURVEYED

5000 LB RIPRAP

C-STONE

.3

.0

O

.8

.0

O

.3

.0

O

.6

.8

O

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

D Q

C R

E V

IE

W

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

B

D

IR

K S

P

.E

S T

L

O U

IS

D

IS

T

R

IC

T

E N

G

IN

E E

R S

U .S

A

R M

Y C

O R

P S

O F

IN

L

A N

D N

A V

IG

A

T

IO

N D

E S

IG

N

C E

N T

E R

R

IP

R A

P E

X C

A V

A T

IO

N

A N

D S

E P

A R

A T

O R

W A

CG305

P

P E

R M

IS

S

IS

S

IP

P

I R

IV

E

R

N A

V

IG

A T

IO

N

E C

O S

Y S

T E

M S

U S

T A

IN

A

B

IL

IT

Y

P R

O J E

C T

N

E S

P

L O

C K

A N

D D

A M

N O

L O

C K

F O

U N

D A

T

IO

N A

N D

S

IT

E P

R E

P A

R A

T

IO

N

A

C O

M B

S

P .E

B S

A Y

L O

R

K D

O R

S C

H P

S I

D

A U

G U

S T

W

P

-2

-R -A

W P

-X

X -X

-X X

L

O U

IS

D

IS

T

R

IC

T

S P

R U

C E

S T

R E

E T

S T

L

O U

IS

M

IS

S O

U R

I

B

M R

L D

L o c k s a n d

D a m

W in fi e ld

\B

M R

L D

L o c k

F o u n d a ti o n a n d S it e P re p a ra ti o n

\B

M

R L

D

-C

A D

S

H E

E T

-2

-0

-1

-C -C

G

S

H T

.d g n

D S

A

E C

S c re e n F u ll

S iz e .d s c ri p t

P D

A

E C p d f.

p lt c fg

:2

:4

P

M

/1 /2

C R

O S

S S

E C

T

IO

N

CROSS SECTIONS - RIPRAP EXCAVATION AND SEPARATOR WALL

5+50

-240 -220 -200 -180 -160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 160 180 200 220 240

340 340

360 360

380 380

400 400

420 420

440 440

460 460

480 480

RIVER BOTTOM

AVERAGE SURVEYED

5000 LB RIPRAP

C-STONE

.1

.0

O

.6

.0

O

.3

.0

O

.6

.8

O

6+00

-240 -220 -200 -180 -160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 160 180 200 220 240

340 340

360 360

380 380

400 400

420 420

440 440

460 460

480 480

RIVER BOTTOM

AVERAGE SURVEYED

5000 LB RIPRAP

C-STONE

CONCRETE APRON DO NOT DISTURB

.7

.0

O

.6

.0

O

.4

.0

O

.2

.8

O

RIPRAP EXCAVATION PHASE 1 RIPRAP EXCAVATION PHASE 2

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

D Q

C R

E V

IE

W

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

B

D

IR

K S

P

.E

S T

L

O U

IS

D

IS

T

R

IC

T

E N

G

IN

E E

R S

U .S

A

R M

Y C

O R

P S

O F

IN

L

A N

D N

A V

IG

A

T

IO

N D

E S

IG

N

C E

N T

E R

R

IP

R A

P E

X C

A V

A T

IO

N

A N

D S

E P

A R

A T

O R

W A

CG306

P

P E

R M

IS

S

IS

S

IP

P

I R

IV

E

R

N A

V

IG

A T

IO

N

E C

O S

Y S

T E

M S

U S

T A

IN

A

B

IL

IT

Y

P R

O J E

C T

N

E S

P

L O

C K

A N

D D

A M

N O

L O

C K

F O

U N

D A

T

IO

N A

N D

S

IT

E P

R E

P A

R A

T

IO

N

A

C O

M B

S

P .E

B S

A Y

L O

R

K D

O R

S C

H P

S I

D

A U

G U

S T

W

P

-2

-R -A

W P

-X

X -X

-X X

L

O U

IS

D

IS

T

R

IC

T

S P

R U

C E

S T

R E

E T

S T

L

O U

IS

M

IS

S O

U R

I

B

M R

L D

L o c k s a n d

D a m

W in fi e ld

\B

M R

L D

L o c k

F o u n d a ti o n a n d S it e P re p a ra ti o n

\B

M

R L

D

-C

A D

S

H E

E T

-2

-0

-1

-C -C

G

S

H T

.d g n

D S

A

E C

S c re e n F u ll

S iz e .d s c ri p t

P D

A

E C p d f.

p lt c fg

:2

:5

P

M

/1 /2

C R

O S

S S

E C

T

IO

N

CROSS SECTIONS - RIPRAP EXCAVATION AND SEPARATOR WALL

6+50

-240 -220 -200 -180 -160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 160 180 200 220 240

360 360

380 380

400 400

420 420

440 440

460 460

480 480

RIVER BOTTOM

AVERAGE SURVEYED

5000 LB RIPRAP

.0

.0

O

.6

.0

O

.2

.0

O

.3

.7

O

RIPRAP EXCAVATION PHASE 1 RIPRAP EXCAVATION PHASE 2

7+00

-240 -220 -200 -180 -160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 160 180 200 220 240

360 360

380 380

400 400

420 420

440 440

460 460

480 480

RIVER BOTTOM

AVERAGE SURVEYED

5000 LB RIPRAP

.8

.0

O

.9

.7

O

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

D Q

C R

E V

IE

W

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

B

D

IR

K S

P

.E

S T

L

O U

IS

D

IS

T

R

IC

T

E N

G

IN

E E

R S

U .S

A

R M

Y C

O R

P S

O F

IN

L

A N

D N

A V

IG

A

T

IO

N D

E S

IG

N

C E

N T

E R

R

IP

R A

P E

X C

A V

A T

IO

N

A N

D S

E P

A R

A T

O R

W A

CG307

P

P E

R M

IS

S

IS

S

IP

P

I R

IV

E

R

N A

V

IG

A T

IO

N

E C

O S

Y S

T E

M S

U S

T A

IN

A

B

IL

IT

Y

P R

O J E

C T

N

E S

P

L O

C K

A N

D D

A M

N O

L O

C K

F O

U N

D A

T

IO

N A

N D

S

IT

E P

R E

P A

R A

T

IO

N

A

C O

M B

S

P .E

B S

A Y

L O

R

K D

O R

S C

H P

S I

D

A U

G U

S T

W

P

-2

-R -A

W P

-X

X -X

-X X

L

O U

IS

D

IS

T

R

IC

T

S P

R U

C E

S T

R E

E T

S T

L

O U

IS

M

IS

S O

U R

I

B

M R

L D

L o c k s a n d

D a m

W in fi e ld

\B

M R

L D

L o c k

F o u n d a ti o n a n d S it e P re p a ra ti o n

\B

M

R L

D

-C

A D

S

H E

E T

-2

-0

-1

-C -C

G

S

H T

.d g n

D S

A

E C

S c re e n F u ll

S iz e .d s c ri p t

P D

A

E C p d f.

p lt c fg

:2

:0

P

M

/1 /2

C R

O S

S S

E C

T

IO

N

CROSS SECTIONS - RIPRAP EXCAVATION AND SEPARATOR WALL

7+50

-240 -220 -200 -180 -160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 160 180 200 220 240

360 360

380 380

400 400

420 420

440 440

460 460

480 480

RIVER BOTTOM

AVERAGE SURVEYED

5000 LB RIPRAP

2200 LB RIPRAP

.8

.1

O

.4

.4

O

8+00

-240 -220 -200 -180 -160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 160 180 200 220 240

360 360

380 380

400 400

420 420

440 440

460 460

480 480

AVERAGE SURVEYED RIVER BOTTOM

.6

.4

O

.4

.3

O

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

D Q

C R

E V

IE

W

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

B

D

IR

K S

P

.E

S T

L

O U

IS

D

IS

T

R

IC

T

E N

G

IN

E E

R S

U .S

A

R M

Y C

O R

P S

O F

IN

L

A N

D N

A V

IG

A

T

IO

N D

E S

IG

N

C E

N T

E R

R

IP

R A

P E

X C

A V

A T

IO

N

A N

D S

E P

A R

A T

O R

W A

CG308

P

P E

R M

IS

S

IS

S

IP

P

I R

IV

E

R

N A

V

IG

A T

IO

N

E C

O S

Y S

T E

M S

U S

T A

IN

A

B

IL

IT

Y

P R

O J E

C T

N

E S

P

L O

C K

A N

D D

A M

N O

L O

C K

F O

U N

D A

T

IO

N A

N D

S

IT

E P

R E

P A

R A

T

IO

N

A

C O

M B

S

P .E

B S

A Y

L O

R

K D

O R

S C

H P

S I

D

A U

G U

S T

W

P

-2

-R -A

W P

-X

X -X

-X X

L

O U

IS

D

IS

T

R

IC

T

S P

R U

C E

S T

R E

E T

S T

L

O U

IS

M

IS

S O

U R

I

B

M R

L D

L o c k s a n d

D a m

W in fi e ld

\B

M R

L D

L o c k

F o u n d a ti o n a n d S it e P re p a ra ti o n

\B

M

R L

D

-C

A D

S

H E

E T

-2

-0

-1

-C -C

G

S

H T

.d g n

D S

A

E C

S c re e n F u ll

S iz e .d s c ri p t

P D

A

E C p d f.

p lt c fg

:2

:1

P

M

/1 /2

C R

O S

S S

E C

T

IO

N

CROSS SECTIONS - FOUNDATION PREPARATION

0+00

-300 -280 -260 -240 -220 -200 -180 -160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 160 180 200 220 240

360 360

380 380

400 400

420 420

440 440

460 460

480 480

RIVER BOTTOM

AVERAGE SURVEYED

EXISTING LOCK FLOOR

REMOVE ALUVIUM TO

.6

.0

O

0+50

-300 -280 -260 -240 -220 -200 -180 -160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 160 180 200 220 240

320 320

340 340

360 360

380 380

400 400

420 420

440 440

460 460

480 480

RIVER BOTTOM

AVERAGE SURVEYED

.6

.0

O

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

D Q

C R

E V

IE

W

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

B

D

IR

K S

P

.E

S T

L

O U

IS

D

IS

T

R

IC

T

E N

G

IN

E E

R S

U .S

A

R M

Y C

O R

P S

O F

IN

L

A N

D N

A V

IG

A

T

IO

N D

E S

IG

N

C E

N T

E R

F O

U N

D A

T

IO

N P

R E

P A

R A

T

IO

CG309

P

P E

R M

IS

S

IS

S

IP

P

I R

IV

E

R

N A

V

IG

A T

IO

N

E C

O S

Y S

T E

M S

U S

T A

IN

A

B

IL

IT

Y

P R

O J E

C T

N

E S

P

L O

C K

A N

D D

A M

N O

L O

C K

F O

U N

D A

T

IO

N A

N D

S

IT

E P

R E

P A

R A

T

IO

N

A

C O

M B

S

P .E

B S

A Y

L O

R

K D

O R

S C

H P

S I

D

A U

G U

S T

W

P

-2

-R -A

W P

-X

X -X

-X X

L

O U

IS

D

IS

T

R

IC

T

S P

R U

C E

S T

R E

E T

S T

L

O U

IS

M

IS

S O

U R

I

B

M R

L D

L o c k s a n d

D a m

W in fi e ld

\B

M R

L D

L o c k

F o u n d a ti o n a n d S it e P re p a ra ti o n

\B

M

R L

D

-C

A D

S

H E

E T

-2

-0

-1

-C -C

G

S

H T

.d g n

D S

A

E C

S c re e n F u ll

S iz e .d s c ri p t

P D

A

E C p d f.

p lt c fg

:2

:3

P

M

/1 /2

C R

O S

S S

E C

T

IO

N

CROSS SECTIONS - FOUNDATION PREPARATION

1+00

-300 -280 -260 -240 -220 -200 -180 -160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 160 180 200 220 240

360 360

380 380

400 400

420 420

440 440

460 460

480 480

RIVER BOTTOM

AVERAGE SURVEYED

.6

.0

O

SEPARATOR WALL

1+50

-300 -280 -260 -240 -220 -200 -180 -160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 160 180 200 220 240

360 360

380 380

400 400

420 420

440 440

460 460

480 480

RIVER BOTTOM

AVERAGE SURVEYED

SEPARATOR WALL

5000LB RIPRAP

FORMED CONCRETE MATTRESS

ARTICULATING FABRIC EXCAVATION GRADE

BEGIN 5000LB RIPRAP STA. 1+46.00

BEGIN SAND FILL STA. 1+04.00

.5

.0

O

.0

.0

O

EL 407

SAND FILL GRADE

PIPE PILE

.0

.0

S

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

D Q

C R

E V

IE

W

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

B

D

IR

K S

P

.E

S T

L

O U

IS

D

IS

T

R

IC

T

E N

G

IN

E E

R S

U .S

A

R M

Y C

O R

P S

O F

IN

L

A N

D N

A V

IG

A

T

IO

N D

E S

IG

N

C E

N T

E R

F O

U N

D A

T

IO

N P

R E

P A

R A

T

CG310

P

P E

R M

IS

S

IS

S

IP

P

I R

IV

E

R

N A

V

IG

A T

IO

N

E C

O S

Y S

T E

M S

U S

T A

IN

A

B

IL

IT

Y

P R

O J E

C T

N

E S

P

L O

C K

A N

D D

A M

N O

L O

C K

F O

U N

D A

T

IO

N A

N D

S

IT

E P

R E

P A

R A

T

IO

N

A

C O

M B

S

P .E

B S

A Y

L O

R

K D

O R

S C

H P

S I

D

A U

G U

S T

W

P

-2

-R -A

W P

-X

X -X

-X X

L

O U

IS

D

IS

T

R

IC

T

S P

R U

C E

S T

R E

E T

S T

L

O U

IS

M

IS

S O

U R

I

B

M R

L D

L o c k s a n d

D a m

W in fi e ld

\B

M R

L D

L o c k

F o u n d a ti o n a n d S it e P re p a ra ti o n

\B

M

R L

D

-C

A D

S

H E

E T

-2

-0

-1

-C -C

G

S

H T

.d g n

D S

A

E C

S c re e n F u ll

S iz e .d s c ri p t

P D

A

E C p d f.

p lt c fg

:2

:4

P

M

/1 /2

C R

O S

S S

E C

T

IO

N

CROSS SECTIONS - FOUNDATION PREPARATION

2+00

-300 -280 -260 -240 -220 -200 -180 -160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 160 180 200 220 240

360 360

380 380

400 400

420 420

440 440

460 460

480 480

RIVER BOTTOM

AVERAGE SURVEYED

SEPARATOR WALL

EXCAVATION GRADE

EXISTING TIMBER CRIB

.5

.0

O

.0

.0

O

.0

.0

O

5000LB RIPRAP

CONCRETE MATTRESS

ARTICULATED FABRIC FORMED

2+50

-300 -280 -260 -240 -220 -200 -180 -160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 160 180 200 220 240

360 360

380 380

400 400

420 420

440 440

460 460

480 480

RIVER BOTTOM

AVERAGE SURVEYED

SEPARATOR WALL

EXCAVATION GRADE

EL 407

SAND FILL GRADE

RIPRAP BERM

INITIAL RIPRAP BACKFILL

.0

.0

O

.0

.0

O

.6

.0

O

.3

.6

O

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

D Q

C R

E V

IE

W

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

B

D

IR

K S

P

.E

S T

L

O U

IS

D

IS

T

R

IC

T

E N

G

IN

E E

R S

U .S

A

R M

Y C

O R

P S

O F

IN

L

A N

D N

A V

IG

A

T

IO

N D

E S

IG

N

C E

N T

E R

F O

U N

D A

T

IO

N P

R E

P A

R A

T

CG311

P

P E

R M

IS

S

IS

S

IP

P

I R

IV

E

R

N A

V

IG

A T

IO

N

E C

O S

Y S

T E

M S

U S

T A

IN

A

B

IL

IT

Y

P R

O J E

C T

N

E S

P

L O

C K

A N

D D

A M

N O

L O

C K

F O

U N

D A

T

IO

N A

N D

S

IT

E P

R E

P A

R A

T

IO

N

A

C O

M B

S

P .E

B S

A Y

L O

R

K D

O R

S C

H P

S I

D

A U

G U

S T

W

P

-2

-R -A

W P

-X

X -X

-X X

L

O U

IS

D

IS

T

R

IC

T

S P

R U

C E

S T

R E

E T

S T

L

O U

IS

M

IS

S O

U R

I

B

M R

L D

L o c k s a n d

D a m

W in fi e ld

\B

M R

L D

L o c k

F o u n d a ti o n a n d S it e P re p a ra ti o n

\B

M

R L

D

-C

A D

S

H E

E T

-2

-0

-1

-C -C

G

S

H T

.d g n

D S

A

E C

S c re e n F u ll

S iz e .d s c ri p t

P D

A

E C p d f.

p lt c fg

:2

:5

P

M

/1 /2

C R

O S

S S

E C

T

IO

N

CROSS SECTIONS - FOUNDATION PREPARATION

3+00

-300 -280 -260 -240 -220 -200 -180 -160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 160 180 200 220 240

360 360

380 380

400 400

420 420

440 440

460 460

480 480

RIVER BOTTOM

AVERAGE SURVEYED

SEPARATOR WALL

EXCAVATION GRADE

RIPRAP BERM

INITIAL RIPRAP BACKFILL

EXISTING TIMBER CRIB

.1

.8

O

.6

.0

O

.0

.0

O

.0

.0

O

3+50

-300 -280 -260 -240 -220 -200 -180 -160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 160 180 200 220 240

360 360

380 380

400 400

420 420

440 440

460 460

480 480

RIVER BOTTOM

AVERAGE SURVEYED

SEPARATOR WALL

EXCAVATION GRADE

RIPRAP BERM

INITIAL RIPRAP BACKFILL

.1

.8

O

.6

.0

O

.0

.0

O

.0

.0

O

EXISTING TIMBER CRIB

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

D Q

C R

E V

IE

W

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

B

D

IR

K S

P

.E

S T

L

O U

IS

D

IS

T

R

IC

T

E N

G

IN

E E

R S

U .S

A

R M

Y C

O R

P S

O F

IN

L

A N

D N

A V

IG

A

T

IO

N D

E S

IG

N

C E

N T

E R

F O

U N

D A

T

IO

N P

R E

P A

R A

T

CG312

P

P E

R M

IS

S

IS

S

IP

P

I R

IV

E

R

N A

V

IG

A T

IO

N

E C

O S

Y S

T E

M S

U S

T A

IN

A

B

IL

IT

Y

P R

O J E

C T

N

E S

P

L O

C K

A N

D D

A M

N O

L O

C K

F O

U N

D A

T

IO

N A

N D

S

IT

E P

R E

P A

R A

T

IO

N

A

C O

M B

S

P .E

B S

A Y

L O

R

K D

O R

S C

H P

S I

D

A U

G U

S T

W

P

-2

-R -A

W P

-X

X -X

-X X

L

O U

IS

D

IS

T

R

IC

T

S P

R U

C E

S T

R E

E T

S T

L

O U

IS

M

IS

S O

U R

I

B

M R

L D

L o c k s a n d

D a m

W in fi e ld

\B

M R

L D

L o c k

F o u n d a ti o n a n d S it e P re p a ra ti o n

\B

M

R L

D

-C

A D

S

H E

E T

-2

-0

-1

-C -C

G

S

H T

.d g n

D S

A

E C

S c re e n F u ll

S iz e .d s c ri p t

P D

A

E C p d f.

p lt c fg

:2

:0

P

M

/1 /2

C R

O S

S S

E C

T

IO

N

CROSS SECTIONS - FOUNDATION PREPARATION

4+00

-300 -280 -260 -240 -220 -200 -180 -160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 160 180 200 220 240

340 340

360 360

380 380

400 400

420 420

440 440

460 460

480 480

RIVER BOTTOM

AVERAGE SURVEYED

SEPARATOR WALL

EXCAVATION GRADE

RIPRAP BERM

INITIAL RIPRAP BACKFILL

EL 407

.8

.4

O

.0

.2

O

.0

.2

O

.6

.0

O

.0

.0

O

.0

.0

O

4+50

-300 -280 -260 -240 -220 -200 -180 -160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 160 180 200 220 240

340 340

360 360

380 380

400 400

420 420

440 440

460 460

480 480

RIVER BOTTOM

AVERAGE SURVEYED

SEPARATOR WALL

EXCAVATION GRADE

INITIAL RIPRAP BACKFILL

RIPRAP BERM

EL 407

.1

.9

O

.0

.2

O

.0

.2

O

.6

.0

O

.0

.0

O

.0

.0

O

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

D Q

C R

E V

IE

W

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

B

D

IR

K S

P

.E

S T

L

O U

IS

D

IS

T

R

IC

T

E N

G

IN

E E

R S

U .S

A

R M

Y C

O R

P S

O F

IN

L

A N

D N

A V

IG

A

T

IO

N D

E S

IG

N

C E

N T

E R

F O

U N

D A

T

IO

N P

R E

P A

R A

T

CG313

P

P E

R M

IS

S

IS

S

IP

P

I R

IV

E

R

N A

V

IG

A T

IO

N

E C

O S

Y S

T E

M S

U S

T A

IN

A

B

IL

IT

Y

P R

O J E

C T

N

E S

P

L O

C K

A N

D D

A M

N O

L O

C K

F O

U N

D A

T

IO

N A

N D

S

IT

E P

R E

P A

R A

T

IO

N

A

C O

M B

S

P .E

B S

A Y

L O

R

K D

O R

S C

H P

S I

D

A U

G U

S T

W

P

-2

-R -A

W P

-X

X -X

-X X

L

O U

IS

D

IS

T

R

IC

T

S P

R U

C E

S T

R E

E T

S T

L

O U

IS

M

IS

S O

U R

I

B

M R

L D

L o c k s a n d

D a m

W in fi e ld

\B

M R

L D

L o c k

F o u n d a ti o n a n d S it e P re p a ra ti o n

\B

M

R L

D

-C

A D

S

H E

E T

-2

-0

-1

-C -C

G

S

H T

.d g n

D S

A

E C

S c re e n F u ll

S iz e .d s c ri p t

P D

A

E C p d f.

p lt c fg

:2

:1

P

M

/1 /2

C R

O S

S S

E C

T

IO

N

CROSS SECTIONS - FOUNDATION PREPARATION

5+00

-300 -280 -260 -240 -220 -200 -180 -160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 160 180 200 220 240

340 340

360 360

380 380

400 400

420 420

440 440

460 460

480 480

RIVER BOTTOM

AVERAGE SURVEYED

SEPARATOR WALL

EXCAVATION GRADE

INITIAL RIPRAP BACKFILL

RIPRAP BERM EL 407

.4

.4

O

.0

.2

O

.0

.2

O

.6

.0

O

.0

.0

O

.0

.0

O

5+50

-300 -280 -260 -240 -220 -200 -180 -160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 160 180 200 220 240

340 340

360 360

380 380

400 400

420 420

440 440

460 460

480 480

RIVER BOTTOM

AVERAGE SURVEYED

SEPARATOR WALL

EXCAVATION GRADE

INITIAL RIPRAP BACKFILL

RIPRAP BERM EL 407

.1

.9

O

.0

.2

O

.0

.2

O

.6

.0

O

.0

.0

O

.0

.0

O

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

D Q

C R

E V

IE

W

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

B

D

IR

K S

P

.E

S T

L

O U

IS

D

IS

T

R

IC

T

E N

G

IN

E E

R S

U .S

A

R M

Y C

O R

P S

O F

IN

L

A N

D N

A V

IG

A

T

IO

N D

E S

IG

N

C E

N T

E R

F O

U N

D A

T

IO

N P

R E

P A

R A

T

CG314

P

P E

R M

IS

S

IS

S

IP

P

I R

IV

E

R

N A

V

IG

A T

IO

N

E C

O S

Y S

T E

M S

U S

T A

IN

A

B

IL

IT

Y

P R

O J E

C T

N

E S

P

L O

C K

A N

D D

A M

N O

L O

C K

F O

U N

D A

T

IO

N A

N D

S

IT

E P

R E

P A

R A

T

IO

N

A

C O

M B

S

P .E

B S

A Y

L O

R

K D

O R

S C

H P

S I

D

A U

G U

S T

W

P

-2

-R -A

W P

-X

X -X

-X X

L

O U

IS

D

IS

T

R

IC

T

S P

R U

C E

S T

R E

E T

S T

L

O U

IS

M

IS

S O

U R

I

B

M R

L D

L o c k s a n d

D a m

W in fi e ld

\B

M R

L D

L o c k

F o u n d a ti o n a n d S it e P re p a ra ti o n

\B

M

R L

D

-C

A D

S

H E

E T

-2

-0

-1

-C -C

G

S

H T

.d g n

D S

A

E C

S c re e n F u ll

S iz e .d s c ri p t

P D

A

E C p d f.

p lt c fg

:2

:2

P

M

/1 /2

C R

O S

S S

E C

T

IO

N

CROSS SECTIONS - FOUNDATION PREPARATION

6+00

-300 -280 -260 -240 -220 -200 -180 -160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 160 180 200 220 240

340 340

360 360

380 380

400 400

420 420

440 440

460 460

480 480

RIVER BOTTOM

AVERAGE SURVEYED

SEPARATOR WALL

EXCAVATION GRADE

EXISTING CONCRETE APRON

INITIAL RIPRAP BACKFILL

RIPRAP BERM

EXISTING COMBI - WALL

.7

.7

O

.0

.2

O

.0

.2

O

.6

.0

O

.0

.0

O

.0

.0

O

6+50

-300 -280 -260 -240 -220 -200 -180 -160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 160 180 200 220 240

360 360

380 380

400 400

420 420

440 440

460 460

480 480

RIVER BOTTOM

AVERAGE SURVEYED

SEPARATOR WALL

EXCAVATION GRADE

EXISTING CONCRETE APRON

INITIAL RIPRAP BACKFILL

RIPRAP BERM

EXISTING COMBI - WALL

.2

.7

O

.0

.2

O

.0

.2

O

.6

.0

O

.0

.0

O

.0

.0

O

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

D Q

C R

E V

IE

W

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

B

D

IR

K S

P

.E

S T

L

O U

IS

D

IS

T

R

IC

T

E N

G

IN

E E

R S

U .S

A

R M

Y C

O R

P S

O F

IN

L

A N

D N

A V

IG

A

T

IO

N D

E S

IG

N

C E

N T

E R

F O

U N

D A

T

IO

N P

R E

P A

R A

T

CG315

P

P E

R M

IS

S

IS

S

IP

P

I R

IV

E

R

N A

V

IG

A T

IO

N

E C

O S

Y S

T E

M S

U S

T A

IN

A

B

IL

IT

Y

P R

O J E

C T

N

E S

P

L O

C K

A N

D D

A M

N O

L O

C K

F O

U N

D A

T

IO

N A

N D

S

IT

E P

R E

P A

R A

T

IO

N

A

C O

M B

S

P .E

B S

A Y

L O

R

K D

O R

S C

H P

S I

D

A U

G U

S T

W

P

-2

-R -A

W P

-X

X -X

-X X

L

O U

IS

D

IS

T

R

IC

T

S P

R U

C E

S T

R E

E T

S T

L

O U

IS

M

IS

S O

U R

I

B

M R

L D

L o c k s a n d

D a m

W in fi e ld

\B

M R

L D

L o c k

F o u n d a ti o n a n d S it e P re p a ra ti o n

\B

M

R L

D

-C

A D

S

H E

E T

-2

-0

-1

-C -C

G

S

H T

.d g n

D S

A

E C

S c re e n F u ll

S iz e .d s c ri p t

P D

A

E C p d f.

p lt c fg

:2

:3

P

M

/1 /2

C R

O S

S S

E C

T

IO

N

CROSS SECTIONS - FOUNDATION PREPARATION

7+00

-300 -280 -260 -240 -220 -200 -180 -160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 160 180 200 220 240

360 360

380 380

400 400

420 420

440 440

460 460

480 480

RIVER BOTTOM

AVERAGE SURVEYED

SEPARATOR WALL

EXCAVATION GRADE

EXISTING CONCRETE APRON

INITIAL RIPRAP BACKFILL

RIPRAP BERM

.5

.0

O

.0

.2

O

.0

.2

O

.6

.0

O

.0

.0

O

.0

.0

O

7+50

-300 -280 -260 -240 -220 -200 -180 -160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 160 180 200 220 240

360 360

380 380

400 400

420 420

440 440

460 460

480 480

RIVER BOTTOM

AVERAGE SURVEYED

SEPARATOR WALL

EXCAVATION GRADE

INITIAL RIPRAP BACKFILL

RIPRAP BERM

STA. 7+50, END R5000 RIPRAP BERM SECTION. BEGIN B-STONE RIPRAP BERM SECTION

.6

.9

O

.6

.0

O

.0

.0

O

.0

.0

O

DO NOT FILL OVER EXISTING 2200LB RIPRAP

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

D Q

C R

E V

IE

W

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

B

D

IR

K S

P

.E

S T

L

O U

IS

D

IS

T

R

IC

T

E N

G

IN

E E

R S

U .S

A

R M

Y C

O R

P S

O F

IN

L

A N

D N

A V

IG

A

T

IO

N D

E S

IG

N

C E

N T

E R

F O

U N

D A

T

IO

N P

R E

P A

R A

T

CG316

P

P E

R M

IS

S

IS

S

IP

P

I R

IV

E

R

N A

V

IG

A T

IO

N

E C

O S

Y S

T E

M S

U S

T A

IN

A

B

IL

IT

Y

P R

O J E

C T

N

E S

P

L O

C K

A N

D D

A M

N O

L O

C K

F O

U N

D A

T

IO

N A

N D

S

IT

E P

R E

P A

R A

T

IO

N

A

C O

M B

S

P .E

B S

A Y

L O

R

K D

O R

S C

H P

S I

D

A U

G U

S T

W

P

-2

-R -A

W P

-X

X -X

-X X

L

O U

IS

D

IS

T

R

IC

T

S P

R U

C E

S T

R E

E T

S T

L

O U

IS

M

IS

S O

U R

I

B

M R

L D

L o c k s a n d

D a m

W in fi e ld

\B

M R

L D

L o c k

F o u n d a ti o n a n d S it e P re p a ra ti o n

\B

M

R L

D

-C

A D

S

H E

E T

-2

-0

-1

-C -C

G

S

H T

.d g n

D S

A

E C

S c re e n F u ll

S iz e .d s c ri p t

P D

A

E C p d f.

p lt c fg

:2

:4

P

M

/1 /2

C R

O S

S S

E C

T

IO

N

CROSS SECTIONS - FOUNDATION PREPARATION

8+00

-300 -280 -260 -240 -220 -200 -180 -160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 160 180 200 220 240

360 360

380 380

400 400

420 420

440 440

460 460

480 480

RIVER BOTTOM

AVERAGE SURVEYED

SEPARATOR WALL

EXCAVATION GRADE

RIPRAP BERM

.8

.4

O

.6

.0

O

.0

.0

O

.0

.0

O

8+50

-300 -280 -260 -240 -220 -200 -180 -160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 160 180 200 220 240

360 360

380 380

400 400

420 420

440 440

460 460

480 480

RIVER BOTTOM

AVERAGE SURVEYED

SEPARATOR WALL

RIPRAP BERM

EL 407

SAND FILL GRADE

.3

.6

O

.6

.0

O

.0

.0

O

.0

.0

O

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

D Q

C R

E V

IE

W

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

B

D

IR

K S

P

.E

S T

L

O U

IS

D

IS

T

R

IC

T

E N

G

IN

E E

R S

U .S

A

R M

Y C

O R

P S

O F

IN

L

A N

D N

A V

IG

A

T

IO

N D

E S

IG

N

C E

N T

E R

F O

U N

D A

T

IO

N P

R E

P A

R A

T

CG317

P

P E

R M

IS

S

IS

S

IP

P

I R

IV

E

R

N A

V

IG

A T

IO

N

E C

O S

Y S

T E

M S

U S

T A

IN

A

B

IL

IT

Y

P R

O J E

C T

N

E S

P

L O

C K

A N

D D

A M

N O

L O

C K

F O

U N

D A

T

IO

N A

N D

S

IT

E P

R E

P A

R A

T

IO

N

A

C O

M B

S

P .E

B S

A Y

L O

R

K D

O R

S C

H P

S I

D

A U

G U

S T

W

P

-2

-R -A

W P

-X

X -X

-X X

L

O U

IS

D

IS

T

R

IC

T

S P

R U

C E

S T

R E

E T

S T

L

O U

IS

M

IS

S O

U R

I

B

M R

L D

L o c k s a n d

D a m

W in fi e ld

\B

M R

L D

L o c k

F o u n d a ti o n a n d S it e P re p a ra ti o n

\B

M

R L

D

-C

A D

S

H E

E T

-2

-0

-1

-C -C

G

S

H T

.d g n

D S

A

E C

S c re e n F u ll

S iz e .d s c ri p t

P D

A

E C p d f.

p lt c fg

:2

:5

P

M

/1 /2

C R

O S

S S

E C

T

IO

N

CROSS SECTIONS - FOUNDATION PREPARATION

9+00

-300 -280 -260 -240 -220 -200 -180 -160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 160 180 200 220 240

360 360

380 380

400 400

420 420

440 440

460 460

480 480

RIVER BOTTOM

AVERAGE SURVEYED

SEPARATOR WALL

RIPRAP BERM

EL 407

SAND FILL GRADE

.1

.8

O

.6

.0

O

.0

.0

O

.0

.0

O

9+50

-300 -280 -260 -240 -220 -200 -180 -160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 160 180 200 220 240

360 360

380 380

400 400

420 420

440 440

460 460

480 480

RIVER BOTTOM

AVERAGE SURVEYED

SEPARATOR WALL

RIPRAP BERM

.0

.0

O

.6

.0

O

.0

.0

O

MINIMUM RIPRAP SECTION

EXCAVATE AS REQUIRED TO INSTALL

.0

.0

O

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

D Q

C R

E V

IE

W

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

B

D

IR

K S

P

.E

S T

L

O U

IS

D

IS

T

R

IC

T

E N

G

IN

E E

R S

U .S

A

R M

Y C

O R

P S

O F

IN

L

A N

D N

A V

IG

A

T

IO

N D

E S

IG

N

C E

N T

E R

F O

U N

D A

T

IO

N P

R E

P A

R A

T

CG318

P

P E

R M

IS

S

IS

S

IP

P

I R

IV

E

R

N A

V

IG

A T

IO

N

E C

O S

Y S

T E

M S

U S

T A

IN

A

B

IL

IT

Y

P R

O J E

C T

N

E S

P

L O

C K

A N

D D

A M

N O

L O

C K

F O

U N

D A

T

IO

N A

N D

S

IT

E P

R E

P A

R A

T

IO

N

A

C O

M B

S

P .E

B S

A Y

L O

R

K D

O R

S C

H P

S I

D

A U

G U

S T

W

P

-2

-R -A

W P

-X

X -X

-X X

L

O U

IS

D

IS

T

R

IC

T

S P

R U

C E

S T

R E

E T

S T

L

O U

IS

M

IS

S O

U R

I

B

M R

L D

L o c k s a n d

D a m

W in fi e ld

\B

M R

L D

L o c k

F o u n d a ti o n a n d S it e P re p a ra ti o n

\B

M

R L

D

-C

A D

S

H E

E T

-2

-0

-1

-C -C

G

S

H T

.d g n

D S

A

E C

S c re e n F u ll

S iz e .d s c ri p t

P D

A

E C p d f.

p lt c fg

:2

:5

P

M

/1 /2

C R

O S

S S

E C

T

IO

N

CROSS SECTIONS - FOUNDATION PREPARATION

10+00

-300 -280 -260 -240 -220 -200 -180 -160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 160 180 200 220 240

360 360

380 380

400 400

420 420

440 440

460 460

480 480

RIVER BOTTOM

AVERAGE SURVEYED

SEPARATOR WALL

RIPRAP BERM

EL 407

EXCAVATE AS REQUIRED TO INSTALL MINIMIN RIPRAP SECTION

.6

.0

O

.0

.1

O

.0

.0

O

.3

.0

O

.0

.0

O

10+50

-300 -280 -260 -240 -220 -200 -180 -160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 160 180 200 220 240

360 360

380 380

400 400

420 420

440 440

460 460

480 480

RIVER BOTTOM

AVERAGE SURVEYED

SEPARATOR WALL

RIPRAP BERM

EL 407

EXCAVATE AS REQUIRED TO INSTALL MINIMUM RIPRAP SECTION

.1

.9

O

.6

.0

O

.3

.0

O

.0

.0

O

.0

.0

O

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

D Q

C R

E V

IE

W

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

B

D

IR

K S

P

.E

S T

L

O U

IS

D

IS

T

R

IC

T

E N

G

IN

E E

R S

U .S

A

R M

Y C

O R

P S

O F

IN

L

A N

D N

A V

IG

A

T

IO

N D

E S

IG

N

C E

N T

E R

F O

U N

D A

T

IO

N P

R E

P A

R A

T

CG319

P

P E

R M

IS

S

IS

S

IP

P

I R

IV

E

R

N A

V

IG

A T

IO

N

E C

O S

Y S

T E

M S

U S

T A

IN

A

B

IL

IT

Y

P R

O J E

C T

N

E S

P

L O

C K

A N

D D

A M

N O

L O

C K

F O

U N

D A

T

IO

N A

N D

S

IT

E P

R E

P A

R A

T

IO

N

A

C O

M B

S

P .E

B S

A Y

L O

R

K D

O R

S C

H P

S I

D

A U

G U

S T

W

P

-2

-R -A

W P

-X

X -X

-X X

L

O U

IS

D

IS

T

R

IC

T

S P

R U

C E

S T

R E

E T

S T

L

O U

IS

M

IS

S O

U R

I

B

M R

L D

L o c k s a n d

D a m

W in fi e ld

\B

M R

L D

L o c k

F o u n d a ti o n a n d S it e P re p a ra ti o n

\B

M

R L

D

-C

A D

S

H E

E T

-2

-0

-1

-C -C

G

S

H T

.d g n

D S

A

E C

S c re e n F u ll

S iz e .d s c ri p t

P D

A

E C p d f.

p lt c fg

:2

:5

P

M

/1 /2

C R

O S

S S

E C

T

IO

N

CROSS SECTIONS - FOUNDATION PREPARATION

11+00

-300 -280 -260 -240 -220 -200 -180 -160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 160 180 200 220 240

360 360

380 380

400 400

420 420

440 440

460 460

480 480

RIVER BOTTOM

AVERAGE SURVEYED

SEPARATOR WALL

RIPRAP BERM

.7

.7

O

.1

.0

O

.0

.0

O

.0

.0

O

11+50

-300 -280 -260 -240 -220 -200 -180 -160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 160 180 200 220 240

360 360

380 380

400 400

420 420

440 440

460 460

480 480

RIVER BOTTOM

AVERAGE SURVEYED

.0

.6

O

.0

.0

O

.0

.0

O

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

D Q

C R

E V

IE

W

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

B

D

IR

K S

P

.E

S T

L

O U

IS

D

IS

T

R

IC

T

E N

G

IN

E E

R S

U .S

A

R M

Y C

O R

P S

O F

IN

L

A N

D N

A V

IG

A

T

IO

N D

E S

IG

N

C E

N T

E R

F O

U N

D A

T

IO

N P

R E

P A

R A

T

CG320

P

P E

R M

IS

S

IS

S

IP

P

I R

IV

E

R

N A

V

IG

A T

IO

N

E C

O S

Y S

T E

M S

U S

T A

IN

A

B

IL

IT

Y

P R

O J E

C T

N

E S

P

L O

C K

A N

D D

A M

N O

L O

C K

F O

U N

D A

T

IO

N A

N D

S

IT

E P

R E

P A

R A

T

IO

N

A

C O

M B

S

P .E

B S

A Y

L O

R

K D

O R

S C

H P

S I

D

A U

G U

S T

W

P

-2

-R -A

W P

-X

X -X

-X X

L

O U

IS

D

IS

T

R

IC

T

S P

R U

C E

S T

R E

E T

S T

L

O U

IS

M

IS

S O

U R

I

B

M R

L D

L o c k s a n d

D a m

W in fi e ld

\B

M R

L D

L o c k

F o u n d a ti o n a n d S it e P re p a ra ti o n

\B

M

R L

D

-C

A D

S

H E

E T

-2

-0

-1

-C -C

G

S

H T

.d g n

D S

A

E C

S c re e n F u ll

S iz e .d s c ri p t

P D

A

E C p d f.

p lt c fg

:2

:0

P

M

/1 /2

C R

O S

S S

E C

T

IO

N

CROSS SECTIONS - FOUNDATION PREPARATION

12+00

-300 -280 -260 -240 -220 -200 -180 -160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 160 180 200 220 240

360 360

380 380

400 400

420 420

440 440

460 460

480 480

RIVER BOTTOM

AVERAGE SURVEYED

.0

.0

O

.0

.0

O

.0

.0

O

12+50

-300 -280 -260 -240 -220 -200 -180 -160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 160 180 200 220 240

360 360

380 380

400 400

420 420

440 440

460 460

480 480

RIVER BOTTOM

AVERAGE SURVEYED

.0

.0

O

.0

.0

O

.0

.0

O

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

D Q

C R

E V

IE

W

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

B

D

IR

K S

P

.E

S T

L

O U

IS

D

IS

T

R

IC

T

E N

G

IN

E E

R S

U .S

A

R M

Y C

O R

P S

O F

IN

L

A N

D N

A V

IG

A

T

IO

N D

E S

IG

N

C E

N T

E R

F O

U N

D A

T

IO

N P

R E

P A

R A

T

CG321

P

P E

R M

IS

S

IS

S

IP

P

I R

IV

E

R

N A

V

IG

A T

IO

N

E C

O S

Y S

T E

M S

U S

T A

IN

A

B

IL

IT

Y

P R

O J E

C T

N

E S

P

L O

C K

A N

D D

A M

N O

L O

C K

F O

U N

D A

T

IO

N A

N D

S

IT

E P

R E

P A

R A

T

IO

N

A

C O

M B

S

P .E

B S

A Y

L O

R

K D

O R

S C

H P

S I

D

A U

G U

S T

W

P

-2

-R -A

W P

-X

X -X

-X X

L

O U

IS

D

IS

T

R

IC

T

S P

R U

C E

S T

R E

E T

S T

L

O U

IS

M

IS

S O

U R

I

B

M R

L D

L o c k s a n d

D a m

W in fi e ld

\B

M R

L D

L o c k

F o u n d a ti o n a n d S it e P re p a ra ti o n

\B

M

R L

D

-C

A D

S

H E

E T

-2

-0

-1

-C -C

G

S

H T

.d g n

D S

A

E C

S c re e n F u ll

S iz e .d s c ri p t

P D

A

E C p d f.

p lt c fg

:2

:0

P

M

/1 /2

C R

O S

S S

E C

T

IO

N

CROSS SECTIONS - FOUNDATION PREPARATION

13+00

-300 -280 -260 -240 -220 -200 -180 -160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 160 180 200 220 240

360 360

380 380

400 400

420 420

440 440

460 460

480 480

RIVER BOTTOM

AVERAGE SURVEYED

.0

.0

O

.0

.0

O

.0

.0

O

13+50

-300 -280 -260 -240 -220 -200 -180 -160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 160 180 200 220 240

360 360

380 380

400 400

420 420

440 440

460 460

480 480

RIVER BOTTOM

AVERAGE SURVEYED

.0

.0

O

.0

.0

O

.0

.0

O

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

D Q

C R

E V

IE

W

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

B

D

IR

K S

P

.E

S T

L

O U

IS

D

IS

T

R

IC

T

E N

G

IN

E E

R S

U .S

A

R M

Y C

O R

P S

O F

IN

L

A N

D N

A V

IG

A

T

IO

N D

E S

IG

N

C E

N T

E R

F O

U N

D A

T

IO

N P

R E

P A

R A

T

CG322

P

P E

R M

IS

S

IS

S

IP

P

I R

IV

E

R

N A

V

IG

A T

IO

N

E C

O S

Y S

T E

M S

U S

T A

IN

A

B

IL

IT

Y

P R

O J E

C T

N

E S

P

L O

C K

A N

D D

A M

N O

L O

C K

F O

U N

D A

T

IO

N A

N D

S

IT

E P

R E

P A

R A

T

IO

N

A

C O

M B

S

P .E

B S

A Y

L O

R

K D

O R

S C

H P

S I

D

A U

G U

S T

W

P

-2

-R -A

W P

-X

X -X

-X X

L

O U

IS

D

IS

T

R

IC

T

S P

R U

C E

S T

R E

E T

S T

L

O U

IS

M

IS

S O

U R

I

B

M R

L D

L o c k s a n d

D a m

W in fi e ld

\B

M R

L D

L o c k

F o u n d a ti o n a n d S it e P re p a ra ti o n

\B

M

R L

D

-C

A D

S

H E

E T

-2

-0

-1

-C -C

G

S

H T

.d g n

D S

A

E C

S c re e n F u ll

S iz e .d s c ri p t

P D

A

E C p d f.

p lt c fg

:2

:0

P

M

/1 /2

C R

O S

S S

E C

T

IO

N

CROSS SECTIONS - FOUNDATION PREPARATION

14+00

-300 -280 -260 -240 -220 -200 -180 -160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 160 180 200 220 240

360 360

380 380

400 400

420 420

440 440

460 460

480 480

RIVER BOTTOM

AVERAGE SURVEYED

.0

.0

O

.0

.0

O

.0

.0

O

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

D Q

C R

E V

IE

W

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

B

D

IR

K S

P

.E

S T

L

O U

IS

D

IS

T

R

IC

T

E N

G

IN

E E

R S

U .S

A

R M

Y C

O R

P S

O F

IN

L

A N

D N

A V

IG

A

T

IO

N D

E S

IG

N

C E

N T

E R

F O

U N

D A

T

IO

N P

R E

P A

R A

T

CG323

P

P E

R M

IS

S

IS

S

IP

P

I R

IV

E

R

N A

V

IG

A T

IO

N

E C

O S

Y S

T E

M S

U S

T A

IN

A

B

IL

IT

Y

P R

O J E

C T

N

E S

P

L O

C K

A N

D D

A M

N O

L O

C K

F O

U N

D A

T

IO

N A

N D

S

IT

E P

R E

P A

R A

T

IO

N

A

C O

M B

S

P .E

B S

A Y

L O

R

K D

O R

S C

H P

S I

D

A U

G U

S T

W

P

-2

-R -A

W P

-X

X -X

-X X

L

O U

IS

D

IS

T

R

IC

T

S P

R U

C E

S T

R E

E T

S T

L

O U

IS

M

IS

S O

U R

I

B

M R

L D

L o c k s a n d

D a m

W in fi e ld

\B

M R

L D

L o c k

F o u n d a ti o n a n d S it e P re p a ra ti o n

\B

M

R L

D

-C

A D

S

H E

E T

-2

-0

-1

-C -C

G

S

H T

.d g n

D S

A

E C

S c re e n F u ll

S iz e .d s c ri p t

P D

A

E C p d f.

p lt c fg

:2

:0

P

M

/1 /2

C R

O S

S S

E C

T

IO

N

20'

95'

25'

NTS

TYPICAL SECTION - FOUNDATION PREPARATION LOCK CENTERLINE (STA. 1+04 TO 14+04.50)

H1

NTS

TYPICAL SECTION - RIPRAP EXCAVATION (STA. 1+46.00 TO 6+97.00) AND SEPARATOR WALL (STA. 1+46.00 TO 11+06)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

D Q

C R

E V

IE

W

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

B

D

IR

K S

P

.E

S T

L

O U

IS

D

IS

T

R

IC

T

E N

G

IN

E E

R S

U .S

A

R M

Y C

O R

P S

O F

IN

L

A N

D N

A V

IG

A

T

IO

N D

E S

IG

N

C E

N T

E R

TOP EL 433.6' NAVD88

SEPARATOR WALL

EMBEDMENT DEPTH 20'

EXCAVATION PHASE 2

EXISTING RIPRAP

EXCAVATION PHASE 1

SEPARATOR WALL

BASELINE

LOCK

CENTERLINE

RIVERWALL

CENTERLINE

TIMBER CRIBBING, DO NOT DISTURB

EXISTING INTERMEDIATE WALL

RIVER BOTTOM

AVERAGE SURVEYED

RIPRAP DISPOSAL BERM

ALLUVIUM

RIPRAP BERM EL 373'

MAX

2H :1V

2H:1V

2H :1V

3 WITHIN 5' OF CRIBBING

DO NOT EXCAVATE

TO REMAIN

TIMBER CRIBBING

EXISTING INTERMEDIATE WALL

LOCK

CENTERLINE

RIVERWALL

CENTERLINE

SEPARATOR WALL

BASELINE

RIPRAP BERM EL 399.6'

APPROXIMATELY 30' WIDE AT EL 373'

REQUIRED RIPRAP BERM

MIN EL 407.0

DREDGE SAND FILL

2H :1V

DISPOSAL BERM

EXCAVATED RIPRAP

25' 70'

30'

10'

MIN TW 418.1

SCOUR PROTECTION

EXISTING RIPRAP

2H :1V

F O

U N

D A

T

IO

N P

R E

P A

R A

T

CG401

P

P E

R M

IS

S

IS

S

IP

P

I R

IV

E

R

N A

V

IG

A T

IO

N

E C

O S

Y S

T E

M S

U S

T A

IN

A

B

IL

IT

Y

P R

O J E

C T

N

E S

P

L O

C K

A N

D D

A M

N O

L O

C K

F O

U N

D A

T

IO

N A

N D

S

IT

E P

R E

P A

R A

T

IO

N

A

C O

M B

S

P .E

B S

A Y

L O

R

K D

O R

S C

H P

S I

D

A U

G U

S T

W

P

-2

-R -A

W P

-X

X -X

-X X

L

O U

IS

D

IS

T

R

IC

T

S P

R U

C E

S T

R E

E T

S T

L

O U

IS

M

IS

S O

U R

I

B

M R

L D

L o c k s a n d

D a m

W in fi e ld

\B

M R

L D

L o c k

F o u n d a ti o n a n d S it e P re p a ra ti o n

\B

M

R L

D

-C

A D

S

H E

E T

-2

-0

-1

-C -C

G

S

H T

.d g n

D S

A

E C

S c re e n F u ll

S iz e .d s c ri p t

P D

A

E C p d f.

p lt c fg

:2

:1

P

M

/1 /2

T Y

P

IC

A L

S E

C T

IO

N

S

SCOUR PROTECTION BERM.

10. 3' THICK C-STONE. PLACE BETWEEN NATURAL RIVER BOTTOM AND RIPRAP

B-STONE STA. 7+50 TO 11+06 MIN. 6.25' THICK.

R5000 STONE STA. 1+04 TO 7+50. GEOMETRY PER CROSS SECTIONS.

9. RIPRAP SCOUR PROTECTION BERM. SEE SECTION 31 37 00 STONE PROTECTION.

8. RIPRAP BACKFILL. R5000 STONE. SEE SECTION 31 37 00 STONE PROTECTION.

7. DREDGED SAND BACKFILL. SEE SECTION 35 20 23.

6. INITIAL RIPRAP BACKFILL AGAINST SEPARATOR WALL. 6' THICK B-STONE.

5. SEPARATOR WALL TO BE INSTALLED AS EXCAVATION PROGRESSES.

2. SEE SECTIONS 35 20 23 FOR BACKFILL REQUIREMENTS.

SIDE OF THE WALL.

SHALL NOT EXCEED FIVE (5) FEET ABOVE THE TOP ELEVATION OF RIPRAP ON THE OPPOSITE

D. FOR SAND PLACEMENT, EACH SUBSEQUENT LIFT SHALL NOT EXCEED TEN (10) FEET AND

THE OPPOSITE SIDE OF THE WALL.

SHALL NOT EXCEED 5 FEET ABOVE THE TOP ELEVATION OF DREDGED SAND ON

C. FOR RIPRAP PLACEMENT, EACH SUBSEQUENT LIFT SHALL NOT EXCEED TEN (10) FEET AND

TOP ELEVATION OF RIPRAP ON THE OPPOSITE SIDE OF THE WALL.

EXCEED NINE (9) FEET IN HEIGHT AND SHALL NOT EXCEED FIVE (5) FEET ABOVE THE

B. FOLLOWING RIPRAP PLACEMENT, THE FIRST LIFT OF DREDGED SAND SHALL NOT

A. THE FIRST LIFT OF RIPRAP SHALL NOT EXCEED SIX (6) FEET IN HEIGHT.

EXCEEDING THE FOLLOWING REQUIREMENTS.

ALONG THE SEPARATOR WALL. RIPRAP AND DREDGED SAND SHALL BE PLACED IN LIFTS NOT

1. CONTRACTOR SHALL LIMIT THE HEIGHT OF FILL PLACEMENT (RIPRAP OR DREDGED SAND)

BACKFILL NOTES:

PROTECTION BERM ALONG SEPARATOR WALL. SEE SECTION 35 23 20.

4. EXCAVATED MATERIAL DISPOSAL TO BE USED FOR FINAL SCOUR

3. EXCAVATION REQUIRED PRIOR TO SAND BACKFILL. SEE SECTION 35 23 20.

SEE SECTION 35 23 20.

2. EXCAVATION REQUIRED FOR INSTALLATION OF SEPARATOR WALL.

CONTRACTOR EXCAVATION PLAN SUBMITTAL.

1. ALLUVIUM EXCAVATION REQUIRED. SEE SECTION 35 23 20

KEYNOTES:

CIVIL
CG301 - RIPRAP EXCAVATION AND SEPARATOR WALL
CG302 - RIPRAP EXCAVATION AND SEPARATOR WALL
CG303 - RIPRAP EXCAVATION AND SEPARATOR WALL
CG304 - RIPRAP EXCAVATION AND SEPARATOR WALL
CG305 - RIPRAP EXCAVATION AND SEPARATOR WALL
CG306 - RIPRAP EXCAVATION AND SEPARATOR WALL
CG307 - RIPRAP EXCAVATION AND SEPARATOR WALL
CG308 - RIPRAP EXCAVATION AND SEPARATOR WALL
CG309 - FOUNDATION PREPARATION
CG310 - FOUNDATION PREPARATION
CG311 - FOUNDATION PREPARATION
CG312 - FOUNDATION PREPARATION
CG313 - FOUNDATION PREPARATION
CG314 - FOUNDATION PREPARATION
CG315 - FOUNDATION PREPARATION
CG316 - FOUNDATION PREPARATION
CG317 - FOUNDATION PREPARATION
CG318 - FOUNDATION PREPARATION
CG319 - FOUNDATION PREPARATION
CG320 - FOUNDATION PREPARATION
CG321 - FOUNDATION PREPARATION
CG322 - FOUNDATION PREPARATION
CG323 - FOUNDATION PREPARATION
CG401 - FOUNDATION PREPARATION

File details come from the government source that posted it. Updated .