Attachment 1 - Specifications (Amendment 0001 Section 01 22 00).pdf
PDF 12 KB Posted
- Attached to
- CAHOKIA HEIGHTS SANITARY SEWER TRUNKLINE
- Solicitation number
- W912P924B0005
About this file
This document outlines payment terms for various sewer rehabilitation services required under solicitation number W912P924B0005 for the Cahokia Heights Sanitary Sewer Trunkline project. The contractor will be compensated for mobilization and demobilization, traffic control and protection, care of flow, cleaning and televising sewer lines ranging from 18 to 30 inches in diameter, and installing cured-in-place pipe liners in sewer lines ranging from 18 to 30 inches. Payment for each line item will be made at the contract unit price according to linear foot of pipe cleaned, televised or lined. The Army Corps of Engineers Engineering District St Louis is the contracting agency for this project to rehabilitate the Cahokia Heights sanitary sewer system.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 22 00
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.1 MOBILIZATION AND DEMOBILIZATION
1.2 TRAFFIC CONTROL & PROTECTION
1.3 CARE OF FLOW
1.4 CLEAN & TELEVISE 18" SEWER
1.4.1 Measurement
1.4.2 Payment
1.5 CLEAN & TELEVISE 24" SEWER
1.5.1 Measurement
1.5.2 Payment
1.6 CLEAN & TELEVISE 30" SEWER
1.6.1 Measurement
1.6.2 Payment
1.7 INSTALL 18" CIPP LINER
1.7.1 Measurement
1.7.2 Payment
1.8 INSTALL 24" CIPP LINER
1.8.1 Measurement
1.8.2 Payment
1.9 INSTALL 30" CIPPP LINER
1.9.1 Measurement
1.9.2 Payment
PART 2 PRODUCTS
PART 3 EXECUTION
-- End of Section Table of Contents --
SECTION 01 22 00 Page 1
SECTION 01 22 00
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.1 MOBILIZATION AND DEMOBILIZATION
Payment for mobilization and demobilization will be made at the contract job price for "Mobilization and Demobilization", as defined in Contract Clause PAYMENT FOR MOBILIZATION AND DEMOBILIZATION. which price and paymet shall constitute full compensation for providing all plant, labor, material, and equipment and performing all operations necessary for work as specificed and as shown on the drawings.
1.2 TRAFFIC CONTROL & PROTECTION
Payment for traffic control & protection will be made at the contract job price for "Traffic Control & Protection", which price and payment shall constitute full compensation for all costs of the plant, labor, materials and equipment necessary to complete the work as specified and as shown on the drawings.
1.3 CARE OF FLOW
Payment for care of flow will be made at the contract job price for "Care of Flow", which price and payment shall constitute full compensation for all costs of the plant, labor, materials and equipment necessary to complete the work as specified and as shown on the drawings.
1.4 CLEAN & TELEVISE 18" SEWER
1.4.1 Measurement
Measurement for payment shall be measured per linear foot of pipe.
1.4.2 Payment
Payment for clean & televise 18" sewer will be made at the contract unit price per linear foot for "Clean & Televise 18" Sewer", which price and payment shall constitute full compensation for all costs of the plant, labor, materials and equipment necessary to complete the work as specified and as shown on the drawings.
1.5 CLEAN & TELEVISE 24" SEWER
1.5.1 Measurement
Measurement for payment shall be measured per linear foot of pipe.
1.5.2 Payment
Payment for clean & televise 24" sewer will be made at the contract unit price per linear foot for "Clean & Televise 24" Sewer", which price and payment shall constitute full compensation for all costs of the plant, SECTION 01 22 00 Page 2 labor, materials and equipment necessary to complete the work as specified and as shown on the drawings.
1.6 CLEAN & TELEVISE 30" SEWER
1.6.1 Measurement
Measurement for payment shall be measured per linear foot of pipe.
1.6.2 Payment
Payment for clean & televise 30" sewer will be made at the contract unit price per linear foot for "Clean & Televise 30" Sewer", which price and payment shall constitute full compensation for all costs of the plant, labor, materials and equipment necessary to complete the work as specified and as shown on the drawings.
1.7 INSTALL 18" CIPP LINER
1.7.1 Measurement
Measurement for payment shall be measured per linear foot of liner installed.
1.7.2 Payment
Payment for installing 18" CIPP liner will be made at the contract unit price per linear foot of liner for "Install 18" CIPP Liner", which price and payment shall constitute full compensation for all costs of the plant, labor, materials and equipment necessary to complete the work as specified and as shown on the drawings.
1.8 INSTALL 24" CIPP LINER
1.8.1 Measurement
Measurement for payment shall be measured per linear foot of liner installed.
1.8.2 Payment
Payment for installing 24" CIPP liner will be made at the contract unit price per linear foot of liner for "Install 24" CIPP Liner", which price and payment shall constitute full compensation for all costs of the plant, labor, materials and equipment necessary to complete the work as specified and as shown on the drawings.
1.9 INSTALL 30" CIPPP LINER
1.9.1 Measurement
Measurement for payment shall be measured per linear foot of liner installed.
1.9.2 Payment
Payment for installing 30" CIPP liner will be made at the contract unit price per linear foot of liner for "Install 30" CIPP Liner", which price and payment shall constitute full compensation for all costs of the plant, SECTION 01 22 00 Page 3 labor, materials and equipment necessary to complete the work as specified and as shown on the drawings.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
-- End of Section --