Attachment 1 - Specifications (Amendment 0001 Section 01 22 00).pdf

PDF 12 KB Posted

Attached to
CAHOKIA HEIGHTS SANITARY SEWER TRUNKLINE
Solicitation number
W912P924B0005
Issued by

About this file

This document outlines payment terms for various sewer rehabilitation services required under solicitation number W912P924B0005 for the Cahokia Heights Sanitary Sewer Trunkline project. The contractor will be compensated for mobilization and demobilization, traffic control and protection, care of flow, cleaning and televising sewer lines ranging from 18 to 30 inches in diameter, and installing cured-in-place pipe liners in sewer lines ranging from 18 to 30 inches. Payment for each line item will be made at the contract unit price according to linear foot of pipe cleaned, televised or lined. The Army Corps of Engineers Engineering District St Louis is the contracting agency for this project to rehabilitate the Cahokia Heights sanitary sewer system.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 22 00

MEASUREMENT AND PAYMENT

PART 1 GENERAL

1.1 MOBILIZATION AND DEMOBILIZATION

1.2 TRAFFIC CONTROL & PROTECTION

1.3 CARE OF FLOW

1.4 CLEAN & TELEVISE 18" SEWER

1.4.1 Measurement

1.4.2 Payment

1.5 CLEAN & TELEVISE 24" SEWER

1.5.1 Measurement

1.5.2 Payment

1.6 CLEAN & TELEVISE 30" SEWER

1.6.1 Measurement

1.6.2 Payment

1.7 INSTALL 18" CIPP LINER

1.7.1 Measurement

1.7.2 Payment

1.8 INSTALL 24" CIPP LINER

1.8.1 Measurement

1.8.2 Payment

1.9 INSTALL 30" CIPPP LINER

1.9.1 Measurement

1.9.2 Payment

PART 2 PRODUCTS

PART 3 EXECUTION

-- End of Section Table of Contents --

SECTION 01 22 00 Page 1

SECTION 01 22 00

MEASUREMENT AND PAYMENT

PART 1 GENERAL

1.1 MOBILIZATION AND DEMOBILIZATION

Payment for mobilization and demobilization will be made at the contract job price for "Mobilization and Demobilization", as defined in Contract Clause PAYMENT FOR MOBILIZATION AND DEMOBILIZATION. which price and paymet shall constitute full compensation for providing all plant, labor, material, and equipment and performing all operations necessary for work as specificed and as shown on the drawings.

1.2 TRAFFIC CONTROL & PROTECTION

Payment for traffic control & protection will be made at the contract job price for "Traffic Control & Protection", which price and payment shall constitute full compensation for all costs of the plant, labor, materials and equipment necessary to complete the work as specified and as shown on the drawings.

1.3 CARE OF FLOW

Payment for care of flow will be made at the contract job price for "Care of Flow", which price and payment shall constitute full compensation for all costs of the plant, labor, materials and equipment necessary to complete the work as specified and as shown on the drawings.

1.4 CLEAN & TELEVISE 18" SEWER

1.4.1 Measurement

Measurement for payment shall be measured per linear foot of pipe.

1.4.2 Payment

Payment for clean & televise 18" sewer will be made at the contract unit price per linear foot for "Clean & Televise 18" Sewer", which price and payment shall constitute full compensation for all costs of the plant, labor, materials and equipment necessary to complete the work as specified and as shown on the drawings.

1.5 CLEAN & TELEVISE 24" SEWER

1.5.1 Measurement

Measurement for payment shall be measured per linear foot of pipe.

1.5.2 Payment

Payment for clean & televise 24" sewer will be made at the contract unit price per linear foot for "Clean & Televise 24" Sewer", which price and payment shall constitute full compensation for all costs of the plant, SECTION 01 22 00 Page 2 labor, materials and equipment necessary to complete the work as specified and as shown on the drawings.

1.6 CLEAN & TELEVISE 30" SEWER

1.6.1 Measurement

Measurement for payment shall be measured per linear foot of pipe.

1.6.2 Payment

Payment for clean & televise 30" sewer will be made at the contract unit price per linear foot for "Clean & Televise 30" Sewer", which price and payment shall constitute full compensation for all costs of the plant, labor, materials and equipment necessary to complete the work as specified and as shown on the drawings.

1.7 INSTALL 18" CIPP LINER

1.7.1 Measurement

Measurement for payment shall be measured per linear foot of liner installed.

1.7.2 Payment

Payment for installing 18" CIPP liner will be made at the contract unit price per linear foot of liner for "Install 18" CIPP Liner", which price and payment shall constitute full compensation for all costs of the plant, labor, materials and equipment necessary to complete the work as specified and as shown on the drawings.

1.8 INSTALL 24" CIPP LINER

1.8.1 Measurement

Measurement for payment shall be measured per linear foot of liner installed.

1.8.2 Payment

Payment for installing 24" CIPP liner will be made at the contract unit price per linear foot of liner for "Install 24" CIPP Liner", which price and payment shall constitute full compensation for all costs of the plant, labor, materials and equipment necessary to complete the work as specified and as shown on the drawings.

1.9 INSTALL 30" CIPPP LINER

1.9.1 Measurement

Measurement for payment shall be measured per linear foot of liner installed.

1.9.2 Payment

Payment for installing 30" CIPP liner will be made at the contract unit price per linear foot of liner for "Install 30" CIPP Liner", which price and payment shall constitute full compensation for all costs of the plant, SECTION 01 22 00 Page 3 labor, materials and equipment necessary to complete the work as specified and as shown on the drawings.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

-- End of Section --