A21_Amended Solicitation-Final.pdf

PDF 424 KB Posted

Attached to
Solar Array-Supply and Installation Federal contract opportunity
Solicitation number
W912P923R0004
Issued by
Department of the Army Corps of Engineers Engineering District St Louis

View the file

Other files for this federal contract opportunity

Other files attached to Solar Array-Supply and Installation, newest first.
File Type Posted
A02_Appendix C HighLowElectricBills22.pdf PDF
A02_Appendix A.pdf PDF
A02_Appendix B.pdf PDF
A21_Solicitation Updated-Final.pdf PDF
A02_Appendix C HighLowElectricBills22.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W81C8X22225091

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Amendment is needed to fill-in blanks left in clause 52.212-2 Evaluation-Commercial Products and Commercial Services; Site visit is strongly encouraged; Q&A added to solicitation. Response date is extended to 10:00 a.m. 4/28/2023.

1. CONTRACT ID CODE PAGE OF PAGES

1 8

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 24-Apr-2023

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P923R0004

X 9B. DATED (SEE ITEM 11)

05-Apr-2023

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

24-Apr-2023

CODE

CONTRACTING DIVISION

US ARMY ENGR DIST ST LOUIS

1222 SPRUCE STREET, RM 4.207

ST LOUIS MO 63103-2833

W912P9 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P923R0004

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

QUESTIONS AND ANSWERS

Q & A

Q: Does the bid need to include a full plan set or just a preliminary design?

A: A full set of plans is required

Q: Does it need to be 3 phase or single phase? I believe everything in the building is single phase, but I would like to verify this.

A: 3 phase

Q: If the roof doesn't fit a 39kW how much smaller of an array is acceptable or will there be an area to install a ground mount?

A: Contractor should maximize using the space available on the southern portion of the roof and provide the largest kW system possible for the provided area. Panels cannot be ground mounted due to flooding.

Q: Can the electrical be subbed out to a master electrician? We have a preferred company we typically sub the electrical to.

A: Electrical can be subbed

Q: Is there a preference in brand for equipment?

A: No preference on brand as long as equipment supplied and installed meets or exceeds requirements in the

SOW

Q: What was the incumbent amount for the previous contract holder?

A: This is a new requirement.

Q: Is there a setback for the roof? Some places require 3' setbacks on eaves and rakes. I looked through the documents and don't see anything, although I could have overlooked it.

A: A 36-inch pathway must be available spanning from the bottom roof edge to the ridge and a 36-inch setback on both sides of ridge.

Q: Do you know if there needs to be a setback?

A: A 36-inch pathway must be available spanning from the bottom roof edge to the ridge and a 36-inch setback on both sides of ridge.

Q: The high bill/low bill attachment does not seem to be working... are you able to reupload it for viewing?

A: Attached

Q: Do you have requirements for setbacks on the roof?

A: A 36-inch pathway must be available spanning from the bottom roof edge to the ridge and a 36-inch setback on both sides of ridge.

Q: Where do we submit our bid for this solar project contract?

A: Proposals should be emailed: Elena.C.Coleman@usace.army.mil

Q: Do we email our docs to you or is there some sort of portal we upload to?

A: Proposals should be emailed: Elena.C.Coleman@usace.army.mil

Q: Are there any other electrical service details you can provide other than it being 3 phase? ie. Transformer kVA rating, service voltage, main service amperage?

A: Transformer 45 KVA, service voltage 480 3 phase, main panel 150-amp 3 phase

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 26-Apr-2023 10:00 AM to 28-Apr-2023 10:00 AM.

TABLE OF CONTENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Appendix C 27-JUL-2022 Attachment 2 Appendix B 27-JUL-2022 Attachment 3 Appendix A 03-OCT-2022 to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Appendix A 03-OCT-2022 Attachment 2 Appendix B 27-JUL-2022 Attachment 3 Appendix C 27-JUL-2022

The following have been modified:

SPECIFICATIONS

Solar Specifications Kaskaskia River Project Administration Office

The US Army Corps of Engineers, Kaskaskia River Project, has a requirement for a Solar PV (Photovoltaic) array system and installation at the Administration Office. This is a request for supply and installation that should meet or exceed the following specifications.

1. SUPPLY AND INSTALLATION OF SOLAR ARRAY

1.1. GENERAL. The contractor shall bid this scope of work as a whole. The following items are meant to clarify the scope of work, not wholly define it. The Contractor is to construct the Solar PV System to the capacity of the south facing roof size capability. The end result of the bidder’s proposal shall include dimensions of the array, basic racking structure array specifications, quantity and type of solar modules, quantity and type and location of solar inverters, and be a fully operational, utility approved and connected, roof mounted, photovoltaic solar array system no greater than 40 kilowatts that will offset the current average energy consumption at the Kaskaskia River Project Administration Office. (See Appendix 1 for current usage report)

1.1.1 SAFETY. All equipment used and work performed shall be in accordance with safety requirements set forth in Corps of Engineers Manual, EM 385-1-1 entitled, "Safety and Health Requirements Manual" July 2014, and all other current revisions. Copies of the Safety Manual are available on the Corps of Engineers St. Louis district website. Any unsafe work and/or actions will be stopped immediately. All equipment or materials found not to be in conformity with the requirements of EM 385-1-1 shall be removed from Government property immediately.

1.1.2. WORK PERIOD. Work listed herein shall start within thirty (30) calendar days after the award of this purchase order and shall be finished within one hundred twenty days (120) after the work begins. Normal working days for the contractor shall be Monday through Friday (0700- 1630), except Federal Holidays.

1.1.3. The contractor shall supply all labor, equipment, and materials for any excavating and/or groundwork needed for site preparations in the area designated by the Government for the solar array. The contractor shall submit a design for the photovoltaic system along with the proposal indicating all materials and locations to be installed. The contractor shall install all materials in accordance with manufacturer’s recommendations for the solar array support racking system honoring the roofing manufacturers warranty. The contractor shall be responsible for and repair any damage to the grounds and structures caused by the contractor or sub-contractor during the performance of the project. The Kaskaskia River Project Administration Office was constructed in 2017. (See Appendix 2 for approximate location)

1.1.4. The contractor is required to coordinate directly with the Egyptian Electric Cooperative, Inc and assure adherence to all standards and meet all requirements in accordance with Cooperative Policies when tying into and connecting to existing electrical boxes. Contact information:

Egyptian Electric Cooperative, Inc., 1732 Finney Rd, Murphysboro, IL 62966 Phone: (800) 606-

1.1.5. The contractor shall be responsible for the conditions of the job site, including safety of all person and property during performance of the work. The contractor shall provide signs, barriers, and barricades to provide a safe working area. The contractor shall at all times keep the premises free from accumulation of waste material and rubbish caused by his work, or his subcontractors.

At the completion of work, the contractor shall thoroughly clean the work site.

1.1.6. All debris, rubbish, and waste material shall be removed from the property at the contractor’s expense. All waste shall either be recycled or sent to a licensed landfill. The contractor shall provide manifests to document proper disposal.

1.1.7. The contractor shall make no changes or deviate from the contractor supplied and Government approved design of this project. In the case where a change is required, the contractor will notify the Contracting Officer of the requirement and will not proceed with the change until such time as a Modification to the contract is issued.

1.2 SITE VISIT. All potential bidders are strongly encouraged to attend the onsite visit of the work area on Tuesday, August 30th, 2022, at 1 PM CST at the Kaskaskia River Project Office, 4800 Lock and Dam Road Modoc, Illinois.

2. GOVERNMENT OCCUPANCY REQUIREMENTS

2.1 Partial Government Occupancy: Government will occupy the premises during the entire construction period, with the exception of the areas under construction. Cooperation will be required during construction operations to minimize conflicts and facilitate Government usage. The contractor shall perform the work so as not to interfere with Government’s operations and maintain access to existing walkways and existing exits, unless otherwise indicated.

3. CONTRACTOR FURNISHED EQUIPMENT, MATERIALS, AND SUPPLIES

3.1 GENERAL. - The Contractor shall furnish and maintain sufficient equipment, labor, and tools suitable to perform the work. All equipment shall be maintained in safe operating conditions in accordance with Corps of Engineers Manual, EM 385-1-1.

3.2 The Contractor shall develop and supply drawings that include dimensions of the array, basic roof racking structure including height of the array and distance between rows, quantity and type of solar modules, and location of solar inverters, and the interconnection point. Drawings shall show the interaction of the AS (automatic transfer switch) in order to establish safe transfer of power to Generator when utility power is lost.

3.3 Vehicles and equipment used in performance of this contract shall be suitable to perform the work described herein. All units shall be equipped with manufacturer's recommended safety protective devices to insure worker and public safety at all times. The contractor shall not drive off paved roads or park on the grass at any time without prior approval of the Contracting Officer’s Representative (COR).

3.4 The Contractor shall Supply a Solar Support Racking System capable of supporting the approved Solar PV System. The Solar Support Racking System shall be complete. No additional charges shall be made to Government for lost or missing parts.

3.5 The Contractor shall supply a Solar PV System Capable of producing the maximum kw under 39 for the allowed space on the administration roof for connection to the existing Kaskaskia River Project Administration Office electric utility service located in the building. The Solar PV System shall be complete, and no additional charges shall be made to Government for lost or missing parts.

3.6 The Contractor shall use the guide below when designing the Solar array system proposal.

a. Photovoltaic Modules:

i. Modules shall be bi-facial silicon crystalline with metal frames. A tier 1 module manufacturer with a proven track record of gigawatts produced, quality, and reliability should be selected for this project

ii. Modules shall be Bloomberg New Energy Finance Tier 1 certified.

b. String Inverters:

i. Inverters shall be string inverters from a top 10 manufacturer.

ii. Rapid Shutdown Units are not required for an installation of this classification per

NEC Year (2011) code.

iii. SMA America STP 480V inverters are specified per the existing site conditions.

c. Racking:

i. A UL Listed, industry leading solar racking system, shall be specified for this project utilizing a standing seam roofing, non-penetrative clamp attachment rated for the uplift of the solar system.

ii. Appropriate fasteners, nuts, bolts, etc. will be used per the specified PV modules support structure manufacturer installation manual and technical notes associated with each application type.

d. Low Voltage Distribution:

i. Contractor shall design, furnish, and install all low voltage distribution equipment, cables, and conduit required to deliver the rated power from the Modules to the Point of Common Coupling.

ii. Point of common coupling (POCC) shall be defined as the location to which the solar electric system is connected to the main utility feed, at a point that is upstream of the main utility service disconnecting means for the facility & downstream of the utility's metering point for the facility's power usage. EFS and its subcontractors shall furnish and install all connection hardware at the defined POCC, and all cabling, raceways, and equipment downstream of the POCC as related to/required by the solar electric system and all applicable codes as defined by the NEC and the local authorities having jurisdiction.

iii. A main service disconnect switch consisting of an OCPD protected, visible break disconnect switch shall be included. This may be a fused knife-blade disconnect switch or main circuit breaker in a switchboard.

iv. All above-ground conduit shall be galvanized rigid conduit.

e. Construction.

i. Contractor shall contract the civil and structural engineering scope of work and self-perform the electrical engineering scope of work.

ii. Contractor shall submit to the customer electronic copies and one full-size hardcopy of solar asset drawings, equipment details, installation, operating, and maintenance instructions, wiring diagrams, parts lists, cable termination sign-off sheets, etc.

iii. Calculations shall be signed and sealed by an engineer currently licensed to practice in the State of Illinois where the project is located and specializing in the Project's type of PV Support Structure design and engineering. Structural and foundation calculations shall include:

f. Structural analysis of structural systems under the applicable wind, seismic, and snow loads with considerations for the complete load path down to the foundation.

g. Reaction loads (for ballast or pile or foundation design) that include forces induced by mounting any additional components or equipment to the PV Module Support Structure including but not limited to inverters, string combiner boxes, panelboards, and convenience-load transformers.

3.7 Prior to commencing work, the Contractor shall submit to the Contracting Officer or his authorized representative a written statement listing all equipment available to perform the services listed in this contract.

3.7.1 The Contracting Officer or his authorized representative may inspect all equipment, supplies and personnel at any time when on Government property. Any individual, crew, equipment or supplies found deficient shall be removed from service and removed from Government property immediately until such time as deficiencies have been corrected and approved by the COR. No such removal will reduce the Contractor's obligation to perform all work required within this contract. This requirement shall not be made the basis of any claim for compensation or damages against the Government or any of its officers or agents.

3.8 If the Contractor is unable to accomplish work in accordance with the requirements of this contract within the times specified, he shall immediately obtain additional equipment necessary to fulfill the requirements of this contract.

3.9 All equipment used to perform work under this contract shall be in good operating and mechanical condition and comply with all requirements of EM 385-1-1.

3.10 Any changes in equipment must be approved by the COR prior to implementation of any such change.

3.11 The U.S. Department of Energy, under the Energy Efficient Program; Federal Energy Management Program (FEMP), designates certain FEMP products or materials for federal procurement. Any designated product that is being offered or supplied under this contract shall meet the U.S. Department of Energy, FEMP content levels. Visit the FEMP website for more information and a list of designated products.

3.12 The Contractor shall assist the Kaskaskia River Project establishing the interconnection agreement between USACE and the electric utility provider which is subject to approval and signature by the Contracting Officer.

4. REQUEST FOR PROPOSAL BID ITEMS

4.1 Supply of Solar Support Racking System. (Refers to Bid Item Number 0001)

4.1.1 Supply Solar Support Roof Mounted Racking System capable of supporting the contractors designed size less than 39 kw Solar PV System in accordance with the UFC Building Guide specifications honoring the roofing manufactures warranty. The Solar Support Racking System shall be delivered with drawings and manufacturer installation instructions and recommendations.

4.1.2. Measurement for payment purposes for this bid item will be made for the design & supply of the Solar Support Roof Mounted Racking System for #0001 Design & Supply of Solar Support Roof Mounted Racking System, price and payment shall constitute full compensation for furnishing all supplies and materials necessary to supply the Design & Solar Support Roof Mounted Racking System.

4.2 Installation of Solar Support Roof Mounted Racking System. (Refers to Bid Item Number 0002)

4.2.1 The Solar Support Roof Mounted Racking System shall be installed per the manufacturer’s instructions and recommendations and in accordance with the UFC Building Guide specifications.

4.2.2. Measurement for payment purposes for this bid item will be made for the installation of the Solar Support Roof Mounted Racking System for #0002 Installation of Solar Support Roof Mounted Racking System, price and payment shall constitute full compensation for furnishing all labor, materials, equipment, and supplies necessary to complete the installation of the Solar Support Roof Mounted Racking System.

4.3 Supply of Solar Array PV System. (Refers to Bid Item Number 0003)

4.3.1. Supply of Solar Array PV System capable of producing up to 40kw or to size system capable on the south facing roof section of the Administration Office, once connected to the Kaskaskia River Administration Office electrical utility. The supply of the Solar Array PV System includes all Solar panels, modules, inverters, combi-switches, fuse combiners and all wiring and connection components for connection to the Kaskaskia River Project Administration Office electrical utility shall be included in this bid item. The Solar Array PV System shall be delivered with drawings and manufacturer’s installation instructions and recommendations.

4.3.2. Measurement for payment purposes for this bid item will be made for the supply of the Solar Array PV System for #0003 Supply of Solar Array PV System, price and payment shall constitute full compensation for furnishing all materials, equipment, and supplies necessary to supply the Solar Array PV System.

4.4 Installation of Solar Array PV System. (Refers to Bid Item Number 0004)

4.4.1 The Solar Array PV System capable of producing up to 40kw shall be installed and connected to the Kaskaskia River Project Administration Office electrical utility. Installation of

Solar Array PV System shall include installation of all Solar panels, modules, inverters, combi-switches, fuse combiners and all wiring and connection components for connection to the Kaskaskia River Project Administration Office electrical utility. The Solar Array PV System shall be installed in accordance with the provided drawings and manufacturer installation instructions and recommendations.

4.4.2 Measurement for payment purposes for this bid item will be made for the installation of the Solar Array PV System for #0004 Installation of the Solar Array PV System, price and payment shall constitute full compensation for furnishing all labor, materials, equipment, and supplies necessary to complete the installation of the Solar Array PV.

52.212-2 EVALUATION--COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (NOV 2021)

(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:

Quotes will be evaluated by performing a direct comparison of one offer with another in a uniform manner to determine which quote provides the government with its needs, as identified in the RFQ. The government reserves the right to consider a response that offers more than the minimum and select that response if it provides a benefit to the government. The government has the discretion to accept other than the lowest priced offeror that provides additional benefits.

(b) Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).

(c) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.

(End of provision)

(End of Summary of Changes)