This abstract of bids summarizes three bids received in response to Solicitation Number W912P923B0005 for work on the Jerry F. Costello Lock and Dam. The solicitation sought bids for rehabilitation, blasting, and painting of two tainter gates and a monorail crane bridge.

Bids were received from C.J. Mahan Construction, LLC for a base bid of $8,391,520 including options, Abhe Svoboda Inc for a base bid of $18,331,000 including options, and an unnamed bidder for a base bid of $12,549,000 including options. The scope of work included mobilization, bonds, structural repairs, blasting and painting of tainter gates and monorail, replacement of components, and other optional work. The Department of the Army Corps of Engineers Engineering District St Louis issued the solicitation and will evaluate the bids received by the March 11, 2023 due date.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IGE Unrestricted - 237990

Bid Bond Received?

Amendments Acknowledge?

Received By Due Date/Time?

ITEM NO DESCRIPTION QUANTITY UNIT UNIT PRICE ESTIMATED AMOUNT QUANTITY UNIT UNIT PRICE

ESTIMATED

AMOUNT QUANTITY UNIT UNIT PRICE

ESTIMATED

AMOUNT

Base Bid Items 0001 Mobilization and Demobilization 1 JB $537,000.00 1 JB 535,000.00$ 535,000.00$ 1 JB 849,000.00$ 849,000.00$

0002 Bonds 1 JB $108,670.00 1 JB 75,000.00$ 75,000.00$ 1 JB 85,000.00$ 85,000.00$

0003 Tainter Gate Support method During Repairs, Structural 1 JB $186,000.00 1 JB 1,915,000.00$ 1,915,000.00$ 1 JB 300,000.00$ 300,000.00$ Repairs of Tainter Gate 1

0004 Blasting and Painting of Tainter Gate 1, Blasting and 1 JB $2,158,000.00 1 JB 8,575,000.00$ 8,575,000.00$ 1 JB 4,780,000.00$ 4,780,000.00$

Painting of Tainter Gate 1 Trunnion Girder Anchor Plates, Skin Plate Replacement, Vertical Ribs Replacement, Structural Bracing Members Replacement, Galvanic Anode Replacement, and Side Seal Replacment

Total Base Bid: $2,989,670.00 Total Base Bid: $11,100,000.00 Total Base Bid: $6,014,000.00

Option 1

0005 Tainter Gate Support method During Repairs, Structural 1 JB $186,000.00 1 JB 120,000.00$ 120,000.00$ 1 JB 230,000.00$ 230,000.00$ Repairs of Tainter Gate 2

0006 Blasting and Painting of Tainter Gate 2, Blasting and 1 JB $2,158,000.00 1 JB 3,185,000.00$ 3,185,000.00$ 1 JB 3,300,000.00$ 3,300,000.00$

Painting of Tainter Gate 2 Trunnion Girder Anchor Plates, Skin Plate Replacement, Vertical Ribs Replacement, Structural Bracing Members Replacement, Galvanic Anode Replacement, and Side Seal Replacment

Total Option 1: $2,344,000.00 Total Option 1: 3,305,000.00$ Total Option 1: 3,530,000.00$

Option 2 0007 Remove existing stainless steel rub plates, end vertical 1 JB $28,800.00 1 JB 34,000.00$ 34,000.00$ 1 JB 30,000.00$ 30,000.00$ ribs, cable hitch pin plates, top of gate cable guide plates, and disassemble wire rope gate connections of Tainter Gate 1

0008 Install new carbon steel rub plates, end vertical ribs, 1 JB $385,400.00 1 JB 214,000.00$ 214,000.00$ 1 JB 410,000.00$ 410,000.00$ cable hitch pin plates, top of gate cable guide plates, wire rope connedction components, and tension wire ropes of Tainter Gate 1

Total Option 2: $414,200.00 Total Option 2: 248,000.00$ Total Option 2: 440,000.00$

Option 3 0009 Remove existing stainless steel rub plates, end vertical 1 JB $28,800.00 1 JB 34,000.00$ 34,000.00$ 1 JB 30,000.00$ 30,000.00$ ribs, cable hitch pin plates, top of gate cable guide plates, and disassemble wire rope gate connections of Tainter Gate 2

0010 Install new carbon steel rub plates, end vertical ribs, 1 JB $385,400.00 1 JB 214,000.00$ 214,000.00$ 1 JB 410,000.00$ 410,000.00$ cable hitch pin plates, top of gate cable guide plates, wire rope connedction components, and tension wire ropes of Tainter Gate 2

Total Option 3: $414,200.00 Total Option 3: 248,000.00$ Total Option 3: 440,000.00$

Option 4 0011 Structural Repairs of Upstream Monorail 1 JB $58,700.00 1 JB 35,000.00$ 35,000.00$ 1 JB 35,000.00$ 35,000.00$

C.J. Mahan Construction, LLC Abhe Svoboda Inc

ABSTRACT OF BIDS

W912P9-23-B-0005

Yes

N/A

Yes

Yes

N/A

Yes

0012 Blasting and Painting of Upstream Monorail, Walkway 1 JB $579,000.00 1 JB 530,000.00$ 530,000.00$ 1 JB 315,000.00$ 315,000.00$ Handrails, Connections to the Crane Girder and

Connections to the Crane Girder Support

Total Option 4: $637,700.00 Total Option 4: 565,000.00$ Total Option 4: 350,000.00$

Option 5

0013 Structural Repairs of Downstream Monorail and 1 JB $103,500.00 1 JB 180,000.00$ 180,000.00$ 1 JB 125,000.00$ 125,000.00$ Replacement of Handrails on the Downstream Monorail

0014 Blasting and Painting of Downstream Monorail, Walkway 1 JB $505,150.00 1 JB 905,000.00$ 905,000.00$ 1 JB 315,000.00$ 315,000.00$ and Handrails

0015 Blasting and Paiting of Bridge Crane Girders and Girder 1 JB $510,000.00 1 JB 570000 570,000.00$ 1 JB 485,000.00$ 485,000.00$ Supports

Total Option 5: $1,118,650.00 Total Option 5: 1,655,000.00$ Total Option 5: 925,000.00$

Option 6

0016 Blasting and Painting of Upstream Tainter Gate 1 JB $473,100.00 1 JB 1,210,000.00$ 1,210,000.00$ 1 JB 850,000.00$ 850,000.00$ Bulkheads, and Seal Replacement

Total Option 6: $473,100.00 Total Option 6: 1,210,000.00$ Total Option 6: 850,000.00$

GRAND TOTAL: $8,391,520.00 GRAND TOTAL: $18,331,000.00 GRAND TOTAL: $12,549,000.00

I CERTIFY THAT I HAVE OPENED, READ AND RECORDED ON THIS ABSTRACT (AND

CONTINUATION SHEETS, IF ANY) ALL OFFERS RECEIVED IN RESPONSE TO THE SOLICITATION.

Betty Foster Contracting Officer 11 March 2023