This document is an amendment to a solicitation for construction services on the Illinois River. The U.S. Army Corps of Engineers, St. Louis District is seeking a firm to construct island protection structures including a 300-foot bullnose chevron, 700-feet of on-bank revetment, and 3 woody bundles between an island head and bullnose structure located at river mile 76 upstream of Meredosia, Illinois. The response date is extended from January 30th to February 1st, 2023 at 10:00 AM CST with all work to be completed via barge in shallow draft work sites within 365 days of the notice to proceed. The amendment provides answers to contractor questions clarifying construction limits, availability of land-based staging areas, and confirmation that the completion date is 365 days from the notice to proceed.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912P923B0002-Attachement 3-DOD Checklist for Reviewing Subcontracting Plans.pdf | ||
| W912P923B0002-Attachment 1- Specifications.pdf | ||
| W912P923B0002-Attachment 2- Plans.pdf | ||
| W912P923B0002-Solicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This purpose for this amendment is to correct the number of days in clause 52.211-10, and provide answ ers to contractor questions.
Proposal due date extended to 1 February 2023 10:00am CST. No other changes.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 17-Jan-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P923B0002
X 9B. DATED (SEE ITEM 11)
28-Dec-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
17-Jan-2023
CODE
CONTRACTING DIVISION
US ARMY ENGR DIST ST LOUIS
1222 SPRUCE STREET, RM 4.207
ST LOUIS MO 63103-2833
W912P9 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P923B0002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
QUESTIONS AND ANSWERS
Questions and Answers Solicitation #W912P923B0002
QUESTION: My question is about the construction limits. Sheet G-101 states that construction limits are described in section 00 08 00 of the specifications. We find no useful description. Can the construction limits be defined?
ANSWER: Refer to 1.1 Rights-of-way in Section 00 08 00 of Attachment 1-Specifications
QUESTION: Is there a land based staging area near the project site to store equipment materials?
ANSWER: Negative
QUESTION: 35 22 23.22 paragraphs 3.1 & 3.10 state that additional work added after award between river mile 0- 80 would not be considered a change to the contract. Is this the intent? If so, it puts the contract in a difficult position. This is a small scope repair with shallow draft requirements, but the pricing we provide could be used for repairs with very different scopes and site requirements.
ANSWER: Related work added after award between river mile 0-80 would not be considered out of scope of to the contract. However, if work were to be added or changes made to the contract, this would be done through a contract modification. The awardee would not be locked into the initial unit prices for any additional work
QUESTION: In 52.211-10 Commencement, Prosecution, and Completion of Work, it notes that the project shall be ready for use within 90 days of the NTP. However, page 1 of the 1442 shows the project shall be completed within 365 days of NTP. Would you mind clarifying which completion date is correct?
ANSWER: The completion date will be 365 days from NTP.
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 30-Jan-2023 10:00 AM to 01-Feb-2023 10:00 AM.
W912P923B0002
SECTION 00 70 00 - CONDITIONS OF THE CONTRACT
The following have been modified:
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 7 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 365 days. The time stated for completion shall include final cleanup of the premises.
(End of clause)