W912P923B0002-Attachement 3-DOD Checklist for Reviewing Subcontracting Plans.pdf
PDF 1 MB Posted
- Attached to
- Moore's Towhead Systemic Mitigation-Illinois River Restoration Federal contract opportunity
- Solicitation number
- W912P923B0002
About this file
This solicitation is seeking a firm to conduct island protection and river restoration work on the Illinois River. The U.S. Army Corps of Engineers, St. Louis District is soliciting bids for construction of a 300-foot bullnose chevron at the head of an island, 700 feet of on-bank revetment, and placement of 3 woody bundles between the island and existing structure. The project is located at river mile 76 on the Illinois River, 5 miles upstream of Meredosia, Illinois. All work must be completed from barges as there is no land access or laydown area available. Bids are due by the date specified in Attachment 1. The award date will be determined by an evaluation of bids received.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment 0001.pdf | ||
| W912P923B0002-Attachment 1- Specifications.pdf | ||
| W912P923B0002-Attachment 2- Plans.pdf | ||
| W912P923B0002-Solicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .