This document contains bidding schedule notes for a federal construction contract opportunity. The solicitation seeks bids for Harlem Baden Phase 3 project involving asphalt overlay work in St. Louis, Missouri. Bidders must complete all items on the bidding schedule and provide unit pricing and estimated amounts. Optional bid items may be included at the contracting officer's discretion. The pre-bid site visit will be held on the specified date, and all bids are due by the August 17th deadline. Bids should be submitted to the Army Corps of Engineers via the provided email address. The selected contractor will be responsible for coordinating utility relocations and confirming cost estimates for asphalt work with the City of St. Louis after award.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| BID ABSTRACT_HARLEM BADEN PKG 3.pdf | ||
| Site Visit Sheet.pdf | ||
| A21 Amendment 1_Narrative_QandA.pdf | ||
| A21 Amendment 1_MSD Technical Specifications.pdf | ||
| A21 Amendment 1.pdf | ||
| A21 Amendment 1_Revised Bid Schedule.pdf | ||
| A21 Amendment 1_USACE Technical Specification Revision_Sec 01 22 00.pdf | ||
| Harlem Baden 3 Adv Specs.pdf | ||
| A21 Solicitation.pdf | ||
| A21 Harlem Baden _Package3_Plans.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BIDDING SCHEDULE NOTES
1. All quantities shown on the BIDDING SCHEDULE are estimated quantities except when the unit is shown as job "JOB".
2. When bids are solicited on a unit price basis, bidders shall insert in the spaces provided therefore in the SCHEDULE both the "unit price" and the "estimated amount" resulting from applying the said unit price to the estimated quantity shown. In event the bidder quotes only a total price ("estimated amount") in its bid and fails to quote the unit price, the Government will determine such unit price by dividing the total price quoted by the quantity of the item set out in the SCHEDULE. The bidder agrees that the unit price so determined shall be used for the purpose of bid evaluation, award and all payments to the Contractor including final payment.
3. All extensions of the unit prices shown will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered to be the bid and the extension will be corrected accordingly.
4. If a modification to a bid based on unit prices is submitted, which provides for a lump sum adjustment to the total estimated cost, the application of the lump sum adjustment to each unit price in the bid schedule must be stated. If it is not stated, the bidder agrees that the lump sum adjustment shall be applied on a pro rata basis to every unit price in the bid schedule.
5. Bidders are required to bid on all items listed on the Bidding Schedule in addition to inserting a total quoted bid in the appropriate space provided. Failure to do so will be considered good cause to disqualify the bid.
6. OPTIONAL BID ITEMS. Bid Items listed under the Option 1 thru 3 headings are OPTIONAL ITEMS. Upon the review of inspection at the site, the Contracting Officer, in accordance with the specifications and drawings, will direct the optional bid item work as needed. The Contractor shall perform the appropriate work ONLY when directed by the Contracting Officer. The Government is not obligated to request any work under any optional item(s).
The bid prices for each optional item shall represent your firm price to perform that service. Payment will be made ONLY for work actually requested and performed to the Government’s satisfaction.
7. Information regarding utility relocations can be found in Order and Coordination of Work, Section 00 08 00.
8. Costs as shown on the bid schedule for base and optional bid items “Asphalt Overlay – City of St. Louis” should be used for bidding purposes in this contract. At NTP, the Contractor shall coordinate all project requirements with the City and seek any revisions to the originally provided estimate. The Contractor shall submit copies of documentation from the City showing the revised estimate to complete the work to the Government within 30 days of scheduling the work to be completed.