Amendment 0003 specs.pdf
PDF 145 KB Posted
- Attached to
- 2019 Flood Repair of MSD Manholes:
- Solicitation number
- W912P921B0005
About this file
This pre-solicitation notice provides details for an upcoming Invitation for Bid to rehabilitate manholes using Cured-in-Place Manhole lining. The U.S. Army Corps of Engineers, St. Louis District will seek bids for cleaning and prepping manholes before installing new pressure-rated frames and lids and applying CIPM lining. Damaged risers will also be replaced. Associated concrete, asphalt, gravel and landscaping will be restored. The solicitation number is W912P9-21-B-0005 and bids are due through the DOD SAFE website. The project magnitude is between $1-5 million. The NAICS code is 237990 and the small business size standard is $39.5 million. The solicitation is expected to issue on April 28, 2021. Interested parties must register in SAM to receive notifications and be eligible for award.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment 0003
SECTION TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 00 08 00.99 15
SPECIAL CONTRACT REQUIREMENTS (PL84-99)
PART 1 GENERAL
1.1 RIGHT-OF-WAY
1.2 PUBLIC UTILITIES AND PRIVATE IMPROVEMENTS
1.3 DAMAGE TO WORK
1.4 QUANTITY SURVEYS
1.5 PARTIAL PAYMENT
1.6 CERTIFICATES OF COMPLIANCE
1.7 PURCHASE ORDERS
1.8 SAFETY AND HEALTH REQUIREMENTS MANUAL EM 385-1-1
1.9 ACCIDENT INVESTIGATIONS AND REPORTING
1.10 ACCIDENT PREVENTION PROGRAM
1.11 DAILY INSPECTIONS
1.12 ENVIRONMENTAL LITIGATION
1.13 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER
1.14 WORK ADJACENT TO RAILROADS
1.15 SUBCONTRACTS
1.16 REQUIRED INSURANCE - WORK ON A NON-GOVERNMENT INSTALLATION.
1.17 PROTECTION OF MATERIAL AND WORK
1.18 CONTAMINATION OF WATER
1.19 COMMERCIAL WARRANTY
1.20 ORDER AND COORDINATION OF WORK
1.21 SUBMITTALS
1.22 CONTRACTOR PERFORMANCE EVALUATIONS
1.23 SECURITY REQUIREMENTS
PART 2 PRODUCTS
PART 3 EXECUTION
-- End of Section Table of Contents --
DOCUMENT 00 08 00.99 15 Page 1
SECTION 00 08 00.99 15 SPECIAL CONTRACT REQUIREMENTS (PL84-99)
PART 1 GENERAL
1.1 RIGHT-OF-WAY
Right-of-way for construction purposes will be furnished by the Government without cost to the Contractor. Where right-of-way for access to a work site is not available over existing public roads, access through private lands as shown on the contract drawings will be furnished by the Government without cost to the Contractor. The Contractor will be required at its own expense to do all work necessary to make such right-of-way suitable for traveling to and from the work site without interrupting the existing drainage. Upon completion of the contract work, any such access roadway and right-of-way furnished by the Government shall be left in a condition satisfactory to the Contracting Officer.
1.2 PUBLIC UTILITIES AND PRIVATE IMPROVEMENTS
a. Unless otherwise specified, shown on the drawings, or stated in writing by the Contracting Officer, the Contractor shall not move or disturb any public utilities or private improvements. Such removals, alterations, and/or relocations, where necessary, will be made by others. The locations shown on the drawings for underground utilities are approximate only. The exact locations of such utilities shall be determined by the Contractor in the field prior to commencing construction operations in their vicinity.
b. The attention of the Contractor is directed to the possibility that public utilities or private improvements may be encountered within the construction limits, some of which may be buried, and the existence of which is presently not known. Should any such utilities or improvements be encountered, the Contractor shall immediately notify the Contracting Officer so that a determination may be made as to whether they shall be removed, relocated, or altered. After such determination is made, the Contractor shall, if so directed by the Contracting Officer, remove, relocate, or alter them as required and an equitable adjustment will be made. In the event the Contracting Officer arranges for such removals, alterations, or relocations to be performed by others, the Contractor shall cooperate with such others during the latters' removal, alteration, or relocation operations.
1.3 DAMAGE TO WORK
The responsibility for damage to any part of the permanent work shall be as set forth in the Contract Clause entitled "Permits and Responsibilities." However, if in the judgment of the Contracting Officer any part of the permanent work performed by the Contractor is damaged by flood or earthquake, which damage is not due to the failure of the Contractor to take reasonable precautions or to exercise sound engineering and construction practices in the conduct of the work, the Contractor shall make the repairs as ordered by the Contracting Officer and full compensation for such repairs will be made at the applicable contract unit or job prices as fixed and established in the contract. If in the opinion of the Contracting Officer there are no contract unit or lump sum prices applicable to any part of such work, an equitable adjustment pursuant to the Contract Clause entitled, "Changes," of the contract will be made as
DOCUMENT 00 08 00.99 15 Page 2 full compensation for the repairs of that part of the permanent work for which there are no applicable contract unit or lump sum prices. Except as herein provided, damage to all work (including temporary construction), utilities, materials, equipment, and plant shall be repaired to the satisfaction of the Contracting Officer at the Contractor's expense, regardless of the cause of such damage.
1.4 QUANTITY SURVEYS
Any Contractor performing slide repairs shall have a Professional Land Surveyor registered in the state the work is being accomplished conduct original and final earthwork surveys. For all other work, the Contractor shall perform surveys in the presence of the Contracting Officer and all field survey notes be initialed by the Government Representative and furnished to the Government within 24 hours.
1.5 PARTIAL PAYMENT
At the discretion of the Contracting Officer, partial payment will be made for equipment delivered and stored on site or off site providing such storage is in accordance with the provisions of these specifications and the Contractor furnishes satisfactory evidence that title to such equipment has been acquired and that it will be utilized on the work covered by these specifications. Partial payment is defined as the invoice amount plus shipping costs. If the equipment is stored off site, the Government shall have the right to inspect the equipment.
1.6 CERTIFICATES OF COMPLIANCE
Any certificates required for demonstrating proof of compliance of materials with specification requirements shall include the signature and title of an official authorized to certify in behalf of the manufacturing company and shall contain the name and address of the Contractor, the project name and location, and the quantity and date or dates of shipment or delivery to which the certificates apply. Copies of laboratory test reports submitted with certificates shall contain the name and address of the testing laboratory and the date or dates of the tests to which the report applies. Certification shall not be construed as relieving the Contractor from responsibility for furnishing satisfactory material if, after tests are performed on selected samples, the material is found not to meet the specific requirements.
1.7 PURCHASE ORDERS
Purchase orders for other than stock materials showing the firm names and addresses and list of material shall be furnished to the Contracting Officer or an authorized representative as soon as issued.
1.8 SAFETY AND HEALTH REQUIREMENTS MANUAL EM 385-1-1
The Safety and Health Requirements Manual EM 385-1-1 forms a part of these specifications. EM 385-1-1 and its changes are available at http://www.publications.usace.army.mil/USACEPublications/EngineerManuals.aspx Contractor shall be responsible for complying with the current edition and all changes posted on the web as of the effective date of this solicitation.
DOCUMENT 00 08 00.99 15 Page 3
1.9 ACCIDENT INVESTIGATIONS AND REPORTING
Refer to EM 385-1-1, Paragraph 01.D. Accidents, involving contractor and/or subcontractor employees performing any work or related work on a USACE project, shall be investigated and reported immediately to the Contracting Officer or authorized Contracting Officer's representative.
This reporting requirement applies to on-site or off-site accidents. Upon receipt of the initial accident report notification, the Contracting Officer shall issue additional guidance concerning continuing project operations which may include a "cease work" directive. If a cease work directive is issued, the Contractor will not be allowed to resume work related to the accident until all conditions of the "cease work" directive are met. After the initial notification, the Contractor shall ensure a formal investigation is conducted and reports are completed by the immediate supervisor of the employee(s) involved and reported to the Contracting Officer or an authorized representative within one working day after the accident occurs. The accident Investigation report shall be made on ENG Form 3394.
1.10 ACCIDENT PREVENTION PROGRAM
Refer to Contract Clause FAR 52.236-13 entitled, "Accident Prevention".
Within 5 days after receipt of Notice to Proceed of the contract, and at least 7 days prior to the prework conference, the original and one copy of the Accident Prevention Program shall be submitted to the Contracting Officer for review. A checklist has been included at the end of this section to aid the Contractor in preparing the Accident Prevention Plan.
The program shall be prepared in the following format:
The program shall also include a copy of company policy statement of accident prevention and any other guidance statements normally provided new employees. Each company employee shall be required to sign the company policy statement of accident prevention to verify that all employees have been informed of the safety program, and such signed statements shall be maintained at the project site.
The Contractor shall not commence physical work at the site until the program has been reviewed and found acceptable by the Contracting Officer, or an authorized representative. The Contractor shall submit for approval the Activity Hazard Analysis for each phase of construction prior to the beginning of work in each phase. Also refer to Section 1 of EM 385-1-1.
1.11 DAILY INSPECTIONS
The Contractor shall perform daily safety inspections and record them in RMS. Reports of daily inspections shall be maintained at the job site.
The reports shall be records of the daily inspections and resulting actions. Each report shall include, as a minimum, the following:
a. Phase(s) of construction underway during the inspection.
b. Locations of areas inspections were made.
c. Results of inspection, including nature of deficiencies observed and corrective actions taken, or to be taken, date, and signature of the person responsible for its contents.
DOCUMENT 00 08 00.99 15 Page 4
1.12 ENVIRONMENTAL LITIGATION
a. If the performance of all or any part of the work is ordered by a court of competent jurisdiction to be suspended, delayed, or interrupted as a result of environmental litigation, as defined below, the Contracting Officer, at the request of the Contractor, shall determine whether the order is due in any part to the acts or omissions of the Contractor or a Subcontractor at any tier not required by the terms of this contract. If it is determined that the order is not due in any part to acts or omissions of the Contractor or a Subcontractor at any tier other than as required by the terms of this contract, such suspension, delay, or interruption shall be considered as if ordered by the Contracting Officer in the administration of this contract under the terms of the Contract Clause entitled "Suspension of Work".
b. The term "environmental litigation", as used herein, means a lawsuit alleging that the work will have an adverse effect on the environment or that the Government has not duly considered, either substantively or procedurally, the effect of the work on the environment.
1.13 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER
a. This provision specifies the procedure for the determination of time extensions for unusually severe weather in accordance with the Contract Clause entitled, "Default (Fixed-Price Construction)". In order for the Contracting Officer to award a time extension under this clause, the following conditions must be satisfied:
(1) The weather experienced at the project site during the contract period must be found to be unusually severe, that is, more severe than the adverse weather anticipated for the project location during any given month.
(2) The unusually severe weather must actually cause a delay to the completion of the project. The delay must be beyond the control and without the fault or negligence of the Contractor.
b. Upon acknowledgement of the Notice to Proceed (NTP) and continuing throughout the contract, the Contractor shall record on the daily CQC report, the occurrence of adverse weather and resultant impact to normally scheduled work. Actual adverse weather delay days must prevent work on critical activities for 50 percent or more of the Contractor's scheduled work day. The delay must be beyond the control and without the fault or negligence of the Contractor. The number of actual adverse weather delay days shall include days impacted by actual adverse weather (even if adverse weather occurred in previous day), be calculated chronologically from the first to the last day of each month, and be recorded as full days. The Contracting Officer will convert any qualifying delays to calendar days, giving full consideration for equivalent fair weather work days, and issue a time extension modification in accordance with the FAR Clause 52.249-10 entitled "Default (Fixed Price Construction)".
1.14 WORK ADJACENT TO RAILROADS
In the event this contract contemplates work on or about the premises of a Railroad Company, hereinafter referred to as "the Railroad", the
DOCUMENT 00 08 00.99 15 Page 5
Contractor shall comply with the following:
a. Notify the Railroad, in writing, at least 30 days in advance of commencing work adjacent to or on the Railroad's property and obtain approval as to its methods of construction and operations.
b. All such work shall be fully coordinated with the operations of the Railroad.
c. In performing such work, all established pertinent regulations and requirements of the Interstate Commerce Commission and the Railroad shall be closely adhered to.
d. All work adjacent to or on the Railroad's property shall be performed so as not to interrupt or delay the operation of trains over the tracks in use, or to interfere with communications and signal lines adjacent to said tracks or upon said premises, except under arrangements effected between the Contractor and the Railroad. During the progress of such work, the Contractor shall contact and maintain liaison with such of the Railroad's officers or representatives as shall be designated by the Railroad so as to ascertain the time of passage of trains at the site of the work, and to clear the Railroad's tracks and facilities of men, equipment, and obstructions to permit free flow of railroad traffic.
e. The Contractor shall, at all times during the period of construction, keep the Railroad's tracks and roadbed free of earth, mud, rocks, materials, or debris that might be caused to accumulate thereon during progress of the work.
f. The Contractor shall not store or pile any materials, supplies, or equipment closer than 12 feet to the nearest rail of the Railroad's tracks over which trains are currently being operated.
g. The Contractor shall at all times keep covered any pits or openings near or under the Railroad's tracks over which trains are currently being operated, except during the time required for actual operations in making such pits or openings and performing work therein.
h. No crossing of any track or tracks shall be installed nor any vehicles or equipment operated over or across any tracks or under or within 15 feet of any communication, signal, or power lines of the Railroad without the prior consent of the Superintendent of the Railroad. Temporary track crossings, by agreement with the Superintendent of the Railroad, shall be installed by Railroad forces at the Contractor's expense.
i. The Contractor will be responsible for the furnishing of such flagmen, watchmen, or other protective devices prescribed by established regulations of the Railroad and the Interstate Commerce Commission as are required by the Railroad to safeguard its operations and its employees during the Contractor's work.
j. The Railroad may, without expense to the Contractor, maintain a resident engineer and inspectors at all times when work is being performed by the Contractor on or adjacent to the right-of-way of the Railroad and/or construction of new track. When, in the opinion of such engineer or inspector, any work is being performed which may interfere with or endanger Railroad traffic, or whenever any work is
DOCUMENT 00 08 00.99 15 Page 6 being performed within 24 feet of any operating track of the Railroad or any excavation made so that the top of the slope on a 1-1/2V to 1H slope will be within 12 feet of any track, flagmen may be maintained by the Railroad at the Contractor's expense. Before any such work is performed, the Contractor shall contact the Railroad Company's Superintendent, arrange for such flagmen, who shall be employees of the Railroad Company, and deposit with the Railroad Company the estimated cost of such flagging service, any excess deposit to be returned to the Contractor upon completion of the work. Such inspectors, flagmen, and engineer will be employees of the Railroad.
The inspectors or engineer shall request the Contracting Officer to stop any work which is being performed when, in their opinion, dangerous conditions have developed or are developing because of such work, provided that said inspector shall specifically inform the Contracting Officer and the Contractor as to the nature of such dangerous conditions. After such stoppage of work, the Contractor shall correct the developed conditions and revise its method of operations as required to meet the inspectors' objections and thereafter proceed with the work in a manner approved by the Railroad and the Contracting Officer.
1.15 SUBCONTRACTS
In accordance with the Contract Clause entitled "Subcontracts", the Contractor shall, within seven days after the award of any subcontract by the Contractor or a Subcontractor, deliver to the Contracting Officer an electronic copy of a completed Standard Form 1413 with the original signatures of both parties.
1.16 REQUIRED INSURANCE - WORK ON A NON-GOVERNMENT INSTALLATION.
a. The Contractor shall, at its own expense, provide and maintain during the entire performance period of this contract at least the kinds and minimum amounts of insurance required in the following schedule:
(1) Workmen's Compensation . Amounts required by applicable jurisdictional statutes.
(2) Employer's Liability Insurance . $100,000
(3) Comprehensive General Liability Insurance .
Bodily Injury - $500,000 per occurrence
(4) Comprehensive Automobile Insurance .
Bodily Injury - $200,000 each person $500,000 each accident Property Damage - $ 20,000 each accident
b. Within 15 days after receipt of Notice of Award and before commencing work under this contract, the Contractor shall notify the Contracting Officer in writing that the required insurance has been obtained. The policies evidencing required insurance shall contain an endorsement to the effect that any cancellation or any material change adversely affecting the Government's interest shall not be effective
(1) for such period as the laws of the State in which this contract is to be performed prescribe, or (2) until 30 days after the insurer or
DOCUMENT 00 08 00.99 15 Page 7 the Contractor gives written notice to the Contracting Officer, whichever period is longer.
c. The Contractor shall insert the substance of this clause, including this paragraph c, in subcontracts under this contract and shall require subcontractors to provide and maintain the insurance required in paragraph a above. The Contractor shall maintain a copy of all subcontractor's proofs of required insurance, and shall make copies available to the Contracting Officer upon request.
d. Statements of required insurance should be submitted to one of the following addresses as directed by the Contracting Officer:
Department of the Army St. Louis District, Corps of Engineers Central Area Office; CEMVS-EC-CA 1222 Spruce Street St. Louis, Missouri 63103
1.17 PROTECTION OF MATERIAL AND WORK
The Contractor shall at all times protect and preserve all materials, supplies, and equipment of every description (including property which may be Government-furnished or owned) and all work performed. All reasonable requests of the Contracting Officer to enclose or specially protect such property shall be complied with. If, as determined by the Contracting Officer, material, equipment, supplies, and work performed are not adequately protected by the Contractor, such property may be protected by the Government and the cost thereof may be charged to the Contractor or deducted from any payments due to the Contractor.
1.18 CONTAMINATION OF WATER
In addition to the requirements set forth in SECTION 01 11 30, paragraph Protection of Water Resources, the Contractor shall take positive protective measures to prevent spillage of potential pollutant materials such as fuel, emulsion materials, chemicals etc., from storage containers or equipment, into lakes or tributary waters. Such positive protective measures may include, but are not limited to, the following:
(1) A berm enclosure of sufficient capacity to contain such materials.
(2) Security measures to prevent acts of vandalism which could result in spillage of such materials (fences, guards, etc.).
(3) Storage of such materials in an area where the terrain would preclude leakage into lake or tributary waters.
(4) Utilization of secure Government storage areas if the Contracting Officer indicates such space is available. No storage past immediate needs (2 days) without the consent of the Contracting Officer.
The Contractor shall submit its proposals for implementing the above provisions in accordance with SECTION 01 11 30, paragraph Environmental Protection Plan.
1.19 COMMERCIAL WARRANTY
The Contractor agrees that the standard commercial equipment furnished
DOCUMENT 00 08 00.99 15 Page 8 under this contract shall be covered by the most favorable commercial warranties the manufacturer gives to any customer for such equipment, and that the rights and remedies provided herein are in addition to and do not limit any rights afforded to the Government by any other clause of this contract. The Contractor shall furnish an electronic copy of the warranties to the Contracting Officer.
1.20 ORDER AND COORDINATION OF WORK
- Before beginning any construction activities, the Contractor shall videotape the existing condition of all roads and parking areas to be used in the construction activities and hauling operation. The Contracting Officer's Representative will be present during all videotaping.
Representatives of the local Department of Transportation and/or City Roads department will be present during the videotaping of roads under their maintenance. One copy of the video shall be provided to each of the participating representatives.
- Additional site specific order and coordination of work items are included on plan sheet G-002.
1.21 SUBMITTALS
Additional submittals for this contract that are not listed within individual technical provisions are listed below. Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 - SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Accident Prevention Program; G Statements of Required Insurance; G
1.22 CONTRACTOR PERFORMANCE EVALUATIONS
In accordance with the provisions of Subpart 36.201(Evaluation of Contractor Performance) of the Federal Acquisition Regulation (FAR), construction contractor's performance shall be evaluated throughout the performance of the contract. The United States Army Corps of Engineers (USACE) follows the procedures outlined in Engineering Regulation 415-1-17 to fulfill this FAR requirement. For construction contracts awarded at or above $100,000.00, the USACE will evaluate contractor's performance and prepare a performance report using the Contractor Performance Assessment Reporting System (CPARS), which is a web-based system. After an evaluation (interim or final) is written up by the USACE, the contractor will have the ability to access, review and comment on the evaluation for a period of 30 days. Accessing and using CPARS requires specific software, called PKI certification, which is installed on the user's computer. The certification is a Department of Defense requirement and was implemented to provide security in electronic transactions. The certification software could cost approximately $110 - $125 per certificate per year and is purchased from an External Certificate Authorities (ECA) vendor.
Current information about the PKI certification process and for contacting vendors can be found on the web site: http://www.cpars.navy.mil/. If the Contractor wishes to participate in the performance evaluation process, access to CPARS and PKI certification is the sole responsibility of the
DOCUMENT 00 08 00.99 15 Page 9
Contractor.
1.23 SECURITY REQUIREMENTS
Security requirements will be provided for each task order and all costs associated shall be included in the Mobilization and Demobilization bid item.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Section --
DOCUMENT 00 08 00.99 15 Page 10
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 22 00.99 15
MEASUREMENT AND PAYMENT (PL84-99)
PART 1 GENERAL
1.1 MOBILIZATION AND DEMOBILIZATION
1.2 BONDS
1.3 PRESSURE CAP
1.3.1 Measurement
1.3.2 Payment
1.4 RISER REPLACEMENT
1.4.1 Measurement
1.4.2 Payment
1.5 CURED-IN-PLACE MANHOLE REHABILITATION
1.5.1 Measurement
1.5.2 Payment
1.6 BYPASS PUMPING
1.6.1 Measurement
1.6.2 Payment
1.7 PAVEMENT REPLACEMENT
1.7.1 Measurement
1.7.2 Payment
1.8 MISCELLANEOUS SITE RESTORATION
1.9 OPTIONAL ITEMS
PART 2 PRODUCTS
PART 3 EXECUTION
SECTION 01 22 00.99 15 Page 1
SECTION 01 22 00.99 15
MEASUREMENT AND PAYMENT (PL84-99)
PART 1 GENERAL
1.1 MOBILIZATION AND DEMOBILIZATION
Payment for mobilization and demobilization will be made at the contract job price for "Mobilization and Demobilization", which price and payment shall constitute full compensation for providing all plant, labor, material, and equipment and performing all operations necessary for project mobilization and demobilization as defined in Contract Clause
PAYMENT FOR MOBILIZATION AND DEMOBILIZATION.
1.2 BONDS
Costs for bonds will not be measured for payment. Payment for costs associated with bonding will be made at the contract job price for "Bonds", as defined in the Contract Clauses.
1.3 PRESSURE CAP
1.3.1 Measurement
Pressure caps shall be measured per each pressure cap installed at the locations designated, in accordance with specification section 02 41 00 and 03 30 00 and as shown on the drawings.
1.3.2 Payment
Payment will be made upon completion and inspection of the feature of work per unit installed. All costs associated with replacing the pressure caps at each of the rehabilitation sites shall include demolition, removal, and disposal of existing manhole concrete, frames, lids, and pavement, and placement of new concrete caps, lids, and frames. These prices and payments shall constitute full compensation for any additional costs, beyond the base item cost, associated with furnishing all plant, labor, equipment and material and performing all operations necessary to complete placement of concrete, formwork, reinforcing steel as specified in Sections 02 41 00 and 03 30 00 of the Specifications and as shown on the drawings.
1.4 RISER REPLACEMENT
1.4.1 Measurement
Riser replacement shall be measured per each manhole where risers are installed at the locations designated, in accordance with specification section 02 41 00, 03 30 00, and 33 01 30.72 and shown in the drawings.
1.4.2 Payment
Payment will only be made upon completion and inspection of the feature of work per each manhole location. All costs associated with riser replacement at each of the rehabilitation sites shall include demolition, SECTION 01 22 00.99 15 Page 2 removal, disposal of existing riser concrete, excavation of native materials, placement of new risers, and backfilling materials to restore the site. Backfill material cost, transportation, and placement shall be considered incidental to work included in this bid item. These prices and payments shall constitute full compensation for any additional costs, beyond the base item cost, associated with furnishing all plant, labor, equipment and material and performing all operations necessary to complete placement of concrete, formwork, reinforcing steel as specified in Sections 02 41 00, 03 30 00, and 33 01 30.72 of the Specifications and as shown on the drawings.
1.5 CURED-IN-PLACE MANHOLE REHABILITATION
1.5.1 Measurement
Cured-in-place manhole rehabilitation shall be measured per each manhole where CIPM are installed at the locations designated, in accordance with specification section 33 01 30.72 and shown in the drawings.
1.5.2 Payment
Payment will only be made upon completion and inspection of the feature of work per unit installed. All costs associated with cure-in-place manhole rehabilitation shall be included in the unit per each site shown in the drawings and as defined in specification section 33 01 30.72.
1.6 BYPASS PUMPING
1.6.1 Measurement
Bypass pumping shall be measured per each manhole where cure-in-place manhole rehabilitation is performed.
1.6.2 Payment
Payment will only be made upon completion and inspection of the feature of work per each manhole location. All costs associated with bypass pumping at each of the rehabilitation sites shall include all costs necessary to complete cure-in-place manhole rehabilitation in accordance with specification section 33 01 30.72 and as shown on the drawings.
1.7 PAVEMENT REPLACEMENT
1.7.1 Measurement
Pavement replacement shall be measured by disturbed pavement surface area, in SQUARE FEET, required to rehabilitate each manhole location as specified in the specification sections 32 25 15.99 and 03 30 00 and as shown on the drawings. Prior to work being performed, the Contractor must layout the excavation limits. Excavation limits shall be confirmed by the Contracting Officer prior to excavation.
1.7.2 Payment
Payment will only be made upon completion and inspection of the feature of work per unit installed. All costs associated with replacement of pavement removed shall constitute full compensation for furnishing all plant, labor, equipment and material and performing all operations necessary to restore pavement to thickness of existing adjacent pavement as shown in
SECTION 01 22 00.99 15 Page 3 the drawings and defined in Section 32 25 15.99 and 03 30 00. No payment will be made for pavement replacement outside the excavation limits agreed to by the Contracting Officer.
1.8 MISCELLANEOUS SITE RESTORATION
Payment for miscellaneous site restoration will be made at the contract job price, which price and payment shall constitute full compensation for providing all plant, labor, material, and equipment for performing all operations necessary to restore gravel roads and surfaces to preconstruction condition and establish turf as specified in Sections 32 22 30.99 15 and 32 29 35.99 and as shown on the drawings.
1.9 OPTIONAL ITEMS
Payment for each of the optional items will be made at the contract job price for each named manhole, which price and payment shall constitute full compensation for providing all plant, labor, material, and equipment and performing all operations necessary to complete the work listed in the description in the bid schedule at each manhole location and listed in the summary table on the plan sheet.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
SECTION 01 22 00.99 15 Page 4
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 5 PAGES
2019 Flood Recovery City of St. Louis and MSD Manhole Repairs
00 08 00.99 15 SD-01 Preconstruction Submittals
1.10 GAccident Prevention Program
1.16 GStatements of Required
Insurance
01 11 30 SD-01 Preconstruction Submittals
1.5 GEnvironmental Protection Plan
3.1.3 GCommercial Borrow
01 13 20 SD-01 Preconstruction Submittals
3.3 GProject Schedule
01 15 00 SD-01 Preconstruction Submittals
3.1 GAccess/Haul Road Plan
01 45 00.00 10 SD-01 Preconstruction Submittals
3.2 GContractor Quality Control (CQC)
Plan
SD-06 Test Reports
3.9.2Verification Statement
01 78 00 SD-11 Closeout Submittals
2.1 GAs-Built Drawings
02 41 00 SD-01 Preconstruction Submittals
1.2.2 GEC-DSDemolition Plan
03 30 00 SD-01 Preconstruction Submittals
1.5.3.1Concrete Curing Plan
1.5.2.1 GForm Removal Schedule
3.3.9Maturity Method Data
SD-02 Shop Drawings
1.5.2.1 GFormwork
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 5 PAGES
03 30 00 1.5.2.2 G EC-DReinforcing Steel
SD-03 Product Data
2.1Formwork Materials
2.3.1Cementitious Materials
2.4.1Concrete Curing Materials
2.6 G EC-DReinforcement
2.3.4Admixtures
2.6.2Mechanical Reinforcing Bar
Connectors
2.2.2Waterstops
2.2.3Biodegradable Form Release
Agent
1.5.3.2Pumping Concrete
1.5.3.3Finishing Plan
2.4.2Nonshrink Grout
2.4.3 G EC-DEpoxy Anchors
2.4.3 G EC-DEpoxy Anchors
1.5.1.1Formwork Design
GG, EC-DS
SD-05 Design Data
1.5.1.2 GConcrete Mix Design
SD-06 Test Reports
1.5.1.2 GConcrete Mix Design
1.5.4.1Aggregates
3.13.2.3 GCompressive Strength Tests
3.13.2.4Air Content
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 5 PAGES
03 30 00 3.13.2.1Slump Tests
2.3.2Water
SD-07 Certificates
2.6.1 G EC-DReinforcing Bars
1.6Welder Qualifications
1.5.3.4Safety Data Sheets
SD-08 Manufacturer’s Instructions
2.4.1Curing Compound
03 42 13.00 10 SD-01 Preconstruction Submittals
1.3.2.2Quality Control Procedures
SD-02 Shop Drawings
2.1.1 GPrecast Units
SD-03 Product Data
2.1.1 GPrecast Units
3.1.4 GEmbedded Items
2.2.3 GAccessories
SD-05 Design Data
GDesign Calculations
2.1.3.1 GConcrete Mix Proportions
SD-06 Test Reports
1.3.2.4Test Reports
SD-07 Certificates
1.3.2.2Quality Control Procedures
Materials
SD-11 Closeout Submittals
Construction Records
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 5 PAGES
32 22 30.99 15 SD-07 Certificates
2.1Crushed Stone Surfacing
32 25 15.99 15 SD-01 Preconstruction Submittals
2.1 GAggregate Base Course
2.2 GPrime Coat
2.3 GCover and Seal Coats
2.4 GCover and Seal Coat Aggregates
SD-07 Certificates
2.1Aggregate Base Course
2.4Cover and Seal Coat Aggregates
2.2Prime Coat
2.3Cover and Seal Coats
32 29 35.99 15 SD-06 Test Reports
3.1Testing
33 01 30.72 SD-01 Preconstruction Submittals
1.6.1 GContractor Quality Control (CQC)
Plan
2.2.2 GEquipment
3.1.1 GSequence Of Liner Installation
3.1.2 GTraffic Control Plan
3.4 GBypass Plan
SD-03 Product Data
2.2.4.1 GManufacturer's Technology Data
2.2.6 GCatalyst
2.2.7 GRaw Resin Data
2.2.8 GFlexible Membrane
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 5 PAGES
33 01 30.72 2.2.9 GLubricant
SD-04 Samples
3.11.1 GCIPM Liner Samples
SD-05 Design Data
2.1.2 GEngineering Design Calculations
GFlow Capacity Waiver
SD-06 Test Reports
3.9 GCuring Logs
GTemperature Logs
3.11.1 GCIPM Liner Sample Test Results
3.16.1 GPre-TV and Post-TV CDs/DVDs
SD-07 Certificates
1.6.3 GLiner Manufacturer's
Qualifications
1.6.4 GContractor's Qualifications
1.6.5 GCIPM Installer's Qualifications
GSuperintendent's Qualifications
SD-11 Closeout Submittals
1.9.1 GWarranty-TV Inspection
3.16.1 GAs-Built Drawings
33 40 00 SD-03 Product Data
1.3.1 GPressure Manhole Frame and
Lids
1.3.2 GFlexible Adhesive Waterstop Strip
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
DIVISION 03 - CONCRETE
SECTION 03 42 13.00 10
PLANT-PRECAST CONCRETE PRODUCTS FOR BELOW GRADE CONSTRUCTION
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 QUALITY ASSURANCE
1.3.1 NPCA Plant Certification
1.3.2 Qualifications, Quality Control and Inspection
1.3.2.1 Qualifications
1.3.2.2 Quality Control Procedures
1.3.2.2.1 Slump
1.3.2.2.2 Temperature
1.3.2.2.3 Compressive Strength
1.3.2.2.4 Air Content
1.3.2.2.5 Unit Weight
1.3.2.3 Inspection
1.3.2.4 Test Reports
1.3.2.4.1 Material Certifications or Laboratory Test Reports
1.3.2.4.2 Mix Test
1.3.2.4.3 Self-Consolidating Concrete
1.3.2.4.4 In-Plant QA/QC Inspection Reports
1.4 DELIVERY, STORAGE, AND HANDLING
1.4.1 Delivery
1.4.2 Storage
1.4.3 Handling
PART 2 PRODUCTS
2.1 SYSTEM DESCRIPTION
2.1.1 Precast Units
2.1.2 Joints and Sealants
2.1.3 Concrete Mix Design
2.1.3.1 Concrete Mix Proportions
2.1.3.2 Concrete Strength
2.1.3.3 Water-to-Cement Ratio
2.1.3.4 Air Content
2.2 MATERIALS
2.2.1 Reinforcement
2.2.1.1 Reinforcing Bars
2.2.1.2 Welded Wire Reinforcement
2.2.2 Inserts and Embedded Metal
2.2.3 Accessories
2.2.4 Grout
PART 3 EXECUTION
3.1 FABRICATION AND PLACEMENT
SECTION 03 42 13.00 10 Page 1
3.1.1 Casting Beds
3.1.2 Forms
3.1.3 Reinforcement
3.1.4 Embedded Items
3.2 CONCRETE
3.2.1 Concrete Mixing
3.2.2 Concrete Placing
3.2.2.1 Cold Weather Concreting
3.2.2.2 Hot Weather Concreting
3.2.3 Concrete Curing
3.2.3.1 Curing by Moisture Retention
3.2.3.2 Curing with Heat and Moisture
3.2.4 Surface Finish
3.2.4.1 Formed Non-Architectural Surfaces
3.2.4.2 Unformed Surfaces
3.2.4.3 Special Finishes
3.2.5 Stripping Products from Forms
3.2.6 Patching and Repair
3.2.6.1 Repairing Minor Defects
3.2.6.2 Repairing Honeycombed Areas
3.2.6.3 Repairing Major Defects
3.2.7 Shipping Products
3.3 INSTALLATION
3.3.1 Site Access
3.3.2 General Requirements
3.3.3 Water Tightness
SECTION 03 42 13.00 10 Page 2
SECTION 03 42 13.00 10
PLANT-PRECAST CONCRETE PRODUCTS FOR BELOW GRADE CONSTRUCTION
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN CONCRETE INSTITUTE INTERNATIONAL (ACI)
ACI 211.1 (1991; R 2009) Standard Practice for Selecting Proportions for Normal, Heavyweight and Mass Concrete
ACI 305R (2010) Guide to Hot Weather Concreting
ACI 306.1 (1990; R 2002) Standard Specification for Cold Weather Concreting
ACI 318 (2014; Errata 1-2 2014; Errata 3-5 2015;
Errata 6 2016) Building Code Requirements for Structural Concrete and Commentary
AMERICAN WELDING SOCIETY (AWS)
AWS D1.1/D1.1M (2015; Errata 1 2015; Errata 2 2016) Structural Welding Code - Steel
AWS D1.4/D1.4M (2011) Structural Welding Code - Reinforcing Steel
ASTM INTERNATIONAL (ASTM)
ASTM A1064/A1064M (2017) Standard Specification for Carbon-Steel Wire and Welded Wire Reinforcement, Plain and Deformed, for Concrete
ASTM A153/A153M (2016) Standard Specification for Zinc Coating (Hot-Dip) on Iron and Steel Hardware
ASTM A36/A36M (2008) Standard Specification for Carbon Structural Steel
ASTM A53/A53M (2012) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless
ASTM A563 (2007a) Standard Specification for Carbon and Alloy Steel Nuts
SECTION 03 42 13.00 10 Page 3
ASTM A615/A615M (2015a; E 2015) Standard Specification for Deformed and Plain Carbon-Steel Bars for Concrete Reinforcement
ASTM A706/A706M (2014) Standard Specification for Low-Alloy Steel Deformed and Plain Bars for Concrete Reinforcement
ASTM C1064/C1064M (2011) Standard Test Method for Temperature of Freshly Mixed Hydraulic-Cement Concrete
ASTM C1107/C1107M (2014a) Standard Specification for Packaged Dry, Hydraulic-Cement Grout (Nonshrink)
ASTM C143/C143M (2012) Standard Test Method for Slump of Hydraulic-Cement Concrete
ASTM C1677 (2011a; R 2017) Joints for Concrete Box, Using Rubber Gaskets
ASTM C171 (2007) Standard Specification for Sheet Materials for Curing Concrete
ASTM C173/C173M (2014) Standard Test Method for Air Content of Freshly Mixed Concrete by the Volumetric Method
ASTM C192/C192M (2015) Standard Practice for Making and Curing Concrete Test Specimens in the Laboratory
ASTM C231/C231M (2014) Standard Test Method for Air Content of Freshly Mixed Concrete by the Pressure Method
ASTM C309 (2011) Standard Specification for Liquid Membrane-Forming Compounds for Curing Concrete
ASTM C31/C31M (2015a; E 2016) Standard Practice for Making and Curing Concrete Test Specimens in the Field
ASTM C39/C39M (2015a) Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens
ASTM C857 (2014) Standard Practice for Minimum Structural Design Loading for Underground Precast Concrete Utility Structures
ASTM C858 (2010; E 2012) Standard Specification for Underground Precast Concrete Utility Structures
ASTM C891 (2011) Installation of Underground Precast
SECTION 03 42 13.00 10 Page 4
Concrete Utility Structures
ASTM C920 (2014a) Standard Specification for Elastomeric Joint Sealants
ASTM C990 (2009; R 2014) Standard Specification for Joints for Concrete Pipe, Manholes and Precast Box Sections Using Preformed Flexible Joint Sealants
ASTM D482 (2013) Ash from Petroleum Products
ASTM D6 (1995; R 2006) Loss on Heating of Oil and Asphaltic Compounds
ASTM D71 (1994; R 2015) Relative Density of Solid Pitch and Asphalt (Displacement Method)
ASTM D92 (2005a) Standard Test Method for Flash and Fire Points by Cleveland Open Cup Tester
ASTM F436 (2011) Hardened Steel Washers
CSA GROUP (CSA)
CSA A23.4 (2009; R 2014) Precast Concrete - Materials and Construction
NATIONAL PRECAST CONCRETE ASSOCIATION (NPCA)
NPCA QC Manual (2012) Quality Control Manual for Precast and Prestressed Concrete Plants
1.2 SUBMITTALS
All submittals are the responsibility of the precast concrete producer.
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only.
Submittals with an "S" are for inclusion in the Sustainability Notebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Quality Control Procedures
SD-02 Shop Drawings
Precast Units; G
SD-03 Product Data
Precast Units; G Embedded Items; G Submit product data sheets and proper installation instructions for anchors, lifting inserts and other devices. Clearly indicate the products' dimensions and safe working loads.
Accessories; G Submit proper installation instructions and relevant product data
SECTION 03 42 13.00 10 Page 5 for items including, but not limited to, sealants, gaskets, waterstops, and other items installed before or after delivery.
SD-05 Design Data
Design Calculations; G Concrete Mix Proportions; G
SD-06 Test Reports
Test Reports
SD-07 Certificates
Quality Control Procedures Materials
SD-11 Closeout Submittals
Construction Records Construction records of the manufacturing, handling, and erection of the precast concrete members.
1.3 QUALITY ASSURANCE
Demonstrate adherence to the standards set forth in NPCA QC Manual . Meet requirements written in the subparagraphs below.
1.3.1 NPCA Plant Certification
The precast concrete producer must be certified by the National Precast Concrete Association's Plant Certification Program prior to and during production of the products for this project.
1.3.2 Qualifications, Quality Control and Inspection
1.3.2.1 Qualifications
Select a precast concrete producer that has been in the business of producing precast concrete units similar to those specified for a minimum of 3 years. The precast concrete producer must maintain a permanent quality control department or retain an independent testing agency on a continuing basis.
1.3.2.2 Quality Control Procedures
Submit quality control procedures established by the precast manufacturer in accordance with NPCA QC Manual . Show that the following QC tests are performed as required and in accordance with the ASTM standards indicated.
1.3.2.2.1 Slump
Perform a slump test for each 150 cu yd of concrete produced, or once a day, whichever comes first. Perform slump tests in accordance with
ASTM C143/C143M.
1.3.2.2.2 Temperature
Measure the temperature of fresh concrete when slump or air content tests
SECTION 03 42 13.00 10 Page 6 are made and when compressive test specimens are made in accordance with
ASTM C1064/C1064M .
1.3.2.2.3 Compressive Strength
Make at least four compressive strength specimens for each 150 cubic yards of concrete of each mix in accordance with the following Standards:
ASTM C31/C31M, ASTM C192/C192M, ASTM C39/C39M.
1.3.2.2.4 Air Content
Perform tests for air content on air-entrained, wet-cast concrete for each 150 cu yd of concrete, but not less often than once each day when air-entrained concrete is used. Determine the air content in accordance with either ASTM C231/C231M or ASTM C173/C173M for normal weight aggregates and ASTM C173/C173M for lightweight aggregates.
1.3.2.2.5 Unit Weight
Perform tests for unit weight a minimum of once per week to verify the yield of batch mixes.
1.3.2.3 Inspection
The Contracting Officer may place an inspector in the plant when the units covered by this specification are being manufactured. The burden of payment for plant inspection will be clearly detailed in the specification. The precast concrete producer must give notice 14 days prior to the time the units will be available for plant inspection.
Neither the exercise nor waiver of inspection at the plant will affect the Government's right to enforce contractual provisions after units are transported or erected.
1.3.2.4 Test Reports
Submit the following:
1.3.2.4.1 Material Certifications or Laboratory Test Reports
Include mill tests and all other test data, for portland cement, blended cement, pozzolans, ground granulated blast furnace slag, silica fume, aggregate, admixtures, and curing compound proposed for use on this project.
1.3.2.4.2 Mix Test
Submit reports showing that the mix has been successfully tested to produce concrete with the properties specified and will be suitable for the job conditions. Such tests may include compressive strength, flexural strength, plastic or hardened air content, freeze thaw durability, abrasion and absorption. Clearly detail in the specifications special tests for precast concrete or cast-in items.
1.3.2.4.3 Self-Consolidating Concrete
Submit sufficient documentation, when the use of self-consolidating concrete (SCC) is proposed, showing a minimum of 30-days production track records demonstrating that SCC is appropriate for casting of the product.
SECTION 03 42 13.00 10 Page 7
1.3.2.4.4 In-Plant QA/QC Inspection Reports
Submit inspection reports upon the request of the Contracting Officer.
1.4 DELIVERY, STORAGE, AND HANDLING
1.4.1 Delivery
Deliver precast units to the site in accordance with the delivery schedule to avoid excessive build-up of units in storage at the site. Upon delivery to the jobsite, all precast concrete units will be inspected by the Contracting Officer for quality and final acceptance.
1.4.2 Storage
Store units off the ground or in a manner that minimizes potential damage.
1.4.3 Handling
Handle, transport, and store products in a manner to minimize damage.
Provisions shall be made for supporting the items to prevent damage due to deflection or vibration. Adequate padding material shall be provided between tie chains or cables to preclude chipping of concrete. Any noticeable indication of deflection or vibration during transportation shall be corrected by rigid bracing or support. Lifting devices or holes must be consistent with industry standards. Perform lifting with methods or devices intended for this purpose as indicated on shop drawings.
PART 2 PRODUCTS
2.1 SYSTEM DESCRIPTION
Furnish precast concrete units fabricated by an experienced and acceptable precast concrete manufacturer who has been, for at least three years, regularly and continuously engaged in the manufacture of precast concrete work similar to that indicated on the drawings. Coordinate precast work with the work of other trades. Below grade structures must comply with
ASTM C858.
2.1.1 Precast Units
Ensure that precast concrete units can withstand stresses induced during handling, shipping and installation as to avoid product cracking or other handling damage, in accordance with applicable industry design standards ACI 318 , ASTM C857. Indicate handling, shipping, and installation loads for precast concrete units on the shop drawings.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .